Routine Repair Requests Opened in September 2003 (115) | School | Description | Open Date |
| Park View ES | FM-200336631 9/1/03 Park View Break-In !!! Back side of Building ( Alley Side) 1) Repair Door. | September 1, 2003 |
| Patricia R Harris Ed Center | FM-200336670 9/2/03 Harris, P.R. / Patterson Third floor Boys bathroom Stairwell 4 Repair partition, broke loose from floor tile. Asbestos Code A - Clear for repairs on 09/03/03. Horne Engineering - Troy Wilcome (RG 09/04/03) | September 2, 2003 |
| Stanton Elementary School | FM-200336645 9/2/03 Stanton Annex Room A-9 need balance replace and carpenter to put up chalk boards. Asbestos Code A - Clear for repairs on 09/02/03. Horne Engineeing - Bipin Nanavaty (RG 09/04/03) | September 2, 2003 |
| Reed LC | FM-200336689 9/2/03 Reed, Marie Ground UPO playground A plumber is needed to unstop a strom drain, located on UPO playground. | September 2, 2003 |
| Patricia R Harris Ed Center | FM-200336669 9/2/03 Harris, P.R. / Patterson Third floor teachers bathroom Replace stop valve stairwell 6. | September 2, 2003 |
| Stanton Elementary School | FM-200336756 9/3/03 Stanton Cafeteria Ceiling fan is hanging by the wires. Asbestos Code A - Clear for repairs on 09/04/03. Horne Engineering - Sheryll James (RG 09/08/03) | September 3, 2003 |
| Stanton Elementary School | FM-200336716 9/3/03 Stanton Exterior Grounds 1) Provide and install light poles with mounted light fixtures and concrete bases. Drill from outside brick wall into the mechanical tunnel to the electrical service room. Area is all brick. Poc - Clancy March - 301-512-0972 | September 3, 2003 |
| Savoy Elementary School | FM-200336775 9/3/03 Savoy First floor custodial utility closet slop sink Replacement of broken slop sink. Slop sink has hole in bottom of it. caused by a teacher who dropped a heavy item in it. Needs to be replaced (immediately) Constantly leaks water due to people ignoring signs not to dump.Teachers bath room toilet leaks. Need to be repair. ASAP | September 3, 2003 |
| Patricia R Harris Ed Center | FM-200337009 9/3/03 (Harris, P.R.) REPAIR TILT FRY PAN. | September 3, 2003 |
| Patricia R Harris Ed Center | FM-200337008 9/3/03 (Harris, P.R.) REPAIR CONVECTION OVENS. | September 3, 2003 |
| Browne Junior High School | FM-200336739 9/3/03 Browne Second Floor 1. Repair electrical outlets in room 211. ( no power in classroom) Asbestos Code A - Clear for repairs on 09/05/03. Horne Engineering - Sheryll James (RG 09/08/03) | September 3, 2003 |
| Park View ES | FM-200336811 9/4/03 ParkView Third Floor 1. Hole in ceiling need to be re -plastered in room #224. Asbestos Code A - Clear for repairs on 09/04/03. Horne Engineering - Tony Marcolin (RG 09/08/03) | September 4, 2003 |
| Francis Junior High School | FM-200336823 3 9/4/03 Francis Second floor boys gym (East) Water leaking from ceiling by (vent), by free throw line. Code A-clear for repair by Horne Engineer Troy Wilcome on 9/5/03 (CEB) | September 4, 2003 |
| Watkins Elementary School | FM-200336817 9/4/03 Watkins All classrooms All windows where A/C are placed Water leaks. | September 4, 2003 |
| Watkins Elementary School | FM-200336815 9/4/03 Watkins Rooms 111 and 416 Glazer required to replace window in room door room 111, window broken room 416 and room 205. | September 4, 2003 |
| Watkins Elementary School | FM-200336822 9/4/03 Watkins Kitchen Outside kitchen needs back up water heater. Heater needs to be replaced. | September 4, 2003 |
| Ketcham Elementary School | FM-200336837 9/4/03 Ketcham Room - 204 1) Install carpet for Resource Center. | September 4, 2003 |
| Bruce-Monroe Elementary School | FM-200336914 9/5/03 Bruce-Monroe Str. 201/ stairways Plaster work is needed on the East / West South stairways and lobby restrooms ctr. 201 boys restroom. Lead & Asbestos Code A - Clear for repairs on 09/08/03. Horne Engineering Edward Rodriguez (RG09/09/03) | September 5, 2003 |
| Stanton Elementary School | FM-200336905 9/5/03 Stanton WUSA is doing plumbing repairs throughout building. | September 5, 2003 |
| Patricia R Harris Ed Center | FM-200336890 9/5/03 Harris, P.R. Basement open space Servey partition in basement that divide and seperate classrooms. There is a white powder substance coming fro partition. Asbestos Code A - Clear for repairs on 09/09/03. Horne Engineering - Edward Rodriguez (RG 09/10/03) | September 5, 2003 |
| Hine JHS | FM-200336945 9/5/03 (Hine) Exterior- Repair outside light fixture by stairwell#5- exposed wires. Repair exterior light on 8th st by cafeteria. | September 5, 2003 |
| Stoddert ES | FM-200336901 01 9/5/03 Stoddert First floor girls restroom Swinging door in toilet area have been knock down. Need someone to replace door hindges. Health Hazard Code A-clear for repair by DCPS Charles Buchanan on 9/9/03 | September 5, 2003 |
| Davis Elementary School | FM-200336980 9/8/03 Davis First floor Room 114 teacher unable to lock her door because door is out of alignment also align rooms 118, 122, 222, 214, and fire door by security desk. Asbestos Code A - Clear for repairs on 09/08/03. Horne Engineering - Tony Marcolin (RG 09/09/03) | September 8, 2003 |
| Bruce-Monroe Elementary School | FM-200336975 9/8/03 Bruce-Monroe Boiler Room Boiler #1,#2 and #3 need calibration of burners at all modulation levels. Note: When burners are not modulating properly, it creats big problems, when cleaning boilers and reduce efficiency. Need to pass D.C. Inspection. | September 8, 2003 |
| Hyde Elementary School | FM-200337040 9/8/03 Hyde Boiler Room Furnish and install two steam pressure gauges, one for boiler #1 and one for Boiler #2. Calibrated 0 to 30 PSI. Note: Per Boiler Inspector (DC) | September 8, 2003 |
| Hendley Elementary School | FM-200337064 9/8/03 (Hendley) Annex/Room #18: Repair or replace door in annex; also, door to room #310 is very hard to close. Asbestos Code A - Clear for repairs on 09/10/03. Horne Engineering - Troy Wilcome (RG 09/11/03) | September 8, 2003 |
| Stanton Elementary School | FM-200336984 9/8/03 Stanton Third floor room 309 Ceiling fan is not working. Room very hot. Code A-clear for repair by DCPS Charles Buchanan on 9/9/03 | September 8, 2003 |
| Bancroft Elementary School | FM-200337084 84 9/9/03 Bancroft Playground entrance from parking lot Replace missing gutter connection. | September 9, 2003 |
| Takoma Educational Center | FM-200337132 9/9/03 Takoma Mechanical Room Repair or replace AHU #5 bottom of unit rusted out all the way through. Size 37" X 61" (W X L) unit supplies air for Kindergarden. | September 9, 2003 |
| Cardozo High School | FM-200337109 9/9/03 Cardozo Sub-Basement Replace 3/4" domestic cold water supply line coming from Sub-Basement to Ground floor. | September 9, 2003 |
| Turner Elementary School | FM-200337161 9/9/03 (Turner) Through-Out Building: Make electrical repairs in classrooms, and stairwells. Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Edward Rodriguez (RG 09/12/03) | September 9, 2003 |
| Wilkinson ES | FM-200337071 9/9/03 Wilkinson First Floor - Multi Purpose Room 1. Replace or repair (7) u-shape light fixtures in cafeteria ceiling, lights keep going off and on. Asbestos Code A - Clear for repairs on 09/09/03. Horne Engineering - Sheryll James (RG 09/10/03) | September 9, 2003 |
| Cardozo High School | FM-200337192 9/10/03 Cardozo Ground by room 15 Repair or replace leaking domestic col water supply pipe to water cooler. Pipe aize appox. 3/4 inch galvanize. Asbestos Code A - Clear for repairs on 09/09/03. Horne Engineering - Bipin Nanavaty (RG 09/11/03) | September 10, 2003 |
| Benjamin Banneker Academic HS | FM-200337190 9/10/03 Banneker Basement court yard / Kitchen side Wood door to enter the court yard is sticking at the bottom and do not open or shut properley. Need carpenter. Asbestos Code A - Clear for repairs on 10/16/03. Horne Engineering - Troy Wilcome (RG 10/21/03) | September 10, 2003 |
| Wilkinson ES | FM-200337171 9/10/03 Wilkinson Second Floor - Room # 248 1. Replace or repair (1) fluorescent light fixture. Asbestos Code A - Clear for repairs on 09/25/03. Horne Engineering - Sheryll James (RG 09/26/03) | September 10, 2003 |
| Park View ES | FM-200337255 9/11/03 Park View Second floor boys restroom Door need to be replaced, big hole in door. Asbestos Code A - Clear for repairs on 09/15/03. Horne Engineering - Roger Kager (RG 11/18/03) | September 11, 2003 |
| Terrell Mc ES | FM-200337230 9/11/03 Terrell, M.C. Auditorium - Chair Room Repair or replace starter on Air Handler unit control box. Starter bad unit off, unit control teacher room. | September 11, 2003 |
| Terrell Mc ES | FM-200337231 9/11/03 Terrell, M.C. Lower Level Replace missing motor on Air Handler unit in custodial. Supplies room, unit not running. | September 11, 2003 |
| Walker-Jones EC | FM-200337293 9/11/03 (Walker Jones) First floor Repair ceiling in the following classrooms due to peeling rooms 106, 105 and 107. Lead & Asbestos Code A - Clear for repairs on 09/16/03. Horne Engineering - Edward Rodriguez (RG 09/24/03) | September 11, 2003 |
| Bunker Hill Elementary School | FM-200337335 9/11/03 (Bunker-Hill) Main Office: Restore electrical power to outlets. | September 11, 2003 |
| Cook J.F. Elementary School | FM-200337319 9/11/03 Cook,J.F. Boiler Room Asbestos assessment required Furnish and install (1) electrical outlet to service sump pump. Pump is currently plugged to extention cord. Fire code violation. Note: 120 Volts required Emergency!!!! Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Edward Rodriguez (RG 09/12/03) | September 11, 2003 |
| Coolidge High School | FM-200337292 9/11/03 Coolidge Boiler Room Boilers #1 and #2 needs chemical cleaning. | September 11, 2003 |
| Wilson High School | FM-200337265 9/11/03 Wilson, W. Second floor rooms 201 - 202 Install two (2) electrical outlets each in the above rooms. Asbestos Code A - Clear for repairs on 09/15/03. Horne Engineering - Bipin Nanavaty (RG 09/17/03) | September 11, 2003 |
| Langdon Elementary School | FM-200337260 9/11/03 Langdon !! Emergency !! Second Floor 1. Repair broken windows in classrooms 212 and 213, due to vandalism. | September 11, 2003 |
| Reed LC | FM-200337276 9/11/03 Reed Outside grounds pool patio Please unstop two (2) drains in outside pool patio area. | September 11, 2003 |
| Park View ES | FM-200337259 9/11/03 Park View Third floor room 224 Hole in ceiling need to be replaster. Asbestos Code A - Clear for repairs on 09/15/03. Horne Engineering - Roger Kager (RG 11/18/03) | September 11, 2003 |
| Rudolph Elementary School | FM-200337264 9/11/03 Rudolph Roof leaking from girls. Ceiling in the lavatories in rec area. Please attend to this matter ASAP. | September 11, 2003 |
| Eaton Elementary School | FM-200337492 9/15/03 Eaton Emergency Roofs-East, West, Middle, and Kitchen R/R roof, missing slates, damage gutters, and damage flashing from last year snow storm. Water leaking into the class rooms and office areas every time it rains-leaks are very bad. | September 15, 2003 |
| Beers Elementary School | FM-200337539 9/15/03 Beers Second floor bldg. # 2 Room 204 walls and ceiling need scraping and painting, lots of paint is peeling. Lead & Asbestos Code A - Clear for repairs on 09/23/03. Horne Engineering - Edward Rodriguez (RG 09/26/03) | September 15, 2003 |
| Garfield ES | FM-200337533 9/15/03 Garfield Service need to be restore to outlets. One on the first floor new wing by room 103 and one by room 1A in the hallway. Code A-clear for repair by Charles Buchanan on 9/16/03 | September 15, 2003 |
| Gage-Eckington ES | FM-200337542 9/15/03 Gage-Eckington Second floor kitchen area Paint is peeling from ceiling over top steam table. Need to be scraped and painted. Due to roof leaking. Continuing to come back. Lead & Asbestos Code A - Clear for repairs on 09/22/03. Horne Engineering - Edward Rodriguez (RG 09/25/03) | September 15, 2003 |
| Garfield ES | FM-200337532 9/15/03 Garfield Rooms 103, 204, 2E and kitchen Repair or replace four water fountains Also 13 filters are needed throughout. 1. First floor new wing by room 103 and 204 2. Second floor main bldg. by room 2E also one by the kitchen. | September 15, 2003 |
| Bruce-Monroe Elementary School | FM-200337473 9/15/03 Bruce-Monroe Boiler Room Unstop six (6) floor drain in Boiler Room. Engineer has attempt to unstop put with no success. | September 15, 2003 |
| Seaton Elementary School | FM-200337606 9/16/03 Seaton First floor front door frame Heavy rain - water comes under trench the door frame and flood the lobby. | September 16, 2003 |
| Horace Mann Elementary School | FM-200337574 9/16/03 Mann Outside Annex Replace cooling unit located outside annex portion of building. Unit not cooling. Note: Carrier type unit (Heat pump) | September 16, 2003 |
| Meyer Elementary School | FM-200337588 9/16/03 Meyer Boiler Room Area 1).Unstop drain at base of exterior stairway to Boiler Room. 2). Also check and correct any drainage.(Floor drain) problems in Boiler Room. Note: Boiler room has a continuous flow of water into it and if drains stop-up, Flooding will follow. | September 16, 2003 |
| Murch Elementary School | FM-200337647 9/16/03 Murch Out side Annex Building Replace split system heat pump air conditioning. Type-Carrier, Model 38AE016-500; Serial - T890136; Volt - 208 - 230 Amps - 20; Ton - 5-10 Unit will not run old unit. | September 16, 2003 |
| Reed LC | FM-200337609 9/16/03 Reed Second Floor 1. Repair roof leak in the auditorium near learning center #3 and roof top planters over canopy. | September 16, 2003 |
| Nalle Elementary School | FM-200337641 9/16/03 Nalle, J.C. Second floor boys restroom Ceiling damage due to roof leak. Asbestos Code A - Clear for repairs on 10/23/03. Horne Engineering - Sheryll James (RG 10/27/03) | September 16, 2003 |
| Johnson JHS | FM-200337621 9/16/03 Johnson First floor teacher lounge Principal request that electrican come out an run line for new copier machine. Asbestos Code A - Clear for repairs on 09/23/03. Horne Engineering - Philp Connolly (RG 09/29/03) | September 16, 2003 |
| Emery Elementary School | FM-200338258 9/17/03 (Emery) Asbestos Assessment Required. Second floor boy bathroom urinal has a crack need replacement. | September 17, 2003 |
| Kramer Middle School | FM-200337699 9/17/03 Kramer Roof 1. Unclog and or repair drains on the roof - causing water damage to the walls in the auditorium . | September 17, 2003 |
| Ferebee-Hope Elementary School | FM-200337683 9/17/03 Ferebee -Hope Fourth Floor 1. Repair window frame ( water coming in during the rain and wetting the capet). Asbestos Code A - Clear for repairs on 09/23/03. Horne Engineering - Philp Connolly (RG 09/29/03) | September 17, 2003 |
| Walker-Jones EC | FM-200337687 9/17/03 Walker - Jones First Floor 1. Repair serveral interior and exterior doors that are not closing properly. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Tony Marcolin (RG 09/26/03) | September 17, 2003 |
| Emery Elementary School | FM-200338263 9/17/03 (Emery) Unstop two playground storm drains. | September 17, 2003 |
| Emery Elementary School | FM-200338260 9/17/03 (Emery) Repair stove oven part of the stove will not come on. | September 17, 2003 |
| Seaton Elementary School | FM-200337760 9/18/03 (Seaton) 1st Floor/Room #113: Hole in hot water pipe, please replace pipe, and faucet.Water is needed in this classroom because we have special students, | September 18, 2003 |
| Whittier Elementary School | FM-200337823 9/22/03 (Whittier) 2nd Floor/Media Center: Roof leaking through ceiling tile. Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Tony Marcolin (RG 10/08/03) | September 22, 2003 |
| Whittier Elementary School | FM-200337824 9/22/03 (Whittier) Asbestos Assessment Required. Old Side/1st Floor: Repair wall in Assist. Principal's restroom; water leaking from the outside. (Possible roof leak) Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Tony Marcolin (RG 10/08/03) | September 22, 2003 |
| Whittier Elementary School | FM-200337827 9/22/03 (Whittier) Asbestos Assessment Required. 2nd Floor/Teachers Lounge: Repair middle of wall damaged by water. (Possible roof leak) Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Tony Marcolin (RG 11/18/03) | September 22, 2003 |
| Shaw JHS | FM-200337855 9/23/03 Shaw Roof Drain 1) Stairwell 1 - Flooded | September 23, 2003 |
| Beers Elementary School | FM-200337891 9/23/03 Beers Second floor building 2 Room 210 due to weather storm and rain the ceilings are very wet and the roof leaks. | September 23, 2003 |
| Ferebee-Hope Elementary School | FM-200337845 9/23/03 Ferebee-Hope First floor kitchen area Electrical: Survey to connect walk-in refrigerator and freezer to emergency generator. (Natual gas generator located outside) Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Sheryll James (RG 09/26/03) | September 23, 2003 |
| Deal Junior High School | FM-200337854 9/23/03 Deal Girls Gym - Southwest Corner - Water coming down walls. Girls Locker Room - Water coming in around windows. Boys Gym Office - Water coming down wall. Boys Locker Room - Water coming down wall. Hallway leading to Kitchen - Roof Leak. | September 23, 2003 |
| Stanton Elementary School | FM-200337843 9/23/03 Stanton !! Emergency !! First Floor 1. Unstop outside drain ,water is coming into the Cafeteria. | September 23, 2003 |
| Watkins Elementary School | FM-200337894 9/23/03 Watkins Room 302 and 416 Classrooms windows broken. Window cvalced room 205. Classroom door falling off hinge (wood at the top) | September 23, 2003 |
| Garfield ES | FM-200337842 9/23/03 Garfield !! Emergency !! First Floor 1. Unstop outside drain , Roof hatch open... | September 23, 2003 |
| Cardozo High School | FM-200337974 9/24/03 Cardozo Ground floor # 6 Furnish and install additional electric receptacles outlets in room. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Edward Rodriguez (RG 09/30/03) | September 24, 2003 |
| Cardozo High School | FM-200337973 9/24/03 Cardozo Ground floor # 6 Scrape and paint walls and ceilings. Lead & Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Edward Rodriguez (RG 09/30/03) | September 24, 2003 |
| Cardozo High School | FM-200337969 9/24/03 Cardozo Ground floor # 6 Furnish and install 2 air conditioners, window units. Code A-clear for repair by DCPS Charles Buchanan on 9/25/03 | September 24, 2003 |
| Cardozo High School | FM-200337968 9/24/03 Cardozo Ground floor # 6 Build enclosure around all exposed plumbing pipes. Code A-clear for repair by DCPS Charles Buchanan on 9/25/03 | September 24, 2003 |
| Cardozo High School | FM-200337966 9/24/03 Cardozo Ground floor # 6 Repair deteriorating plaster walls. Code A-clear for repair by DCPS Charles Buchanan on 9/25/03 HA-005 Plaster white hard wall plaster NAD HA-705 Brown coast NAD | September 24, 2003 |
| Brent Elementary School | FM-200337929 9/24/03 Brent First Floor 1. To paint shelves in the kitchen storage room. Lead Code A - Clear for repairs on 09/25/03. Horne Engineering - Edward Rodriguez (RG 09/26/03) | September 24, 2003 |
| Cardozo High School | FM-200337963 9/24/03 Cardozo Ground floor # 4 Upgrade electrical service and receptacle outlets. Code A-clear for repair by DCPS Charles Buchanan on 9/25/03 | September 24, 2003 |
| Cardozo High School | FM-200337960 9/24/03 Cardozo Front north side, east and west Unclog outside storm drains. | September 24, 2003 |
| Seaton Elementary School | FM-200337997 9/24/03 (Seaton) 3rd Floor/Room #315: Roof leak in Room #315, over teachers desk. (Very heavy rains) Asbestos Code A - Clear For Repairs On 09/25/03. Horne Engineering - Troy Wilcome (RG 09/26/03) | September 24, 2003 |
| Wilson High School | FM-200337947 9/24/03 Wilson, W. First Floor - Library 1) Replace ceiling tile in library that has fallen due to skylite leak. Asbestos Code A - Clear for repairs on 09/18/03. Horne Engineering -Ray Agnant (RG 09/25/03 | September 24, 2003 |
| Walker-Jones EC | FM-200337927 9/24/03 Walker Jones Exterior Of Building Assess insulation of light fixtures at exit to playgrounds. Identify all similar light fixtures on the exterior of the school for asbestos content. Poc - Dr. Rahimi Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Ray Agnant (RG 09/30/03) | September 24, 2003 |
| Cardozo High School | FM-200337975 9/24/03 Cardozo Ground floor # 6 Build new door opening to connect room 4 to room 6. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Edward Rodriguez (RG 09/30/03) | September 24, 2003 |
| Park View ES | FM-200338067 9/25/03 Park View Second floor room 221 Light kit is needed for the doors. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Tony Marcolin (RG 09/30/03) | September 25, 2003 |
| Beers Elementary School | FM-200338044 9/25/03 Beers Roof air vents Three (3) air vents on roof not working. Bathroom in other parts of bldg. Need the circulation. | September 25, 2003 |
| Beers Elementary School | FM-200338045 9/25/03 Beers Second floor building 1 Water is coming through roof hallway by boys and girls bathroom. Contractors are during pipe work also asbestos team. That area needs repair before contractor put up ceiling tile. | September 25, 2003 |
| Beers Elementary School | FM-200338047 9/25/03 (Beers) Bldg. 1 Electrical / balances are out room 226, 223 and 222. (2) out in each room also P.T.A. hallway, cafeteria and kitchen. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Bipin Nanavaty (RG 09/30/03) | September 25, 2003 |
| Beers Elementary School | FM-200338049 9/25/03 Beers First and second floor bldg. # 3 Hallways and restrooms are in need of plastering and painting Bldg. # 2. Restrooms also and classroom ceiling in Bldg. # 2. Lead & Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Edward Rodriguez (RG 09/29/03) | September 25, 2003 |
| Francis Junior High School | FM-200338057 7 9/25/03 Francis Tunnel leading from Boiler Room Repair and or replace 4" or 6" roof drain line pipe. Pipe is busted and water is leaking on first floor. | September 25, 2003 |
| Young Elementary School | FM-200338030 9/25/03 Young First and second floor Plastering is needed throughout the building. Area needin plastering are: Gym passage way by steps Auditorium two side rooms and stage Kindergarten room wall by window on top landing step from main office (ceiling) Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Sheryll James (RG 09/29/03) | September 25, 2003 |
| Young Elementary School | FM-200338033 9/25/03 Young First and second floor Baseboards are needed in some areas. Baseboards are missing and some will not stay on wall. AREAS: Lunch room, second floor across from boys toilet and by steps center 3. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Sheryll James (RG 09/29/03) | September 25, 2003 |
| Young Elementary School | FM-200338034 9/25/03 Young First floor Two sets of steps in center 1 Survey and repair or replace missing and damage iron steps treads. There are Approx. five damage or missing treads. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Sheryll James (RG 09/29/03) | September 25, 2003 |
| Meyer Elementary School | FM-200338062 9/25/03 Meyers A terrible leak in the A.P.R. in ceiling need attention ASAP. | September 25, 2003 |
| Stanton Elementary School | FM-200338058 9/25/03 Stanton Third floor stairwells Windows need to be put in. | September 25, 2003 |
| West Elementary School | FM-200338061 9/25/03 West Boilers Room Check domestic hot water heater. Temperature well is leaking. | September 25, 2003 |
| West Elementary School | FM-200338075 9/25/03 West First floor commerce room Learning center by computer lab Florescent light has a short in it. Turn the power off. Code A-clear for repair by DCPS Charles Buchanan on 9/26/03 | September 25, 2003 |
| Wilkinson ES | FM-200338055 9/25/03 (Wilkinson) 2nd Floor/Near Library: Light fixture is very loose in room #73, coat area. Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Bipin Nanavaty (RG 09/29/03) | September 25, 2003 |
| Montgomery ES | FM-200338114 -200338114 9/26/03 Montgomery First floor multi-purpose room Repair water leak in multi-purpose room II causing the lay in ceiling to fall down during the hurricane Isabel storm. Asbestos Code A - Clear for repairs on 09/29/03. Horne Engineering - Bipin Nanavaty (RG 10/01/30) | September 26, 2003 |
| Amidon Elementary School | FM-200338170 9/29/03 Amidon Second floor Srairway next to Lrn. Ctr. ctr. The ceiling need to be repaired and replastered cracks and looks like it would collapsed. Lead & Asbestos Code A - Clear for repairs on 09/30/03. Horne Engineering - Tony Marcolin (RG 09/30/03) | September 29, 2003 |
| Winston EC | FM-200338186 9/29/03 Winston Third and fourth floor Roof leaking third floor corridor by rooms 312, 320 and main entrance by security fourth fllor storage room in cafeteria. | September 29, 2003 |
| Browne Junior High School | FM-200338196 9/29/03 Browne Basement stairwell and coach office Plaster and paint ceiling in stairwell,leading to gym and coach office in gym.. Rupture pipe repaired. Lead & Asbestos Code A - Clear for repairs on 09/30/03. Horne Engineering - Edward Rodriguez (RG 10/01/03) | September 29, 2003 |
| Stanton Elementary School | FM-200338176 9/29/03 Stanton Outside drain leading to parking lot is clogged. | September 29, 2003 |
| Key Elementary School | FM-200338243 9/30/03 Key Boiler Room Replace bad sump pump #1, Have not work from day one. The company name is Messco- control; Columbia, Md.; Sump pumps Co. Phone No. 301-621-8899 | September 30, 2003 |
| Eastern High School | FM-200338235 9/30/03 Eastern Field press box Repair or replace insulation on duct work-Press box roof. | September 30, 2003 |
| Gibbs Elementary School | FM-200338270 9/30/03 Gibbs First floor room 101 Window is broken need repairing. | September 30, 2003 |
| Ferebee-Hope Elementary School | FM-200338276 9/30/03 Ferebee-Hope Roof by muisc room and rec game room Roof leaking in the above areas. | September 30, 2003 |
| Spingarn High School | FM-200338239 9/30/03 Spingarn First floor gym Replace key switch that rises the basketball courts up and down. Alos, check the electrical switch that moves the bleachers in and out . Switch do not work. August 19, 2004: Staff called in with a concern of when repairs will be made, as it has been one (1) year past due. (Please give this request attention ASAP) | September 30, 2003 |
| Horace Mann Elementary School | FM-200338280 9/30/03 Mann Steps Plaster falling on northeast steps. Asbestos Code A - Clear for repairs on10/01/03. Horne Engineering - Tony Marcolin (RG 10/03/03) | September 30, 2003 |
| Horace Mann Elementary School | FM-200338277 9/30/03 Mann Second floor storage room Ms. Brasur and room 104 Ms. Menell Plaster falling from ceiling and water leaking . Asbestos Code A - Clear for repairs on10/01/03. Horne Engineering - Tony Marcolin (RG 10/03/03) | September 30, 2003 |