Urgent Repair Requests Opened in June 2004 (17) | School | Description | Open Date |
| Ludlow-Taylor ES | FM-200448653 6/1/04 (Ludlow-Taylor) !!!VERY URGENT!!! Basement/Boiler Room: Old bulbs removed, replaced with new, and lights will not come on . (Appears to be an electrical problem) | June 1, 2004 |
| Payne Elementary School | FM-200448693 6/2/04 Payne Boiler Room Boiler #1 and #2 install pull chain on safety valve. Safety hazard. | June 2, 2004 |
| Turner Elementary School | FM-200448849 6/3/04 (Turner) !!!VERY URGENT!!! Old Building -1st, and 2nd Floors: Replace broken glass in door of room #206, and the door across from water fountain 1st floor old building. | June 3, 2004 |
| Kramer Middle School | FM-200448875 6/4/04 Kramer Boiler Room Install temperature thermometer on hot water storage tank 0 degree to 200 degrees. Urgent !!!! | June 4, 2004 |
| Backus Middle School | FM-200449008 6/7/04 Backus URGENT Kitchen Repair or replace exhaust fan motor in kitchen hood. | June 7, 2004 |
| Gibbs Elementary School | FM-200449194 6/10/04 (Gibbs) !!!VERY URGENT!!! 1st Floor: rooms 126, 206, 124, 128 and library Condensation wetting floors, damaging asbestos floor (9 X 9) tile. Asbestos Code A - Clear for repairs on 07/20/04. ( To stop condensation wetting floors ONLY ) DCPS Safety - Leroy Minton Jr. (RG 07/20/04) !! NOT FOR FLOOR TILES !! | June 10, 2004 |
| Bancroft Elementary School | FM-200449223 6/10/04 Bancroft First floor boys bathroom (main bldg.) Re-attach partition railing. Sharp edge may cause someone to get hurt. Asbestos Code A - Clear for repairs on 06/10/04. DCPS Safety - Richard Gibson (RG 06/10/04) | June 10, 2004 |
| Shepherd ES | FM-200449530 6/15/04 Health Inspection violation- Inadequate lighting in food preparation area,wall swich broken. Asbestos Code A - Clear for repairs on 06/30/04. DCPS Safety - Richard Gibson (RG) | June 15, 2004 |
| Turner Elementary School | FM-200449481 6/18/04 (Turner) !!!URGENT!!! Basement/Boiler Room: Provide electrical service for sump pumps installed on 06/17/2004. | June 18, 2004 |
| Tyler Elementary School | FM-200449548 6/21/04 Tyler Boiler Room Replace or repair sump pump in boiler room. Sump stop working. Water is backing up in boiler room. Urgent !!!! | June 21, 2004 |
| Turner Elementary School | FM-200449551 6/21/04 (Turner) !!!URGENT!!! 3rd Floor/Old Building: Repair leaking water fountain in hall next to boys restrooms. | June 21, 2004 |
| Turner Elementary School | FM-200449550 6/21/04 (Turner) !!!URGENT!!! 3rd Floor/New Building: Unstop sink in custodian closet next to boys restroom. | June 21, 2004 |
| Brent Elementary School | FM-200449615 6/22/04 Brent Second floor storage closet next to 207 Plaster is cracking and fallin from ceiling need repairing. Code A - clear for repairs as of 6/29/04 by safety office. Sylvia. | June 22, 2004 |
| Patricia R Harris Ed Center | FM-200449736 6/24/04 Harria, P.R. Grounds outside security lights Replace or repair outside security lights at stairway # 3. Lights are tied in to old lights that are not working anymore and keep tripping breakers inside of bldg. to classrooms and outlets. To much on one breaker switch. Breakers is tripping, due to outside old light system. Safety hazard entrance is dark at night. | June 24, 2004 |
| Slowe Elementary School | FM-200449739 6/24/04 Slowe Repair breach in wall on stairwell handrail has broken from the wall. Code A- clear for repairs as of 6/25/04 by DCPS safety Sylvia Grimes | June 24, 2004 |
| Stanton Elementary School | FM-200449745 6/24/04 Stanton Annex rooms A-1 and A-2 Room need electrical outlets. Asbestos Code A - Clear for repairs on 07/02/04. DCPS Safety - Sylvia Grimes (RG 07/07/04) | June 24, 2004 |
| Eastern High School | FM-200449733 6/24/04 Eastern Sub -B Room outside elevator Retighten (4) hub connectors in room outside the elevator. Wall must be survey for asbestos since drain pipe is partly in wall. This must be done to stop water from going into elevator pit. Asbestos Code A - Clear for repairs on 06/25/04. DCPS Safety - Leroy Minton Jr. (RG 06/25/04) WORK DONE | June 24, 2004 |
Routine Repair Requests Opened in June 2004 (79) | School | Description | Open Date |
| West Elementary School | FM-200448612 6/1/04 West Air Handler Unit for the library Replace burnt contactor for AHU # 6 for the library . | June 1, 2004 |
| Bruce-Monroe Elementary School | FM-200448647 6/1/04 Bruce-Monroe Emergency First flloor Repair is needed for the stage plank. Structure / hardware is needed to hold people. Performance / graduation is in the near future. Asbestos Code A - Clear for repairs on 06/02/04. Horne Engineering - Tony Marcolin (RG 06/02/04) | June 1, 2004 |
| Johnson JHS | FM-200448618 6/1/04 Johnson Jr. B Wing hallway 1st floor Replace broken breeder valve and copper line on unit in the B wing hallway 1st floor. | June 1, 2004 |
| Shaed Elementary School | FM-200448663 6/1/04 Shaed Kitchenette between rooms 101-102 Remove electric stove. Need an electrician and plumber to disconnect from dishwasher and refrigerator. | June 1, 2004 |
| Wilson High School | FM-200448642 6/1/04 Wilsom, W. First floor rooms 117A and 109A Third floor room 318 Replace broken 110V A/C units rooms 117A and 109a. Install a 220V window A/C unit and a dedicated electrical line with receptacle. A/C unit is on site purchased by school. | June 1, 2004 |
| Thomas Elementary School | FM-200448638 6/1/04 Thomas Through out bldg. Corridor, lobby stairwells and restrooms Survey and upgrade lights. Asbestos Code A - Clear for repairs on 06/02/04. Horne Engineering - Bipin Nanavaty ( RG 03/06 ) | June 1, 2004 |
| Thomas Elementary School | FM-200448625 6/1/04 Thomas Third Floor Room 301 1) Cut through wall in Room 201 and 101 to unstop drain on roof. Asbestos Code A - Clear for repairs on 06/03/04. Horne Engineering - Edward Rodriguez (RG 06/04/04) | June 1, 2004 |
| Johnson JHS | FM-200448765 6/2/04 Johnson All floors students lockers Principal request that all lockers be repair. | June 2, 2004 |
| Young Elementary School | FM-200448679 6/2/04 Young Boiler Room Asbestos assessment required Repair or replace leaking 4" chill water pipe | June 2, 2004 |
| Ferebee-Hope Elementary School | FM-200448706 6/2/04 Ferebee-Hope Swimming Pool Repair or replace circulating pump and motor that provide heat to pool water. Needed for pool water and air temperature. French will install equipment. | June 2, 2004 |
| Turner Elementary School | FM-200448815 6/3/04 Turnner Play Ground area Survey , locate, and replace ruptured sewage line comming off of the sewage ejector pumps , line is busted, on the play ground. | June 3, 2004 |
| Hart Middle School | FM-200448808 6/3/04 Hart Boiler room Repair sump pumps control unit will not operate in automatic mode. | June 3, 2004 |
| Cardozo High School | FM-200448826 6/3/04 CARDOZO SHS boiler room Replace damaged shaft on domestic hot water circulating pump and motor. Approx. - 44" x 1-1/2" size shaft. | June 3, 2004 |
| Turner Elementary School | FM-200448848 6/3/04 (Turner) 3rd Floor/Room #309: Repair or replace window in the hall next to room #309; window attempting to fall out. | June 3, 2004 |
| Hine JHS | FM-200448824 6/3/04 Hine Room #307 Repair trane univent coil valve not working unit not cooling. Due to valve not opening to let water pass. | June 3, 2004 |
| Moten Elementary School | FM-200448892 6/4/04 (Moten) 2nd Floor/Rooms #214, 214-A, 217: Provide expanded metal to cover transoms in these classrooms. (Per. Alphonso Biddy) Asbestos Code A - Clear for repairs on 06/04/04. Horne Engineering - Edward Rodriguez (RG 06/07/04) | June 4, 2004 |
| Coolidge High School | FM-200448919 6/4/04 Coolidge Boiler Room Repair or replace loose brick work around entrance to fire box on Boiler #1 | June 4, 2004 |
| Draper Elementary School | FM-200448859 6/4/04 Draper 1st Floor Assembly Hall Install A/C window units in the window in the 1st floor assembly hall, A/C unit are on the job site and electrical hookups 208/230. Asbestos Code A - Clear for repairs on 06/04/04. Horne Engineering - Bipin Nanavaty (RG 06/10/04) | June 4, 2004 |
| Stoddert ES | FM-200448873 6/4/04 Stoddert Exterior Grounds 1) Install Garden - Wetland Planting Poc - Laura Dunleavy - 202-724-5348 | June 4, 2004 |
| Thomas Elementary School | FM-200448858 6/4/04 N.Thomas Boiler room Check and correct loud noise in the condenser pump. | June 4, 2004 |
| Woodson High School | FM-200448947 6/5/04 Woodson Boiler room Repair sump pump, boiler room is flooded 1" water on the floor. | June 5, 2004 |
| West Elementary School | FM-200448957 6/6/04 West Boiler Room Repair or replace air compressor #1 motor down. | June 6, 2004 |
| Smothers ES | FM-200448984 6/7/04 Smothers Bolier room 1. Remove (4) plugs , and (2) bolts on the water column and LWCO of # 1 boiler . 2. Remove (2) plugs , and union on boiler # 2. This is Needed for boiler inspection. | June 7, 2004 |
| Davis Elementary School | FM-200449019 6/7/04 Davis First floor hallway fire by room 100, 114, 116 and 120 Replace damage fire glass to the above rooms. | June 7, 2004 |
| Turner Elementary School | FM-200449054 6/8/04 Turner Boiler Room Repair or replace sewerage injector pump in boiler room. Pump inform: Model #2108VERT Weil Service Pump 2HP 1750 RPM 1 PH 115/208 Volts | June 8, 2004 |
| Jessie LaSalle Elementary | FM-200449038 8 6/8/04 (Lasalle) Classroom #14: Install electrical line | June 8, 2004 |
| Emery Elementary School | FM-200449142 6/9/04 EMERY Repair compressor # 1, !A, 2, and 2A. Compressor 2A has an electrical shortage/overload. Electrical box is smoking See attachment | June 9, 2004 |
| Moten Elementary School | FM-200449140 6/9/04 Moten Room 403, 408, 415A and 417 1) Water fountains reqired; of four water fountains only one of them work, but that one needs an electrical line installed. The water is warm from the other three, the supply line has been ruptured, and one of them from my understanding has been kicked off the wall. Asbestos Code A - Clear for repairs on 06/10/04. Horne Engineering - Bipin Nanavaty (RG 06/14/04) | June 9, 2004 |
| Bancroft Elementary School | FM-200449236 6/10/04 Bancroft First floor boys/girls bathroom primary Patch up hold in the ceiling. Asbestos Code A - Clear for repairs on 06/14/04. Horne Engineering - Bipin Nanavaty (RG 06/15/04) | June 10, 2004 |
| Bancroft Elementary School | FM-200449243 6/10/04 Bancroft Between First and second floor primary Repair broken window hinge. Will not close properly. Asbestos Code A - Clear for repairs on 06/14/04. Horne Engineering - Bipin Nanavaty (RG 06/15/04) | June 10, 2004 |
| Walker-Jones EC | FM-200449214 6/10/04 Walker-Jones Boiler Room Unit will not start, out on High motor temp. | June 10, 2004 |
| Marshall Educational Center | FM-200449206 6/10/04 Marshall Rooftop unit/Stage 3 Main Office Mechanical Room Unstop the drain lines under and on the units. | June 10, 2004 |
| Johnson JHS | FM-200449218 6/10/04 Johnson Vandalism Third floor room 312 Small door glass window need to be replace / student vandalized. | June 10, 2004 |
| Woodson High School | FM-200449173 6/10/04 Woodson HD Boiler room Cheac and repair sump pumps in the boiler room , the floor has 2' feet of water on it. | June 10, 2004 |
| Woodson High School | FM-200449230 6/10/04 (Woodson, H.D.) 1st Floor/Hallway: Replace water cooler that is inoperable, leaking, and falling off wall. Asbestos Code A - Clear for repairs on 06/10/04. Horne Engineering - Philp Connolly (RG 06/14/04) | June 10, 2004 |
| Rudolph Elementary School | FM-200449248 6/11/04 Rudolph Boiler Room Repair leaking domestic hot water pipe (size 2") located in ceiling | June 11, 2004 |
| Garfield ES | FM-200449254 6/11/04 Garfield Roof - Alley side of Building Repair or replace gas vent lines from main gas, because when the wind blows it sends a smell in the room, on the side of building to the alley side of building. | June 11, 2004 |
| Webb Elementary School | FM-200449267 6/13/04 Webb Room #149 Install A/C unit Model #7AS155K144 volts 115 , HZ 60, PH--1, Amps-15 BTU 15199 Electrical service is needed for A/C unit. Unit is on floor in classroom . | June 13, 2004 |
| Kimball Elementary School | FM-200449266 6/13/04 Kimball Room #212 Install window A/C unit in room #212. Unit is located in storage room 25,000, 208 volts 20 amps. | June 13, 2004 |
| Woodson High School | FM-200449284 6/14/04 Woodson, H.D. First floor hallway Water cooler has fallen off wall, need new brackets, screws also water cooler need replacing. Asbestos Code A - Clear for repairs on 06/14/04. Horne Engineering - Philp Connolly (RG 06/14/04) | June 14, 2004 |
| Burrville Elementary School | FM-200449282 282 6/14/04 Burrville Second floor learning center Lockers need repairing. They need remounting back in place. Asbestos Code A - Clear for repairs on 06/14/04. Horne Engineering - Edward Rodriguez (RG 06/15/04) | June 14, 2004 |
| Burrville Elementary School | FM-200449280 280 6/14/04 Burrville Second floor Girls locker room need plastering and painting. Lead & Asbestos Code A - Clear for repairs on 06/14/04. Horne Engineering - Edward Rodriguez (RG 06/15/04) | June 14, 2004 |
| Seaton Elementary School | FM-200449299 6/14/04 SEATON ES boiler room Repair leaking 1" copper pipe on return domestic hot water line pump. | June 14, 2004 |
| Johnson JHS | FM-200449311 6/15/04 Johnson Jr H.S. Rooms 413,324, 330 Fabricate guard for univent ,top grill for the following rooms 413,324, and 330. ( 48" X 6" ) Asbestos Code A - Clear for repairs on 06/15/04. Horne Engineering - Philp Connolly (RG 06/16/04) | June 15, 2004 |
| Walker-Jones EC | FM-200449333 6/15/04 Walker-Jones 2nd Floor Open Space Unstop condensatedrain on air handler unit. | June 15, 2004 |
| Garfield ES | FM-200449358 6/16/04 Garfield Emergency Main roof Need a hatch out back on. | June 16, 2004 |
| Seaton Elementary School | FM-200449373 6/16/04 Seaton School Need field cut by Friday June 18th for Field Day June 21st | June 16, 2004 |
| Wilson High School | FM-200449375 6/16/04 Wilson School Driveway is in need of repairing | June 16, 2004 |
| Turner Elementary School | FM-200449499 6/18/04 (Turner) Boys Restroom: Repair urinal next to toilet; there is a hole under the bottom, and water is leaking on the floors. | June 18, 2004 |
| Ferebee-Hope Elementary School | FM-200449498 6/18/04 Frebee-Hope Boiler room Repair or replace air compressure # 1 and # 2 . | June 18, 2004 |
| Thomas Elementary School | FM-200449479 6/18/04 Thomas Survey and replaces in the following areas. Principals office Counselor suite Cafeteria managers office Kitchen Dressing room Rooms 200-1. 200-1, 205-1, 306-1, 3rd floor cooridor, 109-2, 104-1, 107-2, 103-3, 101-1 1st floor landing. Ballasts are on site. Code A-clear for repair by Charles Buchanan on 6/22/04 | June 18, 2004 |
| Browne Junior High School | FM-200449505 6/18/04 Browne EMERGENCY EMERENCY Second and first floor bathroom new side Repair water lines in bathroom, no running water in sinks. HA 005 Plaster White Wall & Ceiling Plaster No Asbestos 705 Brown Coat With HA 005 No Asbestos HA001 pipe insulation white 2" & 10" Block ionsulation Yes Asbestos HA 053 Pipe insulation Gray/Black 4-8 O.D. compressed paper pipe insulation Yes Asbestos Asbestos Code A - Clear for repairs on 01/25/07. Tidewater - Kenny Long (RG 02/22/07) | June 18, 2004 |
| King M L ES | FM-200449529 6/21/04 King Outside lobby roof Need to have the lobby roof repair or replace it is leaking. | June 21, 2004 |
| West Elementary School | FM-200449537 6/21/04 West Outside Outside of kindergarten need small doors for water faucets valve to be coved. (small panel doors) Brick around area were trap door is being installed. | June 21, 2004 |
| Bowen Elementary School | FM-200449624 6/22/04 (Bowen) 1st Floor/Boys Gym: Install two (2) new back boards for basket-ball courts. | June 22, 2004 |
| Dunbar High School | FM-200449638 6/22/04 Dunbar SHS Dunbar Room BG-021 - computer lab 1) Install 4 dedicated 110V, 20 amp circuits for 4 portable cooling units. 2) Replace ten 2' x 4' acoustical ceiling tiles, where missing or damaged. 3) Install one 110V duplex receptacle in the storage room for the computer. 4) Replace 15 damaged 12"x 12" vinyl floor tiles 5) Replace hinges and door closer on rear door. Room 5W-01 1) Remove two 4' x 8' chalk boards 2) Furnish & Install two 4' x 8' white boards 3) Paint 1200 sf of walls 4) Repair two perimeter fan coil units. 5) Remove 1,070 sf of carpet and replace with new 12" x 12" vinyl tile. 6) Install one 110V duplex receptacle on rear wall. 7) Install one 110V duplex receptacle in storage room. 8) Replace ten 12" x 24" ceiling tiles. Room 4ME 1) Remove 1,070 sf of carpet. 2) Install 1,070 sf of 12" x 12" vinyl tile. 3) Paint 1,200 sf of walls. 4) Install 11 new wall mounted 110v duplex receptacles. 5) Install ten 12" x 24" ceiling tiles where missing or damaged. David Husson, CCM Senior Project Manager DC Public Schools Office of Planning, Design & Construction TEL 571-437-5145 FAX 413-691-6681 david.husson@k12.dc.us HA 044 Carpet Mastic NAD HA 022 Ceiling tile white 1' X 2' with rondom gouges and shallow pinholes Asbestos/Lead Code A-clear for repair by DCPS Charles Buchanan on 6/25/04 (Do notscrape chip or peel any of this paint surface repaint over only.) | June 22, 2004 |
| Savoy Elementary School | FM-200449653 6/22/04 (Savoy) 1st Floor/Cafeteria: Circuit breaker continues to pop off, needs to be tied in-to a separate line. | June 22, 2004 |
| Ludlow-Taylor ES | FM-200449821 6/22/04 Ludlow-Taylor 2nd floor An electrician is needed for A/C unit on 2nd floor . Check 2nd floor Rooms #211, #213, #317 and #318. | June 22, 2004 |
| Woodson High School | FM-200449675 6/23/04 Woodson Throughout Building Replace the following condensation drip pans that are rusted out in the univents in the following rooms: #610; #617;#611;#504;#410;#416;#303;#305;#310;#316; #201;#202;P-18;P-19;Music room;Band room; G-66. | June 23, 2004 |
| Woodson High School | FM-200449665 6/23/04 Woodson Rear of Auditorium (AHU Mechanical Room) Make the necessary repairs the condensate drip pan for the AHU in the mechanical Room rear of the auditorium. The drip pan is completely rusted away causing condensate water to flood the floor, constantly. | June 23, 2004 |
| Brent Elementary School | FM-200449661 6/23/04 Brent Boiler Room Replace tubes in boilers. Boiler #2 has 12 tubes leaking. Boiler #1 has 4 tubes leaking. | June 23, 2004 |
| Slowe Elementary School | FM-200449738 6/24/04 Slowe First floor room 124 A/C unit compressor do not work. | June 24, 2004 |
| Shepherd ES | FM-200449750 6/24/04 Shepherd 14th Street Entrance 1) 14th Street entrance column has structural damage. Column 1, 3,4,5 and 6. | June 24, 2004 |
| Ferebee-Hope Elementary School | FM-200449718 6/24/04 Ferebee-Hope Boiler Room Replace control transformer for air compressor, comp. inop. Style: AU50/421 Class: 490 Volts: 50/60 HZ -H260 440/220/110 320182853 | June 24, 2004 |
| Shaed Elementary School | FM-200449727 6/24/04 Shaed Low Level Center Repair compressor and run new line to A/C unit on Low Level Center. | June 24, 2004 |
| Duke Ellington School | FM-200449734 6/24/04 Ellington EMERGENCY Roof area Repair area that house rooms 265 and 265A. Roofing area need repairing because of ceiling damage to rooms 265 and counselor office 265 B. | June 24, 2004 |
| Stoddert ES | FM-200449806 6/25/04 Stoddert New wing Replace bricks on North and South side of bldg., water is leaking into classroom. | June 25, 2004 |
| Stanton Elementary School | FM-200449818 6/25/04 (Stanton) Asbestos Assessment Required. 1st Floor/Room #107: & Room 106 Water leaking from ceiling coming from the over-hang. Code A-clear for repair by DCPS Charles Buchanan on 07/01/04 HA 016 Plaster No ACM in room 107 (AMP 108) HA 716 Brown Coat No ACM 1st Floo/Room # 106 ) HA 016 Plaster No ACM in room Room 106 (AMP 103) HA 716 Brown Coat No ACM | June 25, 2004 |
| Duke Ellington School | FM-200449812 6/25/04 Ellington Boiler Room Investigate and make repairs to lecking section on boiler #3 Failed D.C.Boiler Inspection. Asbestos Code A - Clear for repairs on 09/27/05. Tidewater - Philp Connolly (RG 09/28/05) | June 25, 2004 |
| Ferebee-Hope Elementary School | FM-200449834 6/28/04 Ferebee-Hope Air Handler Unit Fabricate 3 condensate pans to air handler units #1,#3 and #4 | June 28, 2004 |
| Ferebee-Hope Elementary School | FM-200449838 6/28/04 Ferebee-Hope Air Handler Unit Replace all isolation valves to heat and cooling coils in air handler units #1,#2,#3 and #4 | June 28, 2004 |
| Ferebee-Hope Elementary School | FM-200449849 6/28/04 Ferebee-Hope Air Handler Unit Supply duct tape, plastic and 3 pieces of plexiglass cut to sizes as specified below to prevent winter freeze-up via air handler units vent. 2 each 31"x20" 2 each 13"x26" 2 each 25 1/2"x39" | June 28, 2004 |
| Johnson JHS | FM-200449835 6/28/04 Johnson VANDALISM Auditorium Someone came over the weekend and broke out the large big window. Need to be replace. | June 28, 2004 |
| Ferebee-Hope Elementary School | FM-200449833 6/28/04 Ferebee-Hope Air Handler Unit Provide water tight caulking to seal bolt penetrations for air handler units | June 28, 2004 |
| Seaton Elementary School | FM-200449848 6/28/04 Seaton Library Media center Fabricate condensate drip pan for air handler units #1 and #2 located in ceiling of library and pipe drain line size of pan approximately 12"x 15". Pan should be located under accutor valves. | June 28, 2004 |
| Shaed Elementary School | FM-200449870 6/29/04 Shaed Ground Floor Repair air handler unit on ground floor. | June 29, 2004 |
| Gibbs Elementary School | FM-200449944 6/30/04 Gibbs First floor room 126 Broken window need replacing. | June 30, 2004 |
| Gibbs Elementary School | FM-200449941 6/30/04 Gibbs First floor room 124 Univent top cracked and broken need replaced. | June 30, 2004 |
| Gibbs Elementary School | FM-200449942 6/30/04 Gibbs Second floor room 205 Outlet is not working in need of repair. | June 30, 2004 |