Urgent Repair Requests Opened in July 2004 (32)
| School |
Description |
Open Date |
| Reed LC |
FM-200449962 7/1/04 Reed, Marie First floor early childhood Please survey and repair carpet. The carpet is loose and is a safety hazard. Asbestos Code A-clear for repair by DCPS Charles Buchanan on 7/08/04 |
July 1, 2004 |
| Browne Junior High School |
FM-200449965 7/1/04 Browne First floor Vault in new wing ceiling need to be plastered. Asbestos Code A - Clear for repairs on 07/16/04. DCPS Safety - Leroy Minton Jr. (RG 07/21/04) |
July 1, 2004 |
| Browne Junior High School |
FM-200449966 7/1/04 Browne First floor door new wing Knob needed on custodian closet. Asbestos Code A - Clear for repairs on 07/16/04. DCPS Safety - Leroy Minton Jr. (RG 07/21/04) |
July 1, 2004 |
| Beers Elementary School |
FM-200450031 7/8/04 Beers URGENT Handicap ramp Principal is requesting for someone to survey for handicap ramps. Two are needed. |
July 8, 2004 |
| Ketcham Elementary School |
FM-200450136 7/12/04 Ketcham N/Wing First floor library Request to have windows repaired. Water runs in when it rains. The window can not be closed. Windows need to be repaired in room 105. Request for repair of coolers in room 215 and 216. Repair for repair of air conditioners in math lab on third floor in open space in the new wing. Code A - clear for repairs as of 7/13/04 by safety office Sylvia Grimes. Room 105 replace glass only not entire window. |
July 12, 2004 |
| Shepherd ES |
FM-200450117 7/12/04 (Shepherd) !!!URGENT!!! Old Wing Playground Door Entrance: Replace security lights destroyed by vandals. |
July 12, 2004 |
| Smothers ES |
FM-200450153 7/13/04 Smothers Health suite Plaster falling off the wall and ceiling. It is very bad and is a health hazard. Asbestos Code A - Clear for repairs on 07/14/04. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) |
July 13, 2004 |
| Jessie LaSalle Elementary |
FM-200450206 6 7/13/04 (Lasalle) !!!URGENT!!! Kitchen/Cafeteria: Sink leaking from trap; sink is used to wash pots, and pans. |
July 13, 2004 |
| Ketcham Elementary School |
FM-200450225 7/14/04 Ketcham First floor room 106 Plastering and painting in room 106. Asbestos Code A - Clear for repairs on 07/19/04. DCPS Safety - Leroy Minton Jr. (RG 07/20/04) |
July 14, 2004 |
| Benjamin Banneker Academic HS |
FM-200450248 7/14/04 Banneker First floor auditorium Stage need to be redone / sanded down floor is wood and it is discolored. Asbestos Code A - Clear for repairs on 07/14504. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) Asbestos Code A - Clear for repairs on 07/14/04. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) |
July 14, 2004 |
| King M L ES |
FM-200450243 7/14/04 King Third floor room 311 Need to have electrician to run a 220 line so we can install an AC unit. Asbestos Code A - Clear for repairs on 07/14/04. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) |
July 14, 2004 |
| Gage-Eckington ES |
FM-200450296 7/15/04 Gage-Eckington Second floor auditorium drapes We are in need for asuditorium drapes, they are torn and rope is broken (old) have know way to open nor close when having a program. (need to be replaced) Asbestos Code A - Clear for repairs on 07/14/04. DCPS Safety - Leroy Minton Jr. (RG 07/15/04) |
July 15, 2004 |
| Green Elementary School |
FM-200450519 7/20/04 Green First floor All - purpose room Replace missing ceiling tiles in all purpose room six (6) pieces. Asbestos Code A - Clear for repairs on 07/20/04. DCPS Safety - Richard Gibson (RG) |
July 20, 2004 |
| Ketcham Elementary School |
FM-200450543 7/20/04 Ketcham Front entrance Door closer need to be replaced, door does not close properly and can not be secured properly. Code A -clear for repairs as of 8/19/04 safety Sylvia. |
July 20, 2004 |
| Ketcham Elementary School |
FM-200450508 7/20/04 Ketcham Vandalism New wing A/C was taken out during break in, need to be put back in. They also remove the cinder block. That need to be put back also. Asbestos Code A - Clear for repairs on 07/21/04. DCPS Safety - Leroy Minton Jr. (RG 07/21/04) |
July 20, 2004 |
| Woodson High School |
FM-200450575 7/21/04 Woodson,H.D. Throughout Building SAFETY Insulate the following areas: Room #105,#201,#202,#207,#209,#210,#303,#307,#401,#501,#606,#710,#711-(8" OSY valve) Pool area, Music room,Book room, Cafeteria and Principal office closet. Code A-clear for repair by DCPS Charles Buchanan 8/16/04 |
July 21, 2004 |
| Eastern High School |
FM-200450748 7/26/04 Eastern Repair door to cafeteria - door defective. (FCV) Asbestos Code A - Clear for repairs on 09/08/04. DCPS Safety - Leroy Minton Jr. (RG 09/08/04) |
July 26, 2004 |
| Eastern High School |
FM-200450754 7/26/04 Eastern B-14 basement floor Plaster wall in rear of room due to down spout, leakwall need plastering and painting. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. |
July 26, 2004 |
| Eastern High School |
FM-200450756 7/26/04 Eastern VANDALISM Stairwell across from room 322 Reinstall handrail that was damaged due to vandalism. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. |
July 26, 2004 |
| Eastern High School |
FM-200450776 7/26/04 Eastern Greenhouse Repair or replace lexan windows for greenhouse and re-inforce braces in greenhouse. The school has been grarted funds for school beautification program. The repair of greenhouse exterior is important to secure goods and prevent water from leaking inside on materials. We've made numerous attempts to fix this problem and prevent vandals from entering. Asbestos Code A - Clear for repairs on 09/08/04. DCPS Safety - Leroy Minton Jr. (RG 09/08/04) |
July 26, 2004 |
| Eastern High School |
FM-200450773 7/26/04 Eastern Weight room B-20 and SB-56 Install (5) receptables around wall for electrical weight room equipment. Install 220 electrical line for air conditioner. The electrical service is important for weight training for athelics program, and install electrical service for new washer machine and dryer for football team. The machine has been in school for (2) two years. This is not the first attempt to get it done. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. |
July 26, 2004 |
| Eastern High School |
FM-200450735 7/26/04 Eastern B-35 and armory Repair ceiling by room B-35 ramp and armory wall hole in wall very unsafe and unstable. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. |
July 26, 2004 |
| Eastern High School |
FM-200450738 7/26/04 Eastern DSefective doors by rooms 240, 241, B-9. (FCV) Asbestos Code A - Clear for repairs on 09/08/04. DCPS Safety - Leroy Minton Jr. (RG 09/08/04) |
July 26, 2004 |
| Eastern High School |
FM-200450739 7/26/04 Eastern Furnish and install safety glass for ext. cabinet B-74, b-43, room 155, 160 223 and 254. |
July 26, 2004 |
| Eastern High School |
FM-200450741 7/26/04 Eastern Repair defective doors to room 346, 260, and 235. Door to bathroom 356 door closure, room 319, 327, 335, 219, 228 and b-40 defective or door closures. Asbestos Code A - Clear for repairs on 09/08/04. DCPS Safety - Leroy Minton Jr. (RG 09/08/04) |
July 26, 2004 |
| Eastern High School |
FM-200450750 7/26/04 Eastern VANDALISM By 148 and by B-20 Furnish and install exit signs that were damaged due to vandalism. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. |
July 26, 2004 |
| Eastern High School |
FM-200450779 7/26/04 Eastern Stairwell by 321 Repair and remount hanging stairwell rail in corridor by room 321 (safety hazard). Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. |
July 26, 2004 |
| Davis Elementary School |
FM-200451029 7/28/04 Davis Second floor new wing bricks court yard Safety hazard for childred outside bricks need to be pointed, when it rain water comes through the wall and go down the steps. |
July 28, 2004 |
| Woodson High School |
FM-200450923 7/28/04 Woodson, H.D. Room #202 #303 and Library Asbestos assessment required On insulation on pipe in room#303, #202 and Library area and over hing plaster ceiling. No asbestos impact to ceiling inthese room 202, 303, & library. HA 008 Placter & Ceiting NAD HA 708 Brown Coat with HA 008 NAD Code A-clear for repair by DCPS Charles Buchanan on 8/16/04 Code 'C' Re-assigned -- (Abatement of asbestos tar coumpond must be conducted within the Library univent; an exploratory investigation must be conducted above plaster ceiling over hang). DCPS Safety, R. Edwrards -- 8/16/04. Code A - asbestos abated on 08/20/04 per DCPS Safety Ronald Edwards confirmed. ( RG 08/24/04) |
July 28, 2004 |
| Ketcham Elementary School |
FM-200450930 7/28/04 Ketcham First floor main office Hall door to principals office is stuck, swollen and will not open. This is a safety hazard. Code A- clear for repairs as of 8/19/04 safety Sylvia. |
July 28, 2004 |
| Coolidge High School |
FM-200451111 7/29/04 (Coolidge) !!!VERY URGENT!!! Asbestos Assessment Required. 3rd Floor/Hallway Leaking from roof into 3rd floor hallway. Asbestos Code A - Clear for repairs on 08/11/04. DCPS Safety - Leroy Minton Jr. (RG 08/17/04) |
July 29, 2004 |
| Stanton Elementary School |
FM-200451156 7/30/04 (Stanton) !!!VERY URGENT!!! Outside Boiler Room Door: Drains stopped up, water seeping in-to the building. |
July 30, 2004 |
Routine Repair Requests Opened in July 2004 (105)
| School |
Description |
Open Date |
| Reed LC |
FM-200449960 7/1/04 Reed, Marie Outside grounds wall located near rec. area Power wash building wall to remove several layers of peeling paint. |
July 1, 2004 |
| Rudolph Elementary School |
FM-200449958 7/1/04 Rudolph First floor Door window is broken nearest to room 108 need to be replaced. ASAP |
July 1, 2004 |
| Woodson High School |
FM-200450110 7/7/04 Woodson, H.D. Swimming Pool Check swimming pool, pool is dumping. |
July 7, 2004 |
| Payne Elementary School |
FM-200450109 7/7/04 Payne Boiler Room Repair or replace sump pump and unstop drain. |
July 7, 2004 |
| Bunker Hill Elementary School |
FM-200450102 7/7/04 Bunker Hill Boiler Room Remove plug from Boiler #1 and #2 and remove check valve on Boilers. |
July 7, 2004 |
| Gage-Eckington ES |
FM-200449999 7/7/04 (Gage-Eckington) HEALTH CODE VIOLATION: 14 DAY NOTICE/KITCHEN: Asbestos Assessment Required Repair or replace all missing /damaged ceiling tiles in order to prevent rodent entry. Asbetos Code A-clear for repair by DCPS Charles Buchanan on 7/13/04 HA 710,Ceiling tile located in Kitche n, cafeteria, & corridor. NAD |
July 7, 2004 |
| Woodson High School |
FM-200450037 7/8/04 Woodson, H.D. Room 208 Clean and paint 51 SF walls over mounted air conditioning unit and door frame. Replace 80 SF of stained and buckled 2'x4' ceiling tiles. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (1) new door stop. Remove (1) 6'-6" high x 3' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. Repair (4) lower sections of windows to make them operational so that they will open and close properly. Clean and service wall mounted air conditioning unit. Replace existing 3' x 7' entry door with new security door painted with hardware. Remove (1) 8' long x 3' high x 2'-6" wide laboratory vanity cabinet. Cap all service lines (water and gas). Provide and install wall mounted outlet to accommodate 9 computers at location designated by the school principle. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450040 7/8/04 Woodson, H.D. Room 302 NOTE: The following line item will be deleted from this service order per request of Mr. Vigil Colemen, Project manager, PD&C, "Replace existing 12'-2 1/2" x 4'-2" caulk board with new.". The remaining items are cleared for repairs. R. Edwards 9/10/04 Replace 144 SF of stained and buckled 2'x4' ceiling tiles. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (1) new door stop. Repair (1) lower sections of windows to make them operational so that they will open and close properly. Clean and service wall mounted air conditioning unit. Provide and install wall mounted outlets to accommodate 9 computers at location designated by school principle. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450033 7/8/04 Woodson, H.D. Room 205 Clean and paint 717 SF of walls and trim. Replace 48 SF of stained and buckled 2'x4' ceiling tiles. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (1) new door stop. Remove (1) 6'-6" high x 3' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. Repair (5) lower sections of windows to make them operational so that they will open and close properly. Clean and service wall air conditioning unit. Remove 246 SF pf movable partition and replace with painted drywall with vinyl base. Also, include in drywall outlets to accomodate 9 computers. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450039 7/8/04 Woodson, H.D. Room 210 Clean and paint 719 SF of walls and door frame in classroom. Clean and paint 352 SF of walls and door frame in teacher office. Replace 88 SF of stained and buckled 2'x4' ceiling tiles. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (1) new door stop. Remove (1) 6'-6" high x 3' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. Repair (1) lower sections of windows to make them operational so that they will open and close properly. Clean and service wall mounted air conditioning unit. Provide and install wall mounted outlets to accommodate 9 computers at location designated by school principle. Replace 3 laboratory goose neck faucets. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450038 7/8/04 Woodson, H.D. Room 209 Clean and paint 719 SF of walls and door frame in classroom. Clean and paint 352 SF of walls and door frame in teacher office. Replace 80 SF of stained and buckled 2'x4' ceiling tiles. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (1) new door stop. Remove (1) 6'-6" high x 3' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. Repair (5) lower sections of windows to make them operational so that they will open and close properly. Replace entry door closure. Clean and service wall mounted air conditioning unit. Provide and install wall mounted outlets to accommodate 9 computers at location designated by school principle. Replace 3 laboratory goose neck faucets. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450011 7/8/04 Woodson, H.D. Room 203 Clean and paint 655 SF wall and door frame. Replace (6) stained and buckled 2'x4' ceiling tile. Provide and install (5) new door stops. Patch 5"x9" hole in base glazed wall tile under classroom clock. Provide and install (9) wall mounted outlets at location designed by school principle. Replace light fixture (3) rows 20' Long 4' sections 2 bulbs. Repair (4) lower window sections to make them operational so that they will open and close properly. Remove (1) 6'-6" high x 3' wide x 1'-6" wide metal storage cabinet and replace with new. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Eastern High School |
FM-200450029 7/8/04 Eastern First floor counselors suite 134 Repair roof top lights, they are inoperative. |
July 8, 2004 |
| Woodson High School |
FM-200450012 7/8/04 Woodson, H.D. Room 204 Clean and paint 33 SF of walls above air conditioning unit. Replace 32 SF of stained and bukled 2'x4' ceiling tiles. Remove 3 rows of 20' long 4' section, 2 bulb pendent type light fixtures and replace with new. Provide and install new door stop. Remove (1) 6'-6" high x 3' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. Provide and install 14 gauges painted metal enclosure 9'-10 1/2" high to cover exposed vertical plumbing lines. Repair 4 lower sections of windows to make them operational so that they will open and close properly. Clean and service wall mounted air conditioning units. Replace existing 3'x7' hollow core entry door with security door painted with new hardware and kick plates. Remove 246 SF of movable partition and replace with painted drywall with vinyl base. Also, include in drywall outlets to accomodate 9 computers. Replace 2 outlet cover plates. Cover plate under black board projects 1/8" from face of wall needs filler. Other plate needs to be oversized to rough opening. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450010 7/8/04 Woodson, H.D. Room 201 Clean and paint 85 SF of plaster walls over wall air conditioning unit. Clean and paint 497 SF of CMU walls column and door frame. Replace 120 SF stained and buckled 2'x4' ceiling tile. Remove 3 rows of 20' long 4' section, 2 bulb pendent type light fixtures and replace with new. Provide and install new door stop. Remove 42 SF of wall mounted cabinet above laboratory counter and paint. Provide wall mounted outlets to accommodate (6) computers at locations designated by the school principle. Replace existing 3'-7' hollow core wood door to backroom (teacher copy area) and replace with security doors with hardware. Remove wooden drawers from wall mounted base cabinet at (2) locations and replace with (2) 1'-6 1/2"x 2'-7" painted plywood facing to match existing color. Replace existing entry door lock and lock plates. Remove 297 SF of movable partition and replace with drywall painted with 6" vinyl base. Drywall shall include wall outlets to accommodate 2 computers. Remove (1) 8' long x 4' wide x3' high laboratory cabinet that is located in front of the wall mounted base cabinet. Remove (1) 6'-10" high x 2'-11" wide x 2' deep laboratory cabinet. Repair 4 lower window sections to make them operational so that they will open and close properly. Clean and service wall air conditioning units. Rework 5'-9"x5'-8" display case to accomodate its opening from the class room instead of the corridor. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450034 7/8/04 Woodson, H.D. Room 206 Clean and paint 679 SF of walls and trim. Replace 48 SF of stained and buckled 2'x4' ceiling tiles. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (1) new door stop. Remove (1) 6'-6" high x 3' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. Repair (4) lower sections of windows to make them operational so that they will open and close properly. Clean and service wall mounted air conditioning unit. Remove 242 SF pf movable partition and replace with painted drywall with vinyl base. Also, include in drywall outlets to accomodate 9 computers. Replace existing 3' x 7' entry door with new security door painted with hardware. Provide missing duplex wall cover plate. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450043 7/8/04 Woodson, H.D. Room 312 NOTE: The following line item will be deleted from this service order per request of Mr. Vigil Colemen, Project manager, PD&C, "Replace window glazing in teacher's conference area (2'-10 1/2" x 4'-11") and classroom (4'-11" x 4'-2") and Remove (15) floor outlets and cover with plates.". The remaining items are cleared for repairs. R. Edwards 9/10/04 Clean and paint 44 SF plaster wall over wall air conditioning unit door. Clean and paint 708 SF of CMU wall in teacher's conference area, office and door frames. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (2) new door stop. Clean and service wall mounted air conditioning unit. Provide and install wall mounted outlets to accommodate 14 computers at location designated by school principle. Replace temporary plywood enclosure (1) 1'-6" x 2' painted metal panel. Remove 11'-2" long x 5'-8" high display case to accommodate its opening from the classroom instead of the corridor. Remove (1) 6'-6" high x 3 ' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450042 7/8/04 Woodson, H.D. Room 305 NOTE: The following line item will be deleted from this service order per request of Mr. Vigil Colemen, Project manager, PD&C, "Replace existing 12'-2 1/2" x 4'-2" caulk board with new.". The remaining items are cleared for repairs. R. Edwards 9/10/04 Clean and paint replace 910 SF wall, door frame and store front office. Replace 80 SF of stained and buckled 2'x4' ceiling tiles. Remove 2 rows 24' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (6) new door stop. Repair (3) lower sections of windows to make them operational so that they will open and close properly. Clean and service wall mounted air conditioning unit. Provide and install wall mounted outlets to accommodate 14 computers at location designated by school principle. Replace temporary plywood enclosure (1) 1'-6" x 2' painted metal panel. Remove 11'-2" long x 5'-8" high display case to accommodate its opening from the classroom instead of the corridor. Remove (1) 6'-6" high x 3 ' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450008 7/8/04 Woodson, H.D. Room 200A NOTE: The following line item will be deleted from this service order per request of Mr. Vigil Colemen, Project manager, PD&C, "Remove 299 SF of existing carpeting and refinish 299 SF of existing tile floor". The remaining items are cleared for repairs. R. Edwards 9/10/04 Replace (80) of stained and buckled 2'x4' ceiling tile. Provide and install new door stop. Clean and paint 144 SF of CMU back wall and door frame. Repair leaking thermpstat. Provide and install (4) wall mounted outlets at location designed by school principle. Replace (2) 4' long bulbs. Repair an 11"x11" opening in plaster over interior of entry door. Remove (2) 42"Hx18"Dx42"W metal file cabinets and replace with (3) rows of 42" Long shelving to match existing. Clean and service below ceiling mounted air conditioning unit. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450006 7/8/04 Woodson, H.D. Room 200 NOTE: The following line item will be deleted from this service order per request of Mr. Vigil Colemen, Project manager, PD&C, "Remove 450 SF existing carpeting and refinish 570 SF of existing tile floor.r". The remaining items are cleared for repairs. R. Edwards 9/10/04 Clean and paint 506 SF of wall and door frame. Replace 104 SF of stained and buckled 2'x4' ceiling tile. Provide and install (5) new door stops. Remove (2) temporary plywood panels and install (2) new metal 1'-11"x2" -8" section panels in store front trim. Repair leaking thermostat. Clean and service (4) wall air conditioning units. Provide and install (4) wall mounted outlets at location designed by school principle. Clean and paint exterior/interior metal office storefront trim. 6'-7"x9', 11'-9" x 9' and 11'-5"x 9'. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450041 7/8/04 Woodson, H.D. Room 303 Clean and paint 101 wall and door frame trim. Replace 80 SF of stained and buckled 2'x4' ceiling tiles. Provide and install new 3' x 7' security door with hardware that will allow the door to swing into classroom. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (1) new door stop. Repair (1) lower sections of windows to make them operational so that they will open and close properly. Provide and install 2 duplex cover plates. Repair lock on face panel cover to wall air conditioning unit to allow secure closing. Clean and service wall mounted air conditioning unit. Provide and install wall mounted outlets to accommodate 9 computers at location designated by school principle. Provide and install window shades sizes 2'-11" wide x 7' long and 4'-3" wide x 7' long. Remove (1) 6'-6" high x 3 ' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Woodson High School |
FM-200450035 7/8/04 Woodson, H.D. Room 207 Clean and paint 772 SF of walls and trim. Replace 136 SF of stained and buckled 2'x4' ceiling tiles. Remove 3 rows 20' long 4 ' section, 2 bulbs pendent type light fixtures and replace with new. Provide and install (1) new door stop. Remove (1) 6'-6" high x 3' wide x 1'-6" deep metal teacher's storage cabinet and replace with new. Repair (3) lower sections of windows to make them operational so that they will open and close properly. Clean and service wall mounted air conditioning unit. Remove 242 SF of folding partition and replace with painted drywall with vinyl base. Also, include in drywall outlets to accomodate 9 computers. Replace existing 3' x 7' entry door with new security door painted with hardware. Provide missing duplex wall cover plate. HA 005 Ceiling tile white 2x4 Pinhole and divots in a circular pattern No ACM HA 008 Plaster white on wall and and celling No ACM HA 708 Brown Coat with HA 008 No ACM HA 056 Fire Door ...ACM Code A-clear for repair by Charles Buchanan on 7/14/04 |
July 8, 2004 |
| Browne Junior High School |
FM-200450099 7/9/04 (Browne) Basement/Cafeteria: Replace hanging cable in cafeteria over the top of soda machine. |
July 9, 2004 |
| Eastern High School |
FM-200450054 7/9/04 Eastern Greenhouse Repair or replace lexon windows for Greenhouse - and re-enforce braces in greenhouse. The school has been grated funds for school beautification program. The repair of greenhouse exterior is important to secure goodsand prevent water from leaking inside on materials we've made numerous attempts to fix this problem and prevent vandals from entering. |
July 9, 2004 |
| Ferebee-Hope Elementary School |
FM-200450085 7/9/04 Ferebee-Hope Boiler Room Mech. Maintenance Shop In-Stall Electronic bleed off for air compressor. |
July 9, 2004 |
| Wilkinson ES |
FM-200450083 7/9/04 Wilkinson Air Handler Unit Repair or replace Air Handler Unit motor in main office area. |
July 9, 2004 |
| Tyler Elementary School |
FM-200450089 7/9/04 Tyler Parking lot need to be line. |
July 9, 2004 |
| Stanton Elementary School |
FM-200450046 7/9/04 (Stanton) Annex: Repair brick wall in classroom, |
July 9, 2004 |
| Cardozo High School |
FM-200450086 7/9/04 Cardozo Stairwell Throughout Building Handrail need by replace on stairwell, throughout building. Code A-clear for repair by DCPS Charles Buchanan 7/14/04 HA 005 Plaster White Hard Wall Plaster HA 705 Browon Coat With HA 005 |
July 9, 2004 |
| Cardozo High School |
FM-200450062 7/9/04 Cardozo Day care Repair plaster walls that are deteriorting and paint and plaster is falling off of the walls, in the room and outside hallway. Code A-clear for repair by DCPS Charles Buchanan 7/14/04 Day Care room/AMP 05 HA 005 Plaster White Hard Wall Plaster HA 705 Browon Coat With HA 005 |
July 9, 2004 |
| Meyer Elementary School |
FM-200450053 7/9/04 Meyer Basement boiler room A broken window in boiler room need to be replace ASAP. |
July 9, 2004 |
| Shepherd ES |
FM-200450105 7/10/04 Shepherd Boiler Room Remove 4" cap from drip line on steam header. Engineering staff attemped to remove with negative result. |
July 10, 2004 |
| Turner Elementary School |
FM-200450134 7/12/04 (Turner) !!!EMERGENCY!!! 3rd Floor/Room #317: Vandals removed glass from window frame to gain entry to school. (Plexi-glass) |
July 12, 2004 |
| Cardozo High School |
FM-200450129 7/12/04 Cardozo Ground 5 Survey and correct electrical outages are used for an computer are used for an extended time. Breaker trips after some hours of computer use. |
July 12, 2004 |
| Ketcham Elementary School |
FM-200450138 7/12/04 Ketcham Second snd third floor boys and girls in new wing Toilets and urinals need to be replace ASAP before school starts. |
July 12, 2004 |
| Brookland Elementary |
FM-200450135 7/12/04 Brookland Second floor rooms 110-116(learning center -2). 126- 134 and 137 (learning center-1) Repair , wrap intake and outtake pipes. (Pipe/thermal system insulation). The constant condensation causes excessive leaks throughout the ceiling POC id different. Code A-clear for repair by DCPS Charles Buchanan on 5/30/05 |
July 12, 2004 |
| Kramer Middle School |
FM-200450199 7/13/04 Kramer Boiler Room Boiler #2 remove plug from city make up water line, left hand corner. |
July 13, 2004 |
| Peabody Elementary School |
FM-200450148 8 7/13/04 Peabody Boiler Room Repair or replace sump pump in Boiler Room, pump not working. |
July 13, 2004 |
| Langdon Elementary School |
FM-200450158 7/13/04 Langdon Boiler Room Furnish fuses for air handler unit, to use for cooling. |
July 13, 2004 |
| King M L ES |
FM-200450245 7/14/04 King Outside parking lot Need to have a hole patch on the school parking lot. |
July 14, 2004 |
| Rudolph Elementary School |
FM-200450217 7/14/04 Replace circuit breaker in electrical panel box to prevent breaker from tripping when A/C window units in main office and health suite are in operation at the same time. |
July 14, 2004 |
| Eastern High School |
FM-200450250 7/14/04 Eastern Roof Annex Repair or replace tarp / flashing around AC unit and or pan inside AC unit to stop leak in room 152. |
July 14, 2004 |
| Gage-Eckington ES |
FM-200450283 7/15/04 Gage-Eckington Main entrance ramp Ramp entering into main entrance door cement is cracking up do toweather beaten, may cause someone to fall. Need to be re-cemented. |
July 15, 2004 |
| Deal Junior High School |
FM-200450406 7/17/04 Replace /repair damaged tube door refractory. |
July 17, 2004 |
| Garrison ES |
FM-200450414 7/17/04 Garrison Boiler Room Boilers #1 thru #6 remove automatic timers. D.C. Boiler inspector failed boilers. |
July 17, 2004 |
| Park View ES |
FM-200450408 7/17/04 Park View Boiler Room Boiler #1 and #5 repair or replace leaking sections. D.C. Boiler Inspector failed boiler. Asbestos Code A - Clear for repairs on 09/27/05. Tidewater - Philp Connolly (RG 09/28/05) |
July 17, 2004 |
| Park View ES |
FM-200450405 7/17/04 Park View Boiler Room 1. All boilers - Remove automatic blowdowsn from boilers and aux. equipment |
July 17, 2004 |
| Roosevelt High School |
FM-200450420 7/18/04 Roosevelt Boiler Room/Cond. Unit Repair automatic condenser cleaner system . Replace 1/4" tubing and fitting, leaking from freezing. |
July 18, 2004 |
| Ludlow-Taylor ES |
FM-200450448 7/19/04 REPAIR PNEUMATIC SYSTEM Repair or replace existing air compressor not functioning. |
July 19, 2004 |
| Stanton Elementary School |
FM-200450471 7/20/04 Stanton Boiler Room Repair or replace sump pump, pump is not working. |
July 20, 2004 |
| Green Elementary School |
FM-200450522 7/20/04 Green Second floor hallway and room 218 Replace circuit breaker that control hallway lights, breaker do not turn on lights. Replace two (2) electric receptables that are broken in room 218. |
July 20, 2004 |
| Park View ES |
FM-200450588 7/21/04 Parkview Boiler Room Install, vents, and siphons on the gages of each boiler. |
July 21, 2004 |
| Coolidge High School |
FM-200450585 7/21/04 Coolidge Room #108 Provide electrical power for (4) four 115 volt A/C window units in council suite in room #108 |
July 21, 2004 |
| Dunbar High School |
FM-200450592 7/21/04 Dunbar 1) Use school elevator to transport one 200 lb equipment rack to the penhouse. Rack will be hand carried up the stairs to the roof and installed in the existing cingular shelter on the roof. Poc - Richard Frontera - 443-629-1842 Cingular Wireless Poc - Reggie Holland - 202-673-7233 |
July 21, 2004 |
| Park View ES |
FM-200450574 7/21/04 Park View Boiler Room Boiler #2 condensate pump has leaking seal. D.C. Boiler Inspector failed boiler. |
July 21, 2004 |
| Walker-Jones EC |
FM-200450603 7/21/04 Walker-Jones Exterior Grounds 1) Paint a 24' X 36' mural of the United States on the Walker-Jones playground, repaint all the existing hop - scotch and 4 - squares on the playground. Poc - Crystal Balagun Business Manager 202-535-1222 |
July 21, 2004 |
| Wilson High School |
FM-200450596 7/21/04 Wilson, W. Second floor Repair or replace doors on rooms: 205-200-208-201-202-203-216-214-218-224-220-226-215-228 and 225. These fire door or metal doors & wooden solid listed in the Manager Plan or Assumed to be Asbestos Doors. A survey of 5 doors found that the was No asbestos. HA 131, Fire foor 3' x 7' wooden solid HA 132, Fire foor 3'x7' wooden solid HA 134 Fire door 6,5' x 4' Metal Asbestos Code A-claer for repair by DCPS Charles Buchanan on 7/25/04 |
July 21, 2004 |
| Wilson High School |
FM-200450597 7/21/04 Wilson, W. First floor Repair or replace doors on rooms: 121-117-117A-115-113-103-104-108-123-125-120-124-119-auditorium doors 1A. These fire door or metal doors & wooden solid listed in the Manager Plan or Assumed to be Asbestos Doors. A survey of 5 doors found that the was No asbestos. HA 131, Fire foor 3' x 7' wooden solid HA 132, Fire foor 3'x7' wooden solid HA 134 Fire door 6,5' x 4' Metal Asbestos Code A-claer for repair by DCPS Charles Buchanan on 7/25/04 |
July 21, 2004 |
| Wilson High School |
FM-200450599 7/21/04 Wilson, W. Third floor Repair or replace classroom doors on rooms 311-313-307-306-301-302-308-316-314-318-330-331-329 and 319. These fire door or metal doors & wooden solid listed in the Manager Plan or Assumed to be Asbestos Doors. A survey of 5 doors found that the was No asbestos. HA 131, Fire foor 3' x 7' wooden solid HA 132, Fire foor 3'x7' wooden solid HA 134 Fire door 6,5' x 4' Metal Asbestos Code A-claer for repair by DCPS Charles Buchanan on 7/25/04 |
July 21, 2004 |
| Shaed Elementary School |
FM-200450626 7/22/04 Shead Boiler Room Repair or replace sump pumps in boiler room. Pumps failed D.C. Inspection. |
July 22, 2004 |
| Woodson High School |
FM-200450623 7/22/04 Woodson, H.D. Repair or replace drip pan in univent. Rooms #202,#209,#303, Book room, Music room and Auditorum AHU |
July 22, 2004 |
| Hine JHS |
FM-200450607 7/22/04 Hine Boiler Room Boiler #2 supply and return line repair or replace two (2) 6" OS&Y shut off valves. Valves not holding. |
July 22, 2004 |
| Ludlow-Taylor ES |
FM-200450604 7/22/04 Ludlow-Taylor Boiler Room Boiler #1 Repair brick work at the rear of boiler on the outside brick. Boilers failed D.C.Inspection. |
July 22, 2004 |
| Bruce-Monroe Elementary School |
FM-200450672 7/23/04 Bruce-Monroe Boiler Room Boiler #1 & 2 need calibrated. Boiler failed D.C. Inspection. |
July 23, 2004 |
| Ballou Senior High School |
FM-200450673 7/23/04 Ballou Stay Sub basement A-6 and A-8 Electrical - power poles and additional outlets needed. Code A-clear for repair by DCPS Charles Buchan on 7/10/04 |
July 23, 2004 |
| Backus Middle School |
FM-200450676 7/23/04 Backus Boiler Room Replace 1" nipple 1 1/2" long. (1) 1" gate valve need to be replace, valve is leaking. |
July 23, 2004 |
| Ferebee-Hope Elementary School |
FM-200450688 7/23/04 Ferebee-Hope First floor B-building custodial closet unstop sink was plunged; First floor C-building by custodial closet replace missing urinal; Third floor A-building boys bathroom Replace two (2) urinals (broken). |
July 23, 2004 |
| Cardozo High School |
FM-200450695 7/24/04 Cardozo Boiler Room Repair or replace domestic hot water circulating pump, pump has bad shaft. Boilers failed inspection. |
July 24, 2004 |
| Cardozo High School |
FM-200450694 7/24/04 Cardozo Boiler Room Boiler #1 Repair mud drum leaking. Boilers failed inspection. Asbestos Code A - Clear for repairs on 09/27/05. Tidewater - Philp Connolly (RG 09/28/05) |
July 24, 2004 |
| Patricia R Harris Ed Center |
FM-200450718 7/25/04 Harris,P.R. Stairwell #5 Repair or replace broken fan shaft and pulley on air handle-unit #22 at stairwell #5 ground floor level. Type M17, make: Trane Unit J Balance- K Serial # K4E258233 Front shaft bearing (Seal Master) TFT- 23TC-1 1 7/16 Rear shaft bearing (Seal Master) TFT- 23TC - 1 1 7/16 Part # 7009542 |
July 25, 2004 |
| Eastern High School |
FM-200450755 7/26/04 Eastern First floor auditorium Foot lights on stage is smoking when in use. |
July 26, 2004 |
| Stanton Elementary School |
FM-200450730 7/26/04 Stanton Boiler Room Repair or replace sump pump in Boiler Room. Boiler Room flooded. |
July 26, 2004 |
| Terrell Mc ES |
FM-200450753 7/26/04 Terrell, M.C. Boiler Room Repair or replace compressor, Compressor keep cutting off. When compressor goes off, you have to reset it. |
July 26, 2004 |
| Eastern High School |
FM-200450778 7/26/04 Eastern - Greenhouse Repair itrigation watering system for greenhouse to water plants and flowers - watering system not working. |
July 26, 2004 |
| Eastern High School |
FM-200450769 7/26/04 Eastern Across from B-37 and across from 153 Furnish and install broken face bowl - in bathroom in annex and custodial closet sink across from B-37. |
July 26, 2004 |
| Eastern High School |
FM-200450760 7/26/04 Eastern Rooms 152, 153, 150 and 154 Repair or replace double pane in classrooms, additional windows were broken this weekend - 5-1-04. Plus wire mesh windows for classrooms. Replace windows with windows guards on annex. if possible they break window every week. Rooms 152, 153 has holes straight thru windows water coming in when raining. |
July 26, 2004 |
| Eastern High School |
FM-200450759 7/26/04 Eastern Across from B-78, B-42 and B-35 Replace sinks at two (2) bathrooms across from B-78 and B-42. Replace closet custodial sink, replace sink in custodial closet; big hole in it, replace urinal in boys bathroom from B-79- Replace or repair handle tail pipe- leaking water bad. Repaie leaking urinal in boys bathroom from B-79. Men bathroom across from (144) leaking urinal from bacl of both urinals. (creating a bad odor). |
July 26, 2004 |
| Garrison ES |
FM-200450851 7/27/04 Garrison Boiler Room Calibrate burner on Boilers #1 thru #4. Boilers failed D.C. Inspection. |
July 27, 2004 |
| Murch Elementary School |
FM-200450845 7/27/04 Murch Boiler Room Remove master control (timer) on Boilers #1 thru #5. Boilers failed D.C. Inspection. |
July 27, 2004 |
| Stoddert ES |
FM-200450826 7/27/04 Hearst Boiler Room (Tunnel Area) Repair ruptured main steam line 4" or 6"service line. |
July 27, 2004 |
| Garfield ES |
FM-200450836 7/27/04 Garfield Repair 3/8"x1/2" supply line on lavatories boys and girls. |
July 27, 2004 |
| Bunker Hill Elementary School |
FM-200451072 7/28/04 Bunker Hill ES - Boiler Room Boilers #1  Replace vapor stat |
July 28, 2004 |
| Bunker Hill Elementary School |
FM-200451074 7/28/04 Bunker Hill ES - Boiler Room Boilers #2 Calibrate burner |
July 28, 2004 |
| Seaton Elementary School |
FM-200451069 7/28/04 Seaton ES - Boiler Room Domestic hot water circulating pump leaking |
July 28, 2004 |
| Bunker Hill Elementary School |
FM-200451075 7/28/04 Bunker Hill ES - Boiler Room Pump-Heating hot water, leaking |
July 28, 2004 |
| Hine JHS |
FM-200450922 7/28/04 Hine First floor room 107 Refurbish wood shop to be used as classroom. (paint, replace ceiling tile, etc...) Code A-clear for repair by DCPS Charles Buchanan on 8/04/04 |
July 28, 2004 |
| Johnson JHS |
FM-200450971 7/28/04 Johnson AHU-A,B,C Section Repair air handler unit -A,B,C Section of building. |
July 28, 2004 |
| Johnson JHS |
FM-200450960 7/28/04 Johnson School Cutting of grass |
July 28, 2004 |
| Hine JHS |
FM-200450924 7/28/04 Hine Second floor room 201 Refurbish home making room to be used as classroom. (remove gas stove,paint, replace ceiling tile, etc...) Code A-clear for repair by DCPS Charles Buchanan on 8/04/04 |
July 28, 2004 |
| Bunker Hill Elementary School |
FM-200451060 7/28/04 Bunker Hill ES - Boiler #2 Replace casing insulating |
July 28, 2004 |
| West Elementary School |
FM-200450908 7/28/04 West Boiler Room Repair or replace stand by chill water pump, inoperable. Pump failed inspection. |
July 28, 2004 |
| West Elementary School |
FM-200450909 7/28/04 West Boiler Room Repair or replace head on house air compressor, one of the heads are bad. Compressor failed inspection. |
July 28, 2004 |
| West Elementary School |
FM-200451023 7/28/04 West Second floor ESL room The roof is leaking in the ESL classroom and the ceiling is falling. |
July 28, 2004 |
| Cook J.F. Elementary School |
FM-200451137 7/29/04 (Cook, J.F.) Replace Windows in the following area: 1. Window in balcony door. 2. Window in book case room #202. 3. Window in book case room #205. 4. Two (2) window in book case room #203 5. One (1) window in front door room #302 6. One (1) window in book case room #322 7. Three (3) window in book case room #304. 8. One (1) window in book case room #305. 9. One (1) window in book case room #301. |
July 29, 2004 |
| Spingarn High School |
FM-200451095 7/29/04 Spingarn- Boiler Room Boiler #3 - Replace refractory on door. |
July 29, 2004 |
| Patricia R Harris Ed Center |
FM-200451141 7/29/04 (Harris, P.R.) HEALTH CODE VIOLATION; Kitchen: Repair lights in walk-in unit. |
July 29, 2004 |
| Terrell Mc ES |
FM-200451086 7/29/04 Terrell, M.C. Roof There is a lot of water standing on the roof. the water is leaking in the hallway and the kindegarten area. |
July 29, 2004 |
| Patricia R Harris Ed Center |
FM-200451088 7/29/04 (Harris, P.R.) HEALTH CODE VIOLATION: Kitchen: Repair damaged door in order to prevent rodent entry. August 02, 2004: Call of concern came today. Code A-clear for repair by DCPS Charles Buchan on 7/10/04 |
July 29, 2004 |
| Walker-Jones EC |
FM-200451127 7/29/04 Walker-Jones . ES- Boiler Room Boiler #1 & #2 - Callibrate burners |
July 29, 2004 |
| Gage-Eckington ES |
FM-200451051 7/29/04 Gage Eckington Boiler room Install Vent valve on boilers # 1&2 |
July 29, 2004 |
| Davis Elementary School |
FM-200451130 7/29/04 Davis First and second floor boys and girls bathroom new wing Replace about six (6) faucets in bathrooms that are in bad condition, |
July 29, 2004 |
| Rudolph Elementary School |
FM-200451150 7/30/04 Rudolph Repair gas line leak on boiler # 2. |
July 30, 2004 |
| Woodson High School |
FM-200451151 7/30/04 Woodson H.D. Check and make correction chiller is not cooling. |
July 30, 2004 |
| Stanton Elementary School |
FM-200451155 7/30/04 Repair Domestic hot water heater |
July 30, 2004 |
| Johnson JHS |
FM-200451219 7/31/04 Johnson Roofing Shop Fabrication covering for serveral univents fourth floor / as follows rooms #422,#419,#420,#423,#424,#416; Third floor (2) covers for convertor in stairway bothsides, on this floor some classrooms do not have number, so I use the Locker next to the room. Lockers as follow #3247, #3038,#3218 and #330. |
July 31, 2004 |