Urgent Repair Requests Opened in September 2002 (20)
| School |
Description |
Open Date |
| Deal Junior High School |
FM-200216294 9/3/02 Deal 1st Floor Room 110B Repair breach in wall that was caused by a steam leak. The leak has been repaired. Asbestos Code A - Clear for repairs on 09/03/02. DCPS Safety - Leroy Minton Jr. (RG 09/04/02) |
September 3, 2002 |
| Gibbs Elementary School |
FM-200216320 9/3/02 (GIBBS) Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors Throughout Building Exterior doors need to be sealed for safety. POC: Mr. Manigan Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) |
September 3, 2002 |
| Benning Elementary School |
FM-200216319 9 9/3/02 (Benning) !!!Urgent!!! 1. Asbestos assessment required. Ground Floor/Multipurpose room: Repair or replace door that is swollen and very hard to open. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) |
September 3, 2002 |
| Cardozo High School |
FM-200216441 9/4/02 Cardozo Asbestos Assessment Reqd. Basement Auto Shop Replace or repair electrical wiring for outside lighting on the parking lot for security and safety. Asbestos Code A - Clear for repairs on 09/04/02. DCPS Safety - Leroy Minton Jr. (RG 09/05/02) |
September 4, 2002 |
| Patricia R Harris Ed Center |
FM-200216614 9/5/02 Harris,P.R. Asbestos Assessment Reqd. 3rd Floor Rooms 305 Repair or replace door that is sticking. Asbestos Code A - Clear for repairs on 09/05/02. DCPS Safety - Leroy Minton Jr. (RG 09/06/02) |
September 5, 2002 |
| Raymond Elementary School |
FM-200216853 3 9/6/02 Raymond -- First floor - Cafeteria lobby area The walls are in need of plastering urgently before the walls can be painted. Asbesstos/LeadCode A-clear for repair by Horne Engineer Edward Ridgiruez DCPS Charles E. Buchanan on 9/18/02 |
September 6, 2002 |
| Duke Ellington School |
FM-200217113 9/10/02 Ellington ****Urgent**** Asbestos Assessment Reqd. 3rd Floor Room 309 Water is leaking from the ceiling. Asbestos Code A - Clear for repairs on 09/11/02. Horne Engineering - Bipin Nanavaty (RG 09/12/02 |
September 10, 2002 |
| Burrville Elementary School |
FM-200217280 280 9/11/02 Burrville ****Urgent**** Asbestos Assessment Reqd. 1st Floor Research Room by Adult Learning Center The pipe insulation is breaking down and needs to be replaced because Asbestos Code A - Cleared for repairs on 12-02-02 ( LM / 12-02-02) Leroy Minton Jr. Safety Office 202-576-8962. the condensation is ruining the ceiling tiles. There is also a very strong, moldy odor coming from the tiles from the constant dampness. Asbestos Code A - Cleared for repairs on 09-23-02 (LM / 09-23-02) Leroy Minton Jr. Safety Office (202-576-8962). |
September 11, 2002 |
| Watkins Elementary School |
FM-200217590 0 9/16/02 (Watkins) "VERY URGENT" 2nd, 3rd, & 4th Floor: No electrical power in the above area's. (All breakers are on ) |
September 16, 2002 |
| Reed LC |
FM-200217520 9/16/02 Reed LC First floor - Early childhood Repair one door near Mrs. Williams classroom and one door on step 7. Doors will not open. Fire and safety hazard Asbestos Code A-clear for repair by DCPS Charles E Buchanan on 9/17/02 |
September 16, 2002 |
| Wilson High School |
FM-200217687 9/17/02 Wilson,W. Asbestos Assessment Reqd. 1st Floor Library Install eight (8) wall outlets in the library. Asbestos Code A - Clear for repairs on 09/19/02. DCPS Safety - Leroy Minton (RG 09/20/02) |
September 17, 2002 |
| Stuart-Hobson Middle School |
FM-200217640 9/17/02 Stuart-Hobson Asbestos Assessment Reqd. 1st FloorRoom 102 Repair interior masonry wall where cracked under the chalkboard. Asbestos Code A - Clear for repairs on 09/20/02. DCPS Safety - Leroy Minton Jr. (RG 09/24/02) |
September 17, 2002 |
| Patricia R Harris Ed Center |
FM-200217800 9/18/02 Harris P.R. - Patterson Asbestos Assessment Reqd. 3rd Floor Room 360 Replace damaged/missing ceiling tile in room 360. Asbestos Code A - Cleared for repairs on 02-04-03 by Leroy Minton Jr (LM/02-05-03) Safety Office (202) 576-8962. |
September 18, 2002 |
| Ferebee-Hope Elementary School |
FM-200217886 9/19/02 Ferebee-Hope Second floor - D-Building UDC Electrical: Install wall plug by room 207A Asbestos Code A - Clear for repairs on 09/19/02. DCPS Safety - Leroy Minton (RG 09/20/02) |
September 19, 2002 |
| Slowe Elementary School |
FM-200217887 9/19/02 Slowe Asbestos Assessment Reqd. 1st Floor Boys' Restroom Replace bathroom partitions. Asbestos Code A - Clear for repairs on 09/20/02. DCPS Safety - Leroy Minton Jr. (RG 09/24/02) |
September 19, 2002 |
| Wilson High School |
FM-200217976 9/20/02 Wilson, W. Second floor - Room 224 Repair or replace defective crack classroom door. Asbestos Code A - Clear for repairs on 10/18/02. DCPS Safety - Leroy Minton Jr. (RG 10/21/02) |
September 20, 2002 |
| Truesdell Elementary |
FM-200218090 9/23/02 Truesdell First and second floor 1) First floor annex - Repair leaking flush valve around middle urinal. Replace leaking elbow on right sink. 2) First floor Unstop drain so that water fountain may be cut back on. 3) Second floor - Repair leaking flush valve on first and third urinals. Replace leaking flush valve on middle commode. Secure cold water spigot on left basin. Asbestos Code A - Cleared for repairs on 10-17-02 (LM / 10-18-02) Leroy Minton Jr. Safety Office 202-576-8962. |
September 23, 2002 |
| Cardozo High School |
FM-200218147 9/24/02 Cardozo Asbestos Assessment Reqd. Basement & Ground Levels Rooms 1, 3, 11, 13 & Woodshop Furnish and install a/c units in computer labs and woodshop. Asbestos Code A - Clear for repairs on 10/18/02. DCPS Safety - Leroy Minton Jr. (RG 10/21/02) |
September 24, 2002 |
| Shaed Elementary School |
FM-200218411 9/26/02 (Shaed) Rear Entrance: Close off opening just to the right of the entrance doors in the basement area way. This will stop rodents or any undesirables from crawling into the opening. A white drain pipe is currently protruding out of the opening; the opening is metal. Asbestos Code A - Clear for repairs on 10/09/02. DCPS Safety - Leroy Minton Jr. (RG 10/10/02) |
September 26, 2002 |
| Truesdell Elementary |
FM-200218452 9/27/02 (Truesdell) !!!VERY URGENT!!! Main building: Ceiling leaking from the 3rd floor. |
September 27, 2002 |
Routine Repair Requests Opened in September 2002 (78)
| School |
Description |
Open Date |
| Reed LC |
FM-200216390 9/3/02 Reed Ground Floor Boys' Lavatory in Gym Area Replace a spud on urinal in gym area. |
September 3, 2002 |
| Shepherd ES |
FM-200216346 9/3/02 Shepherd Building Exterior 1) Seal and re-paint all exterior doors to prevent leaching and further deterioration. 2) Seal and re-paint all window facing rear playground to prevent leaching and further deterioration. 3} Seal and re-paint all green hand rails to entrances, to match black hand rails to Old Building, Main Entrance None of the doors, windows or rails require scraping or sanding. |
September 3, 2002 |
| Reed LC |
FM-200216389 9/3/02 Reed Ground Floor Guard's Room at Pool Area Replace flange and wax ring for floor-mounted toilet. |
September 3, 2002 |
| Reed LC |
FM-200216387 9/3/02 Reed 2nd Floor Girls' Lavatory by Stairwell #1 Replace flush valve and defective shut-off valve. |
September 3, 2002 |
| Reed LC |
FM-200216386 9/3/02 Reed 1st Floor Early Childhood Lavatory by Stairwell #6 Masonry work is needed to repair a hole in the brick wall made by the plumbers. Area recently cleared [Ref. FM-200203674]. |
September 3, 2002 |
| Maury Elementary School |
FM-200216373 9/3/02 Maury 1st Floor Boys' Restroom Replace cracked urinal, flush valve and stop valve. |
September 3, 2002 |
| Maury Elementary School |
FM-200216360 9/3/02 Maury 2nd Floor Special Education [Rm. 8] Replace 8 broken windows in classroom 8. |
September 3, 2002 |
| Shaed Elementary School |
FM-200216344 9/3/02 Shaed Unclog floor drain in boiler room |
September 3, 2002 |
| Reed LC |
FM-200216391 9/3/02 Reed 2nd Floor Boys' Lavatory by Stairway #3 A wax-ring is needed for a wall-mounted urinal [third urinal]. |
September 3, 2002 |
| Johnson JHS |
FM-200216351 9/3/02 Johnson 1st Floor Gym/Coach's Office The restroom sink is leaking in the coach's office. |
September 3, 2002 |
| Wilson High School |
FM-200216407 9/4/02 Wilson, W Basement - Classroom below Library 1) Repair damaged walls in stairways near 140 due to rain leaks. Asbestos Code A-clear for repair by Horne Engineer Sheryll James On 9/05/02 DCPS Charles E. Buchanan |
September 4, 2002 |
| Plummer Elementary School |
FM-200216476 6 9/4/02 Plummer Asbestos Assessment Reqd. 1st Floor Main Office Install a dedicated electric line in the panel box in the hallway to power the copier machine in the main office. Asbestos Code A-clear for repair by Horne Engineer Sheryll James On 9/05/02 DCPS Charles E. Buchanan |
September 4, 2002 |
| Stevens Elementary School |
FM-200216482 9/4/02 Stevens Third Floor Hall By Room # 31 1) Hallway area has hole in the wall, also southside hallway has plaster breach. Asbestos Code A-clear for repair by Horne Engineer Edward Rodrigiuez On 9/05/02 DCPS Charles E. Buchanan |
September 4, 2002 |
| Stevens Elementary School |
FM-200216484 9/4/02 Stevens Third Floor - Middle Hallway 1) Ceiling tiles are loose and have brown stains. Need to be replaced # Ceiling tile can be replaced already been through asbestos. |
September 4, 2002 |
| Thomas Elementary School |
FM-200216490 9/4/02 (Thomas) 1st & 2nd FLoors Old and New Wings 1. Furnish water coolers to replace water fountains that are not working on the 1st floor in the old wing; and 2. Repair water fountains that are not working on the 2nd floor of the new wing. |
September 4, 2002 |
| Tubman Elementary School |
FM-200216496 9/4/02 Tubman 3rd Floor Room 302 Remove electrical outlets mounted on the classroom wall and one mounted on classroom locker. |
September 4, 2002 |
| West Elementary School |
FM-200216418 9/4/02 West Learning Center - Primary Side 1) Need lights row 3 2nd light, row 7 lights 5,row 3 lights 6. Need ballasts. |
September 4, 2002 |
| West Elementary School |
FM-200216442 9/4/02 West Learning Center - First Floor - (from left to right) 1) 2nd row light 5 3rd row light 7 5th row light 1 6th row light 37th row light 6 Closet by both rooms need ballasts. |
September 4, 2002 |
| West Elementary School |
FM-200216449 9/4/02 West Learning Center - First Floor 1) Closet by 5th class room ( Ms. Booth ) right side learning center from right to left row 3, second light . All need ballasts. |
September 4, 2002 |
| West Elementary School |
FM-200216450 9/4/02 West Learning Center - Copier Room 1) The light over the copier room needs a ballast. |
September 4, 2002 |
| Wilson High School |
FM-200216406 9/4/02 Wilson, W First Floor - Boys and Girls Bathroom - Near 147a and 148a in the Gym Area. 1) Paint Bathrooms. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Eodriguez On 9/05/02 DCPS Charles E. Buchanan |
September 4, 2002 |
| Patricia R Harris Ed Center |
FM-200216642 9/5/02 Harris P. R. - Patterson 2nd Floor Main Entrance Exit door is stuck and hard to push open. |
September 5, 2002 |
| Ferebee-Hope Elementary School |
FM-200216672 9/5/02 Ferebee-Hope E.S Basement Pool Pump Room Replace Chemical Bromine. Chemical feeder not operational. Contractor survey work, price sent to Mr. Tony Law |
September 5, 2002 |
| Thomas Elementary School |
FM-200216687 9/5/02 Nevel Thomas First Floor Cafeteria-Northeast Unit Replace defective trane univent middle shaft bearing. |
September 5, 2002 |
| Patricia R Harris Ed Center |
FM-200216643 9/5/02 Harris, P.R. - Patterson Asbestos Assessment Reqd. 3rd Floor Room 369 Replace ceiling tile [one piece]. Asbestos Code A-clear for repair by Horne Engineer Troy Wilcome DCPS Charles E. Buchanan on 9/06/02 |
September 5, 2002 |
| Kramer Middle School |
FM-200216746 9/6/02 Kramer A/C in classroom needs repair. Breakers keep cutting off. Room gets hot for class size. |
September 6, 2002 |
| Wilson High School |
FM-200216766 9/6/02 Wilson,W. Asbestos Assessment Reqd. Rooms 101, 102, 105 & 227 Paint main office, school bank and asst. principal's office. Lead & Asbestos Code A - Clear for repairs on 09/09/02. Horne Engineering - Edward Rodriguez (RG 09/10/02) |
September 6, 2002 |
| Wilson High School |
FM-200216763 9/6/02 Wilson,W. Asbestos Assessment Reqd. 1st Floor Counselor's Office #103 Paint counselor's office, including sitting area walls. Asbestos/Lead Code A-clear for repair by Horne Engineer Edwards Rodriguez DCPS Charles E. Buchanan on 9/10/02 |
September 6, 2002 |
| West Elementary School |
FM-200216802 9/6/02 West Basement Boiler Room Replace bearing in #2 chill water circulator motor Name-US Elcet. Motor R.P.M 1750 P.H-3 H.P-20 Frame-256T Volts-230/460 Amps-.54-27 |
September 6, 2002 |
| West Elementary School |
FM-200216797 9/6/02 West First floor learning center - 6th grade area (Lights are out) It may be a defective breaker, but custodians cannot find it in the panel box. Please expedite No work can be done in the above area. |
September 6, 2002 |
| Wilson High School |
FM-200216767 9/6/02 Wilson,W. Building Exterior Repair or replace the gutters and downspouts on the building exterior. |
September 6, 2002 |
| Coolidge High School |
FM-200217049 49 9/9/02 Coolidge Third Floor - Room 323 Install light kit in new door. Steel door |
September 9, 2002 |
| Stanton Elementary School |
FM-200217060 9/9/02 Stanton Basement floor girls bathroom fourth toilet not flushing. |
September 9, 2002 |
| Smothers ES |
FM-200217045 45 9/9/02 Smothers All Please install twenty-eight (28) locks cylinders in classroom doors. Locks pin are worn out and are hard to open doors. (unlock doors) |
September 9, 2002 |
| Walker-Jones EC |
FM-200216953 9/9/02 Walker-Jones Second floor open space individual instruction (4) Paint wall and remove tar. Needs to be tost for asbestos. Asbestos Code C abasement Requir Lead Code A-clear for repair by Horne Engineer Philip Connolly DCPS Charles E Buchanan on 9/11/02 |
September 9, 2002 |
| Seaton Elementary School |
FM-200217054 9/9/02 Seaton Lower basement - Boiler room Replace burned out breaker number 3. Effect the use of the exhaust fan and all the outlets in the engineers office. |
September 9, 2002 |
| King M L ES |
FM-200217154 9/10/02 King, M.L. Third floor room 317 classroom Need to have two (2) lockers repaired. Number 3 and 7 |
September 10, 2002 |
| Patricia R Harris Ed Center |
FM-200217180 9/10/02 Davis Room 205 Remove peeling plaster and paint and repair, paint the whole classroom. Lead & Asbestos Code A - Clear for repairs on 09/11/02. Horne Engineering - Bipin Nanavaty (RG 09/12/02 |
September 10, 2002 |
| Browne Junior High School |
FM-200217169 9/10/02 Browne First and second floor Install twenty (20) top pieces of locker trim on the First and second floor. |
September 10, 2002 |
| Davis Elementary School |
FM-200217173 9/10/02 Davis Room 205 Remove peeling plaster and paint and repair, paint the whole classroom. Lead & Asbestos Code A - Clear for repairs on 09/11/02. Horne Engineering - Bipin Nanavaty (RG 09/12/02 |
September 10, 2002 |
| Wilson High School |
FM-200217184 9/10/02 Wilson, W. Bookroom and kitchen Walls needs painting. Lead & Asbestos Code A - Clear for repairs on 09/11/02. Horne Engineering - Edward Rodriguez (RG 09/12/02 |
September 10, 2002 |
| Coolidge High School |
FM-200217183 83 9/10/02 Coolidge Back hallway Roof leak from drain on roof. |
September 10, 2002 |
| Garfield ES |
FM-200217317 9/11/02 (Garfield) !!!!EMERGENCY!!!! 1st Floor/Main Entry glass doors: Glass door slammed shut and shattered; door is 3/8 of an inch thick, 6 ft. X 5 inches/ 2 ft. X 7 inches. Call came in at 3:05 p.m. Principal indicated that security has been alerted, and will have double security monitoring the school. Also, in the event that repairs are not made, the iron gate will be pulled down for security until the repair personnel arrives. |
September 11, 2002 |
| Green Elementary School |
FM-200217232 9/11/02 Green All purpose Repair downspout on the southeast side of the all purpose room. |
September 11, 2002 |
| Reed LC |
FM-200217228 9/11/02 Reed Ground & 2nd Floors/Clinic by Mens' Room, Art Room, Stairway #4 & Rec. Hallway Girls' Restroom Furnish or replace Halsey-Taylor Mod.#RC8A push-button type for drinking fountain (or kits). Furnish 8 Kohler handles for goose-neck type faucets. |
September 11, 2002 |
| Wilson High School |
FM-200217254 9/11/02 Wilson, W. Replace fluorescent light fixtures throughout boys and girls lockerroom area. Many have broken missing parts and all new fixtures need to be ceiling mounted. Asbestos Code A - Clear for repairs on 09/11/02. Horne Engineering - Philp Connolly (RG 09/12/02 |
September 11, 2002 |
| Wilson High School |
FM-200217266 9/11/02 Woodrow Wilson Ground Floor Boiler Room Replace No. 2 high pressure condensate pump. Motor-GE, HP- 1/2, V -208/230, PH-3, RPM-1725, Code-L. AMP 2.3-2.2, FR-56J & Time Rating -Cont. No Asbestos in this area. Note:Motor and mechanical end burnt-out |
September 11, 2002 |
| Wilson High School |
FM-200217295 9/11/02 Woodrow Wilson SHS Ground Floor Mechanical Room-Library Building Replace two(2( centrifugal pumps to Hot Water Heating System for Gym Building. Motor-Marathon Electric, Mod. No.7N213TTDR704CB W, HP- 7 1/2, Frame-213T, Typr-TDR-Be, Des B, PH-3, Code-D. RPM-1755, Cy.-60, V-208, AMB-40 C, Class of INS. -B, Duty Cont, Shaft End Bearing-77508, Opp. End Braring-77505 & S.F.-1.05. Pump-AURORA, Model No.-69-17270-2, GPM-225, Type-OJPA, Head Feet-75, Size- 2 1/2 x 3 x 12 & RPM-1750. No Asbestos in this area. Note: Packing bad problems causing some flooding |
September 11, 2002 |
| Ballou Senior High School |
FM-200217242 9/11/02 Ballou Ground - Cosmetology classroom Assemble shampoo equipment also pedicuer unit. No assessment needed. |
September 11, 2002 |
| Woodson High School |
FM-200217305 0217305 9/11/02 Woodrow Wilson SHS Basement Pool Pump Room R/R 6" acruwaiter valve on return line. Valve might be bad, won't close when power goes out. Pool dumps when power goes out. |
September 11, 2002 |
| Patricia R Harris Ed Center |
FM-200217222 9/11/02 Harris P.R. - Patterson 3rd Floor Boys' Room Stairwell #3 Repair or replace two light fisxtures---the light holders broke. |
September 11, 2002 |
| Patricia R Harris Ed Center |
FM-200217223 9/11/02 Harris P. R. ( Patterson ) 3rd Floor Stairwell #4 Repair or replace fountain that is off the wall bracket, fountain leaks. |
September 11, 2002 |
| Patricia R Harris Ed Center |
FM-200217224 9/11/02 Harris, P.R. - Patterson Asbestos Assessment Reqd. Ground Floor Level The exterior door to the payground is hard to open and dragging on the bottom. Asbestos Code A-clear for repair by DCPS Charles E Buchanan on 9/11/02 |
September 11, 2002 |
| Ballou Senior High School |
FM-200217361 9/12/02 Ballou Room 202 Replace a/c window unit (bad compressor). INFO: Carrier mod. # JCA 243D, ser. # 1799B74433, btu 24000/23500, v. 187/253, hz 60, amp 12.5/13.4. |
September 12, 2002 |
| Coolidge High School |
FM-200217337 9/12/02 Coolidge Third floor Rooms 21-a, 21-b and 323 Install light kit to newly installed doors. |
September 12, 2002 |
| Ballou Senior High School |
FM-200217366 9/12/02 Ballou Room 209 Replace a/c window unit . INFO: Carrier mod. # JCA 243D, ser. # 1799B74400, btu 24000/23500, v. 230/208, amp 12.5/13.4. NOTE: If furnished inhouse staff will install unit |
September 12, 2002 |
| Young Elementary School |
FM-200217436 9/13/02 Young 1st & 2nd Floors Throughout Entire Facility Request to have the locks throughout entire building rekeyed. This is an open- space school. Almost no keys were given when the staff changed over. [NOTE: See attached memo in regards to master keys.] |
September 13, 2002 |
| Reed LC |
FM-200217516 9/16/02 Reed LC Learning center #2 An electrician is needed to determine why there is no current to the outlets in Mr. Anthony and Mrs. Wallace area. |
September 16, 2002 |
| Meyer Elementary School |
FM-200217974 9/16/02 (Meyer) On the playground there is a drain that is stopped up. Need to unstop, so kids can have outdoor recess. Need attention ASAP. |
September 16, 2002 |
| Gibbs Elementary School |
FM-200217530 9/16/02 Gibbs Roof Main Roof Fabricate exhaust fan cover for missing cover. |
September 16, 2002 |
| Wilson High School |
FM-200217608 9/17/02 Wilson, W. Asbestos Assessment Reqd. Gym Area 150 Install three (3) electrical wall outlets. Asbesstos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Charles E. Buchanan on 9/18/02 |
September 17, 2002 |
| Stuart-Hobson Middle School |
FM-200217639 0217639 9/17/02 Stuart-Hobson Asbestos Assessment Reqd. 1st FLoor Auditorium Plaster is falling from the window ledge in chunks due to dampness whenever there is a heavy rain. Asbesstos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Charles E. Buchanan on 9/20/02 |
September 17, 2002 |
| Draper Elementary School |
FM-200217855 9/18/02 (DRAPER) Kindergarten Room Water is leaking into the kindergarten room from the floor above. Need survey to establish cause of leak and repairs made as may be necessary. |
September 18, 2002 |
| Gibbs Elementary School |
FM-200217727 9/18/02 Gibbs 1st Floor - Room 105 1) Lights go on and off doing the day. Shortage in the wiring, need a electrician. |
September 18, 2002 |
| Ferebee-Hope Elementary School |
FM-200217759 9/18/02 Ferebee-Hope Pool maintenance work is no longer done by Tricon |
September 18, 2002 |
| Ludlow-Taylor ES |
FM-200217911 0217911 9/19/02 Ludlow-Taylor Asbestos Assessment Reqd. 3rd FLoor Room 308A Install an electrical outlet for the Xerox copy machine. POC: R. Thornton Asbesstos Code A-clear for repair by DCPS Charles E. Buchanan on 9/20/02 |
September 19, 2002 |
| Kenilworth ES |
FM-200217954 7954 9/19/02 Kenilworth 1st Floor Cafeteria & Handicapped Ramp The new wing doors do not close and lock properly---door closures may be faulty. |
September 19, 2002 |
| Wilkinson ES |
FM-200218032 032 9/20/02 Wilkinson 1st Floor near Room 21 [Kindergarten Area] Replace water cooler that bubbles. |
September 20, 2002 |
| Kenilworth ES |
FM-200217962 7962 9/20/02 Kenilworth 1st Floor Kitchen Replace or upgrade light ballasts. [In-house school maintenance staff will change the ballasts.] |
September 20, 2002 |
| Terrell Mc ES |
FM-200218000 0218000 9/20/02 Terrell,M.C. Lobby and hallway Electrical wire hanging from skylight. |
September 20, 2002 |
| Powell Elementary School |
FM-200219062 9/23/02 (Powell) On the second floor power keeps going out in rooms 203-205 and teachers lounge breaker keeps kicking off. Needs a response ASAP. |
September 23, 2002 |
| Backus Middle School |
FM-200219077 9/24/02 Backus Boiler room Repair electrical conduit behind boilers that control backlights and sump pump, line was broken during abatement. |
September 24, 2002 |
| Hart Middle School |
FM-200218157 9/24/02 Hart Asbestos Assessment Reqd. Throughout Entire Building Replace ballasts in the following rooms: 300, 301, 304 & 307; 313, 314, 316 thru 319 & 323; 203, 205 & 206; 213 thru 220; 223 thru 225; 229 thru 232 and 277; 121, 123 thru 125; 132 thru 134, 140. Asbestos Code A - Clear for repairs on 09/25/02. Horne Engineering - Bipin Nanavaty (RG 09/26/02) |
September 24, 2002 |
| Bowen Elementary School |
FM-200221151 9/24/02 (Bowen) Marjority of outside lights need to be repaired. |
September 24, 2002 |
| Ballou Senior High School |
FM-200218326 9/25/02 Ballou Asbestos Assessment Reqd. Sub-basement Both the male and female restrooms need to be converted for handicapped usage. [NOTE: Contact person on vacation---cannot confirm exactly what is needed until Mr. Sherrod's return.] Asbestos Code A - Clear for repairs on 10/01/02. Horne Engineering - Troy Wilcome (RG 10/02/02) |
September 25, 2002 |
| Shaed Elementary School |
FM-200218398 9/26/02 (Shaed) Rear entrance: Replace burned out lights over repair entrance. |
September 26, 2002 |
| Garnet-Patterson MS |
FM-200218415 9/26/02 Garnet-Patterson Throughout Rekey all locks to the master keys throughout the school and provide pass key for the teacher. |
September 26, 2002 |
| Woodson High School |
FM-200218532 0218532 9/30/02 Repair sheet metal work on the back of # 2 boiler, as per A. Colvin , Boiler Inspector. |
September 30, 2002 |