Open Repair Requests in July 2003

Open Repairs Summary

  • Urgent Requests
    14
  • Routine Requests
    53
  • Total Requests
    67

Detailed Reports

Urgent Repair Requests Opened in July 2003 (14)
School Description Open Date
Ferebee-Hope Elementary School FM-200333083 7/9/03 (Ferebee-Hope) Ground Level: Install 6 X 6 feet fence outside brick wall near the stadium, to prevent future break-ins. Asbestos Code A - Clear for repairs on 07/10/03. DCPS Safety - Richard Gibson (RG) July 9, 2003
Gibbs Elementary School FM-200333173 7/10/03 (Gibbs) !!!URGENT!!! Roof Top/East Wing: Please check roof drain on roof, east wing. There is a large amount of standing water on the roof. July 10, 2003
Stanton Elementary School FM-200333097 7/10/03 (Stanton) Outside Drain: Drain near boiler room is clogged. (Very Urgent) July 10, 2003
Reed LC FM-200333195 7/11/03 (Reed) Grounds/Outside Gym Entrance: Please divert rain water run-off to prevent it from entering the gym area. Code A-clear for repair by Charles Buchanan Safety compliance July 11, 2003
Johnson JHS FM-200333268 7/15/03 (Johnson) !!!VERY URGENT!!! Roof Top: Skylight broken by vandals. Call came in approx. 3:20 p.m. July 15, 2003
Brookland Elementary FM-200333481 7/21/03 Brookland All purpose Room URGENT) Need plumber to locate and repair leak in the all purpose room over the electrical pannel box ( nature of leak unknown) Code A - Clear for repairs per Dr. Saeed Rahimi comfirmed (RG 10/01/03) July 21, 2003
Webb Elementary School FM-200333542 7/22/03 Webb Second floor room 206 and exit door Repair door closer. Safety Hazard July 22, 2003
Backus Middle School FM-200333881 7/28/03 (Backus) !!!VERY URGENT!!! 2nd Floor/Room #209: Air conditioner leaking in science classroom; water is running in-to the next classroom, and the floor below. July 28, 2003
Patricia R Harris Ed Center FM-200333882 7/28/03 Harris, P.R. Wood shop 232 Repair electrical wall and floor outlets. Unable to use for class shop tools. Assessment needed. Code A-clear for repair by Safety Office on 7/29/03 Charles Buchanan July 28, 2003
Patricia R Harris Ed Center FM-200333879 7/28/03 Harris, P.R. Pre-Kgn front bldge. Furinish and replace ceiling tile and guild rods in the following areas(53" diam. tile spaces each) 1. Groung floor Pre-K rooms - 3, front of building, ground floor. 2. First floor room # 232 wood shop, hall ways and common areas front and back sides of bldg. Code A-clear for repair by Safety Office on 7/29/03 Charles Buchanan July 28, 2003
Patricia R Harris Ed Center FM-200333874 7/28/03 Harris, P.R. Room 329 Replace classroom entrance door. Door is split down the middle. Safety Hazard Code A-clear for repair by Safety Office on 7/29/03 Charles Buchanan July 28, 2003
Patricia R Harris Ed Center FM-200333870 7/28/03 Harris, P.R. Exit door stairwell #4 small gym exit door Repair or replace hinges on both doors. Will not close properly. Code A-clear for repair by Safety Office on 7/29/03 Charles Buchanan July 28, 2003
Truesdell Elementary FM-200333955 7/29/03 (Truesdell) !!!VERY URGENT!!! 1st Floor/Custodian Office: Repair a/c unit, broke, and will not come on. July 29, 2003
Lafayette Elementary School FM-200333969 969 7/29/03 (Lafayette) !!!VERY URGENT!!! Roof: Repair skylight; broken by vandals. July 29, 2003

Routine Repair Requests Opened in July 2003 (53)
School Description Open Date
Ferebee-Hope Elementary School FM-200332752 7/1/03 Ferebee - Hope First Floor 1. Repair 8' inch spread faucet in the family service kitchen area . July 1, 2003
John Burroughs ES FM-200332755 755 7/1/03 (Burroughs) 1st Floor/Room #16: Very hot in the classroom; a/c stop working. July 1, 2003
Johnson JHS FM-200332774 7/1/03 Johnson Second floor Room 201 New installation Install window A/C unit. A/C unit is on site. July 1, 2003
River Terrace ES FM-200332934 7/1/03 (River Terrace) Asbestos Assessment Required. Plaster work requested in the following areas: 1) ceiling over top of windows in principal's office, main office, counselor's office, nurse's office, teacher's lounge, conference room and resource center (rm#9). 2) ceilings in hallway near library, staff bathroom and boys' restroom near classroom #5. 3) Ceiling outside of classroom #5 and wall in kitchen near entrance door. 4) Holes in ramp wall near classroom #13 Asbestos Code A - Clear for repairs on 11/09/05. Tidewater - Rodney Distance (RG 11/14/05) July 1, 2003
Tubman Elementary School FM-200332785 7/1/03 Tubman Room 114,117 and 134 First Floor Furnish and install air condition units for the three rooms indicated above. The rooms are going to be use for summer school and they have no air condition units in them now. Rooms Approx. Size are 25" x 28" July 1, 2003
Wilson High School FM-200332762 7/1/03 Wilson, W. First floor gym lobby Repair or replace exit doors in the gym lobby. Also repair or replace panic bars on doors in gym lobby. 8 doors Fire code violation. Asbestos Code A - Clear for repairs on 07/02/03. Horne Engineering - Bipin Nanavaty ( RG 07/03/03) July 1, 2003
Wilson High School FM-200332782 7/1/03 Wilson First Floor - Classroom #113 1. Replace badly damaged door unable to secure properly. Asbestos Code A - Clear for repairs on 07/02/03. Horne Engineering - Bipin Nanavaty ( RG 07/03/03) July 1, 2003
Stanton Elementary School FM-200332852 7/2/03 Stanton First Floor - Cafeteria 1. Replace cafeteria ceiling fan that fell this morning . Reattach 2 window guards to frame - Due to an attempted break in . Replace ceiling tiles damaged by second floor flood. Check light fixtures in exit area since flood gushed through it. Asbestos Code A - Clear for repairs on 07/03/03. Horne Engineering - Roger Kager ( RG 07/08/03) July 2, 2003
Johnson JHS FM-200332848 7/2/03 Johnson Fourth floor room 405 (Big) Classroom window need to be replace / student vandalized. July 2, 2003
Brent Elementary School FM-200332859 7/3/03 Brent Counsel office 3rd Return and replace shaft bearing and motor by the Mr.Banks. July 3, 2003
Ballou Senior High School FM-200332873 7/3/03 Ballou Rooms 14, 112, gym and auditorium Replace panic bars on doors. July 3, 2003
Marshall Educational Center FM-200332889 0332889 7/3/03 Marshall Roof Repair or replace the drain pan under the air handler unit the services the stages 2-3 areas. July 3, 2003
Ballou Senior High School FM-200332987 7/8/03 Ballou Second Floor 1. Repair or adjust entry door to room #204 . July 8, 2003
Ferebee-Hope Elementary School FM-200332975 7/8/03 Ferebee -Hope !! Emergency !! Second Floor 1. Repair broken window payne in the yellow stairwell in the A-building . July 8, 2003
Takoma Educational Center FM-200333030 7/8/03 (Takoma) Third floor -boys restroom blue team area One (1) urinal is stopped up, one (1) toilet is broken. Girls one (1) commode stopped up. Unstop toilets and replace broken toilet. July 8, 2003
Ballou Senior High School FM-200332988 7/8/03 Ballou Repair roof leaks room 121, gym, cooridor by 117, teachers prog. area, both sides of lobby. July 8, 2003
River Terrace ES FM-200333068 7/9/03 RIVER TERRACE Adjust defective gas valve for DHW heater and place unit back in service. July 9, 2003
Walker-Jones EC FM-200333038 7/9/03 WALKER- JONES Repair/replace bearings on roof top unit. July 9, 2003
Duke Ellington School FM-200333131 7/10/03 (Ellington) !!!EMERGENCY!!! Roof, and Inside Drains Sub-Basement/Gym: Drains are stopped up, and causing a back up in drains on the sub-basement level. July 11, 2003, call came in to report water coming through other area's of the roof. Engineer states, emergency service is needed. Asbestos Code A - Clear for repairs on 07/11/03. Horne Engineering - Sharon Voss (RG 07/15/03) July 10, 2003
Patricia R Harris Ed Center FM-200333084 7/10/03 P. R. Harris Stairway 4 Mechanical Room 1st Floor/Basement Unclog floor drains inside mechanical room and gardener shed. July 10, 2003
Eastern High School FM-200333174 7/10/03 (Eastern) Room #33: Install a/c unit in the window; air conditioning unit is on site. Asbestos Code A - Clear for repairs on 07/15/03. Horne Engineering - Roger Kager (RG 07/16/03) July 10, 2003
Orr Elementary School FM-200333086 7/10/03 ORR Make adjustment to outside air dampers to allow OSHA requirement of 30 % outside air to enter building. Outside air dampers are present closed at 0 % . July 10, 2003
Webb Elementary School FM-200333171 7/10/03 (Webb) 1st Floor/Front Entrance: Repair hole from fallen cement above front door entrance of building. Asbestos Code A - Clear for repairs on 07/15/03. Horne Engineering - Roger Kager (RG 07/16/03) July 10, 2003
Garnet-Patterson MS FM-200333219 7/14/03 Garnet-Patterson First floor boys bathroom Faucet handset (cold water) pop off. Cut water off need to be replace. ASAP July 14, 2003
Garfield ES FM-200333225 7/14/03 Garfield Boiler Room Unstop 4" leaking roof drain line water leaking in Boiler room brick ceiling,water is going through building. Leak is in room next to hot water heater. Check with Ms. Toon, the Engineer. July 14, 2003
Thomas Elementary School FM-200333204 7/14/03 Thomas 1st, 2nd and 3rd Floor 1. Windows need caulking to keep water from flooding the floors in the areas listed below . ( 103,105,107,109,landings,205,207,209,305,307 and 309 ) July 14, 2003
Shaed Elementary School FM-200333245 7/15/03 Shaed Boiler room Repair or replace condenser pump and or motor , possible bearing problems. Motor: Magnetek century H.P 100 ; RPM 1750; Volts 200/208 ; Amps 30/29 ; Ser.# BH5 ; Part # 6355809-01 : Frame S215T : Type ST July 15, 2003
Gibbs Elementary School FM-200333291 7/16/03 Gibbs First floor room 300 and 100 Repair broken window. July 16, 2003
Ferebee-Hope Elementary School FM-200333403 7/17/03 (Ferebee-Hope) 1st floor Kitchen/Ladies Bathroom: Replace toilet that was broken while unclogging building sewage drain. July 17, 2003
Meyer Elementary School FM-200333375 7/17/03 Meyer !! Emergency !! Need some ballasts for class rooms, each classroom have at least 3 or more lights out. This need attention as soon as possible. July 17, 2003
Randle-Highlands ES FM-200333389 -200333389 7/17/03 Randle -Highlands !! Emergency !! Basement Level 1. Replace 2 broken windows in classroom # 2B-06 . July 17, 2003
Ferebee-Hope Elementary School FM-200333402 7/17/03 (Ferebee-Hope) D-Building, 1st Floor/Headstart Bathroom: Replace toilet that was broken while unclogging building sewage drain. July 17, 2003
Shaw JHS FM-200333423 7/18/03 SHAW ROOM 150 REPLACE (2) 18,000 BTU WINDOW A/C UNITS. July 18, 2003
Ferebee-Hope Elementary School FM-200333428 7/18/03 Ferebee -Hope First Floor - Family Services 1. Supply hot and cold water in boys and girls restrooms . July 18, 2003
Browne Junior High School FM-200333452 7/21/03 Browne Third Floor - Art Room #312 1. Floor tile 9 x9 is coming up ,wooden floor under tile is bucklining . floor in need of repair before the next school year . Cade A-clear for by Sharon Voss Horne Engineer on 8/01/03 (Charles Buchanan) July 21, 2003
Gibbs Elementary School FM-200333479 7/21/03 Gibbs Exterior 1. Repair door on storage shed located in the rear of building . July 21, 2003
Coolidge High School FM-200333548 7/22/03 Coolidge Third floor room 306 Replace floor tile in classroom. Sub floor is wood. Also replace sub floor. Asbestos Code A - Clear for repairs on 07/22/03. Horne Engineering - Sheryll James (RG 07/24/03) July 22, 2003
Kimball Elementary School FM-200333554 4 7/22/03 (Kimball) Asbestos Assessment Required. 2nd Floor/Room #202: Scrape, and paint wall and ceiling. Lead & Asbestos Code A - Clear for repairs on 07/23/03. Horne Engineering - Edward Rodriguez (RG 07/22/03) July 22, 2003
Kimball Elementary School FM-200333529 9 7/22/03 Kimball Room 202 Scrape and paint walls and ceiling. Lead & Asbestos Code A - Clear for repairs on 07/21/03. Horne Engineering - Edward Rodriguez (RG 07/23/03) July 22, 2003
Hine JHS FM-200333520 7/22/03 Hine Third Floor 1. Plaster ceiling in the girls and boys restroom. Lead & Asbestos Code A - Clear for repairs on 05/14/04. Horne Engineering - Edward Rodriguez/Bjarne Smith (RG 05/14/04) July 22, 2003
Walker-Jones EC FM-200333561 7/22/03 (Walker Jones) Through-Out Building: Repair the windows in the following classrooms: #105 & 109, 206, & 209, 301, 304, 307, & 308, July 22, 2003
Ballou Senior High School FM-200333771 7/23/03 (Ballou) Drain stagnant water from the dry pit in the auto tech classroom and install a sump pump or repair leak. July 23, 2003
Murch Elementary School FM-200333755 7/24/03 Murch Outside (By the main office) Replace/Repair cooling unit ,will not start. July 24, 2003
Stanton Elementary School FM-200333753 7/24/03 Stanton 3rd 0r 1st floor See Mr Rice Panel box in room A-9 has water leaking in it. Electrical equipment improperly installed. July 24, 2003
Watkins Elementary School FM-200333799 7/25/03 Watkins Fire Code Violation Throughout the Building 1) Glass missing from extinguisher cabinet. July 25, 2003
Shaed Elementary School FM-200333783 7/25/03 Shaed Boiler Room Replace sump pump in boiler room. Pumps have gone bad July 25, 2003
River Terrace ES FM-200333786 7/25/03 River Terrace Repair 3/4" galvanized line - for make -up water to heating H/W system. July 25, 2003
Johnson JHS FM-200333956 7/29/03 Johnson Boiler Room Restore electrical service to chiller panel box. One (1) leg is out. July 29, 2003
Beers Elementary School FM-200334012 7/30/03 Beers Outside Outside lights (night lights) need to be on a timer. Lights stay on all day. Outside lights by library exit door, leading to playground need repair and cover over lights. July 30, 2003
Deal Junior High School FM-200334008 7/30/03 (Deal) !!!EMERGENCY!!! Basement/Hall near Cafeteria: Assessment is needed on wall, basement level for structure soundness. Wall is bowing at bottom. This problem did not start until water continued to come in-to the building on the basement level. Cade A-clear for by Troy wilcome Horne Engineer on 8/01/03 (Charles Buchanan) July 30, 2003
Beers Elementary School FM-200334017 7/30/03 Beers First floor Bldg. # 2 Fallout shelter sump pump is not working, motor is not working. Flood from outside drain water is coming into the building. July 30, 2003
Beers Elementary School FM-200334014 7/30/03 Beers First and Second floor Bldg. 1, 2 and 3 Hallways / stairwells need plastering and painting, certain areas are bad. Hazard for kids. Asbestos & Lead Cade A-clear for by Sharon Voss Horne Engineer on 8/01/03 (Charles Buchanan) July 30, 2003
Meyer Elementary School FM-200334071 7/31/03 Meyer Playground area Outside lights on playground on south of the building need to be replace, due to vandalism. July 31, 2003

© The Washington Post Company