Urgent Repair Requests Opened in August 2002 (13)
| School |
Description |
Open Date |
| Spingarn High School |
FM-200213460 8/2/02 Spingarn 1. Asbestos Assessment Reqd. Basement Record Room 2. Repair existing hole in the bathroom ceiling and paint. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) |
August 2, 2002 |
| Thomas Elementary School |
FM-200213561 8/5/02 Thomas 1. Asbestos Assessment Reqd. 3rd Floor Room 302 & Girls' Restroom 2. There are wall leaks, source unknown----need to have problem identified and repairs made. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) |
August 5, 2002 |
| Spingarn High School |
FM-200213596 8/6/02 Spingarn ****Urgent**** 1st Floor North Side Stairway #5 1. Fire door is off the hinges and needs to be rehung; and 2. The wire-mesh glass needs to be replaced. |
August 6, 2002 |
| Green Elementary School |
FM-200213993 8/9/02 Green ****Urgent**** Room 109 [St. John] Replace steady, continuously leaking faucet in the above room. Asbestos Code A - Clear for repairs on 08/09/02. DCPS-Safety - Richard Gibson (RG 08/09/02) |
August 9, 2002 |
| Turner Elementary School |
FM-200214001 8/12/02 Turner 1. Asbestos Assessment Reqd. 2nd Floor Room 205 2. Install new security doors in room 205---the room will be used to house technical equipment for the summer. POC: Ms. Parker, Principal Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) |
August 12, 2002 |
| Turner Elementary School |
FM-200214220 8/13/02 (Turner) 1. Asbestos assessment required. Need locks on all electric panel boxes through-out building. (Someone keeps cutting off switches in boxes. Asbestos Code A - Clear for repairs on 08/19/02. DCPS Safety - Leroy Minton Jr (RG 08/19/02) |
August 13, 2002 |
| Garfield ES |
FM-200215035 8/19/02 Garfield 1st Floor Level Building Exterior Roofing/New Wing Three areas outside rooms 101 & 102 have roofing that is in need of repair. Due to standing water and erosion, the areas have sharp edges and the students can reach these areas [safety hazard]. |
August 19, 2002 |
| Coolidge High School |
FM-200216065 65 8/28/02 Coolidge/Frank Williams Center ***Urgent**** Roof leak is coming through the gym ceiling when it rains, and causing a leaking problem in room 316. The cause of the roof leak has not been identified. The fall school session starts on next Tuesday and we would like the problem not to expand into other areas. |
August 28, 2002 |
| Coolidge High School |
FM-200216149 49 8/29/02 (Coolidge) ***Urgent*** Front side of building/3rd Floor: Water leaking from roof down in-to room #309. |
August 29, 2002 |
| Patricia R Harris Ed Center |
FM-200216281 8/30/02 Brightwood Asbestos Assessment Reqd. Main Office Level Install a 250v receptacle [3-prong] to support new copy machine. Note: Confirm area of placement in field. Asbestos Code A - Clear for repairs on 09/03/02. DCPS Safety - Leroy Minton Jr. (RG 09/04/02) |
August 30, 2002 |
| Browne Junior High School |
FM-200216284 8/30/02 Browne Asbestos Assessment Reqd. 1st & 2nd Floors, Rooms 100 & 200 Install electrical line in both areas to support new copier machines. Asbestos Code A - Clear for repairs on 09/03/02. DCPS Safety - Leroy Minton Jr. (RG 09/04/02) |
August 30, 2002 |
| Stevens Elementary School |
FM-200216250 8/30/02 Stevens 1. Asbestos Assessment Reqd. 3rd Floor Hallway by Room #31 2. Repair hole in the wall by room #31; and 3. Repair breach in plaster in the southside hallway. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) |
August 30, 2002 |
| Stevens Elementary School |
FM-200216248 8/30/02 Stevens 1. Asbestos Assessment Reqd. 3rd Floor Middle of Hallway Repair/replace loose, stained ceiling tiles. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) |
August 30, 2002 |
Routine Repair Requests Opened in August 2002 (43)
| School |
Description |
Open Date |
| Hendley Elementary School |
FM-200213401 1 8/1/02 Hendly 1. Asbestos Assessment Reqd. Basement Kitchen/Cafeteria 2. Repair ceiling over window where the plaster has fallen (two locations). Asbestos code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 8/08/02 DCPS Charles Buchanan |
August 1, 2002 |
| Ludlow-Taylor ES |
FM-200213433 0213433 8/1/02 Ludlow-Taylor 2nd Floor Rooms 211 & 213 Replace burned out ballasts----can still detect the burned odor. |
August 1, 2002 |
| Spingarn High School |
FM-200213458 8/2/02 Spingarn 1. Asbestos Assessment Reqd. 1st Floor Corridors & Classrooms 2. Paint all classrooms and corridor doors on the first floor---use paint in the existing color. Asbestos code A-clear for repair by Horne Engineer ( stephen Caldwell/Edward Rodriguez ) on 8/20/02 Charles E. Buchanan |
August 2, 2002 |
| Thomas Elementary School |
FM-200213562 8/5/02 Thomas 1. Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors/Counselor's Suite, Partitions, Adult Restroom, Exit and Exterior Doors 2. Need an authorization to paint the above listed areas [work to be executed by school staff]. 2. There are wall leaks, source unknown----need to have problem identified and repairs made. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/Edward Rodriguez On 9/05/02 DCPS Charles E. Buchanan |
August 5, 2002 |
| Wilson High School |
FM-200213548 8/5/02 Wilson,W. 1. Asbestos Assessment Reqd. 1st Floor Boys' Locker Room 2. Paint lockers in boys' locker room. 2. Install a dedicated electric line with receptacle and a 220v window a/c unit [unit on site]. Lead & Asbestos Code A - Clear for repairs on 08/06/02. Horne Engineering - Stephen Caldwell\Philp Connolly (RG 08/08/02) |
August 5, 2002 |
| Hine JHS |
FM-200213536 8/5/02 Hine Room #408 Fashion and install drip pan for univent, water leaks on floor when unit is in use. |
August 5, 2002 |
| Gage-Eckington ES |
FM-200213626 M-200213626 8/6/02 Gage-Eckington ****Emergency/BREAK-IN**** 2nd Floor Cafeteria Replace skylight in the cafeteria that was broken during a break-in. |
August 6, 2002 |
| Spingarn High School |
FM-200213770 8/7/02 Spingarn 1. Asbestos Assessment Reqd. Basement/custodian's Office Restroom 2. Repair hole in the ceiling and paint. Asbeastos/Lead code Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) 8/09/02 DCPS Charles Buchanan |
August 7, 2002 |
| Hyde Elementary School |
FM-200213767 8/7/02 Hyde Building Exterior [West Side] Overlooking the Playground A floodlight has fallen off the building and the other is not working on the west-side of the building. |
August 7, 2002 |
| Seaton Elementary School |
FM-200214036 8/12/02 Seaton 1st Through 3rd Floor Boys' Restroom Remove Bradley basins in boys' restroom from 1st through 3rd floors [No Penetration for the removal]. |
August 12, 2002 |
| Aiton Elementary School |
FM-200214084 8/12/02 Aiton 1. Asbestos Assessment Reqd. 2nd Floor Boys' Toilet 2. Repair plaster ceiling where it has fallen. Asbestos/LeadCode A-clear for repair by Horne Engineer ( Edward Rodriguez ) Charles Buchanan on 8/13/02 |
August 12, 2002 |
| Turner Elementary School |
FM-200214144 8/13/02 Turner 2nd Floor/Old Wing 1. Three (3) urinals in the boys' restroom are not working; 2. The sink next to the wall supply line leaks; 3. One sink in the girls' restroom is not working; and 4. The toilet next to the wall in the teachers' lounge needs a new spud. |
August 13, 2002 |
| Johnson JHS |
FM-200214234 8/13/02 Johnson 1st & 2nd Floors/Main Office [B-wing Area] There are 11 new a/c units on site to replace a/c units that were previously removed in the following rooms: Main Office=4 units Rms. 200 through 204=1 unit each [5 units] Total units to be placed=9 |
August 13, 2002 |
| Turner Elementary School |
FM-200214139 8/13/02 Turner 1st Floor Boys & Girls' Restrooms/Old Wing 1. Urinals 1, 3 & 5 are not flushing properly and need new flush valves; 2. #6 toilet in girls' restroom is stopped up and needs clearing. |
August 13, 2002 |
| Emery Elementary School |
FM-200214138 8/13/02 Emery Library Survey, isolate leak, and make necessary repairs to ruptured 3/4" galvanize supply to a/c unit in library. |
August 13, 2002 |
| Patricia R Harris Ed Center |
FM-200214318 8/14/02 Harris,P.R. 1. Asbestos Assessment Reqd. Stairwell #4 2. Removal of floor tiles and mastic/restoration. Asbestos Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) Charles Buchanan on 8/16/02 |
August 14, 2002 |
| Eastern High School |
FM-200214314 8/14/02 Eastern Roof Furnish & install bearings for exhaust fan on roof. INFO: Power Line Fans, model: 245BRE8K, CFM - 3880, SP-7/8, RPM - 755, HP - 1-1/2, P - 3., VLT - 208. |
August 14, 2002 |
| Whittier Elementary School |
FM-200214842 8/16/02 Whittier 1. Asbestos Assessment Reqd. 1st Floor Health Suite 2. Plaster bathroom wall. 2. Plaster damaged spot in ceiling. Asbestos/Lead code A-clear for repair by Horne Engineer ( Troy Welcome/Edward Rodriguez ) on 8/20/02 Charles E. Buchanan |
August 16, 2002 |
| Browne Junior High School |
FM-200214900 8/16/02 Browne 1. Asbestos Assessment Reqd. Throughout Building 2. No electrical outlets were install when the windows were replaced. Asbestos code A-clear for repair by Horne Engineer (Philip Connolly ) on 8/20/02 Charles E. Buchanan |
August 16, 2002 |
| Garfield ES |
FM-200215021 21 8/19/02 Garfield 1. Asbestos Assessment Reqd. 1st Floor Main Bldg. Room 1B 2. Plastering needed in room 1B due to water damaged from ceiling to floor. Asbestos Code A-clear for repair by Horne Engineer Troy Wilcome/ Edward Rodriguez on 8/22/02 DCPS Charles E. Buchanan |
August 19, 2002 |
| Cook J.F. Elementary School |
FM-200215307 8/19/02 (Cooke, J.F.) NONE OF THE ELECTRICAL OUTLETS IN THE CLASSROOM ARE NOT WORKING. Requester Phone: 673-7221 |
August 19, 2002 |
| Merritt Middle School |
FM-200214948 8 8/19/02 Merritt Throughout Building The handrailings throughout the building are in desperate need of repiar. Some of them are hanging from the walls, others have broken or missing screws, and the holes around screws have enlarged in others from constant use over long periods of time. |
August 19, 2002 |
| Spingarn High School |
FM-200214930 8/19/02 Spingarn 1. Asbestos Assessment Reqd. Basement rap Room #25 2. Remove & replace existing water-damaged carpeting. Asbestos Code A-clear for repair by Horne Engineer Sheryll James on 8/26/02 DCPS Charles E. Buchanan |
August 19, 2002 |
| Garfield ES |
FM-200215028 8/19/02 Garfield D Wing Exterior/Demountables Replace exterior lighting at the rear of demountables, broken due to vandalism. |
August 19, 2002 |
| Emery Elementary School |
FM-200215314 8/19/02 (Emery) 1. Asbestos assessment required. 3rd floor hallway water fountain leaking from the bottom. Three fountain leaking. Requester Phone: 5766034 Asbestos Code A - Clear for repairs on 04/29/03. Horne Engeering - Bipin Nanavaty (RG 04/30/03) |
August 19, 2002 |
| Cook J.F. Elementary School |
FM-200215308 8/19/02 (Cook, J.F.) CEILING LIGHT CONTINUES TO BLINK. FLUORESCENT BULB HAS BEEN CHANGED,AND THE BULB CONTINUES TO BLINK. Requester Phone: 673-7221 |
August 19, 2002 |
| Roosevelt High School |
FM-200215170 170 8/20/02 Roosevelt Swimming Pool Filtration Room Repair door jamb and other hardware to allow filtration room door to close. |
August 20, 2002 |
| Shaw JHS |
FM-200215157 8/20/02 Repair or replace sump pump motor and float ball . motor make: Westinghouse ser.# 31P162A SER FM 73 Type FS; HP1/2 ; FR B566 SF 1.25; AMB 40c; volts 240/460; Amp.2.8 Hz 60 |
August 20, 2002 |
| Young Elementary School |
FM-200215285 8/21/02 Young 1. Asbestos Assessment Reqd. 1st and 2nd Floors/Centers 2, 3 and Multi-Purpose Room 2. Repair or replace the plaster in Centers 2, 3 and multi-purpose room. The plaster is puckering and peeling on the lower part of the walls. AsbestosLead Code A-clear for repair by Horne Engineer Sheryll James/ Edward Rodriguez on 8/26/02 DCPS Charles E. Buchanan |
August 21, 2002 |
| Patricia R Harris Ed Center |
FM-200215288 8/21/02 Harris P. R. - Patterson 3rd Floor Boys' Room Stairwells Repair or replace light fixture---Tombstone broke. |
August 21, 2002 |
| Turner Elementary School |
FM-200215320 8/22/02 (Turner) 1. Asbestos assessment required. 2nd & 3rd Floors/Rooms #211 & 310: Repair light fixture in custodias closet, ballast has gone bad. Asbestos Code A-clear for repair by Horne Engineer Sam Ebrahim 8/23/02 DCPS Charles E. Buchanan |
August 22, 2002 |
| Takoma Educational Center |
FM-200215491 8/23/02 Tokoma Second and Third Floor - Bathrooms - 147,148,126,127,222,221,200 and 199. 1) Minor adjustments needed on the Bradley Basin in the students restrooms. Daniel Hodges - 202-581-7025 H&M Supply Co. Inc |
August 23, 2002 |
| Shaed Elementary School |
FM-200215412 8/23/02 Shead Headstart room/Library Air flow issues- problem with motor/univent in Headstart room/Library. |
August 23, 2002 |
| Truesdell Elementary |
FM-200215658 8/27/02 Truesdell Second Floor - Principal Office 1) Replace ceiling tile..tile is falling out out ceiling. ( 12x12) Asbestos Code A-clear for repair 8/27/02 by DCPS Charles E. Buchanan HA 063 Ceiling Tile White Fissured1X1 No Asbestos HA 064 Ceiling Tile White Textured With Holes No Asbestos HA 065 Ceiling Tile White Randon Dotted Large and Small Pinholes No Asbestos HA 066 Ceiling tile mastic Brown No Asbestos |
August 27, 2002 |
| Maury Elementary School |
FM-200216151 8/29/02 Maury Second Floor - Special Ed 1) Replace ( 5 ) broken window in special ed. (1) broken window in room (8). |
August 29, 2002 |
| Truesdell Elementary |
FM-200216118 8/29/02 (Truesdell) !!Emergency) 3rd Floor/Hallway: Ceiling leaking from roof leak, causing large portions of ceiling tile to fall. |
August 29, 2002 |
| Walker-Jones EC |
FM-200216099 8/29/02 Walker Jones Corridor near main office Furnish and replace ceiling tiles in corridor near main office. |
August 29, 2002 |
| Ferebee-Hope Elementary School |
FM-200216133 8/29/02 Ferebee-Hope Emergency !! 4th Floor - Common Area 1) Pipes is leaking in the ceiling..water coming down hard.. |
August 29, 2002 |
| Birney Elementary School |
FM-200216276 8/30/02 Birney Asbestos Assessment Reqd. 3rd Floor Level/Exit 2 Stairway Repair breach in the wall. POC: Robert Gillespie Asbestos Code A-clear for repair by Horne Engineer Sharon Voss On 9/05/02 DCPS Charles E. Buchanan |
August 30, 2002 |
| Thomas Elementary School |
FM-200216163 8/30/02 (Thomas) 1st FLoor Boys' & Girls' Toilets & 2nd Floor Girls' Restroom (Old Wing) 1. Unstop clogged urinal in boys' restroom; and 2. Unstop toilet in girls' restroom, and 3. Repair sink that needs a trap in the 2nd floor girls' restroom. |
August 30, 2002 |
| Stevens Elementary School |
FM-200216258 8/30/02 Stevens Room 22 Coat Closet Coat closet needs hooks. |
August 30, 2002 |
| Stevens Elementary School |
FM-200216232 8/30/02 Stevens 1. Asbestos Assessment Reqd. Basement #B2 [Art Room]/3rd Floor Room #35 2. Paint is peeling in the basement art room & room 35---scrape (?) and repaint. . Lead & Asbestos Code A - Clear for repairs on 09/03/02. Horne Engineering - Edward Rodriguez (RG 09/04/02) Asbestos Code A-clear for repair by Horne Engineer Edward Rodriguez On 9/05/02 DCPS Charles E. Buchanan |
August 30, 2002 |
| Stevens Elementary School |
FM-200216261 8/30/02 Stevens Room 31 The map that fits above the chalkboard needs to be remounted. |
August 30, 2002 |