Open Repair Requests in June 2003

Open Repairs Summary

  • Urgent Requests
    7
  • Routine Requests
    75
  • Total Requests
    82

Detailed Reports

Urgent Repair Requests Opened in June 2003 (7)
School Description Open Date
Eastern High School FM-200330976 6/2/03 (Eastern) !!!VERY URGENT!!! 1st Floor/Room #150: Repair two (2) double pane windows; a brick was thrown at windows by vandals. (These vandals are able to gain entry to the building, after the closing of school) June 2, 2003
Patricia R Harris Ed Center FM-200331315 6/5/03 Harris, P.R. Ground floor Pre-K Area Boys Restroom Repair the floor (ceramic tile ). Asbestos Code A - Cleared for repairs on 09-10-03 by Leroy Minton Jr. (LM/09-10-03) Safety Office 202-576-8962. Note: Informed by Charles Gross that the water leak was repaired and it was coming from around the wax ring and not from the ceiling. June 5, 2003
Ferebee-Hope Elementary School FM-200331576 6/11/03 Ferebee-Hope First floor C-building men's bathroom Remount urinal to wall. Asbestos Code A - Cleared for repairs by Leroy Minton Jr on 06-11-03 (LM/06-11-03) Safety Office 202-576-8962. June 11, 2003
Stanton Elementary School FM-200331639 6/11/03 (Stanton) !!!URGENT!!! Annex/1st Floor A-15: No electrical power in this area, need power to lights, and outlets. June 11, 2003
Hart Middle School FM-200331784 6/13/03 (Hart) !!!VERY URGENT!!! Through-Out the Building: A total of (25) windows affected by storm; please replace broken windows in the following locations: Room #304 - Total of (7) windows Room #309 - Total of (9) windows. Room #318 - Total of (2) windows. Hallway - Total of (4) windows. 2nd Floor - Total of (2) windows in stairwell #9. 1st Floor both computer labs - Total of ( 1 ) window in each . June 13, 2003
Johnson JHS FM-200331964 6/17/03 Johnson !! URGENT !! Exterior 1. Unstop three storm drains around the building - standing water . June 17, 2003
Hendley Elementary School FM-200332140 0 6/19/03 Hendley A back up generator is needed. We had three power blackouts this year. The principal hace a big concern about safety. When the power is out the school have very little light in some areas, some areas no lights at all. June 19, 2003

Routine Repair Requests Opened in June 2003 (75)
School Description Open Date
Johnson JHS FM-200331177 6/4/03 Johnson Gym Repair three water fountains in the gym. Water fountains are ripped away from wall. Asbestos Code A - Clear for repairs on 06/04/03. Horne Engineering - Troy Wilcome (RG 06/05/03) June 4, 2003
Spingarn High School FM-200331187 6/4/03 (Spingarn) Basement behind armory Requesting hole in ceiling to be plaster due to work that was done by plummers. Asbestos Code A - Clear for repairs on 06/04/03. Horne Engineering - Philp Connolly (RG 06/05/03) June 4, 2003
Ludlow-Taylor ES FM-200331214 6/4/03 Ludlow-Taylor Second floor entrance door Replace door glass in door leading into stairway # 1. June 4, 2003
Ketcham Elementary School FM-200331254 6/4/03 Ketcham Requesting replacement of old stained windows, with new ones, for old windows inhibits light through windows. There by creating very poor light in classrooms and hallways, auditorium, rooms 101, 102, 103, 104, 100, 106, 107, 200, 201, 202, 203, 204, and first and second floor hallways (old wing), front entrance. June 4, 2003
Gibbs Elementary School FM-200331288 6/5/03 Gibbs Boiler room Replace broken Main Gas stop ball cock valve on the main gas line June 5, 2003
Patricia R Harris Ed Center FM-200331316 6/5/03 Harris, P.R. Ground floor Pre-K area and first floor Replace ceiling tile. ASAP Asbestos Code A - Clear for repairs on 06/02/03. Horne Engineering - Bipin Nanavaty (RG 06/06/03) June 5, 2003
Johnson JHS FM-200331344 6/5/03 Johnson Second floor room 212 Door wire mesh glass need to be replace student vandalized. June 5, 2003
Ferebee-Hope Elementary School FM-200331385 6/6/03 Ferebee-Hope Filter Room Furnish the Industrial Equipment Mechanic Dept.with a sewer vacuum pump to clean air way leading to filter room . June 6, 2003
Wilson High School FM-200331515 6/9/03 Wilson, W Pool Mechanical Room Furnish B & G circulating pump to No. 1 Dehumidificate unit. Motor- B&G, No. -903574, model No. 7VN56T17D55979 P, FR-562-70; PH- 3, Type-TS, HZ-60, HP-1 1/2, RPM-1725, V-208-230, Code-X & Duty-cont. pump-60, Size-1.5 X 7 6.750AB, Pump Cap-40 GPM, PT,- 50, HP-1,5 & RPM-1800, June 9, 2003
Ballou Senior High School FM-200331524 6/9/03 (Ballou) Sub-B/A: Stop leak in the event of a hard rain; the water gets through structure, lands on book cases, and univents. June 9, 2003
Wilson High School FM-200331516 6/9/03 Wilson, W Pool Mechanical Room Furnish B & G pool water circulating pump to No. 2 Dehumidification unit.ITT Industries; Part No. -903585, model No. 8VA48T17D163D P, FR-48Y; PH- 3, Type-TS, HZ-60, HP-1 , RPM-1725, V-208-230/480, AMB-40, INS-B3, Duty-cont, Des-B, Fla-3.4-3-4/1.7, SF-1.25, SFA-3.8-38/1.9 & Code-L.Pump-60, Size -1-1/2X6-1/4, B614T CIO & Ident. No. 172774. June 9, 2003
Young Elementary School FM-200331448 6/9/03 Young Roof Boiler Room 1. Install guard rail around smoke stack near cooling tower on roof . Asbestos Code A - Clear for repairs on 06/09/03. Horne Engineering - Tony Marcolin (RG 06/09/03) June 9, 2003
Orr Elementary School FM-200331456 6/9/03 Orr Roof Repair or replace all exhaust fans on the roof. June 9, 2003
Davis Elementary School FM-200331504 6/9/03 Davis Boys bathroom new wing basement Furnish and install a new sink, A child broke the old sink off the wall. Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Tony Marcolin (RG 06/24/03) June 9, 2003
Walker-Jones EC FM-200331454 6/9/03 Walker/Jones Boiler room Rplace sumps in the boiler room ,temperary pump will not handle heavy rain storms and the boiler room floods. June 9, 2003
Horace Mann Elementary School FM-200331530 6/10/03 Mann Community Center 1) Replace broken window in the boys Restroom . Note : Approximate - 24" x 35" set in wood frame . June 10, 2003
Duke Ellington School FM-200331541 6/10/03 Ellington Boiler room Repair or replace Quincy air compressor in the boiler room June 10, 2003
Cardozo High School FM-200331573 6/11/03 Cardozo Replace one and two tube ballasts. School has purchase and installed atotal of 62 ballasts. June 11, 2003
Woodson High School FM-200331605 6/11/03 Woodson Boiler Room Install vibration eliminator for each sump pump discharge line. June 11, 2003
Woodson High School FM-200331600 6/11/03 Woodson Boiler Room Unstop block drains in boiler room and clean out sump pump. NOTE: One drain is collapsed. Boiler room could flood if not repair. EMERGENCY !!!! June 11, 2003
Beers Elementary School FM-200331589 6/11/03 Beers Through-out bldg. Window A/C is needed specially in computer room, lunch room and auditorium very hot need A/C. Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Tony Marcolin (RG 06/25/03) June 11, 2003
Thomas Elementary School FM-200331598 6/11/03 Neval Thomas Correct cause of hi pressure failure of compressor units # 1 and 2 on multistack chiller. June 11, 2003
Coolidge High School FM-200331627 6/11/03 Coolidge Fan Room (1 st floor) Remove old defective window A/C unit from the building and dispose of properly. Unit stored in fan room on 1 st floor. June 11, 2003
Maury Elementary School FM-200331632 6/11/03 Maury First and second floor rooms 3, 4, 7 and 8 Survey and repair walls due to water damage. Lead & Asbestos Code A - Clear for repairs on 06/12/03 Horne Engeering - Edward Rodriguez (RG 06/16/03) June 11, 2003
Terrell Mc ES FM-200332533 6/12/03 Chiller is not cooling the throughout the building. Some areas, i.e., all of 3rd Floor is HOT, only a portion of the 2nd and 1st Floor is cool. Areas 160, 159, 156, 153, 140, 139, 138 freezing temperatures. June 12, 2003
Orr Elementary School FM-200331870 6/16/03 Orr Fourth floor- Library Media Center Roof leaking in computer area gravel falling around window. June 16, 2003
Ballou Senior High School FM-200331885 6/16/03 Ballou Room #313 and #315 Replace (2) two 40 AMP. circuit breakers that supplies the air conditioning window units to rooms #313 and #315. Info: #9+11 Breaker-40 AMP #25+27 Breaker- 40 AMP June 16, 2003
Deal Junior High School FM-200331817 6/16/03 Deal Throught - Out Building 1. Need an electrical upgrade to power a/c units and to stop breakers from tripping in the following areas . Classrooms : 107,106, 116,120,122,124,126, 208,220,226, 320,322,324 and 326. June 16, 2003
Orr Elementary School FM-200331867 6/16/03 Orr Third floor pratice cruz area Electricity out on third floor cruz area. Need emergency repairs of broken cement stairs. Handrail ready for install . Stairs has to be repaired before new hand rail can be installed. June 16, 2003
Browne Junior High School FM-200331837 6/16/03 Browne Second Floor - Classroom #210 1.Repair leak in the ceiling inside classroom . Asbestos Code A - Clear for repairs on 06/16/03. Horne Engineering - Troy Wilcome (RG 06/17/03) June 16, 2003
Turner Elementary School FM-200331916 6/16/03 Turner Boilerroom Reset overload on the motor starter. June 16, 2003
Garfield ES FM-200331918 6/16/03 Main Building/Roof:Needs to replaced Flashing off building. Approximately 60 feet long off side of building. Reference #'s - FM-200617563 & fm-200623371 June 16, 2003
Browne Junior High School FM-200331929 6/17/03 Browne Gymnasium : There is loose 3 x 6 ceiling panel , may fall soon . Please assess and repair as soon as possible . POC : Sheryll James / Horne Engineer Asbestos Code A - Clear for repairs on 06/18/03. Horne Engineering - Sheryll James (RG 06/24/03) June 17, 2003
River Terrace ES FM-200331982 6/17/03 (River Terrace) !!!EMERGENCY!!! 1st Floor/Room #7: Change lock, and issue key for the computer room, keys have fallen in the wrong hands. June 17, 2003
Cardozo High School FM-200331952 6/17/03 Cardozo West 13th St., Tennis court Secure storm drain grate, man hole cover. June 17, 2003
River Terrace ES FM-200331981 6/17/03 (River Terrace) Skylight: Due to attempted break-in, skylight parts are damaged. Staff is unable to secure. June 17, 2003
Woodson High School FM-200332047 6/18/03 Woodson, H.D. Boiler Room Check panel to control for A/C units. Units goes off and on with no indication or reason. The building is not being properly cooled. Note: Building will have summer school starting Monday June 30, 2003. June 18, 2003
Davis Elementary School FM-200332028 6/18/03 Davis Basement teachers lounge bathroom Repair ceiling, part of the ceiling fell down. Asbestos Code A - Clear for repairs on 06/18/03. Horne Engineering - Bipin Nanavaty (RG 06/19/03) June 18, 2003
Stanton Elementary School FM-200332040 6/18/03 Stanton Annex Electrical/Mechanical Survey electrical system to provide service for window air conditioning. June 18, 2003
West Elementary School FM-200332032 6/18/03 West Boiler Room Replace feed water regulator on chill water side size 3/4" inlet and outlet ser.#08197 No. #U135B; Range 25-75 regulator will not feed water into the system when needed. June 18, 2003
Gibbs Elementary School FM-200332100 6/19/03 Gibbs !! EMERGENCY !! First Floor - Chair Room 1. Repair roof leaking damaging ceiling and water running on to the floor and causing mildew . June 19, 2003
Gibbs Elementary School FM-200332114 6/19/03 Gibbs Third Floor - Classroom # 301 1. Repair broken window . June 19, 2003
Beers Elementary School FM-200332077 6/19/03 Beers Through -Out - Electrical Up -Grade 1. Electrical panel box has old fuses ,. panel box need to changes for a new electrical system , also in the boiler room . Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Tony Marcolin (RG 06/24/03) June 19, 2003
Murch Elementary School FM-200332095 6/19/03 Murch Basement - Boiler Room 1. Ground electrical service in panel box . June 19, 2003
Browne Junior High School FM-200332185 6/20/03 Browne Basement Level 1. Replace light fixtures in the cafeteria and Kitchen areas . Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Sheryll James (RG 06/24/03) June 20, 2003
Duke Ellington School FM-200332248 6/20/03 Ellington Roof Check and repair all exhaust fan on 3rd floor roof, 2nd floor roof and overtop of Dance studio and units near cooling tower. Exhaust fans are not working. There are approx. 11 exhaust fans that need to be repair. June 20, 2003
Stanton Elementary School FM-200332215 6/20/03 Stanton Cafeteria Drain need cleaning because water is through wall or coming in. June 20, 2003
Stanton Elementary School FM-200332259 6/20/03 Stanton Emergency Outside Clogged drain between annex and main bldg. June 20, 2003
Garfield ES FM-200332217 6/20/03 Garfield Roof is leaking and the ceiling has fallen. Room #2A and #2B Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Philp Connolly (RG 06/23/03) June 20, 2003
Park View ES FM-200332237 6/20/03 Park View Boiler Room Check sump pump in Boiler Room, Water on floor, No power to pump. June 20, 2003
Benning Elementary School FM-200332269 6/20/03 Benning Ground floor health suite Water leaking from the wall. June 20, 2003
Kenilworth ES FM-200332372 6/23/03 Keniworth First floor kitchen Roofing unit needs to penetrate ceiling in order to repair roof drains. Asbestos Code A - Clear for repairs on 06/23/03. Horne Engineering - Bipin Nanavaty (RG 06/24/03 June 23, 2003
Shaw JHS FM-200332486 6/23/03 (Shaw) Asbestos Assessment Required. Leaks coming from ceiling see mr. smith for area. having summer school this year. Code A-clear for repair by Horne Engireer Edward Rodriguez on 9/2/03 Charlees Buchanan June 23, 2003
Bowen Elementary School FM-200332304 6/23/03 !!EMERGENCY!! Bowen Gymnasium Reattach exhaust fan that is hanging from the rear of the building above playground area June 23, 2003
Powell Elementary School FM-200332441 6/24/03 (Powell) Asbestos Assessment Required. Water is leaking 4 places from the ceiling in room 211 and also out side the front door of 211. Asbestos Code A - Clear for repairs on 06/25/03. Horne Engineering - Bipin Nanavaty ( RG 06/27/03) June 24, 2003
Benjamin Banneker Academic HS FM-200332408 6/24/03 Banneker Third floor on wall by room 309 Holes in tile wall near lockers by room 309 need to be patched. Fire code violatio. Asbestos Code A - Clear for repairs on 06/24/03. Horne Engineering - Tony Marcolin (RG 06/25/03) June 24, 2003
Amidon Elementary School FM-200332382 6/24/03 Amidon First floor - Gymnasium 1. Repair and or Replace (5) 400 watt high intense discharge ballast in gym . Asbestos Code A - Clear for repair on 06/24/03. Horne Engineering - Philp Connoyll (RG 06/25/03) June 24, 2003
Rudolph Elementary School FM-200332391 6/24/03 Rudolph Basement Level 1. Repair and or replace the bradley basin in the boys restroom , water continuously run . 2. Repair and or replace the bradley basin in the girls restroom , no running water . Asbestos Code A - Clear for repairs on 06/24/03. Horne Engineering - Sharon Voss (RG 06/25/03) June 24, 2003
Benjamin Banneker Academic HS FM-200332411 6/24/03 Banneker Second Floor 1. Door closure on the boys restroom door is bent and will not close , please repair . Asbestos Code A - Clear for repairs on 06/25/03. Horne Engineering - Sheryll James ( RG 06/26/03) June 24, 2003
Shaw JHS FM-200332521 6/25/03 SHAW !!EMERGENCY !! Second Floor 1. Repair leaks coming from ceiling , this will be used for summer school starts on June 30,2003 .( see Mr. Smith for area ) Asbestos Code A - Clear for repairs on 06/26/03. Horne Engineering - Sheryll James ( RG 06/27/03) June 25, 2003
Browne Junior High School FM-200332492 6/25/03 Brown Exterior 1. Check and unstop roof drains . June 25, 2003
Bowen Elementary School FM-200332507 6/25/03 Bowen Room 308, 307,306 and 304 Ceiling fell in room 308 and ceiling attempted to fall in room 307 and 304. Asbestos Code A - Clear for repairs on 06/25/03. Horne Engineering - Sharon Voss ( RG 06/27/03) June 25, 2003
Johnson JHS FM-200332466 6/25/03 Johnson Fourth Floor - Room #401 1. Check electrical service to a/c unit in the computer lab ( 401) breaker keeps tripping. June 25, 2003
Turner Elementary School FM-200332430 6/25/03 (Turner) 2nd Floor/Girls restroom: Restroom needs three (3) toilet seats, drinking fountains on 2nd floor hallway needs repair or replace; water fountain is broken in teachers lounge, needs to be replaced. June 25, 2003
Turner Elementary School FM-200332478 6/25/03 (Turner) Through-out Building: Water fountains need repairs on 1st, 2nd & 3rd Floors. June 25, 2003
Benning Elementary School FM-200332480 6/25/03 !!EMERGENCY!! Benning ES Roof Main Building Restore electical service to small exhaust fan located on main roof. June 25, 2003
Browne Junior High School FM-200332495 6/25/03 Brown Exterior 1. Repair gutters and down spouts comming off of the main roof . June 25, 2003
Plummer Elementary School FM-200332522 2 6/26/03 Plummer Roof Check, repair or replace exhaust fans on all level of the roof. Fans not working properly. Approx.12 fans. June 26, 2003
Wilkinson ES FM-200332649 6/27/03 Wilkenson Boiler room Repair Condenser pump for A/C unit. June 27, 2003
Kimball Elementary School FM-200332638 8 6/27/03 Kimball Boiler Room 2" inch leaking domestic hot water line in the tunnel near the boiler room. June 27, 2003
Cardozo High School FM-200332631 6/27/03 Cardozo West side 13th Street - Tennis Court 1) Unstop storm drain. June 27, 2003
Thomas Elementary School FM-200332648 6/27/03 Thomas First ,Second & Third Floor 1. Survey, plaster and paint the following areas - # 100, #102, #103, # 106, kitchen, managers office, storage room , #202, #203, #205, #209, landing, girls and boys restrooms, #302,#304 & #306. Lead & Asbestos Code A - Clear for repairs on 07/02/03. Horne Engineering - Edward Rodriguez (RG 07/02/03) June 27, 2003
Ferebee-Hope Elementary School FM-200332607 6/27/03 Ferebee -Hope Penthouse Roof 1. Survey outside louver ( water leaking in to building causing damage to carpet . June 27, 2003
Tubman Elementary School FM-200332706 6/30/03 Tubman Rear Boiler Room Exterior Ground Level Secure air vent opening (2) where metal louvers are missing. These areas needs to be closed in to prevent possible leak-in and pest rodents and trashs from entering the boiler room. Approx. Opening Size : 5" x 2" and 1" x 3". June 30, 2003
West Elementary School FM-200332691 6/30/03 West Boiler Room Repair or replace chiller. Unit shut down on motor temperature. Note: Building is without windows. June 30, 2003

© The Washington Post Company