Routine Repair Requests Opened in August 2003 (86) | School | Description | Open Date |
| Wilson High School | FM-200334114 8/1/03 Wilson, W. First floor Girls locker room Repair exit door in back of locker room. Fire code violation Asbestos Code A - Clear for repairs on 08/01/03. Horne Engineering - Troy Wilcome (RG 08/05/03) | August 1, 2003 |
| Amidon Elementary School | FM-200334158 8/1/03 (Amidon) Stairway #4: Water running down the wall from the roof. Asbestos Code A - Clear for repairs on 08/04/03. Horne Engineering - Troy Wilcome (RG 08/05/03) | August 1, 2003 |
| Garfield ES | FM-200334226 8/4/03 Garfield Second And Third Floor 1. Install new 2 x 4 ceiling tiles in the hallways and classroom areas on 2nd & 3rd floor . Asbestos Code A - Clear for repairs on 08/04/03. Horne Engineering - Philp Connolly (RG 08/13/03) | August 4, 2003 |
| Woodson High School | FM-200334223 8/4/03 Woodson Boiler Room Boiler room drain stop up, water on floor. Please unstop drain. | August 4, 2003 |
| Lafayette Elementary School | FM-200334214 8/4/03 Lafayette Second floor team 3 Repair and plaster ceiling above 3rd column to right. Lead & Asbestos Code A - Clear for repairs on 08/05/03. Horne Engineering - Edward Rodriguez (RG 08/06/03) | August 4, 2003 |
| Woodson High School | FM-200334229 8/4/03 Woodson Physical Heating Plant Repair #1 and #2 air compressor and air check compressor are not able to reach desired 60 pounds for the operation of pneumatic zones. Only 30 pounds can be maintained these are alternating air compressors this is not efficient to operation of compressors. | August 4, 2003 |
| Whittier Elementary School | FM-200334206 8/4/03 Whittier First floor hallway new and old side Replace door closure, is broken at the tip. Asbestos Code A - Clear for repairs on 09/12/03. Horne Engineering - Bipin Nanavaty (RG 09/15/03) | August 4, 2003 |
| Whittier Elementary School | FM-200334201 8/4/03 Whittier Second floor room 213 and first floor room 115 Need classroom door hard to open. Room 115 is stuck in close position. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Bipin Nanavaty (RG 09/15/03) | August 4, 2003 |
| Woodson High School | FM-200334225 8/4/03 Woodson Elevator Room / Penthouse Replace (1) window A/C unit in the Penthouse Elevator Room, unit not working properly. A/C window unit is needed to cool all senors for properly operation of #1 and #2 elevator. | August 4, 2003 |
| Payne Elementary School | FM-200334439 8/5/03 Payne First floor New wing Door closurer need to be replaced 0r repaired. Asbestos Code A - Clear for repairs on 09/12/03. Horne Engineering - Ray Agnant (RG 11/12/03) | August 5, 2003 |
| Bunker Hill Elementary School | FM-200334394 8/5/03 Bunker Hill Second floor west wing outside Repair gutter. Water pours over side of building when it rains. | August 5, 2003 |
| Bunker Hill Elementary School | FM-200334398 8/5/03 Bunker Hill Middle wing outside 2 water leaks Repair gutter and down spout to stop water led in run. Water iruns down side of building when it rains hard, seeping through walls causing leaks in ceiling in room 111. | August 5, 2003 |
| Woodson High School | FM-200334434 8/5/03 Woodson, H.D. Plaza Paint main office, rooms 1, 2, 3 and 4, work room, corridor hall, teachers resource room center and conference room.Repair or replace lights ballasts inthe following Areas: Lead & Asbestos Code A - Clear for repairs on 08/06/03. Horne Engineering - Edward Rodriguez (RG 08/07/03) | August 5, 2003 |
| Turner Elementary School | FM-200334328 8/5/03 Turner Boiler Room Replace city water line in boiler room, leading to domestic tank and to kitchen line, 3/4" line- about 20' long. Line have three different breaks in it. | August 5, 2003 |
| Simon Elementary School | FM-200334653 8/7/03 Simon Boiler Room Boiler #1 and #2 need chemical cleaning due to scale buildup, lack of treatment.Failed D.C. Inspection. | August 7, 2003 |
| Webb Elementary School | FM-200334620 8/7/03 Webb First floor room 149 Install AC unit 28000 (BTU) and install holding cage or platform. Asbestos Code A - Clear for repairs on 08/07/03. Horne Engineering - Sheryll James (RG 08/08/03) | August 7, 2003 |
| Whittier Elementary School | FM-200334705 8/8/03 Whittier First floor hallway (new side) Repair structure damage to wall over converter. Asbestos Code A - Clear for repairs on 08/12/03. Horne Engineering - Philp Connolly (RG 08/13/03) | August 8, 2003 |
| Gage-Eckington ES | FM-200334700 8/8/03 Gage-Eckington Second floor kitchen walk in box Walkin box is very hard to open, Do to rubbing the floor when trying to open. Floor needs sanded down or box needs cut at bottom. | August 8, 2003 |
| Whittier Elementary School | FM-200334706 8/8/03 Whittier Basement boys restroom Repair or replace flush valve on urinal and spud. no isolated. | August 8, 2003 |
| Wilson High School | FM-200334687 8/8/03 Wilson, W Boiler Room Make necessary repairs to Burnner Corporation Water Conditioning Equipment; Model no. BD-120; Serial No. B-0791000-E & B-0791000-I. No Asbestos in this area | August 8, 2003 |
| Tubman Elementary School | FM-200334691 8/8/03 Tubman Third floor room 306 Water leaking into classroom /coming from roof when it rain. | August 8, 2003 |
| Wilson High School | FM-200334683 8/8/03 Wilson, W Boiler Room Replace missing modulating motor to #2 Burner; Air - Fuel Control Motor. Part No. - M80JAC-3. No Asbestos in this area. | August 8, 2003 |
| Davis Elementary School | FM-200334712 8/8/03 Davis Boiler Room Seal area around outside coal shute, water enters boiler room each time it rains. | August 8, 2003 |
| Ballou Senior High School | FM-200338602 8/8/03 (Ballou) Repair exsisting compressor in auto technology shop. Check toggle switch for proper operation | August 8, 2003 |
| Turner Elementary School | FM-200334695 8/8/03 Turner Third floor room 315 Replace broken glass in door. (L26'xw8 3/4") | August 8, 2003 |
| Turner Elementary School | FM-200334909 8/11/03 (Turner) Asbestos Assessment Required. Ceiling peeling in the following rooms: #100, 109, 201, 202, 203, 204, 205, 305, 307, girls restrooms, and new building 1st floor under windows. Lead & Asbestos Code A - Clear for repairs on 08/13/03. Horne Engineering - Edward Rodriguez (RG 08/19/03) | August 11, 2003 |
| Turner Elementary School | FM-200334925 8/12/03 (Turner) Asbestos Assessment Required. Old and New/Through-Out: Need locks on all electrical panel boxes through-out the building; unknown person(s) continues to cut off switches in boxes. | August 12, 2003 |
| Garfield ES | FM-200334921 8/12/03 Garfield Phase II Repairs 1. Clean out/repair yard drain line in front of the auditorium entrance. | August 12, 2003 |
| Turner Elementary School | FM-200334923 8/12/03 (Turner) Roof/Old & New Building: Repair exterior lights on roof, and outside exit doors; lights have been blown out, or broken. | August 12, 2003 |
| Turner Elementary School | FM-200334926 8/12/03 (Turner) 1st Floor Lobby: Repair two hall lights that has a short in them. (Lights will not stay on) | August 12, 2003 |
| Garfield ES | FM-200335024 8/13/03 Garfield Main Building - Corridor 1. Repair - Plaster and paint walls due to water damage . Lead & Asbestos Code A - Clear for repairs on 08/14/03. Horne Engineering - Edward Rodriguez ( RG 08/18/03 ) | August 13, 2003 |
| Bruce-Monroe Elementary School | FM-200335019 8/13/03 Bruce-Monroe Throughout building There is paint peeling from ceilings throughout building needs repair as soon as possible. There are so many places where paint is peeling from the ceiling. On all stairwells in many of the bathrooms on 2nd and 3rd floors. Lead & Asbestos Code A - Clear for repairs on 08/21/03. Horne Engineering - Edward Rodrigues (RG 08/22/03) | August 13, 2003 |
| Bruce-Monroe Elementary School | FM-200335144 8/13/03 Bruce-Monroe Second floor center 201 boys restroom Repair leak in ceiling. Plaster is falling. Asbestos Code A - Clear for repairs on 08/21/03. Horne Engineering - Roger Kager (RG 08/22/03) | August 13, 2003 |
| Thomas Elementary School | FM-200335148 8/13/03 Thomas Second floor girls and boys restroom Survey rehang or replace partition doors. Code A-clear for repair by DCPS Charles Buchanan on 8/14/03 | August 13, 2003 |
| Powell Elementary School | FM-200335159 8/13/03 (Powell) Asbestos Assessment Required. Stress cracks on the 2fl old side and 1fl old side hallways and class rooms. Need to be patched up and painted. Asbestos Code A - Clear for repairs on 08/19/03. Horne Engineering - Roger Kager (RG 08/19/03) | August 13, 2003 |
| Bruce-Monroe Elementary School | FM-200335107 8/13/03 (Bruce-Monroe) Old Gym Area: 1st Floor: Multiple windows damaged by vandals; this is a building not being used. | August 13, 2003 |
| Reed LC | FM-200335056 8/13/03 Reed, Marie Second floor center 2 Mr. Fereguson/ Ms. Sherod Reseal classroom windows due to water enterind whenever it rain. (A total of two (2) windows). | August 13, 2003 |
| Ballou Senior High School | FM-200335213 8/14/03 Ballou First floor Boys restroom Repair ceiling in area damage from restroom above. Asbestos Code A - Clear for repairs on 08/15/03. Horne Engineering - Tony Marcolin (RG 08/18/03) | August 14, 2003 |
| Walker-Jones EC | FM-200335206 8/14/03 Walker-Jones Second floor near teachers lounge Repair hole in the ceiling. Asbestos Code A - Clear for repairs on 08/15/03. Horne Engineering - Tony Marcolin (RG 08/18/03) | August 14, 2003 |
| Ballou Senior High School | FM-200335199 8/14/03 Ballou First Floor center section Survey and repair the following rooms 104 and 105 for roof leaks. | August 14, 2003 |
| Kimball Elementary School | FM-200335218 8/14/03 Kimball Second floor room 205 Scrape and paint wall / ceiling. Lead & Asbestos Code A - Clear for repairs on 08/20/03. Horne Engineering - Edward Rodriguez (RG 08/21/03) | August 14, 2003 |
| Ketcham Elementary School | FM-200335236 8/14/03 Ketcham Boiler Room Replace electric blow down valve on domestic hot water heater, tank is mark, valve is not holding. | August 14, 2003 |
| Langdon Elementary School | FM-200335335 8/15/03 Langdon Boiler Room Boiler #2 replace (1) 157-5 pump control and low water cut off. | August 15, 2003 |
| Watkins Elementary School | FM-200335398 8/15/03 Watkins ( ARE) Health Code Violation Room - 417 1) Remove chipped paint and plaster. Department of Health Health Regulation Administration Child & Residential Care Facilities Division Lead & Asbestos Code A - Clear for repairs on 08/18/03. Horne Engineering - Edward Rodriguez/Tony Marcolin (RG 08/20/03 | August 15, 2003 |
| Patricia R Harris Ed Center | FM-200335364 8/15/03 Harris, P.R. Room - 115 1) Paint classroom and remove and install carpet Lead & Asbestos Code A - Clear for repairs on 08/20/03. Horne Engineering - Edward Rodriguez (08/21/03) | August 15, 2003 |
| Tyler Elementary School | FM-200335589 8/18/03 Tyler Boiler room Make adjustment on burners , there is signs incomplete combustion in the combustion chambers, as per the boiler inspector's request. | August 18, 2003 |
| Simon Elementary School | FM-200335641 8/18/03 Simon Third and second floor When it rain we get rain the water comes inside from the roof and drips down the side of the third floor stairwell and second floor hall in the stairwell. | August 18, 2003 |
| Johnson JHS | FM-200335634 8/18/03 Johnson Third, fourth, first, second floor and basement Thru out bldg. Ceiling tile size 2x4, replace missing and damaged tile in the following areas: Fourth floor room 416 - 4, 421 - 4 and corridor - 2. Third floor room 305 -5, 323 -4, 319 -5, 318 - 5, 315 -3, Library - 7 and third floor corridor -3. Second floor room 202 -5, 227 -3, 213 - 4 and 233 - 4 First floor room 106 -6 Basement floor all and grides, cafeteria -6. Asbestos Code A - Clear for repairs on 08/19/03. Horne Engineering - Bipin Nanavaty (RG 08/20/03) | August 18, 2003 |
| Stanton Elementary School | FM-200335491 8/18/03 Stanton First floor Room 106 The plaster ceiling in this classroom (106) needs repairs, damaged plaster keeps falling-down. Need asbestos assessment in room 106. Asbestos Code A - Clear for repairs on 08/18/03. Horne Engineering - Tony Marcolin (RG 08/19/03) | August 18, 2003 |
| Brookland Elementary | FM-200335620 8/18/03 Brookland First floor cafeteria Replace missing ceiling tile (2 tiles). Asbestos Code A - Clear for repairs on 08/20/03. Horne Engineering - Troy Wilcome (RG 08/20/03) | August 18, 2003 |
| Deal Junior High School | FM-200335547 8/18/03 Deal UpGrade electrical panel to handle A/C units and computers in second and third floor new wing in old building, also wire the following rooms for A/C units ( to include off / on switch ) rooms : #126 , # 124B , 122 and # 102. Asbestos Code A - Clear for repairs on 08/19/03. Horne Engineering - Sharon Voss (RG 08/20/03) | August 18, 2003 |
| Amidon Elementary School | FM-200335627 8/18/03 Amidon Second floor #4 stairwell Ceiling and wall need to be plaster and painted.Alarm needs to be repaired, it does not work at the moment. Lead & Asbestos Code A - Clear for repairs on 08/20/03. Horne Engineering - Philp Connolly (RG 08/21/03) | August 18, 2003 |
| Ferebee-Hope Elementary School | FM-200335699 8/19/03 Ferebee Hope Through-out building Plumber is needed to snake out slow running drain through-out the building,as per Mr.Edwards request. Asbestos Code A - Clear for repairs on 08/20/03. Horne Engineering - Tony Marcolin (RG 08/22/03) | August 19, 2003 |
| Meyer Elementary School | FM-200335661 8/19/03 Meyer Basement Two (2) windows were broken out during the HAP. Need to be replace. | August 19, 2003 |
| Reed LC | FM-200335651 8/19/03 Reed Garage Mech. Room Replace pillow block bearing for R. A. Fan #1. | August 19, 2003 |
| Stanton Elementary School | FM-200335734 8/19/03 Stanton Annex Gutter on the annex has falling off need repair | August 19, 2003 |
| Takoma Educational Center | FM-200335893 8/20/03 Takoma Mech. Room #3 Repair or replace AHU #5 Bottom of unit rusted out all the way through. Size 37" X 61" (W X L) unit supplies air for kindergarden. Hot!!!!! | August 20, 2003 |
| Peabody Elementary School | FM-200335820 0 8/20/03 Peabody Basement lunch room Remove paint chips and loose plaster from wall in lunch room and re-plaster. 6'x15' and 1'x1'. Lead & Asbestos Code A - Clear for repairs on 08/20/03. Horne Engineering - Edward Rodriguez (RG 08/21/03) | August 20, 2003 |
| Nalle Elementary School | FM-200335883 8/20/03 J.C.Nalle Boiler room Replace Domestic hot heater in the boiler room ,unit is rusted out at bottom and leaning to one side. | August 20, 2003 |
| Whittier Elementary School | FM-200335870 8/20/03 Whittier Boiler Room Unstop floor drain in the AUA indicated also at base of exterior entrance. Engineers attempted to unstop with negative result. Area is continuously flooding. | August 20, 2003 |
| Ballou Senior High School | FM-200335819 8/20/03 Ballou Second floor lounge Survey, furnish and repair two (2) commodes in teachers lounge. | August 20, 2003 |
| Coolidge High School | FM-200336096 8/22/03 Coolidge Trane A/C Unit (10 Ton) Replace (2) motors to Trane A/C unit. Motor information: GE Motor; L399AS; 5KCP39SF; Volt 208/230; AMP 5; RPM 1125; HZ 60; F- 1; Cap. CPN-P662340P01; ROT-CAP 25/440; 05-3 | August 22, 2003 |
| Coolidge High School | FM-200336084 8/22/03 Coolidge Biology Lab Repair or replace two (2) condenser fan motors for the biology lab. | August 22, 2003 |
| Whittier Elementary School | FM-200336225 8/25/03 Whittier Third floor 314, 312 stairwell and reading room Replace window 314 has 2 windows broken; 1 window in room 312 and 1 mesh wire glass broken on classroom door; Reading room 2 windows broken; 3rd floor stairwell near room 313 has 2 windows broken. | August 25, 2003 |
| Leckie Elementary School | FM-200336205 8/25/03 (Leckie) First, Second, Third and Basement Replace ballasts and ends for rooms 309, 211B, 211A, 122, 119, 318, 319, 317, 307, PE room and mult-purpose room. Not enough light for students. Asbestos Code A - Clear for repairs on 09/05/03. Horne Engineering - Troy Wilcome (RG09/08/03) | August 25, 2003 |
| Ketcham Elementary School | FM-200336203 8/25/03 Ketcham Boiler Room Boiler #3 replace L.W.C.O. float, float broken off. Boiler failed isnpection. | August 25, 2003 |
| Terrell Mc ES | FM-200336236 8/25/03 Terrell, M.C. Second floor teachers lounge Unclog drain over teachers lounge. | August 25, 2003 |
| Turner Elementary School | FM-200336248 8/25/03 (Turner) 1st Floor/New side: Repair door hinge to exit door on first floor next to room #117. Asbestos Code A - Clear for repairs on 08/26/03. Horne Engineering - Troy Wilcome (RG 08/29/03) | August 25, 2003 |
| Woodson High School | FM-200336188 8/25/03 Woodson Boiler Room Repair or replace Hot/Cold dual circulating pump, pump #15 need motor replace and pump #14 has leaking seal. Both pumps are needed for the heating and cooloing of the center core of the facility. | August 25, 2003 |
| Hart Middle School | FM-200336292 8/26/03 Hart Throughout Building Univent grate covers needed. Grate size: 7 1/2" X 9" singles, total number needed 30 each. | August 26, 2003 |
| Bunker Hill Elementary School | FM-200336299 8/26/03 Bunker-Hill Boys Restroom Replace exhaust fans in boys restroom. The smell of urine throughout the Building. The exhaust fan is broken. | August 26, 2003 |
| Spingarn High School | FM-200336327 8/27/03 Spingarn First floor boys bathroom Requesting hole in ceiling be plaster, due to work that was done on the above floor. Asbestos Code A - Clear for repairs on 08/29/03. Horne Engineering - Troy Wilcome ( RG 09/02/03) | August 27, 2003 |
| Gibbs Elementary School | FM-200336373 8/27/03 Gibbs Second floor library Newly installed A/C needs new outlets installed. | August 27, 2003 |
| Marshall Educational Center | FM-200336359 0336359 8/27/03 Marshall Roof Unclog corrdensate line on AHU for stage 3 on roof. | August 27, 2003 |
| Gibbs Elementary School | FM-200336374 8/27/03 Gibbs First floor Window A/C unit is not working need repairing. | August 27, 2003 |
| Meyer Elementary School | FM-200336390 8/27/03 Meyer Boiler Room Repair or replace circulation pump for hot water. S-M10293 Bell & Gossett M7A794 HP 1/3 Volts 115 | August 27, 2003 |
| Maury Elementary School | FM-200336478 8/28/03 Maury First and second floor Survey and repair leak on landing between 1st and 2nd floor west building. (Plaster ceiling). | August 28, 2003 |
| Eliot Junior High School | FM-200336602 8/29/03 Eloit Roof top unit for the Library Repair A/C unit for the Library , unit will not run. | August 29, 2003 |
| Davis Elementary School | FM-200336577 8/29/03 Davis Basement boys bathroom new wing Furnish and install a new sink, a child broke the old sink off the wall. | August 29, 2003 |
| Johnson JHS | FM-200336587 8/29/03 Johnson Second floor room 213 Repair missing baseboard. Asbestos Code A - Clear for repairs on 08/29/03. Horne Engineering - Edward Rodriguez ( RG 09/02/03 ) | August 29, 2003 |
| Shaw JHS | FM-200336608 8/29/03 Shaw Throughtout bldg. Replace blown ballast thru-out building. 277 rapid start ballasts for 2 and 4 light fixtures. 50 each | August 29, 2003 |
| Browne Junior High School | FM-200336589 8/29/03 Browne First floor auditorium Repair lights. Lights will not come on in back of auditorium. | August 29, 2003 |
| Langdon Elementary School | FM-200336552 8/29/03 Burroughs Boiler Room Re-calibrate gas burners on # 1 and #2 Boilers. Excessive amount of soot. | August 29, 2003 |
| Johnson JHS | FM-200336564 8/29/03 Johnson JHS Kitchen - Disconnect Utilities on Kitchen Equipment 1) Deck Oven. | August 29, 2003 |
| Johnson JHS | FM-200336586 8/29/03 Johnson Third floor room 314 Repair missing baseboard glaze block wall. Asbestos Code A - Clear for repairs on 08/29/03. Horne Engineering - Edward Rodriguez ( RG 09/02/03 ) | August 29, 2003 |
| Thomas Elementary School | FM-200336618 8/30/03 Naval Thamas Pre-K Kindergarten Replace defective shaft Bearing for the air handler unit. | August 30, 2003 |