"Bathroom" Open Repair Requests
Detailed Reports
| School | Description | Date |
|---|---|---|
| Whittier Elementary School | FM-200202564 64 2/6/02 (WHITTIER) 1. ASBESTOS ASSESSMENT REQUIRED. GROUND FLOOR/BOYS RESTROOM: WINDOW PANE FALLS OUT OF FRAME; NEEDS TO BE RE-GLAZED. ASBESTOS CODE A-CLEAR FOR REPAIR ON 02/08/02 HORNE ENGINEER: PHILIP CONNOLLY | |
| Bunker Hill Elementary School | FM-200202871 02871 2/12/02 (BUNKER HILL) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ ROOMS 130, 129, BOYS RESTROOM ON THE 2ND FLOOR PLEASE REPLACE WINDOW PANES IN ROOMS 130, 129, AND BOYS RESTROOM ON THE 2ND FLOOR WEST. CODE A-CLEAR FOR REPAIR BY HORNE ENGINEER (STEPNEN CALDWELL) ON 2/04/02 (CEB) | |
| Aiton Elementary School | FM-200202952 2/13/02 (AITON) ASBESTOS ASSESSMENT REQ. 1ST, 2ND, AND 3RD FLOORS REPLACE BROKEN WINDOW PANES IN THE FOLLOWING AREAS: ROOMS: K-1, K-2, 101 AND 103. ROOMS: 202, 203, 204, 205, 206, 207, 208, LIBRARY, TEACHERS LOUNGE, BOYS AND GIRLS RESTROOMS. ROOMS: 407, 408, 409, 410, AND 411. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/14/02 HORNE ENGINEER: SHERYLL JAMES | |
| Turner Elementary School | FM-200202989 2/13/02 (TURNER) ASBESTOS ASSESSMENT REQ. REPAIR WINDOWS IN CAFETERIA TEACHERS LOUNGE MAIN ROOM AND RESTROOM WINDOWS ARE BEING HELD CLOSED WITH STICKS. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/14/02 HORNE ENGINEER: SHARON VOSS | |
| Thomas Elementary School | FM-200203405 2/25/02 (Thomas) ***Urgent*** 1st Floor/Custodian Closet, Pre-school Boys & Girls Restrooms Need drains in urinals, commodes & sinks unstopped & faucets repaired. | |
| Woodson High School | FM-200204148 0204148 3/8/02 (Woodson, H.D.) Asbestos assessment req. 4th and ground floor/ Lobby girls and boys restroom Install sink back to wall supply line. Leaking and p-trap commode broken at the base. Code A-clear for repair by Horne Egineer on ( Stephen Caldwell ) 3/14/02 (CEB) | |
| Garfield ES | FM-200204133 33 3/8/02 (Garfield) 2nd floor/ Gilrs Bathroom Light fixture in bathroom went completely out. Changed all bulbs and it is still not working. Dont have a ballast. | |
| Wilkinson ES | FM-200204724 724 3/19/02 (Wilkinson) Asbestos Assessment Required 2nd Floor Room 184 [Girls Restroom] Survey, replace or repair cap to the Bradley Basin head. Asbestos Code A - Clear For Repairs On 03/23/02. DCPS Safety - Ronald Edwards (RG 03/25/02) | |
| Gibbs Elementary School | FM-200204785 3/20/02 Gibbs Main roof Repair or replace exhaust fan and missing hood for boys and girls restrooms. Water leaks into bldg. Fan locked because of rust. Fabricate missing hood for exhaust fan. | |
| Roosevelt High School | FM-200205505 505 4/5/02 Roosevelt 1 Asbestos Assessment Reqd. 1st & 2nd Floor Boys & Girls Restrooms 2. Repair/replace wall tiles in the 1st floor girls restroom. 3. Repair hole in the wall behind the hand-basin in the 2nd floor boys restroom. Code A-clear for repair by Honre Engineer ( Sam Ebrahim ) on 4/09/02 CEB | |
| Hine JHS | FM-200206216 4/22/02 Hine First (1st) FLoor -- Girls Restroom 1. Asbestos Assessment Requried. 2. Repair Ceiling - Falling plaster. Safety Hazard. Code A-clear for repair by Horne Engineer by ( Troy Wilcome ) on 4/24/02 ( CEB ) | |
| Turner Elementary School | FM-200206665 4/25/02 (Turner) "As soon as possible" 1. Asbestos assessment required. Through-out building: Repair peeling and falling plaster in the following rooms; #101, 109, boys restroom, old building 1st floor. Girls restroom, 1st floor new building, and room #303 old building. Code A-clear for repair by Horne Engineer by (Bipin Nanavaty ) on 4/26/02 ( CEB ) | |
| Merritt Middle School | FM-200206753 3 4/26/02 1. Asbestos Assessment Reqd. 3rd Floor Boys Gym Toilet 2. Replace damaged floor tiles at the base of the wall of the toilet on the right side of restroom. Asbestos Code A - Clear for repairs on 05/01/02. Horne Engineering - Bipin Nanavaty (RG 05/01/02) | |
| Park View ES | FM-200206836 4/29/02 1. Asbestos assessment required. 2nd floor hallway/near boys restroom and rm. #227: Windows broken in both rooms. Code A-clear for repair by Horne Engineer by (Sherlly James) on 5/02/02( CEB ) | |
| Reed LC | FM-200207254 5/7/02 Reed 1. Asbestos Assessment Reqd. 2nd Floor Male Restrooms in Centers 1 & 2 Reattach partitions to the wall in the 2nd floor male restrooms [centers 1 & 2]. Asbestos Code A - Clear for repairs on 5/8/02 Horne Engineering - Sheryll James (RE - 5/8/02) | |
| Ketcham Elementary School | FM-200207440 0 5/9/02 Ketcham 1. Asbestos Assessment Reqd. 2nd Floor Restroom in Teachers' Lounge Replace missing partition door. POC: Wadsworth Asbestos Code A - Clear for repairs 5/09/02 Horne Engineering, Phillip Connolly (RE - 5/09/02) | |
| Ketcham Elementary School | FM-200207438 8 5/9/02 Ketcham 1st, 2nd & 3rd Floors Boys' & Girls' Restrooms 1. 1st floor girls' restroom: Replace one broken commode. 2. 2nd & 3rd floors boys' restrooms: Replace one removed wall-mounted urinal in each. POC: Wadsworth | |
| Seaton Elementary School | FM-200207761 5/15/02 Seaton 1. Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors 2. There appear to be structural cracks in the following areas [please survey]: Kindergarten classroom; nurse's office; library; rooms 202 & 205; boys restroom; rooms 107, 111, 208, 210 & 211, 215; 300, 302, 303, 305, 307, 308, 310 & 312. 3. The 2nd floor appears to be sinking towards 10th street. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 5/16/02 | |
| Langdon Elementary School | FM-200209573 3 5/15/02 Langdon Asbestos Assessment Required Sink is broken off the wall in the boys bathroom (near Room 126); Montessori Wing. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. Health and Safety Hazard | |
| Slowe Elementary School | FM-200208231 5/22/02 Slowe All Areas Throughout the Building 66 ballasts throughout the building need to be replaced in time for the summer-school session, as follows: Room 122 (6), Room 126 (20), Room 211 (2), Room 100 (2), Library (10), Second Floor -Old Wing Boys and Girls Restrooms (5), Second Floor -Hallway (5), Kitchen (6). POC: Lewis James | |
| Smothers ES | FM-200209707 07 6/18/02 Smothers 1. Asbestos Assessment Reqd. 3rd Floor boys' Restroom 2. Need assessment of wall behind urinal in the 3rd-floor boys' restroom. POC: M. Mack 576-8046 Pager: 996-6294 Code A-clear for repair by Horne Engineer ( Troy Wilcome ) on 6/19/02 | |
| Ballou Senior High School | FM-200210534 6/27/02 Ballou 1. Asbestos Assessment Reqd. Sub-basement Boys' Restroom 2. There is a door in the ceiling that will not close and there are pipes behind the door that leak and have old decaying insulation. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 07/01/02 DCPS CE Buchanan | |
| Garnet-Patterson MS | FM-200210639 7/1/02 (Garnet-Patterson) ***Urgent*** 1. Asbestos assessment required. 2nd and 3rd floor/Boys bathroom: Students have removed entrance privacy doors from the two (2) bathrooms indicated. Asbestos Code A - Clear for repairs, on 7/02/02 DCPS Safety - R. Edwards (RE- 7/02/02) | |
| Rudolph Elementary School | FM-200212347 7/17/02 (Rudolph) ***Urgent*** Basement/Middle stairway to outside from boys restroom. Four (4) windows broken out and window guards need to be welded. | |
| Smothers ES | FM-200213331 31 7/30/02 Smothers ****Urgent**** 1. Asbestos Assessment Reqd. 3rd Floor Room 303 2. Upgrade electrical outlet from 110v to 220v in room 303 to support a/c unit. 2. 2nd floor science lab ceiling needs to be repaired [plaster ceiling was taken down due to leak which has now been fixed]; 3. Repair 3rd floor ceiling and wall plaster that is coming down in the boys restroom; repair falling ceiling plaster in room 303; 4. Repair ceiling plaster in room 103, 105 & 106. When the plastering in the above areas is complete, the affected ceiling and wall surfaces will require repainting. Asbestos Code A - Clear for repairs on 08/02/02. DCPS Safety - Leroy Minton Jr. ( RG 08/05/02) | |
| Spingarn High School | FM-200213460 8/2/02 Spingarn 1. Asbestos Assessment Reqd. Basement Record Room 2. Repair existing hole in the bathroom ceiling and paint. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) | |
| Thomas Elementary School | FM-200213561 8/5/02 Thomas 1. Asbestos Assessment Reqd. 3rd Floor Room 302 & Girls' Restroom 2. There are wall leaks, source unknown----need to have problem identified and repairs made. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) | |
| Thomas Elementary School | FM-200213562 8/5/02 Thomas 1. Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors/Counselor's Suite, Partitions, Adult Restroom, Exit and Exterior Doors 2. Need an authorization to paint the above listed areas [work to be executed by school staff]. 2. There are wall leaks, source unknown----need to have problem identified and repairs made. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/Edward Rodriguez On 9/05/02 DCPS Charles E. Buchanan | |
| Spingarn High School | FM-200213770 8/7/02 Spingarn 1. Asbestos Assessment Reqd. Basement/custodian's Office Restroom 2. Repair hole in the ceiling and paint. Asbeastos/Lead code Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) 8/09/02 DCPS Charles Buchanan | |
| Seaton Elementary School | FM-200214036 8/12/02 Seaton 1st Through 3rd Floor Boys' Restroom Remove Bradley basins in boys' restroom from 1st through 3rd floors [No Penetration for the removal]. | |
| Turner Elementary School | FM-200214144 8/13/02 Turner 2nd Floor/Old Wing 1. Three (3) urinals in the boys' restroom are not working; 2. The sink next to the wall supply line leaks; 3. One sink in the girls' restroom is not working; and 4. The toilet next to the wall in the teachers' lounge needs a new spud. | |
| Turner Elementary School | FM-200214139 8/13/02 Turner 1st Floor Boys & Girls' Restrooms/Old Wing 1. Urinals 1, 3 & 5 are not flushing properly and need new flush valves; 2. #6 toilet in girls' restroom is stopped up and needs clearing. | |
| Whittier Elementary School | FM-200214842 8/16/02 Whittier 1. Asbestos Assessment Reqd. 1st Floor Health Suite 2. Plaster bathroom wall. 2. Plaster damaged spot in ceiling. Asbestos/Lead code A-clear for repair by Horne Engineer ( Troy Welcome/Edward Rodriguez ) on 8/20/02 Charles E. Buchanan | |
| Patricia R Harris Ed Center | FM-200215288 8/21/02 Harris P. R. - Patterson 3rd Floor Boys' Room Stairwells Repair or replace light fixture---Tombstone broke. | |
| Takoma Educational Center | FM-200215491 8/23/02 Tokoma Second and Third Floor - Bathrooms - 147,148,126,127,222,221,200 and 199. 1) Minor adjustments needed on the Bradley Basin in the students restrooms. Daniel Hodges - 202-581-7025 H&M Supply Co. Inc | |
| Thomas Elementary School | FM-200216163 8/30/02 (Thomas) 1st FLoor Boys' & Girls' Toilets & 2nd Floor Girls' Restroom (Old Wing) 1. Unstop clogged urinal in boys' restroom; and 2. Unstop toilet in girls' restroom, and 3. Repair sink that needs a trap in the 2nd floor girls' restroom. | |
| Maury Elementary School | FM-200216373 9/3/02 Maury 1st Floor Boys' Restroom Replace cracked urinal, flush valve and stop valve. | |
| Johnson JHS | FM-200216351 9/3/02 Johnson 1st Floor Gym/Coach's Office The restroom sink is leaking in the coach's office. | |
| Wilson High School | FM-200216406 9/4/02 Wilson, W First Floor - Boys and Girls Bathroom - Near 147a and 148a in the Gym Area. 1) Paint Bathrooms. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Eodriguez On 9/05/02 DCPS Charles E. Buchanan | |
| Stanton Elementary School | FM-200217060 9/9/02 Stanton Basement floor girls bathroom fourth toilet not flushing. | |
| Patricia R Harris Ed Center | FM-200217222 9/11/02 Harris P.R. - Patterson 3rd Floor Boys' Room Stairwell #3 Repair or replace two light fisxtures---the light holders broke. | |
| Reed LC | FM-200217228 9/11/02 Reed Ground & 2nd Floors/Clinic by Mens' Room, Art Room, Stairway #4 & Rec. Hallway Girls' Restroom Furnish or replace Halsey-Taylor Mod.#RC8A push-button type for drinking fountain (or kits). Furnish 8 Kohler handles for goose-neck type faucets. | |
| Slowe Elementary School | FM-200217887 9/19/02 Slowe Asbestos Assessment Reqd. 1st Floor Boys' Restroom Replace bathroom partitions. Asbestos Code A - Clear for repairs on 09/20/02. DCPS Safety - Leroy Minton Jr. (RG 09/24/02) | |
| Ballou Senior High School | FM-200218326 9/25/02 Ballou Asbestos Assessment Reqd. Sub-basement Both the male and female restrooms need to be converted for handicapped usage. [NOTE: Contact person on vacation---cannot confirm exactly what is needed until Mr. Sherrod's return.] Asbestos Code A - Clear for repairs on 10/01/02. Horne Engineering - Troy Wilcome (RG 10/02/02) | |
| Wilkinson ES | FM-200218695 695 10/2/02 Wilkinson Second floor - 181 near boys bathroom Need to replace about 20 to 30 floor tile. Damage from water leak. Asbestos Code A-clear for repair by Horne Engineer Sheryll James on 10/08/02 DCPS Charles E. Buchanan | |
| Amidon Elementary School | FM-200218783 10/3/02 Amidon Boys and gym bathrooms Need someone to please come out to replaster the ceiling in boys restroom by the main office have a hole in ceiling and in the gym teachers bathroom bathroom, the ceiling is falling down. Asbestos Code A - Clear for repairs on 10/09/02. DCPS Safety - Leroy Minton Jr. (RG 10/10/02) | |
| Plummer Elementary School | FM-200218801 1 10/3/02 Plummer 1) Third Floor Boys Restroom - Replace (6) missing stall doors and hardware. 2) First Floor Girls Bathroom - Replace (1) miissing stall door and hardware. 3) Replace missing hardware on stall doors in various Restrooms throught out the building where needed. | |
| Ballou Senior High School | FM-200219123 10/9/02 Ballou Stadium - Boy restroom Replace two cracked commodes inside this restroom. This will be site for inter-high playoffs. Asbestos Code A - Clear for repairs on 10/11/02. DCPS-Safety - Leroy Minton Jr. (RG 10/15/02) | |
| Amidon Elementary School | FM-200219147 10/9/02 Amidon Cafe / Gym Need someone to come out to replace the bathroom petitions. They are rusted out and have sharp edges. They are not safe for the kids to be around, could cause a very serious health problem. Please Expedite | |
| Wilson High School | FM-200219504 10/16/02 Wilson,W. First floor rooms 123 and 123A Painting walls in offices and in bathrooms. Paint handrailing in all stairways. Lead & Asbestos Code A - Clear for repairs on 10/17/02. Horne Engineering - Edward Rodrigue (RG 10/21/02) | |
| Turner Elementary School | FM-200220160 10/28/02 Turner First floor - Boys restroom old bldg. Repair falling and peeling ceiling plaster over window. Safety Hazard Asbestos/Lead Code A-clear for repair by Horne Engineer Eward Rodriguez on 10/31/02 DCPS Charles E. Buchanan | |
| Eastern High School | FM-200221003 11/14/02 Eastern Girls Bathroom - Field 1) Repair damaged ceiling inside of this restroom. ( Football Playoffs ) Asbestos Code A- clear for repairs as of 11/18/02 by Horne Engineers Troy Wilcome. | |
| Patterson ES | FM-200221143 200221143 11/18/02 Patterson Second floor Paint restrooms (mens) near doors # 5 and 3. Permit was not issued. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Safety on 11/21/02 Charles E. Buchanan | |
| Woodson High School | FM-200221386 11/20/02 Woodson , H.D. First Floor - Girls Restroom Third Floor - Cosmetology Class 1) Re-install (2) sinks that are presently off of the wall. Asbestos Code A - Clear for repairs on 11/2/02. Horne Engineering - Bipin Nanavaty (RG 11/22/02) | |
| Simon Elementary School | FM-200221500 11/21/02 Simon Basement - Boys restroom Hole in wall under sink. Wall tile Asbestos Code A - Clear for repairs on 11/22/02. Horne Engineering - Sheryll James (RG 11/25/02 | |
| Duke Ellington School | FM-200221610 11/25/02 (Ellington) 1. Asbestos assessment required. 2nd Floor/Mens restroom: Paint falling from the ceiling. Lead & Asbestos Code A - Clear for repairs on 11/26/02. Horne Engineering - Edward Rodriguez\Bipin Nanavaty (RG 12/04/02) | |
| Seaton Elementary School | FM-200221669 11/26/02 (Seaton) 1st Floor/Boys bathrooms, exterior door sills. Re-inforce door sill, and door is not closing properly. Asbestos Code A - Cleared for repairs on 12-12-02 (LM/ 12-12-02) Leroy Minton Jr. Safety Office (202) 576-8962. | |
| Patterson ES | FM-200221795 200221795 12/2/02 Patterson, W.B. Third floor - entrance to boys room Replace light holder / tombstone. | |
| Stanton Elementary School | FM-200222027 12/4/02 (Stanton) First floor - boys bathroom Light fixtures need to be repaired. | |
| Wilkinson ES | FM-200222312 12/10/02 Wilkinson Second floor - 181-girls bathroomand 180 boys bathroom Need to repair or replace hand dryer on wall. | |
| Amidon Elementary School | FM-200222736 12/17/02 (Amidon) 1. Asbestos assessment required. 1st Floor/Boys restroom: Repair hole in plaster ceiling which was caused by a water leak that has been repaired. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Charles Buchanan on 12/20/02 Lead Code A-clear for repair by Horne Engineer Sheryll James DCPS Charles Buchanan on 12/20/02 | |
| Turner Elementary School | FM-200223331 12/30/02 (Turner) !!!URGENT!!! Old building/3rd Floor: Repair door handle lock to boys restroom door that leads too outside. (Exit door insecure) Also, the following rooms need servicing: Rooms #203, 210, 211. | |
| Payne Elementary School | FM-200224084 1/16/03 Payne Third floor - Boys bathroom Repair or replace flush valves, no water pressure. | |
| Reed LC | FM-200224170 1/17/03 (Reed) 2nd Floor/Learning center #1: Re-cork, or re-seal large glass window to prevent rain from entering around the windows, Near boys bathroom. | |
| Ferebee-Hope Elementary School | FM-200224404 1/23/03 Ferebee-Hope Third floor boys bathroom Repair urinals (broke from vandalism). | |
| Patricia R Harris Ed Center | FM-200224856 1/29/03 (Harris, P.R.) 1. Asbestos assessment required. 1st Floor boys restrooms/Near urinals: Repair masonry block where plumbers opened a hole to effect earlier repair. Code A - clear for repairs as of 3/17/04 Sylvia Grimes | |
| Garfield ES | FM-200225460 2/10/03 Garfield Cafeteria and boys room by cafeteria Repair or replace upright water fountain in cafeteria by kitchen. Snake out two (2) urinals in boys room near cafeteria. Please expedite | |
| Garfield ES | FM-200225462 2/10/03 Garfield Second floor - new wing boys room Replace four broken supply lines ti sinks. Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Tony Marcolin (RG 03/03) | |
| Turner Elementary School | FM-200225603 2/11/03 (Turner) Throughout bldg. Plaster ceilings ; room 109 boys restroom old side, first floor room 100 girls restroom new side, first floor wall under windows room 305 and 307; ceilings rooms 204, 202, 205, 201, 200 and 203. Lead & Asbestos Code A - Clear for repairs on 02/13/03. Horne Engineering - Edward Rodriguez (RG 02/14/03) | |
| Truesdell Elementary | FM-200225547 2/11/03 (Truesdell) Annex/2nd Floor girls restroom: Low water pressure in bradley basin. | |
| Patricia R Harris Ed Center | FM-200225717 2/12/03 (Harris, P.R./Patterson) 3rd Floor/Boys restroom: Sink has been pulled off wall. Staff has shut the water off, and sink has been removed. Please replace sink. Asbestos Code A - Clear for repairs on 02/13/03. Horne Engineering - Sharon Voss (RG 02/14/03) | |
| Eastern High School | FM-200225809 2/13/03 (Eastern) Furnish and install boys urinal in stadium bathroom. Repair leaking pipe in wall behind face bowl in girls stadium bathroom in corner on Constitution Ave. side due to vandalism. Asbestos Code A - Clear for repairs on 02/14/03. Horne Engineering - Sharon Voss (RG 02/19/03) | |
| Truesdell Elementary | FM-200226057 2/24/03 Truesdell First floor girls room Please modify existing girls room partition / stall to accommodate handicapped girl that was injured by vehicle last September. This student walks with the assistance of a walker and also a wheelchair. Asbestos Code A - Clear for repairs on 02/25/03. Horne Engineering - Edward Rodriguez (RG 02/26/03) | |
| Spingarn High School | FM-200226357 2/27/03 Spingarn Basement - custodian and records bathroom Requesting plaster to be fix ceilings in both areas. | |
| Shepherd ES | FM-200226501 3/4/03 Shepherd First floor new wing Roof leak nearest to teacher bathroom, need to be repair. | |
| Takoma Educational Center | FM-200226578 3/5/03 Takoma Gym Repair falling flashing grom gym on the outside doors of restrooms. The flashing is in reuseable condition, needs to be rehang dur to appearance and water that leaks downside of doors damaging the tile on floor. | |
| Eliot Junior High School | FM-200227246 3/18/03 (Eliot) Asbestos Assessment Required. Kitchen: Paint kitchen ceiling, walls windows, office, lockers, restroom, doors, and trim. Lead & Asbestos Code A - Clear for repairs on 03/19/03. Horne Engineering - Edward Rodriguez (RG 03/20/03) | |
| Hart Middle School | FM-200227210 3/18/03 HART !! EMERGENCY !! Basement Level - old Wing Toddler Boys Restroom Across from the Infant Care Center . 1. Replace light fixture that fell from the ceiling inside the toddler boys restroom and repair the ceiling as well . NOTE: This particular restroom is used for the toddlers that attend the infant center . Asbestos Code A - Clear for repairs on 03/18/03. Horne Engineering - Sharon Voss (RG 03/18/03) | |
| Davis Elementary School | FM-200227297 3/19/03 (Davis) New wing-Basement/Boys bathroom: Furnish and install a new sink in boys bathroom, a child broke the old sink off the wall. | |
| Beers Elementary School | FM-200227671 3/26/03 Beers Building # 2 Shelf fallout shelter plumbing is needed. Sink needs repair and principal is asking restroom to be place there. Asbestos Code A - Clear for repairs on 03/26/03. Horne Engineering - Troy Wilcome (RG 03/27/03) | |
| Smothers ES | FM-200228059 4/1/03 Smothers Third floor boys bathroom Two 6" holes in wall need to be plaster, patch and painted. Lead & Asbestos Code A - Clear for repairs on 04/02/03. Horne Engineering - Edward Rodriguez (RG 04/02/03) | |
| Bunker Hill Elementary School | FM-200228068 4/1/03 BUNKER-HILL Second Floor - Restroom 1. Repair ( 3 ) stall doors in the girls restroom . | |
| Bruce-Monroe Elementary School | FM-200228020 4/1/03 Bruce-Monroe Staff restroom center (203) and first floor women restroom in lobby Ceiling need to be plastered and painted. Asbestos Code A - Clear for repairs on 04/02/03. Horne Engineering - Bipin Nanavaty (RG 04/03/03) | |
| Eastern High School | FM-200228502 4/9/03 Eastern Armory basement Repair or replace two (2)panic bars on door it is broken. Replace door chek bathroom door boys across from room 241. | |
| Payne Elementary School | FM-200228501 4/9/03 Payne Second and third floor boys bathroom Repair or replace flush valves on first commode, no water pressure. | |
| Patricia R Harris Ed Center | FM-200228753 4/15/03 Harris, P.R. First, second and third floor, The whole building In restrooms, classrooms, stairwells, hallways and teachers store rooms, the ballast need to be changed. Please respond ASAP | |
| Patricia R Harris Ed Center | FM-200228769 4/15/03 (Harris, P.R.) Ground Floor/Room #6: Partitions have fallen in gym, and big gym restrooms. Please respond as soon as possible. Asbestos Code A - Clear for repairs on 04/17/03. Horne Engineering - Troy Wilcome (RG 04/18/03) | |
| Garfield ES | FM-200228877 4/18/03 Garfield First floor custodial closet 1.) Snake out slop sink , that was snake out before but ha re-occured. Girls bathroom, first floor , new wing. 2.) Unstop third sink, first floor wing health suite main building (real sink). 3.) Unstop real sink, main bldg. 4.) Room 1-G main bldg. snake out toilet. | |
| Beers Elementary School | FM-200329063 4/25/03 Beers Bldg. 2 Shelf fallout shelter plumbing is needed. Sink needs repairing and Principal is asking restroom to be place there. | |
| Takoma Educational Center | FM-200329362 5/2/03 Takoma Second floor room 128 Repair breech in ceiling in girls bathroom. Asbestos Code A - Clear for repairs on 05/05/03. Horne Engineering - Tony Marcolin (RG 05/06/03 | |
| Kramer Middle School | FM-200329499 5/5/03 (Kramer Middle School) Asbestos Assessment Required. 1st Floor/Boys bathroom: Repair ceiling Due to previous leak, ceiling is still very moist, and very large portions have falling down on the bathroom urinals. Asbestos Code A - Clear for repairs on 05/05/03. Horne Engineering - Edward Rodriguez (RG 05/06/03) | |
| Takoma Educational Center | FM-200329663 5/6/03 (Takoma) 3rd Floor/Room #222: Repair broken toilets, and urinals in the boys restrooms | |
| Garnet-Patterson MS | FM-200330504 5/21/03 (Garnet-Patterson) !!!URGENT!!! 1st Floor/Boys bathroom:l Cold water stem broke completely off faucet; water leaking, (Engineer has shut the water off) | |
| Patricia R Harris Ed Center | FM-200330583 5/22/03 Harris, P.R. / Patterson Third floor boys room stairwell 4 Repair partition broke loose from floor tiles. Asbestos Code A - Clear for repairs on 02/22/03. Horne Engineering - Sharon Voss (RG 05/27/03) | |
| Wilkinson ES | FM-200330884 5/29/03 (Wilkinson) Through Out the Building: Fluorescent lights are operating intermittently in the following rooms: 2nd Floor, electrical room, hall corridor, boys bathroom, women restroom,. Room #180, 181,182, and 184. | |
| Reed LC | FM-200330912 5/30/03 Reed, Marie First floor early childhood male restroom Survey and replace missing floor tile (small ceramic tile). Asbestos Code A - Clear for repairs on 06/02/03. Horne Engineering - Sharon Voss (RG 06/02/03) | |
| Reed LC | FM-200330914 5/30/03 Reed, Marie Three male restrooms - center 1 and 3 Re-attach four petitions to walls in male restroms. Asbestos Code A - Clear for repairs on 05/30/03. Horne Engineering - Roger Kager (RG 06/02/03) | |
| Patricia R Harris Ed Center | FM-200330946 5/30/03 (Harris, P.R./Patterson) 3rd Floor Girls bathroom/Stairwell #6: Replace stop valves on two (2) leaking toilets. | |
| Patricia R Harris Ed Center | FM-200331315 6/5/03 Harris, P.R. Ground floor Pre-K Area Boys Restroom Repair the floor (ceramic tile ). Asbestos Code A - Cleared for repairs on 09-10-03 by Leroy Minton Jr. (LM/09-10-03) Safety Office 202-576-8962. Note: Informed by Charles Gross that the water leak was repaired and it was coming from around the wax ring and not from the ceiling. | |
| Davis Elementary School | FM-200331504 6/9/03 Davis Boys bathroom new wing basement Furnish and install a new sink, A child broke the old sink off the wall. Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Tony Marcolin (RG 06/24/03) | |
| Horace Mann Elementary School | FM-200331530 6/10/03 Mann Community Center 1) Replace broken window in the boys Restroom . Note : Approximate - 24" x 35" set in wood frame . | |
| Ferebee-Hope Elementary School | FM-200331576 6/11/03 Ferebee-Hope First floor C-building men's bathroom Remount urinal to wall. Asbestos Code A - Cleared for repairs by Leroy Minton Jr on 06-11-03 (LM/06-11-03) Safety Office 202-576-8962. | |
| Davis Elementary School | FM-200332028 6/18/03 Davis Basement teachers lounge bathroom Repair ceiling, part of the ceiling fell down. Asbestos Code A - Clear for repairs on 06/18/03. Horne Engineering - Bipin Nanavaty (RG 06/19/03) | |
| Benjamin Banneker Academic HS | FM-200332411 6/24/03 Banneker Second Floor 1. Door closure on the boys restroom door is bent and will not close , please repair . Asbestos Code A - Clear for repairs on 06/25/03. Horne Engineering - Sheryll James ( RG 06/26/03) | |
| Rudolph Elementary School | FM-200332391 6/24/03 Rudolph Basement Level 1. Repair and or replace the bradley basin in the boys restroom , water continuously run . 2. Repair and or replace the bradley basin in the girls restroom , no running water . Asbestos Code A - Clear for repairs on 06/24/03. Horne Engineering - Sharon Voss (RG 06/25/03) | |
| Turner Elementary School | FM-200332430 6/25/03 (Turner) 2nd Floor/Girls restroom: Restroom needs three (3) toilet seats, drinking fountains on 2nd floor hallway needs repair or replace; water fountain is broken in teachers lounge, needs to be replaced. | |
| Thomas Elementary School | FM-200332648 6/27/03 Thomas First ,Second & Third Floor 1. Survey, plaster and paint the following areas - # 100, #102, #103, # 106, kitchen, managers office, storage room , #202, #203, #205, #209, landing, girls and boys restrooms, #302,#304 & #306. Lead & Asbestos Code A - Clear for repairs on 07/02/03. Horne Engineering - Edward Rodriguez (RG 07/02/03) | |
| River Terrace ES | FM-200332934 7/1/03 (River Terrace) Asbestos Assessment Required. Plaster work requested in the following areas: 1) ceiling over top of windows in principal's office, main office, counselor's office, nurse's office, teacher's lounge, conference room and resource center (rm#9). 2) ceilings in hallway near library, staff bathroom and boys' restroom near classroom #5. 3) Ceiling outside of classroom #5 and wall in kitchen near entrance door. 4) Holes in ramp wall near classroom #13 Asbestos Code A - Clear for repairs on 11/09/05. Tidewater - Rodney Distance (RG 11/14/05) | |
| Takoma Educational Center | FM-200333030 7/8/03 (Takoma) Third floor -boys restroom blue team area One (1) urinal is stopped up, one (1) toilet is broken. Girls one (1) commode stopped up. Unstop toilets and replace broken toilet. | |
| Garnet-Patterson MS | FM-200333219 7/14/03 Garnet-Patterson First floor boys bathroom Faucet handset (cold water) pop off. Cut water off need to be replace. ASAP | |
| Ferebee-Hope Elementary School | FM-200333403 7/17/03 (Ferebee-Hope) 1st floor Kitchen/Ladies Bathroom: Replace toilet that was broken while unclogging building sewage drain. | |
| Ferebee-Hope Elementary School | FM-200333402 7/17/03 (Ferebee-Hope) D-Building, 1st Floor/Headstart Bathroom: Replace toilet that was broken while unclogging building sewage drain. | |
| Ferebee-Hope Elementary School | FM-200333428 7/18/03 Ferebee -Hope First Floor - Family Services 1. Supply hot and cold water in boys and girls restrooms . | |
| Hine JHS | FM-200333520 7/22/03 Hine Third Floor 1. Plaster ceiling in the girls and boys restroom. Lead & Asbestos Code A - Clear for repairs on 05/14/04. Horne Engineering - Edward Rodriguez/Bjarne Smith (RG 05/14/04) | |
| Gage-Eckington ES | FM-200334613 8/7/03 Gage-Eckington First and second floor throughout building Several restrooms in need of partitions, they were removed and never replace. Boys and girls need their privacy. Thank you URGENT Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering -Ray Agnant (RG 09/12/03) | |
| Whittier Elementary School | FM-200334706 8/8/03 Whittier Basement boys restroom Repair or replace flush valve on urinal and spud. no isolated. | |
| Turner Elementary School | FM-200334909 8/11/03 (Turner) Asbestos Assessment Required. Ceiling peeling in the following rooms: #100, 109, 201, 202, 203, 204, 205, 305, 307, girls restrooms, and new building 1st floor under windows. Lead & Asbestos Code A - Clear for repairs on 08/13/03. Horne Engineering - Edward Rodriguez (RG 08/19/03) | |
| Bruce-Monroe Elementary School | FM-200335019 8/13/03 Bruce-Monroe Throughout building There is paint peeling from ceilings throughout building needs repair as soon as possible. There are so many places where paint is peeling from the ceiling. On all stairwells in many of the bathrooms on 2nd and 3rd floors. Lead & Asbestos Code A - Clear for repairs on 08/21/03. Horne Engineering - Edward Rodrigues (RG 08/22/03) | |
| Thomas Elementary School | FM-200335148 8/13/03 Thomas Second floor girls and boys restroom Survey rehang or replace partition doors. Code A-clear for repair by DCPS Charles Buchanan on 8/14/03 | |
| Bruce-Monroe Elementary School | FM-200335144 8/13/03 Bruce-Monroe Second floor center 201 boys restroom Repair leak in ceiling. Plaster is falling. Asbestos Code A - Clear for repairs on 08/21/03. Horne Engineering - Roger Kager (RG 08/22/03) | |
| Ballou Senior High School | FM-200335213 8/14/03 Ballou First floor Boys restroom Repair ceiling in area damage from restroom above. Asbestos Code A - Clear for repairs on 08/15/03. Horne Engineering - Tony Marcolin (RG 08/18/03) | |
| Bunker Hill Elementary School | FM-200336299 8/26/03 Bunker-Hill Boys Restroom Replace exhaust fans in boys restroom. The smell of urine throughout the Building. The exhaust fan is broken. | |
| Spingarn High School | FM-200336327 8/27/03 Spingarn First floor boys bathroom Requesting hole in ceiling be plaster, due to work that was done on the above floor. Asbestos Code A - Clear for repairs on 08/29/03. Horne Engineering - Troy Wilcome ( RG 09/02/03) | |
| Davis Elementary School | FM-200336577 8/29/03 Davis Basement boys bathroom new wing Furnish and install a new sink, a child broke the old sink off the wall. | |
| Patricia R Harris Ed Center | FM-200336669 9/2/03 Harris, P.R. / Patterson Third floor teachers bathroom Replace stop valve stairwell 6. | |
| Patricia R Harris Ed Center | FM-200336670 9/2/03 Harris, P.R. / Patterson Third floor Boys bathroom Stairwell 4 Repair partition, broke loose from floor tile. Asbestos Code A - Clear for repairs on 09/03/03. Horne Engineering - Troy Wilcome (RG 09/04/03) | |
| Bruce-Monroe Elementary School | FM-200336914 9/5/03 Bruce-Monroe Str. 201/ stairways Plaster work is needed on the East / West South stairways and lobby restrooms ctr. 201 boys restroom. Lead & Asbestos Code A - Clear for repairs on 09/08/03. Horne Engineering Edward Rodriguez (RG09/09/03) | |
| Stoddert ES | FM-200336901 01 9/5/03 Stoddert First floor girls restroom Swinging door in toilet area have been knock down. Need someone to replace door hindges. Health Hazard Code A-clear for repair by DCPS Charles Buchanan on 9/9/03 | |
| Park View ES | FM-200337255 9/11/03 Park View Second floor boys restroom Door need to be replaced, big hole in door. Asbestos Code A - Clear for repairs on 09/15/03. Horne Engineering - Roger Kager (RG 11/18/03) | |
| Nalle Elementary School | FM-200337641 9/16/03 Nalle, J.C. Second floor boys restroom Ceiling damage due to roof leak. Asbestos Code A - Clear for repairs on 10/23/03. Horne Engineering - Sheryll James (RG 10/27/03) | |
| Emery Elementary School | FM-200338258 9/17/03 (Emery) Asbestos Assessment Required. Second floor boy bathroom urinal has a crack need replacement. | |
| Whittier Elementary School | FM-200337824 9/22/03 (Whittier) Asbestos Assessment Required. Old Side/1st Floor: Repair wall in Assist. Principal's restroom; water leaking from the outside. (Possible roof leak) Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Tony Marcolin (RG 10/08/03) | |
| Beers Elementary School | FM-200338044 9/25/03 Beers Roof air vents Three (3) air vents on roof not working. Bathroom in other parts of bldg. Need the circulation. | |
| Beers Elementary School | FM-200338049 9/25/03 Beers First and second floor bldg. # 3 Hallways and restrooms are in need of plastering and painting Bldg. # 2. Restrooms also and classroom ceiling in Bldg. # 2. Lead & Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Edward Rodriguez (RG 09/29/03) | |
| Beers Elementary School | FM-200338045 9/25/03 Beers Second floor building 1 Water is coming through roof hallway by boys and girls bathroom. Contractors are during pipe work also asbestos team. That area needs repair before contractor put up ceiling tile. | |
| Stevens Elementary School | FM-200338943 10/15/03 Stevens First floor bathroom room 5 Need new flooring. Asbestos Code A - Clear for repairs on 10/17/03. Horne Engineering - Edward Rodriguez (RG 10/21/03) | |
| Langdon Elementary School | FM-200339232 10/21/03 (Langdon) !!!VERY URGENT!!! 2nd Floor/Boys Bathroom: Sparks coming from light switch when turned on; boys bathroom, and classrooms are on same circuit, there are no lights in classrooms. *** THIS WORK ORDER BELONGS TO THE ELECTRICAL DEPARTMENT ******** | |
| Patricia R Harris Ed Center | FM-200339817 11/3/03 (Harris, P.R./W.B. Patterson) !!!URGENT!!! 3rd Floor/Stairwell #4: Replace flush valve in teachers bathroom. | |
| Bancroft Elementary School | FM-200340089 89 11/7/03 Bancroft First floor Open space Replace light fixture in the bathroom (girls) near franklin room. Asbestos Code A - Clear for repairs on 11/12/03. Horne Engineering - Tony Marcolin (RG 11/14/03) | |
| Turner Elementary School | FM-200341494 12/12/03 Turner Fire Code Second floor new bldg. Replace door closurer on exit door across from boys restroom broken. Code A-clear for repair by DCPS Charles Buchanan on 12/16/03 | |
| Turner Elementary School | FM-200341609 12/15/03 (Turner) Asbestos Assessment Required. New Side/1st, 2nd, & 3rd: Need paint for painting girls, and boys restrooms. Lead & Asbestos Code A - Clear for repairs on 12/16/03. Horne Engineering - Edward Rodriguez (RG 12/17/03) | |
| Ketcham Elementary School | FM-200341974 12/22/03 (Ketcham) 2nd Floor/Boys Restroom: Partitions in boys bathroom, on 2nd floor, falling; believed to have been torn from wall. Asbestos Code A - Clear for repairs on 12/22/03. Horne Engineering - Tony Marcolin (RG 01/06/04) | |
| Marshall Educational Center | FM-200342179 1/2/04 Marshall Pool Area Check chemicals Check temperature Check bathroom toilet | |
| Shaed Elementary School | FM-200442395 1/8/04 Shaed First floor boys and girls restroom !. Repair one bradley basin in boys room that does not come on. Repair one bradley basin in girls room that does not come on. | |
| Francis Junior High School | FM-200442404 1/8/04 (Francis) Asbestos Assessment Required. 2nd Floor/Girls Restroom: Replaster left side of the restroom over top commode. Asbestos Code A - Clear for repairs on 01/08/04. Horne Engineering - Philp Connolly (RG 01/12/04) | |
| Roosevelt High School | FM-200442564 1/12/04 (Roosevelt) 2nd Floor/Boys Bathroom: Replace ceramic wall tile that was never completed by ADA Contractor. (Grounds) Asbestos Code A - Clear for repairs on 01/13/04. Horne Engineering - Tony Marcolin (RG 01/14/04) | |
| Stuart-Hobson Middle School | FM-200442942 1/20/04 Stuart-Hobson SWecond floor girl bathroom A toilet was leaking and the ceiling in the second floor bathroom has come in. Please repair ceiling. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Edward Rodriguez (RG 01/22/04) | |
| Nalle Elementary School | FM-200442964 1/20/04 Nalle, J.C. Urgent !!! Old Side - Second Floor - Boys Bathroom 1) Big chunk of ceiling fell down in the bathroom and hit student in head. Asbestos Code A - Clear for repairs on 01/20/04. Horne Engineering - Troy Wilcome (RG 01/20/04) | |
| Garfield ES | FM-200443366 1/29/04 Garfield By cafeteria Girls bathroom by cafeteria floor tile needs to be repaired or replaced due to water damage. There is a big hole in the middle of the room. Asbestos Code A - Clear for repairs on 01/30/04. Horne Engineering - Edward Rodriguez (RG 02/02/04) | |
| Meyer Elementary School | FM-200443622 2/2/04 (Meyer) 2nd Floor/Boys Bathroom: Replace broken window. | |
| Payne Elementary School | FM-200443623 2/2/04 (Payne) 1st Floor/Girls Bathroom: Ceiling has fallen in bathroom; repair or replace. Asbestos Code A - Clear for repairs on 03/03/04. Horne Engineering - Troy Wilcome (RG 02/04/04) | |
| Turner Elementary School | FM-200443920 2/10/04 (Turner) !!!VERY URGENT!!! Old Side/1st Floor, Boys Bathroom: Partitions that holds stall doors are hanging off, students could be injured if these heavy partitions fall on one of them. Attention: Duplicate service order submitted, and call of concern came in today. "Partitions need too be removed" Code A-clear for repair by DCPS Chaeles Buchanan on 2/11/04 | |
| Bowen Elementary School | FM-200443979 2/11/04 (Bowen) 1st Floor/Girls Restroom: Repair faucets, and other parts on sink. | |
| Turner Elementary School | FM-200444065 2/13/04 Turner First Floor - Old Building - Boys Restroom 1) Repair or replace stall door. Door has fallen off. Code A-clear for repair by DCPS Charles Buchanan on 2/17/04 | |
| Johnson JHS | FM-200444257 2/19/04 (Johnson) !!!VERY URGENT!!! Basement Level/Managers/Staff Restroom: After flushing toilet, water began too come through floor. (Very large amount of water on floor) | |
| Garrison ES | FM-200444641 41 3/1/04 (Garrison) 2nd Floor/Girls Restroom: Bradley basin will not shut off, shut-off valve not working. | |
| Davis Elementary School | FM-200444587 3/1/04 DAVIS fIRST FLOOR BOYS BATHROOM BY 117 iISTALL SINK BACK ON WALL AND REPLACE DAMAGE FAUCET, SINK KEEPS FALLING OFF WALL. Asbestos Code A- Clear for repairs on 03/01/04. Horne Engineering - Bipin Nanavaty (RG 03/02/04) | |
| Davis Elementary School | FM-200444589 3/1/04 DAVIS Bathroom BOYS BATHROOM new wing Furnish and install a new sink, old broke the old sink off wall. Asbestos Code A- Clear for repairs on 03/01/04. Horne Engineering - Bipin Nanavaty (RG 03/02/04) | |
| Gibbs Elementary School | FM-200444583 3/1/04 Gibbs Outside Rails leading ro boy restroom outside from playground need repairing. | |
| Turner Elementary School | FM-200445082 3/9/04 Turner ( Maintenance T School Blitz ) Rooms - 100,109,201,202,203,204,205,305,307, and First Floor - Girls Bathroom . 1) Scrape and paint ceilings. Approx size - 34'x31' ) Lead & Asbestos Code A - Clear for repairs on 03/10/04. Horne Engineering - Edward Rodriguez (RG 03/12/04) | |
| Patricia R Harris Ed Center | FM-200445168 3/10/04 (Harris) !!!URGENT!!! Main Floor/Girls Locker Room: Two (2) toilets in girls restroom running over, snaking did not reolve the problem. | |
| Patricia R Harris Ed Center | FM-200445336 3/12/04 Harris, P.R. Restrooms and stairwell landings # 7 top floor area student restroom need ballances changed # 6 main floor student restroom also. # 7 restroom for students # 1 restroom need ballances changed. Asbestos Code A - Clear for repairs on 03/15/04. Horne Engineering - Philp Connolly (RG 03/17/04) | |
| Patricia R Harris Ed Center | FM-200445330 3/12/04 (Harris,P.R.) Asbestos Assessment Required. Restroom #7/Top Floor: Power outage due to broken tube, and bad ballast. Asbestos Code A - Clear for repairs on 03/15/04. Horne Engineering - Philp Connolly (RG 03/17/04) | |
| Brookland Elementary | FM-200445320 3/12/04 Brookland Roof Top Repair or replace exhaust fan for boys restroom, exhaust fan motor is burnt out. Name - Power line Volts - 120 PH-1 R.P.M. - 1300 Model - 90DE8X HP-110 CFM - 250 | |
| Gibbs Elementary School | FM-200445373 3/15/04 Gibbs Boys and Girls restroom Replace heating units that are not working and has been urinated on and rotton out and motors are inoperable. | |
| Gibbs Elementary School | FM-200445445 3/16/04 Gibbs Main Building Replace Bearing to shaft. For exhaust fan motors Girls and Boys restroom. Main Building top bottom bearings. | |
| Benjamin Banneker Academic HS | FM-200445484 3/17/04 Banneker Second floor boys restroom Electrician is needed for light fixture. Lights will not come on, fixtures were tested for proper voltage. Looked to have all its power. | |
| Seaton Elementary School | FM-200445500 3/17/04 Seaton URGENT Second floor girls bathroom Replace partition to stall near window. partition is in house. Asbestos Code A - Clear for repairs on 03/18/04. Horne Engineering - Tony Marcolin (RG 03/22/04) | |
| Seaton Elementary School | FM-200445793 3/24/04 Seaton Second floor boys bathroom Repair or replace partition to stall near window. Asbestos Code A - Clear for repairs on 03/25/04. Horne Engineering - Tony Marcolin (RG 03/26/04) | |
| Woodson High School | FM-200445993 3/29/04 Woodson SHS Health Suite 1) Plastering is needed for walls, ceiling in the restrooms,bed/sleeping area. Plaster is falling . Lead & Asbestos Code A - Clear for repairs on 03/29/04. Horne Engineering - Edward Rodriguez (RG 03/30/04) | |
| Davis Elementary School | FM-200446718 4/14/04 Davis First floor boys bathroom by 117 Need plummer to install sink back on wall and replace damage faucet, sink keep falling off wall. Back of sink is damage . | |
| King M L ES | FM-200446791 4/16/04 King, M.L. First floor boys bathroom Need to have floor tile replace around a trap door. Asbestos Code A - Clear for repairs on 04/16/04. Horne Engineering - Roger Kager (RG 04/16/04) | |
| Eastern High School | FM-200446874 4/20/04 Eastern Across from B-37 across from 153 Furnish and install broken face bowl in bathrooms in annex and custodial closet SIMC across from B-37. | |
| Cardozo High School | FM-200447280 4/28/04 Cardozo Ground floor tunnel Replace 3/4 inch galvanized pipe and valve- no water supply to health unit bathrooms sinks and water cooler, Domestic cold water supply pipe. Emergency needed for health services. | |
| Hine JHS | FM-200447413 5/3/04 (Hine) !!!URGENT!!! First Floor/Girls restroom Repair panic bar device lock will open. Asbestos code A - Clear for repairs on 05/04/04. Horne Engineering - Bipin Nanavaty (RG 05/05/04) | |
| Eastern High School | FM-200447447 5/4/04 Eastern Auditorium room 152 stadium back across from B-35 and gym hallway Repair or replace down spouts and roof leaks in above locations wall are damage and getting worse. 1. Down spouts on back of school, 17th St. side of bldg. 2. Repair roof leak in boys bathroom in stadium - damaging ceiling. | |
| Eastern High School | FM-200447758 5/11/04 Eastern Cafeteria doors, Balcony and bathroom door in gym Furnish and install panic bars and missing door knobs. Asbestos Code A - Clear for repairs on 11/21/06. Tidewater - Shamika Parker (RG 11/30/06 ) | |
| Ferebee-Hope Elementary School | FM-200447910 5/13/04 (Ferebee-Hope) !!!EMERGENCY!!! 3rd Floor/Boys Bathroom: Remove, and replace broken urinal. (Students could sustain injury from broken porcelain. | |
| Thomas Elementary School | FM-200447998 5/17/04 Thomas First, second and third floor Survey, plaster and paint the following rooms: Rooms 300, 301, 302, 303, 304, 305, 307 and 309. Rooms 200, 202, 203, 205, 207 and 209. Rooms 100, 101, 102, 103, 104, 105, 106, 107 and 109. Corridors, landings, restrooms counselors suite partitions. Lead & Asbestos Code A - Clear for repairs on 05/18/04. Horne Engineering - Bjarne Smith/Edward Rodriguez (RG 05/19/04) SEE LINKED DOCUMENTS | |
| Patricia R Harris Ed Center | FM-200448230 5/20/04 Harris, P.R. Main floor auditorium Repair the door knob; REstroom in the auditorium lock by stage. Asbestos Code A - Clear for repairs on 05/21/04. Horne Engineering - Philp Connolly (RG 05/24/04) | |
| Eastern High School | FM-200448495 5/26/04 Eastern First Floor - Girls Bathroom 1) Repair wall in bathroom - Wall was broken for plumbers to repair leaking line, cinder block and ceramic tile. | |
| Bancroft Elementary School | FM-200448555 5/27/04 Bancroft Third floor boys bathroom main bldg. Replace trap door. Door not connected to the hinges. Asbestos Code A - Clear for repairs on 05/28/04. Horne Engineering - Philp Connolly (RG 06/01/04) | |
| Thomas Elementary School | FM-200448638 6/1/04 Thomas Through out bldg. Corridor, lobby stairwells and restrooms Survey and upgrade lights. Asbestos Code A - Clear for repairs on 06/02/04. Horne Engineering - Bipin Nanavaty ( RG 03/06 ) | |
| Bancroft Elementary School | FM-200449236 6/10/04 Bancroft First floor boys/girls bathroom primary Patch up hold in the ceiling. Asbestos Code A - Clear for repairs on 06/14/04. Horne Engineering - Bipin Nanavaty (RG 06/15/04) | |
| Bancroft Elementary School | FM-200449223 6/10/04 Bancroft First floor boys bathroom (main bldg.) Re-attach partition railing. Sharp edge may cause someone to get hurt. Asbestos Code A - Clear for repairs on 06/10/04. DCPS Safety - Richard Gibson (RG 06/10/04) | |
| Turner Elementary School | FM-200449499 6/18/04 (Turner) Boys Restroom: Repair urinal next to toilet; there is a hole under the bottom, and water is leaking on the floors. | |
| Browne Junior High School | FM-200449505 6/18/04 Browne EMERGENCY EMERENCY Second and first floor bathroom new side Repair water lines in bathroom, no running water in sinks. HA 005 Plaster White Wall & Ceiling Plaster No Asbestos 705 Brown Coat With HA 005 No Asbestos HA001 pipe insulation white 2" & 10" Block ionsulation Yes Asbestos HA 053 Pipe insulation Gray/Black 4-8 O.D. compressed paper pipe insulation Yes Asbestos Asbestos Code A - Clear for repairs on 01/25/07. Tidewater - Kenny Long (RG 02/22/07) | |
| Turner Elementary School | FM-200449550 6/21/04 (Turner) !!!URGENT!!! 3rd Floor/New Building: Unstop sink in custodian closet next to boys restroom. | |
| Turner Elementary School | FM-200449551 6/21/04 (Turner) !!!URGENT!!! 3rd Floor/Old Building: Repair leaking water fountain in hall next to boys restrooms. | |
| Ferebee-Hope Elementary School | FM-200450688 7/23/04 Ferebee-Hope First floor B-building custodial closet unstop sink was plunged; First floor C-building by custodial closet replace missing urinal; Third floor A-building boys bathroom Replace two (2) urinals (broken). | |
| Eastern High School | FM-200450769 7/26/04 Eastern Across from B-37 and across from 153 Furnish and install broken face bowl - in bathroom in annex and custodial closet sink across from B-37. | |
| Eastern High School | FM-200450759 7/26/04 Eastern Across from B-78, B-42 and B-35 Replace sinks at two (2) bathrooms across from B-78 and B-42. Replace closet custodial sink, replace sink in custodial closet; big hole in it, replace urinal in boys bathroom from B-79- Replace or repair handle tail pipe- leaking water bad. Repaie leaking urinal in boys bathroom from B-79. Men bathroom across from (144) leaking urinal from bacl of both urinals. (creating a bad odor). | |
| Eastern High School | FM-200450741 7/26/04 Eastern Repair defective doors to room 346, 260, and 235. Door to bathroom 356 door closure, room 319, 327, 335, 219, 228 and b-40 defective or door closures. Asbestos Code A - Clear for repairs on 09/08/04. DCPS Safety - Leroy Minton Jr. (RG 09/08/04) | |
| Davis Elementary School | FM-200451130 7/29/04 Davis First and second floor boys and girls bathroom new wing Replace about six (6) faucets in bathrooms that are in bad condition, | |
| Spingarn High School | FM-200451999 8/10/04 Spingarn First floor boys bathroom Requesting hole in ceiling to be plaster, due to work that was done on the above floor. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Ricardo Eley (RG 08/18/04) | |
| Spingarn High School | FM-200452027 8/10/04 Spingarn Girls restroom by 115 Third floor girls restroom by 313 Requesting stall door to be replaced. Asbestos Code A - Clear for repairs on 08/12/04. DCPS Safety - Richard Gibson (RG) | |
| Woodson High School | FM-200452825 8/18/04 Woodson, HD 7, 6, 5, 4, 3, 2, 1, Plaza and Ground floor restroom Fix or replace exhaust fans in all restrooms. | |
| Wilson High School | FM-200452830 8/18/04 Wilson, W. First floor gym area All bathrooms in the gym area need ventilation. Bathrooms has no windows. | |
| Wilson High School | FM-200452844 8/18/04 Wilson, W. First, second and third floor boys bathrooms Repair walls. tha damage was done due to gutters. The damaged is near the windows. Asbestos Code A - Clear for repairs on 08/25/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) | |
| Browne Junior High School | FM-200452884 8/18/04 Browne Center Third floor Female bathroom students, room 303, 304, 305and 307 Repair classroom doors, the door hits frame when being closed. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Richard Gibson (RG 08/28/04) | |
| Ketcham Elementary School | FM-200452847 8/18/04 Ketcham Second floor boys restroom (New wing) Ceiling is falling as a result of flooding in third floor restroom, Ceiling may fall any minute. Please have someone come out. Code A -clear for repairs as of 8/31/04 safety Sylvia. | |
| Ballou Senior High School | FM-200453219 8/19/04 (Ballou) Asbestos Assessment Required. SAFTY HAVARD-REPLACE SMALL CERAMIC TILE IN GIRLS RESTROOM 1ST. FLOOR NORTH. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) | |
| Ferebee-Hope Elementary School | FM-200453030 8/20/04 (Ferebee) !!!VERY URGENT!!! 1st Floor/Boys, and Girls Restroom: Boys faucets are not working, and in the girls bathroom, the toilet is rocking and leaking from wax ring, and flooding the floors. (Mount wax ring) | |
| Aiton Elementary School | FM-200453067 8/20/04 Aiton Second floor boys restroom Ceiling need plastering and painting. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Richard Gibson (RG) | |
| Ferebee-Hope Elementary School | FM-200453149 8/20/04 Ferebee-Hope First floor child and family services mens bathroom Replace faucets on sink. | |
| Francis Junior High School | FM-200453114 8/20/04 Francis Need ballast report: Lights and ballast replacement Room 311 - 2 Room 210 - 3 Room 105 - 8 Room 309 - 1 Room 208 - 4 Room 109 - 9 Room 307 - 6 Room 202 - 5 Room 116 - 8 Room 303 - 1 Room 203 - 3 Room 112 - 1 Room 301 - 4 Boys restroom -2 Room 110 - 7 Room 300 - 3 Room 207 - 2 Library 104 - 5 Room 302 - 1 Room 209 - 10 Teacher lunch room - 1 Room 308 - 1 Room 211 - 2 Kid lunch - 4 Room 310 - 4 Boys gym east 24 lights out Room 312 - 1 120 Vac 60 HZ Rapid start ballast for use with 2 F 40 T 12 Lamps. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Leroy Minton Jr. (RG 08/24/04) | |
| Garfield ES | FM-200453200 8/23/04 Garfield Second floor by room 200 New wing and room 2A Replace doors, bathroom door broken. there is 2 in room 2A. Asbestos Code A - Clear for repairs on 08/30/04. DCPS Safety - Richard Gibson (RG 08/31/04) | |
| Johnson JHS | FM-200453173 8/23/04 Johnson First floor teachers bathroom and Asst. Principals office No lights in bathroom, ballasts gone bad, need ballasts. 277 volts 60 Hertz V-2S34-TP | |
| Whittier Elementary School | FM-200453264 8/24/04 Whittier First floor Special Ed office Survey wall in bathroom, plaster falling from wall. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) | |
| Whittier Elementary School | FM-200453261 8/24/04 Whittier Second floor nurse office and restroom Replace 3 windows in nurse office high uo and 2 in the nurse restroom. | |
| Malcolm X ES | FM-200453245 245 8/24/04 (Malcolm X) Asbestos Assessment Required. 3rd Floor/Boys Restroom: Repair plaster ceiling that continues to fall. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Richard Gibson (RG) | |
| Stanton Elementary School | FM-200453327 8/25/04 Stanton Second floor boys and girls bathroom Fixtures need replaced. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |
| Garrison ES | FM-200453486 8/27/04 Garrison Second floor west wing boys bathroom Water is leaking behind the wall on urinals. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. | |
| Garfield ES | FM-200453533 8/27/04 Garfield Basement 1) Re-surface Girls Bathroom floor with concrete. | |
| Cook J.F. Elementary School | FM-200453676 8/31/04 Cook, JF First Floor - boys bathroom two partition to the urinals need to be put up. Cole A-clear for repair by DCPS Charles Buchanan on 9/01/04 | |
| Emery Elementary School | FM-200454926 9/10/04 (Emery) Second floor girls bathroom has no water to bradley basin (girls can't wash there hands) Urgent!! | |
| Terrell Mc ES | FM-200454661 9/14/04 Terrell, MC FIRE CODE VIOLATION: UG Breach in the ceiling gym boys bathroom.. Asbestos Code A - Clear for repairs on 09/15/04. DCPS Safety - Leroy Minton Jr. (RG 09/15/04) | |
| Eastern High School | FM-200454607 9/14/04 Eastern Basement Boys Restroom: 1. Missing urinal 2. Leaking urinal 3. Repair or replace shower head. | |
| Watkins Elementary School | FM-200455095 9/20/04 Watkins Fourth floor Boys bathroom the last toilet need flush valve set and teacher bathroom sink need a new faucet set for hot water. Note: Duplicate ( see FM- 200341499 ) | |
| Beers Elementary School | FM-200455099 9/20/04 Beers Emergency Roof Building # 1 second by girls and boys restroom there is a roof leak. Water is coming thru the lights. | |
| Garnet-Patterson MS | FM-200455586 9/24/04 Garnett Patterson Emergency !!! Second Floor - Boys Restroom 1) Replace (2) porcelin sinks that were vandalized and broken off wall. Sinks have very sharp edges, Bathroom shut down. Asbestos Code A - Clear for repairs on 09/24/04. DCPS Safety - Charles Buchanan (RG 09/24/04) | |
| Kenilworth ES | FM-200455854 9/27/04 Kenilworth Second floor girls restroom The light in the restroom will not come on at all needs to be replace. | |
| Plummer Elementary School | FM-200455845 9/27/04 Plummer First floor boys restroom Repair ceiling. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) | |
| Gibbs Elementary School | FM-200455830 9/27/04 Gibbs First floor boys restroom Ceiling is peeling in need for repairs. Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/06/04) | |
| John Burroughs ES | FM-200456022 9/29/04 Burroughs Lower level boys and girls restrooms Floor concrete, floor damage real bad need repairing, paint. Code A- clear for repairs as of 10/12/04 safety Sylvia | |
| John Burroughs ES | FM-200456043 9/29/04 Burroughs First floor by boys restroom Wall tiles is missing in front of room # 5, 4 missing. Code A - clear for repairs as of 10/12/04 safety Sylvia. | |
| Ballou Senior High School | FM-200456342 10/1/04 Ballou Sub -B Male and female r/r Restroom need to be handicap accessible. Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/06/04) | |
| Kimball Elementary School | FM-200456385 10/4/04 Kimball New wing teacher restroom basement level The knobs are broken. Asbestos Code A - Clear for repairrs on 10/04/04. DCPS Safety - Richard Gibson (RG) | |
| Patricia R Harris Ed Center | FM-200456450 10/5/04 Harris, P.R. Top floor restroom # 1 and 8 These restrooms need parts to be repaired. The trap need to be replaced in # 1 and the handle assembly or parts of it need to be replaced. Please respond ASAP. | |
| Patricia R Harris Ed Center | FM-200456453 10/5/04 Harris, P.R. First, second, ground and main floor We have ballast that need to be replaced, 10 all together that are in classroom areas and restrooms. 1. Mens teachers ITV room. 2. Men teachers next to the teachers lounge on the ground floor. 3. Womens teachers # b6 on the ground floor. 4. 7 in pool A. Asbestos Code A - Clear for repairs on 10/05/03. DCPS Safety - Leroy Minton (RG 10/06/04) | |
| Patricia R Harris Ed Center | FM-200456468 10/5/04 Harris, P.R. Ground floor big gym boys and girls restroom The partition have fallen down and the tile floor need to be replaced ASAP in boys, and girls partition has fallen and need to be replaced. The kids have no walls between them now. Asbestos Code A - Clear for repairs on 10/05/03. DCPS Safety - Leroy Minton (RG 10/06/04) | |
| Patricia R Harris Ed Center | FM-200456452 10/5/04 Harris, P.R. Ground floor restroom # 3 and # 7 Both of these restrooms have out of order toilets; They will not flush. | |
| Gage-Eckington ES | FM-200457828 11/2/04 Gage-Eckington 1) First Floor-Girls Restroom In the girls restroom there is a hole in the wall. The hole was left after the plummer did some repair work Asbestos Code A - Clear for repairs on 11/02/04. DCPS Safety - Richard Gibson (RG) | |
| Meyer Elementary School | FM-200458040 11/8/04 Meyer 2nd floor bathrooms The partition in the boys bathroom is leanin. May be it wll fall. | |
| Reed LC | FM-200458268 11/15/04 Reed Second floor Male restroom Replace or repair vent in resrtroom door. Code A-clear for repair by DCPS Charles Buchanan on 11/16/04 | |
| Turner Elementary School | FM-200458364 11/16/04 (Turner) THROUGH-OUT THE BUILDING: (1) Second Floor/Boys Restroom: First toilet stopped up (Old side) Girls rest room (New side) first toilet stopped up. (2) Third Floor/Girls Restroom (Old side) last toilet stopped up and (New side) girls restroom fourth toilet stopped. | |
| Thomas Elementary School | FM-200458297 11/16/04 Thomas First, second and third floor Boys, girls, ladies, men, adult restrooms and custodian closet Survey, repair or replace flush valves, traps, sink spuds, vacuum breakers, washers and faucets. Unstop urinals and sinks. | |
| Patricia R Harris Ed Center | FM-200458401 11/17/04 Harris P. R. Ground Floor-Teachers Restroom . Repair toilet in teachers restrroom . Water leaking onto floor area. | |
| Whittier Elementary School | FM-200458883 12/1/04 Whittier First floor special Ed. office Survey wall in bathroom, plaster falling from wall. Asbestos Code A - Clear for repairs on 12/01/04. DCPS Safety - Leroy Minton Jr. (RG 12/01/04) | |
| Browne Junior High School | FM-200459085 12/2/04 BROWNE Second floor Girls restroom (new wing_ Need a door handle. Code A-clear for repair by DCPS Charles Buchanan on 12/03/04 | |
| Wilkinson ES | FM-200459138 12/3/04 Wilkinson URGENT!!!!!!! Second floor 180 - boys bathroom Replace motors for exhaust fans on the roof: G.E. Motor (4) Model# M-5K2HG27772 RPM: 1725 Vlolts:230/460 Amps: 2.2 - 1.1 HP 1/2 V.1.25 Hz.60 S. 14905 SFA 2.4 - 1.2 R.C. Motor Frame: K56H SEP GC74 S - 311P299A Hp: 2 RPM: 1725 Volts: 230/460 Amps: 6.6/3.4 Hz. 60 PH: 3 (1) | |
| Wilkinson ES | FM-200459139 12/3/04 Wilkinson Second floor 180 - boys bathroom and 221 N. Robertson Second floor 184 girls bathroom Need to replace radiator covers that is loose from wall. | |
| Eastern High School | FM-200459153 12/3/04 Eastern Roof Of Boys/Girls Restroom Repair or replace heating unit, (heating Coils) on roof of restrooms on the field. | |
| Dunbar High School | FM-200459346 12/8/04 Boys restroom basement 2B The pipe is leaking. Asbestos Code A - Clear for repairs on 12/08/04. DCPS Safety - Leroy Minton Jr. (RG 12/08/04) | |
| Wilson High School | FM-200500072 1/4/05 Wilson, W. First floor girls and boys locker rooms Repair or replace the Bradley basin in the football team room and the track team room. In the boys locker room, also repair or replace the Bradley basin in girls locker room bathroom. | |
| Cook J.F. Elementary School | FM-200501502 1/5/05 (Cook, J.F.) THE LIGHT IN THE BACK OF THE GIRLS BATHROOM IS OUT. FOUR NEW BULBS IN THE BALANCE IS OUT. | |
| Shaw JHS | FM-200500288 1/11/05 Shaw Second floor boys restroom Change all six ballasts still no lights. | |
| Browne Junior High School | FM-200500364 1/12/05 BROWNE SECOND FL. NEW WING/ TEACHERS RESTROOM REPAIR LIGHTS | |
| Davis Elementary School | FM-200500377 1/12/05 DAVIS FIRST FL.BOYS RESTROOM 104 REPAIR TOILETS AND URINALS | |
| Coolidge High School | FM-200500369 1/12/05 Coolidge Ladies bathroom Toilet leaking from base. | |
| Coolidge High School | FM-200500372 1/12/05 Coolidge Basement girls bathroom Secure loose toilet, replace defective 8" deck mount lavatory faucet, and unstop toilet. | |
| Nalle Elementary School | FM-200500436 1/14/05 Nalle URGENT Second floor boys bathroom Ceiling is leaking. | |
| Wilkinson ES | FM-200500720 1/24/05 WILKINSON SECOND FL. BOYS RESTROOM RM 180 REPAIR CERRAMIC FL. TILE Asbestos Code A - Clear for repairs on 01/24/05. DCPS Safety - Richard Gibson (RG) | |
| Wilson High School | FM-200500851 1/26/05 Wilson, W Hallways & Restrooms -Gym Bldg. Repair 4 convectors in Gym hallways and 2 convectors; One in Girls restroom & one in Boys restroom with univents to provide adequate heating during incumbent weather. | |
| Benning Elementary School | FM-200501218 2/4/05 Benning First Fl. Restroom Repair mixing Valve. | |
| Ferebee-Hope Elementary School | FM-200501455 2/9/05 Ferebee-Hope Fourth fl Girls Bathroom Repair sinks & Remount to Wall Asbestos Code A - Clear for repairs on 02/10/05. DCPS Safety - Richard Gibson (RG) | |
| Kramer Middle School | FM-200501438 2/9/05 Kramer Mens bathroom Need a plummer, water is leaking from somewhere. | |
| Ferebee-Hope Elementary School | FM-200501457 2/9/05 Ferebee-Hope First fl. Boys Restroom Replace Faucet Repair sinks & Remount to Wall | |
| Patricia R Harris Ed Center | FM-200501598 2/14/05 Harris, P.R. Second floor Floor in ladies restroom need to be repaired (tile floor). HA 005 Tile Grout Groy No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/17/06 | |
| Seaton Elementary School | FM-200501673 2/16/05 Seaton First floor 009 Tile on bathroom floor in pre-k room, children are pulling up ceramic tile. Safety has alredy been out. HA 009 Tile grout gray with muitti Colored smal floor tile No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 2/17/05 | |
| Leckie Elementary School | FM-200501724 2/17/05 Leckie Thoughout building All teachers restrooms need upgrading, located on all floors. Total of five in all. To have taller commodes, handicap bars to accommodate the older teachers and our handicap teachers. | |
| Coolidge High School | FM-200501737 2/17/05 Coolidge ( High School Bathroom Survey Report ) Throughout Building - Repair All Urinals Ground Floor - Girls - Repair Sink Girls Gym Restroom - Repair faucets and Repair Water Coolers Boys Gym Restroom - Repair Urinals and Repair Water Closets Men's ( Handicapp) - Repair Urinal Boy's Locker Room - Repair Sink and Repair Faucets Nurse's Suite - Men's Room - Replace Handle Kit First Floor - Womens - Replace Water Closet Second Floor - Men's Restroom - Repair Sink, Faucets,Urinals and Replace Water Closets. | |
| Dunbar High School | FM-200501749 2/18/05 Dunbar ( High School Bathroom Survey Report ) Forth Floor - Boys Restroom - Repair Urinal Third Floor - Boys Restroom - Repair Urinal Third Floor - Girls Restroom - Repair Toilet Business Suite - Repair Faucet - No Water Business Suite - Men's - Repair Bradley Basin Ground Floor - Boys - Repair Sink and Faucet Ground Floor - Girls - Repair Faucet and Repair Sink First Floor - Physical Ed - Repair Urinal Custodial - Girls Restroom - Repair Water Closet and Repair Toilet | |
| Eastern High School | FM-200501775 2/18/05 Eastern ( High School Bathroom Survey Report ) First Floor - Boys Restroom - Install Water Closet Seat First Floor - Girls Restroom - Replace (1) Faucet and Install Water Closet Seat First Floor Annex - Girls Restroom - Install (1) Sink With Faucet and Unclog Water Closet First Floor Annex - Boys Restroom - Repair (3) Sets Of Faucets ( loose), Replace (1) Urinal Flush Valve and Unclog (1) Water Closet Gym - Girls Restroom - Repair (1) Set Of Faucet and Replace (1) Water Closet Seat Room B-115 - Handicapp Toilet - Replace All Fixtures Gym Boys Restroom - Repair (1) Set Of Faucets and Unclog (1) Urinal Basement Girl's Restroom - Install (1) Sink With Faucets and Replace (2) Faucet Sets Basement Boys Restroom - Replace (2) Faucet Sets, Install New Urinal and Re-Hang (1) Urinal | |
| Dunbar High School | FM-200501748 2/18/05 Dunbar ( High School Bathroom Survey Report ) Teacher's Restroom - Repair Flush Valve Fifth Floor - Girls Restroom - East and West - Repair Toilet Diaphram Forth Floor - M.E. Area Girls - Repair Toilet Diaphram Forth Floor W - Area Boys - Repair Bradley Basins,Replace Toilet Diaphram Second Floor - Counselor Suite - Repair Sink and Faucet Main Office - No Cold Water Lobby - Boys - Urinal Stopped Up and Need Urinal Diaphram Business Suite - Repair Stopped Up Toilet and Need Flush Valve Girls Gym Hallway - Repair Brabley Basin and Repair Toilet First Armory - Girls Restroom - Repair Toilet and Repair Sink First Floor - Teachers Restroom - No Cold Water First Floor - Girls Restroom - Repair Bradley Basin First Floor - Custodial Room - Repair Urinal Cafeteria - Men's - Repair Sink Fifth Floor - Boys Restroom - Repair Bradley Basins,Water Closet and Urinal | |
| Dunbar High School | FM-200501797 2/20/05 Dunbar ( High School Bathroom Survey Report ) First Floor Custodial Room - Repair Ceiling Fifth Floor Boys Restroom - Repair Hole In Wall Fourth Floor Girls Restroom - Paint Lobby Women Restroom - Repair Wall and Ceiling - Paint Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) | |
| Wilson High School | FM-200501800 2/20/05 Wilson, W. ( High School Bathroom Survey Report ) Second Floor - Boys Restroom - Peeling Plaster Third Floor - Boys Restroom - Peeling Plaster Gym Girls Restroom - Breach Wall To Repair Cold Water On Sink First Floor Girls Restroom - Paint Walls and Ceiling Second Floor - Girls Restroom - Re-Plaster Ceiling and Walls Plaster HA-005 and asscciated brown coat HA 705 have both tasted negative Code A-clear for repair by DCPS Charles Buchanan on 3/7/05 | |
| Eastern High School | FM-200501790 2/20/05 Eastern ( High School Bathroom Survey Report ) Third Floor Boys - Replace Faucets,Replace Urinals - HCFV Leaks and Replace F.C. on Water Closets Third Floor Girls - Water Closet Stooped Up Third Floor Boys - Replace Faucets, Replace Urinals, and Water Closet needs Flush Valve Second Floor Boys - Replace Faucets and Water Closet Clogged Second Floor Girls Restroom - Replace Faucet Second Floor Boys Restroom - Replace (2) Faucets Second Floor Girls Restroom - Replace (2) Faucets First Floor Girls Restroom - Replace (2) Water Closet Flush Valves | |
| Duke Ellington School | FM-200501799 2/20/05 Ellington ( High School Bathroom Survey Report ) Second Floor Womens Restroom - Ceiling Needs To Be Repaired Second Floor Dressing Room - Ceiling Needs To Be Painted Mens Restroom - 206C - Repair Ceiling Ladies Room - 118 D - Repair Wall/ Flaking Plaster Girl Restroom Studio A - Repair Ceiling Above Toilets Code A-clear for repair by DCPS Charles Buchanan on 3/7/05 | |
| Anacostia Senior High School | FM-200501791 2/20/05 Anacostia ( High School Bathroom Survey Report ) Upper Level Girls Restroom - Install (2) Faucets and Install Sink Upper Level Boys Restroom - Install (1) Hand Sink With Faucets Third Floor Boys Restroom - Repair Leaking Traps Third Floor Girls Restroom - Replace Handicap Faucets and Install New Toilet Seat Second Floor Boys Restroom - Replace Faucets in H.C. Lavatory and Replace Flush Valves Second Floor Girls Restroom - Install New Sets Of Faucets First Floor Boys Restroom - Replace Handicap Faucets and Replace Urinal Flush Valves First Floor Girls Restroom - Replace Sink With Faucets and Install Faucets First Floor Boys Restroom - Install P Trap First Floor Gym Girls - Install Faucets | |
| Anacostia Senior High School | FM-200501803 2/20/05 Anacostia ( High School Bathroom Survey Report ) First Floor - Gym Boys - Hole In The Wall Near Entrance HA 019 Plaster white wall plaster NO Asbestos HA 104 Brown coat with HA 019 No Asbestos Code A-clear for repair by DCPS Charles buchanan on 3/1/05 | |
| Ballou Senior High School | FM-200501792 2/20/05 Ballou ( High School Bathroom Survey Report ) First Floor Horse ( Boys) - Install ( 4 ) New Faucets and Handicapp Stall First Floor North Wing ( Boys ) - Install ( 4 ) New Faucets First Floor North Wing ( Girls ) - Install ( 4 ) New Faucets and Install New Water Closets Ballou A Second Floor Girls - Install (1) New Faucet Set and Repair (3) Water Closets First Floor Girls - Install New Faucets and Repair Water Closets Flush Valves | |
| Eastern High School | FM-200501813 2/22/05 Eastern High School - Bathroom Survey Basement Girls Restroom - Replace Stall Door Third Floor - Girls - Replace Missing Stall Door - Second Floor - Boys Restroom - Replace Missing Stall Door Asbestos Code A - Clear for repairs on 02/22/05. DCPS Safety - Richard Gibson (RG) | |
| Ballou Senior High School | FM-200501816 2/22/05 Ballou High School - Bathroom Survey First Floor - Horseshoe ( Boys) - Install Privacy Partition First Floor - North Wing - Girls - Install Stall Door Ballou A First Floor Boys Locker Room - Install New Stall Door and Hardware HA 017 Tile Grout grey No Asbestos Code A-clear for repair by Charles Buchanan on 3/3/05 | |
| Dunbar High School | FM-200501899 2/23/05 Dunbar ( High School Bathroom Survey Report ) Third Floor - East Area - Replace Ceiling Tile Girls Locker Room - Replace Ceiling Tile Third Floor - Boys Restroom - Replace Ceiling Missing Tile Second Floor - Boys Restroom - Replace Missing Ceiling Tile First Floor Parent Center - Replace Missing Ceiling Tile Boys Ground Floor - Replace Ceiling Tile Asbestos Code A - Clear for repairs on 02/23/05. DCPS Safety - Richard Gibson (RG) | |
| Tyler Elementary School | FM-200501929 2/23/05 Tyler Wing Area- Boys Restroom Remount Urinals to the wall Asbestos Code A - Clear for repairs on 02/24/05. DCPS Safety - Richard Gibson (RG) | |
| Turner Elementary School | FM-200501994 2/25/05 Turner First Floor Oldside H.W. Put a door stop behind exit door next to boys restroom; door has knocked the pipe loose with securitylines in it and has shorten out the security alarm system. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) | |
| Turner Elementary School | FM-200501990 2/25/05 Turner Repair ceiling in boys restroom and custodian office, that have been waiting to be repaired for the last three years. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) | |
| Patricia R Harris Ed Center | FM-200501988 2/25/05 Harris, P.R. Second floor P.R. elem side survey ASAP Fior plumbing, Electric thru out classrooms, bathrooms, hallways and stairways. Code A-clear for repair by DCPS Charles Buchanan on 1/17/06 | |
| Garnet-Patterson MS | FM-200502210 3/3/05 Garnet-Patterson All bathrooms and the auditorium Requesting the floors to be repaired or replace due to cracks and holes, auditroium floor is buckle. HA 770 Tile grout gray, NA, tile grout with 2" X 5" ceramic wall tile (No Asbestos) HA 771 Tile grout gray, NA, tile grout with octagonal ceramic floor tile (No asbestos) Code A-clear for repair by DCPS Charles Buchanan on 3/21/05 | |
| Patricia R Harris Ed Center | FM-200502249 3/4/05 Harris, P.R. Second floor girls bathroom Repair missing floor tile ASAP, Tile is damage due to water damage. HA 005 tile Grout, GTray No Asbestos Code A-Clear for repair by DCPS Charles Buchanan on 3/15/05 | |
| Patricia R Harris Ed Center | FM-200502248 3/4/05 Harris, P.R. Second floor boys / girls bathroom Install partition for privacy in children bathroom. Urgent near stairways # 3, # 4, #5 and #6. HA 005 Tile grout, grout No Asbestos Code A-Clear for repair by DCPS Charles Buchanan on 3/14/05 | |
| Patricia R Harris Ed Center | FM-200502225 3/4/05 Harris, P.R. First floor girls restroom Need electrican to replace or repair electrical light fixtures by stairwell # 8. Plus entrance light fixtures leading into restroom. This area is very dark by security desk when entering the main entrance to blkdg. Visitors and teachers have been complaining. (Safety Hazard) | |
| Wilson J. O. ES | FM-200502330 3/8/05 Wilson, J.O. Room #125 Repair or replace Brick wall in room #125 and also repair wall in Girls Restroom next to room #125. | |
| Bunker Hill Elementary School | FM-200502543 3/11/05 Bunker Hill Girls Restroom Repair leak in Girls Restroom next to Computer Lab | |
| Patricia R Harris Ed Center | FM-200502953 3/18/05 Harris, P.R. / Old Patterson Second floor girls restroom Install ceramic tile in missing areas. Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) | |
| Langdon Elementary School | FM-200502921 3/18/05 Langdon (Notice of Infraction from DCRA on 4/7/05) 1) Safety Office - Evaluated the perimeter of the tunnel area remove asbestos related items as needed. 2) Industrial Mechanic - Pump out tunnel area. 3) Steamfitter - Make the necessary repair to the steam and return line (under boy's bathroom) 4) Safety Office - Reinsulated all return and steam lines. HA 029 Cementitious Filling Gray On Fiberglass pipe insulation No Asbestos HA 035 Cementitious Fitting, Gray On Radiator Fiberglass pipe insulation No Asbestos HA 045 Cementitious Fitting, Gray On Fiberglass pipe insulation No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/30/05 The AMP identified the 12 X 12 floor tile in Lunch room to be asbestos material, but in good condition. HA 008 (AMP 17) Floor tile light brown 12" X 12" (asbestoc-containing in Good condition) HA 009 (AMP 17] Floor Mastic Yes for Asbestos (asbestoc-containing in Good condition) Note: This work request was given a Code A clearence under the condition that there will be no floor penetrations. If floor penetrations become necessary, stop work and secue an asbestos contractor to penetrate floor tile. | |
| Patricia R Harris Ed Center | FM-200502951 3/18/05 Harris, P.R. / Old Patterson Second floor all restrooms boys and girls Install restroom partitions. Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) | |
| Davis Elementary School | FM-200503047 3/21/05 (Davis) First floor, Second floor/Ladies restroom in main lobby and restroom across from room 204. Replace or Repair shutoff valves under sinks, custodian was unable to change faucet rosette washer & nutset because shutoffs are frozen. | |
| Patricia R Harris Ed Center | FM-200503119 3/23/05 Harris P R First fl. Teacher's Restroom Please, Repair the Flush Valve Asbestos Code A - Clear for repairs on 03/23/05. DCPS Safety - Richard Gibson (RG) | |
| Davis Elementary School | FM-200503124 3/23/05 Davis Second fl. Girl's Restroom Near Rm 218 Please, Place Wax Ring on Toilet | |
| Garnet-Patterson MS | FM-200503286 3/25/05 Garnet-Patterson Third Floor - Girls Bathroom 1) Replace drain pipe that was removed from under the sink. | |
| Garnet-Patterson MS | FM-200503273 3/25/05 Garnet-Patterson First Floor - Boys Bathroom 1) Repair or replace floor in Bathroom, floor is cracked. Asbestos Code A - Clear for repairs on 01/30/06. Tidewater - Carlos Vera (RG 01/31/06) | |
| Garnet-Patterson MS | FM-200503293 3/25/05 Garnet-Patterson First Floor - Boys Bathroom 1) Repair the Toilet in the last stall on the left. | |
| Garnet-Patterson MS | FM-200503288 3/25/05 Garnet-Patterson Third Floor - Outside Of Girls Bathroom, Outside Of Room 310, Outside Of Room 308, and Outside Of Room 306. 1) Repair lockers 499, 493, 510, 515, 524, and 528. | |
| Garnet-Patterson MS | FM-200503272 3/25/05 Garnet-Patterson Third Floor - Outside Of Boys Bathroom 1) 1) Repair locker 420 and 426. | |
| Garnet-Patterson MS | FM-200503268 3/25/05 Garnet-Patterson Second Floor - Teachers Lounge 1) Repair falling plaster above the Teacher Bathroom door. HA 007 Plaster White Walls & Ceiling No Asbestos HA 707 Brown Coat with HA 007 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/26/06 | |
| Green Elementary School | FM-200503334 3/28/05 ( Green) Asbestos Assessment Required First Floor - Boys Restroom 1) Repair ceiling. Do to water damaged the plaster ceiling in Boys restroom appear to be readed to collapse. Emerrgency repair is need. HA 003 Plaster White No Asbestos HA 703 Brown Coat with ... HA 003 Code A-clear for repair by DCPS Charles Buchanan on 3/31/05 | |
| Ludlow-Taylor ES | FM-200503359 3/29/05 Ludlow-Taylor Third Floor - Teachers Restroom 1) Replace incadescent light fixture with fluorescent light fixture. | |
| Kenilworth ES | FM-200503400 3/30/05 ( Kenilworth ) First Floor - Men Restroom 1) Repair motor to exhaust. | |
| Wilkinson ES | FM-200503532 4/4/05 Wilkinson Library Woman's Restroom Replace Flush Valves | |
| Adams Elementary | FM-200503735 4/8/05 ( ADAMS ) EMERGENCY!!!! Third Floor - Boys Restroom 1) Repair ceiling, it's about to fall. | |
| Ferebee-Hope Elementary School | FM-200503782 4/8/05 ( FEREBEE-HOPE ) Ground Floor - Womens Restroom (child and family services) 1) Replace broken adult toilet, cracked toilet cause flooding. Code A-clear for repair by DCPS Charles Buchanan on 4/12/05 | |
| Plummer Elementary School | FM-200504421 4/21/05 ( PLUMMER ) Third Floor - Boys Restroom 1) Repair hole in the wall. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Richard Gibson (RG) | |
| Plummer Elementary School | FM-200504428 4/21/05 ( PLUMMER ) Third Floor - Girls Restroom 1) Replace flush valve (3). | |
| Plummer Elementary School | FM-200504435 4/21/05 ( PLUMMER ) Third Floor - Girls Restroom 1) Replace/Repair broken faucet. | |
| Truesdell Elementary | FM-200504614 4/22/05 ( TRUESDELL ) Fist Floor - Annex Boys Restroom 1) Water is leaking from the wall in between urinal when ever flushed. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) | |
| Turner Elementary School | FM-200504663 4/25/05 (Turner) Second floor/Old & New Side, Boys' Restrooms. Repair or Replace control valve water runs onto floor, urinal next to window (Old Side) ; Water is coming up out of toilet where spud is located and running onto restroom floor (New Side) . | |
| Turner Elementary School | FM-200504664 4/25/05 (Turner) Second foor and Third floor. Second floor boys' restroom, first toilet stopped up (old side) also girls' restroom (new side) first toilet stopped up. Third floor girls' restroom (old side) last toilet stopped up and (new side) girls' restroom fourth toilet stopped up. | |
| Kimball Elementary School | FM-200504701 4/25/05 ( KIMBALL ) Through out the whole building 1) Install latches on all restroom stall doors | |
| Kimball Elementary School | FM-200504696 4/25/05 ( KIMBALL ) URGENT!!!!! Bathroom and kitchen 1) Need new lights. | |
| Merritt Middle School | FM-200504758 4/26/05 Merritt First / Second/ and Third fl . Boys Restrooms Remove Carpet from fn front of Restroom Doors Asbestos Code A - Clear for repairs on 10/28/05. Tidewater - Philp Connolly (RG 10/28/05) | |
| Garnet-Patterson MS | FM-200505040 5/2/05 ( GARNET-PATTERSON ) Second Floor - Near boys bathroom 1) Repair water fountain. | |
| Turner Elementary School | FM-200505106 5/4/05 (Turner) "Urgent" Second, Third floor restroom in new wing and Throughout building. Unstopped urinals in 2nd and 3rd floor boys' restrooms because they they have a terrible odor. Also repair or replace water fountains throughout building. | |
| Ballou Senior High School | FM-200505160 5/5/05 (Ballou) Sub-Basement - Male Restroom 1) Unclog the drains, the first two urinals drain out slow. ( tried to unclog the drains, but failed) | |
| Thomas Elementary School | FM-200505210 5/6/05 ( THOMAS ) Third Floor - Room 302 and Girls Restroom 1) Survey the wall between room 302 and girls restroom to determine why the wall is wet and plaster is falling. Asbestos Code A - Clear for repairs on 05/06/05. DCPS Safety - Leroy Minton Jr. (RG 05/06/05) | |
| Thomas Elementary School | FM-200505331 5/10/05 ( THOMAS ) First Floor - Girls Restroom 1) Survey and re-caulk sinks to the wall to stablize them. | |
| Green Elementary School | FM-200505311 5/10/05 ( GREEN ) URGENT!!!!! First Floor - Room130 (Computer Lab) 1) Repair ceiling, (it's falling due to over head bathroom leak). Note: (refer to FM-200505310) | |
| Meyer Elementary School | FM-200505333 5/10/05 (Meyer) "Urgent" First Floor - Boys Bathroom 1) Repair sink, it's leaking from underneath. | |
| Hearst Elementary School | FM-200505425 5/12/05 (Hearst) Asbestos Assessment Required. First floor, Restrooms. Install handicap assessible stalls in all restrooms. HA 008 Plaster White No Asbestos HA 708 Brown Coat With ... HA 008 No Asbestos HA 004 Pipe insulation White 4" --- 6" O. D. Preformed Block pipe insulation Yes Asbestos HA 003 Cementitious Fitting off white/gray 4" -- 6" O.D. fitting on fiberglass insulation in crew space No asbestos HA 027 Tile grout .. grout associated with 1" X 2" ceramic floor tiles No Asbestos HA 029 Tile grout off white grout associated with 4" X 4" ceramic wall tile No Asbestos HA 044 tile grout .. with honeycomb pattern floor tile No Asbestos HA 045 Tile grout ... with 2" X 4" ceramic wall tile. No Asbestos This is a code A-clear for repair by DCPS Safety Office. There is asbestos pipe insulation behind the wall list (HA 004 Pipe insulation White 4" --- 6" O. D. Preformed Block pipe insulation Yes Asbestos) excavation may be need. No excavation is to be done before connecting the SAFITY OFFICE for an asbestos surveys. Connected No 202 576 8962 | |
| Johnson JHS | FM-200505588 5/17/05 ( JOHNSON ) URGENT!!!! First, Second, Third, and Fourth Floor - Boys and Girsl Restrooms 1) Need asbestos assessment for all restrooms Code A-clear for repair by DCPS Charles Buchanan on 5/ 20/05 | |
| Webb Elementary School | FM-200505801 5/20/05 (Webb) HEALTH CODE VIOLATION: Asbestos Assessment Required. Kitchen Area: Install self closing device on restroom door. Asbestos Code A - Clear for repairs on 05/24/05. DCPS Safety - Leroy Minton Jr. (RG 05/24/05) | |
| Birney Elementary School | FM-200505933 5/25/05 Birney Basement Kitchen Area Repair Exhust Fan in the Restroom | |
| Wilson High School | FM-200505945 5/25/05 Wilson, W. Gym Buliding Install univent in boys room #152. | |
| Stuart-Hobson Middle School | FM-200505960 5/25/05 ( STUART-HOBSON ) Lower Level Gym - Boy's Restroom 1) Replace or Repair sinks and toilets. | |
| Wilson High School | FM-200505946 5/25/05 Wilson, W. Gym Buliding Install univent in boys restroom. | |
| Wilson High School | FM-200506140 5/31/05 (Wilson, W.) "Urgent" Asbestos Assessment Required. First floor, Girls' restroom/Gymnasium area. Repair holes in wall beneath sinks, May need plumbers to assist by removing sinks off of wall to repair holes. Also need welders to fabricate an access panel for intallation in restroom . Asbestos Code A - Clear for repairs on 06/02/05. DCPS Safety - Leroy Minton Jr. (RG 06/03/05) | |
| Takoma Educational Center | FM-200506208 6/1/05 ( TAKOMA ) First, Second, and Third Floors - Students Restrooms 1) Regrout all student restrooms tile floors. Asbestos Code A - Clear for repairs on 06/06/05. Tidewater - Rodney Distance (RG 06/08/05) | |
| Lafayette Elementary School | FM-200506181 6/1/05 ( LARAYETTE ) Second Floor - Greathall Area, Above Steps on Restroom side, also in Team Three in Mrs. Gregorio area, and in Early Childhood as you enter the team. 1) Repair roof leaks Lead & Asbestos Code A - Clear for repairs on 06/02/05. Tidewater - Philp Connolly (RG 06/07/05) | |
| Wilson J. O. ES | FM-200506232 6/2/05 Wilson Rm. 200,Teachers Prep/Boys & Girls Restroom/Heat Rm Replace and Repair Doors to Render them Operable Code A asbestos was abated 08/31/05 by Goel Construction per Mr. Ringgold comfirmed.(RG 05/15/06) | |
| Ketcham Elementary School | FM-200506427 6/6/05 (Ketcham) Asbestos Assessment Required. First floor new wings/First floor old wings. The door to the bathroom in Headstart room 107, and the door from the principal's office to the corridor are swollen shut and need to be opened and made to function. The boys' restroom on the second floor in the old wing needs to have partitions repaired/replaced. Code A-clear for repair by DCPS Charles Buchanan on 6/13/05 | |
| Stanton Elementary School | FM-200506621 6/10/05 ( STANTON ) URGENT!!!! Annex Second and Third Floors - Boys and Girls Restrooms 1) Sink fixtures are in need of repairs | |
| Seaton Elementary School | FM-200506642 6/13/05 Seaton Third fl. Boys Bathroom Repair Bradley Bacian /water continue Leak | |
| Anacostia Senior High School | FM-200506917 6/14/05 (ANACOSTIA) First Second and Third Floors - Boys Restrooms 1) Unstop urinals | |
| Garnet-Patterson MS | FM-200506990 6/20/05 Garnet-Patterson Third Floor - Girls Restroom 1) Install a drain pipe to the sink. Asbestos Code A - Clear for repairs on 06/22/05. ( If there's suepect pipe insulation encounted after Tidewater - Tony Marcolin (RG 06/23/05) exploratay WORK MUCH STOP) | |
| King M L ES | FM-200507364 7/1/05 King ES First Floor - Teachers Restroom Repair the toilet, it is leaking at the base and water is running on the floor. | |
| Davis Elementary School | FM-200507539 7/7/05 (Summer School Project) Repair or replace water coolers, and check all bathrooms in the building. | |
| Walker-Jones EC | FM-200507542 7/7/05 (Summer School Project) Repair or replace water coolers, and check all bathrooms in the building. | |
| Kramer Middle School | FM-200507533 7/7/05 (Summer School Project) Repair or Replace water coolers, and check all bathrooms in the building. | |
| Garnet-Patterson MS | FM-200507531 7/7/05 (Summer School Project) Repair or Replace water coolers, and check all bathrooms in the building. | |
| Ludlow-Taylor ES | FM-200507580 7/8/05 Third Floor - Girls Restroom Paint the walls. Lead & Asbestos Code A - Clear for repairs on 07/14/05. Tidewater - Rodney Distance (RG 07/20/05) | |
| Wilkinson ES | FM-200508297 7/21/05 (Wilkinson) Second floor/Room 180-Boys' restroom. Need to repair ceiling damage due to water leak. Asbestos Code A - Clear for repairs on 07/22/05. Tidewater - Tony Marcolin (RG 07/26/05) | |
| Kimball Elementary School | FM-200509272 8/1/05 (Kimball) "Urgent" Second floor, Girls' restroom/North wing. Repair or Replace window glass, currently it is off the track. Asbestos Code A - Clear for repairs on 08/03/05. Tidewater - Carlos Vera (RG 08/09/05) | |
| Horace Mann Elementary School | FM-200509421 8/3/05 Mann Boys Restroom Repair Leaking Pipe in the Ceiling Asbestos Code A - Clear for repairs on 08/03/05. Tidewater - Kenny Long (RG 08/09/05) | |
| Cardozo High School | FM-200512941 8/11/05 (Cardozo) STADIUM DUGOUT, VISITORS SIDE BATHROOM. REPLACE FLUSH VALVES ON TWO ( 2 ) TOILETS. | |
| Watkins Elementary School | FM-200510636 8/17/05 Watkins First fl Custodal closet Thirid fl. boys restroom Repair cloged Sink and Urnial | |
| Wilson High School | FM-200510727 8/18/05 Wilson, W Girls Restroom - Gym Asbestos assessment required on floor and pipes Replace pipe in floor of girls restroom in gym. Code A - abeted by Contractors per Ricardo Eley comfrmed (RG 03/13/06) | |
| Hart Middle School | FM-200511139 8/24/05 (Hart) "Emergency" First floor, Boys' Restroom. Repair or Replace leaking waste line in boys' shower in locker room. | |
| Garrison ES | FM-200511277 8/25/05 (Garrison) Repair plumbing. 1.) Teachers' Lounge, Repair Tray 2.) Health Suite, Unclog Sink 3.) Custodian Closet, Stoppage 4.) 2nd. Floor Boys' Restroom, Urinal Leaking. | |
| Patricia R Harris Ed Center | FM-200511286 8/25/05 (Harris, P.R.) First floor, Boys' restroom by office. Repair or Replace flush valve. | |
| Spingarn High School | FM-200511642 8/31/05 Spingarn Boiler Room Repair or replace domestic hot water heater, no hot water in building. (1) Holding tank- one for the kitchen (1)for restroom throughout building Boiler are use for heating water for the holding tank Boiler failed DC inspection Urgent !!!! | |
| Drew Elementary School | FM-200511744 9/1/05 (Drew) "Urgent" Asbestos Assessment Required. First floor ladies restroom, Room 204, 301, 311, and 402. Replace broken window glasses. Asbestos Code A - Clear for repairs on 10/25/05. Tidewater - Carlos Vera (RG 10/28/05) | |
| Ballou Senior High School | FM-200514048 9/9/05 (Ballou) Furnish keys for the following-#121E(4),A124(3),A120(3),Restroom(30),Old Health Suite/Lounde(15)keys are nd.for teacher access(urgent). | |
| Ludlow-Taylor ES | FM-200512157 9/9/05 Ludlow-Taylor First Floor-Room 100 Pre-K Asbestos Assessment Mold growing on ceiling tile check by sampling tile also assess area above ceiling tile (Check carpet and plaster ceiling in the bathroom) Asbestos Code A - Clear for repairs on 09/09/05. Tidewater - Tony Marcolin (RG 10/14/05) | |
| Webb Elementary School | FM-200512401 9/12/05 (Webb) "Urgent" Asbestos Assessment Required. First floor, Girls' restroom. Replace all petitions due to vandlalism. " Asbestos Code A - Clear for repairs on 09/13/05. Tidewater - Tony Marcolin (RG 09/14/05) | |
| Patricia R Harris Ed Center | FM-200512545 9/14/05 Harris, P.R. First Floor-Teachers Rm. Replace wax ring on toilet in womens restroom | |
| Ballou Senior High School | FM-200512701 9/16/05 Ballou Stadium restroom -Boys Repair Door frames Asbestos Code A - Clear for repairs on 09/19/05. Tidewater - Philp Connolly (RG 09/21/05) | |
| Takoma Educational Center | FM-200512752 9/16/05 Takoma 1st, 2nd, 3rd, and Gym Install sanitary napkin holders on partitions in the ladies restrooms Gym-94 Lobby-31 2nd Fl.-136 3rd Fl.-200, 206, 221 | |
| Merritt Middle School | FM-200512766 9/16/05 Merritt first fl. Boys Restroom Repair broken shut-off valve. water is on the fl. | |
| John Burroughs ES | FM-200512716 9/16/05 Burroughs First Floor - New Wing 1) Boys Restroom pipes hanging out from wall need to be cut off. Asbestos Code A - Clear for repairs on 09/20/05. Tidewater - Philp Connolly (RG 09/21/05) | |
| Wilson J. O. ES | FM-200512720 9/16/05 Wilson, J.O. First, Second, and Third Floors Boy and Girls' restroom doors do not close....also the door at room 200 on the 2nd floor is completely off the hinge. Code A-clear for repair by DCPS Charles buchanan on 9/19/05 | |
| Rudolph Elementary School | FM-200512891 9/20/05 Rudolph Very Urgent Ground Floor-Boys' Restroom Ceiling is missing, can see straight up to the first floor. The restroom also needs a paint job. The brass netting is hanging through the gaping hole. There is also mold and mildew and a repughant stench emanating into the hallway Asbestos Code A - Clear for repairs on 09/23/05. Tidewater - Philp Connolly (RG 09/27/05) | |
| Bunker Hill Elementary School | FM-200512883 9/20/05 Bunker Hill Emergency Second Floor-Girls Restroom (middle wing) Repair toilet it's cracked and water is running out of it. | |
| Rudolph Elementary School | FM-200512895 9/20/05 Rudolph Ground Floor-Girls Bathroom Large hole in ceiling with exposed brass netting and insulation, possibly asbestos-insulation. There is mold and mildew and a repugnant stench emanating into the hallway. Asbestos Code A - Clear for repairs on 09/23/05. Tidewater - Philp Connolly (RG 09/27/05) | |
| Moten Elementary School | FM-200512875 9/20/05 Moten Second Floor-Boys Bathroom (old side) Ceiling peeling Lead & Asbestos Code A - Clear for repairs on 09/21/05. Tidewater - Rodney Distance (RG 09/22/05) | |
| Slowe Elementary School | FM-200513031 9/22/05 Slowe Roof Furnish exhaust fan for restroom, kitchen area to be install by the technican. | |
| Cardozo High School | FM-200514462 9/22/05 Cardozo Health unit bathroom,replace leaking hot water faucet. | |
| Wilkinson ES | FM-200513035 9/22/05 Wilkinson Roof Furnish three (3) exhaust fan for restroom, throughout building to be install by the technican. | |
| Browne Junior High School | FM-200513147 9/26/05 Browne Urgent First Floor-Boys' Restroom (new wing) Repair door, it's hanging off the hinges. Asbestos Code A - Clear for repairs on 09/29/05. Tidewater - Rodney Distance (RG 09/30/05) | |
| Johnson JHS | FM-200513163 9/26/05 Johnson Third Floor-Boys' Restroom First urinal in bathroom leaks water all over the floor, repair or replace flush valve | |
| Eastern High School | FM-200513185 9/27/05 Eastern Emergency First Floor-Main Office Restroom Repair the blockage in the bathroom. | |
| Merritt Middle School | FM-200513586 10/6/05 Merritt Urgent Third Floor-Men Restroom Replace faucet | |
| Merritt Middle School | FM-200513584 10/6/05 Merritt Urgent Gym-Girls Restroom Commode need new handle, boys locker room need new faucet. | |
| Merritt Middle School | FM-200513587 10/6/05 Merritt Urgent Third Floor-Girl Restroom Re-hang sink | |
| Garfield ES | FM-200513617 10/7/05 Garfield Very Urgent LL-Girls Restroom Snake out drain line, the roof line is connected together with the sink line causing the bathroom to flood. | |
| Murch Elementary School | FM-200513667 10/7/05 (Murch) "Very Urgent" First & Second Floors-Boys' and Girls' Replace Flush valves and Shut off valves on second floor boys' and girls restrooms. | |
| Garfield ES | FM-200513621 10/7/05 Garfield Very Urgent LL-Girls and Boys Restrooms Install slop sinks for the custodians, there is no water or sinks to use for regular work. Asbestos Code A - Clear for repairs on 10/13/05. Tidewater - Philp Connolly (RG 10/17/05) | |
| Patricia R Harris Ed Center | FM-200513633 10/7/05 Harris, P. R. Urgent Second Floor-Male Bathroom, Near #5 Stairway Install doors and partitions in stall #1 and #2 Asbestos Code A - Clear for repairs on 10/11/05. Tidewater - Tony Marcolin (RG 10/20/05) | |
| Patricia R Harris Ed Center | FM-200513632 10/7/05 Harris, P. R. Very Urgent Second Floor-Male Bathroom, Near #4 Stairway Replace toilet in stall #1 | |
| Patricia R Harris Ed Center | FM-200513631 10/7/05 Harris, P. R. Urgent Second Floor-Male Bathroom, Near #4 Stairway Replace floor tile in stall #1 and #2 Asbestos Code A - Clear for repairs on 10/11/05. Tidewater - Tony Marcolin (RG 10/20/05) | |
| Patricia R Harris Ed Center | FM-200513628 10/7/05 Harris, P. R. Very Urgent Second Floor-Female Bathroom, Near #2 Stairway Repair toilet #3, it is not flushing, and sink #2 cold/hot water is not working. | |
| Patricia R Harris Ed Center | FM-200513627 10/7/05 Harris, P. R. Urgent Second Floor-Male Bathroom, Near #3 Stairs Install partitions Asbestos Code A - Clear for repairs on 10/11/05. Tidewater - Tony Marcolin (RG 10/20/05) | |
| Patricia R Harris Ed Center | FM-200513625 10/7/05 Harris, P. R. Very Urgent Second Floor-Girls Bathroom, Near #4 Stairs Hot/Cold water is not working from the sink. | |
| Patricia R Harris Ed Center | FM-200513624 10/7/05 Harris, P. R. Very Urgent Second Floor-Teacher Bathroom, Near #4 Stairs Sink has no cold water. | |
| Patricia R Harris Ed Center | FM-200513623 10/7/05 Harris, P. R. Very Urgent Replace and install stop valve and flush valve on mens teachers restroom commode by #1 1st Fl.. Install new H/C faucets and stop valves to teachers lounge rm. 357 top floor | |
| Davis Elementary School | FM-200513725 10/11/05 Davis First Floor - Mens Bathroom, Main Lobby 1) Replace wall mounted toilet in Men's Bathroom,toilet broke off wall and when you flush water comes out from the back fast. Asbestos Code A - Clear for repairs on 10/13/05. Tidewater - Tony Marcolin (RG 10/14/05) | |
| Hearst Elementary School | FM-200513704 10/11/05 Hearst Emergency Rooms-208A, Second Floor Boys Restroom, First Floor Boys Bathroom, and Rm. 106 Repair roof leak | |
| Hart Middle School | FM-200513748 10/12/05 Hart Emergency Second Floor-Boys Restroom Repair urinal it's leaking, can't stop the leaking | |
| Park View ES | FM-200513795 10/12/05 Park View Very Urgent 2nd Fl. Rms. 232, 229, and Basement Boys Restroom Repair Ceiling, plaster and/or paint is falling and hanging from the ceiling. Lead & Asbestos Code A - Clear for repairs on 10/14/05. Tidewater - Rodney Distance (RG 10/19/05) | |
| Davis Elementary School | FM-200513734 10/12/05 Davis Basement - Teachers Bathroom in Basement 1) Door is out of alignment. Teacher Aide got stuck in Bathroom. Asbestos Code A - Clear for repairs on 10/14/05. Tidewater - Tony Marcolin (RG 10/14/05) | |
| Smothers ES | FM-200513917 10/18/05 Smothers Third Floor - Boys and Girls Bathroom 1) Urinal is off the wall need hanging brackets to hang it back on wall. 2) Toilet stopped up in Girls Bathroom, need electric snake to unclogg it. Asbestos Code A - Clear for repairs on 10/19/05. Tidewater - Rodney Distance (RG 10/20/05) | |
| Webb Elementary School | FM-200513945 10/18/05 Web Urgent Second Floor-Learning Center 2 (Boys Restroom) Replace Bradley basin with sinks. | |
| Ballou Senior High School | FM-200513905 10/18/05 Ballou Very Urgent Second Floor-Girls Restroom, Female Restroom Flush valve on toilets vacuum breakers needed for operation due to testing | |
| Murch Elementary School | FM-200514023 10/20/05 (Murch) "Urgent" Second Floor-Boys' and Girls' Restrooms Replace Faucets | |
| Cardozo High School | FM-200514069 10/21/05 Cardozo Urgent First Floor-Boys Restroom Snake out 2 commodes. | |
| Oyster Elementary School | FM-200514197 10/22/05 Oyster Art Room 103, Room 208,2nd floor hall Boys Restroom and 4th floor hall. 1) Replace ballasts. Need extended ladder for 4th floor. | |
| Patricia R Harris Ed Center | FM-200514188 10/22/05 Harris, P.R. Third Floor - Boys Restroom - By stairwell 7 - Repair partition. Third Floor - Boys Restroom - Repair partition. Third Floor - Boys Restroom - By stairwell 3 - Repair or replace partition. HA 005 Tile Grout Gray No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 10/25/05 | |
| Brent Elementary School | FM-200514284 10/22/05 (Brent) Urgent First floor, Boys' & Girls' Restroom. Repair or Replace control button that open the doors are broken (2). | |
| Marshall Educational Center | FM-200514351 10/23/05 Marshall First Floor - Boys Gym Bathroom 1) Breeches in Bathroom wall. Asbestos Code A - Clear for repairs on 10/26/05. Tidewater - Thomas Johson (RG 11/01/05) | |
| Barnard Elementary School | FM-200514297 10/23/05 Barnard Second Floor - Boys Bathroom 1) The 1st and 2nd stall doors need to be re-attached. Asbestos Code A - Clear for repairs on 10/25/05. DCPS Safety - Richard Gibson (RG) | |
| Browne Junior High School | FM-200514301 10/23/05 Browne First Floor - New Wing - Boys Restroom - Replace door hinges. Second Floor - New Wing - Room 237 - Replace door hinges. Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Thomas Johson (RG 11/01/05) | |
| Coolidge High School | FM-200514326 10/23/05 Coolidge First Floor - Teachers Restroom 1) Replace commode. | |
| Turner Elementary School | FM-200514549 10/24/05 Turner All Restrooms,Large and Small Kitchen 1) Install soap dispensers in the above areas. Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Carlos Vera (RG 10/28/05) | |
| Langdon Elementary School | FM-200514613 10/25/05 (Langdon) "Urgent" Firs floor, Girls' restroom. Replace sink, a student stood on it and broke it off the wall. Note: The sink is damaged. Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Roger Small (RG 11/01/05) | |
| Eastern High School | FM-200514721 10/27/05 Eastern Urgent Basement-Girsl Restroom Across From Rm. B-77 Furnish and install partition door Asbestos Code A - Clear for repairs on 10/31/05. Tidewater - Tony Marcolin (RG 11/02/05) | |
| Wilson J. O. ES | FM-200514707 10/27/05 Wilson, J.O. Third Floor-Replace sink handles in the boys restroom, the children are flooding the sinks. | |
| Park View ES | FM-200514766 10/28/05 (Parkview) "Emergeny" Asbestos Assessment Required. First floor, Girls' Restroom. The ceiling is falling in chunks . Note: This is a safety issue. Asbestos Code A - Clear for repairs on 10/31/05. Tidewater - Rodney Distance (RG 11/01/05) | |
| Truesdell Elementary | FM-200514880 10/31/05 First and Second Fl. Annex-Girls Restrooms - Bradley basin sink not working. girls are unable to wash their hands. Also in room 100 pre-k class hot and cold water not running. | |
| Browne Junior High School | FM-200514799 10/31/05 Browne Urgnet Second Floor-(old wing) Restroom across from Rm. 207 Restroom need a door check. Asbestos Code A - Clear for repairs on 11/02/05. Tidewater - Samuel May (RG 11/03/05) | |
| Francis Junior High School | FM-200514905 10/31/05 North and South stairs/ Girls restroom/ all classroom doors first second and third fls. Paint the above areas Lead & Asbestos Code A - Clear for repairs on 11/08/05. Tidewater - Rodney Distance (RG 11/14/05) | |
| Johnson JHS | FM-200514943 11/1/05 First, Second and, Third floor. Unstop custodial sinks on the 1st & 2nd floors, sinks are smelling bad. Third floor boys' restroom. Repair ruptured pipe in wall causing leak behind urinal, this leak is causing the restroom to flood quite frequently. Asbestos Code A - Clear for repairs on 11/07/05. Tidewater - Rodney Distance (RG 11/09/05) | |
| Cardozo High School | FM-200515124 11/3/05 CLASSROOM 116. REPAIR PLASTER CEILING THAT IS DETERIORATING FROM BATHROOM TOILET LEAKS . Lead & Asbestos Code A - Clear for repairs on 11/17/05. Tidewater - Roger Small (RG 11/21/05) | |
| Browne Junior High School | FM-200515101 11/4/05 Urgent: Re-align all classroom doors, the door hits the frame when being closed in rms. 302, 303, 304, 305, 308, 310, 311, Conference rm., and Girls restroom on the third floor. Asbestos Code A - Clear for repairs on 11/07/05. Tidewater - Samuel May (RG 11/09/05) | |
| Hart Middle School | FM-200515090 11/4/05 First floor, Boys' restroom acroos from main office. "Emergency" Unstop main line urinals are backing up on the floor. Note: School staff have isolated problem. | |
| Brookland Elementary | FM-200515150 11/7/05 Urgent: Repair two urinals in the boys restroom on the second floor. | |
| Eastern High School | FM-200515153 11/7/05 Urgent: Unstop sinks in rooms 330 and B-70 also unstop urinal in boys bathroom across from rm. 144 and commode in boys bathroom across from rm. 221. | |
| Eastern High School | FM-200515154 11/7/05 Urgent: Gym Area-Furnish and install tailpipe, toilet seats in the locker room bathroom. Repair or replace toilet and urinals in press box bathrooms for turkey bowl game thanksgiving day. | |
| Montgomery ES | FM-200515317 -200515317 11/9/05 1st floor, Storage room & Boys' restroom. Repair holes in ceiling in both of the above locations. Asbestos Code A - Clear for repairs on 11/14/05. Tidewater - Rodney Distance (RG 11/14/05) | |
| Bruce-Monroe Elementary School | FM-200515304 11/9/05 Emergency: The Bradley basin has a busted valve and its leaking in the girls restroom on the second floor. | |
| Seaton Elementary School | FM-200515273 11/9/05 Urgent: Repair or replace two sinks in the boys bathroom on the first floor in front of room 109. | |
| Young Elementary School | FM-200515368 11/10/05 Repair hole in ceilings Seccond fl. Counselor's Office,Girls restroom and Auditorium Asbestos Code A - clear for repairs on 11/14/05 Tidewater - Roger Distance (RG 12/12/05) | |
| Brookland Elementary | FM-200515466 11/15/05 Urgent: Repair/Replace one flush valve in the girls bathroom on the third floor, its broken | |
| Tubman Elementary School | FM-200515484 11/15/05 Asbestos Assessment Required. First floor, Boys' & Girls' restroom. Replace exit doors in Boys' & Girls' restrooms. Asbestos Code A - Clear for repairs on 11/18/05. Tidewater - Tony Marcolin (RG 11/21/05 | |
| Tubman Elementary School | FM-200515485 11/15/05 Asbestos Assessment Required. "Urgent" First floor, Boys' & Girls' restroom. Install panic bars on exit doors in Boys' & Girls' restrooms. Asbestos Code A - Clear for repairs on 11/18/05. Tidewater - Tony Marcolin (RG 11/21/05 | |
| Brookland Elementary | FM-200515464 11/15/05 Urgent: Repair/Replace two urinals in the boys bathroom on the third floor, they are broken. | |
| Ballou Senior High School | FM-200515565 11/16/05 Survey & Repair ceilling in stadium restroom(girls) damage caused from water unable to use for sporting events. Asbestos Code A - Clear for repairs on 12/09/05. Tidewater - Roger Small (RG 12/13/05) | |
| Hearst Elementary School | FM-200515553 11/17/05 Emergency: Repair or replace plaster ceiling in the boys restroom on the first floor. The ceiling has caved in again. Lead & Asbestos Code A - Clear for repairs on 11/17/05. Tidewater - Roger Small (RG 11/21/05 | |
| Merritt Middle School | FM-200515838 11/28/05 Urgnet: Repair cut off valve in the boys restroom on the third floor. Water is leaking from around the cut off valve. | |
| Merritt Middle School | FM-200515793 11/28/05 Girls Restroom-Gym area Repair water line leaking from the wall where the sink was removed last week. | |
| Walker-Jones EC | FM-200515826 11/28/05 Second floor, Open Space/Girls restroom (right hand side). Replace toilet. Toilet is cracked around top lip area in stall number 3. | |
| Simon Elementary School | FM-200515862 11/29/05 First floor/Boys' & Girls' restroom. Repair or Replace leaking commodes in each restroom. | |
| Bowen Elementary School | FM-200515879 11/29/05 First fl. Restrooms and Cafeteria area Repair Lights in area | |
| Spingarn High School | FM-200515969 12/2/05 Spingarn 3rd Floor Girls Restroom 1. Replace steam coil in Girls Restroom on 3rd floor. 2. Replace steam coil on 1st Floor Landing 3. Replace steam coils in Health suite | |
| Powell Elementary School | FM-200516072 12/5/05 On the 2nd floor girls restroom near room 201 there are 2 doors that broke off the partition and on the 1st floor girls restroom near the Principal office 1 door broke off. Code A-clear for repair by DCPS charles Buchanan on 12/7/05 | |
| Malcolm X ES | FM-200516091 091 12/6/05 Malcolm X Roof Replace Marathon motor for Boys and Girls restroom in main building. (Motor burnt up) Model # 7VK56C17D5652D-P PH-1 HP-1 RPM 1725 Frame - 56-70 Volts 115/208/230 FLA - 16/8-8 SF=1.15 | |
| Turner Elementary School | FM-200516187 12/8/05 Re-hang fire exit sign above the exit door across from the girls restroom on the second floor, the clamp is broken. | |
| Emery Elementary School | FM-200516544 12/13/05 Room 116,118,bathroom across from main office need new partitions. (The current partitions are rusting and falling apart) Asbestos Code A - Clear for repairs on 01/05/06. Tidewater - Kenny Long (RG 01/05/06) | |
| Stevens Elementary School | FM-200516394 94 12/13/05 Very Urgent: There is a pipe in the ceiling of the boys restroom on the basement level that is leaking. Asbestos Code A - Clear for repairs on 12/15/05. Tidewater - Tony Marcolin (RG 12/16/05) | |
| Emery Elementary School | FM-200516533 12/13/05 Repair toilet in women's bathroom across from main office.(currently the existing toilet is not working) | |
| Roosevelt High School | FM-200516576 12/15/05 Roosevelt Girls and Boys restroom- Basement Replace steam line circulating pump (Trush Model-555 JXOSM-2597 HP 1/4 RPM 1725 SF10 V 115 A50 HZ 60 | |
| Savoy Elementary School | FM-200516590 12/15/05 Teachers Lounge 2nd fl. /Boys & girls restrooms 1st,2nd, and 3rd. fls. Remount urinals. repair faucets Repair all Leaks. | |
| Harris, C.W. ES | FM-200516802 516802 12/20/05 The teachers bathroom on the first floor need a wax ring for the toilet | |
| Benjamin Banneker Academic HS | FM-200516794 12/20/05 Emergency: Basement-Day Care Restroom Repair ruptured line from the radiator, there is hot water running from it. *(CHECK THE FLOOR AREA DEMOLITION WORK TO THE FLOOR) Asbestos Code A - Clear for repairs on 12/20/05. Tidewater - Philp Connolly (RG 12/20/05) | |
| Cleveland Elementary School | FM-200516834 12/21/05 Re-Install partition in the boys restroom on the third floor. Asbestos Code A - Clear for repairs on 12/21/05. DCPS Safety - Richard Gibson (RG) | |
| Beers Elementary School | FM-200516919 12/23/05 Location: Building 2; second and first floor stair cases; restrooms (all floor) and/or where requested by Principal and Building Foreman. Description: Request for Lead Based Paint Survey -- Assess damaged wall and ceiling surfaces for lead base paint. Lead & Asbestos Code A - Clear for repairs on 01/03/06. Tidewater - Roger Small/Philp Connolly (RG 01/05/06) | |
| Merritt Middle School | FM-200517027 12/29/05 Gymnasium Area, Girls' Restroom. Furnish and install sink in gymnasium girls' restroom. Asbestos Code A - Clear for repairs on 01/05/06. Tidewater - Kenny Long (RG 01/05/06) | |
| Turner Elementary School | FM-200517102 1/4/06 Repair the radiator in the girls restroom on the second floor (old side of the building) | |
| Garfield ES | FM-200517252 1/9/06 Garfield Boiler Room - Behind Boiler Ceiling Replace Bell & Gossett Centifugal pump, leaking continuously. Size: P.D.35S MZ Mod. # 105089 Ser. # 1124817 Motor- HP 1/2 RPM 1725 HZ 60 Volts 115/230 Amp 6.0/3.0 S.F. 125 S.F. Amp 7.0/3.5 C. Rating 40 F Thermal Protection M74791 Part # M80066 Pump is used to serve auditorium, music room, library and restroom near Boiler Room. | |
| Woodson High School | FM-200617385 1/12/06 Sixth floor, Teachers' Lounge Restroom. "Urgent" Repair or Replace restroom lock, staff are unable to unlock door to gain entry into the teachers" restroom. | |
| Park View ES | FM-200617499 1/17/06 First Floor-Boys Restroom Urgnet Scrape and paint the ceiling Lead & Asbestos Code A - Clear for repairs on 01/19/06. Tidewater - Roger Small (RG 01/20/06) | |
| Browne Junior High School | FM-200617455 1/17/06 Second Floor - Room 203 - Door hinges need to be adjusted and needs a door handle. Second Floor - Boys Restroom across from - Room 207- Door needs door closer and handle. Asbestos Code A - Clear for repairs on 01/17/06. Tidewater - Thomas Johnson (RG 01/19/06) | |
| Benning Elementary School | FM-200617471 1/17/06 Urgent: Second Floor-Girls Restroom Some lights are out | |
| Patricia R Harris Ed Center | FM-200617777 1/24/06 Replace blown ballasts in the following areas: (277 rapid start) 1.) Restroom in big gym (girls) 2.) Restroom nest to stairwell # 8, 1st floor (girls). 3.) Restroom teachers' 3rd floor. Note: Ballasts are on job site. | |
| Ballou Senior High School | FM-200617943 1/27/06 Health Suite - Restroom hole in plaster wall from plumbing repairs, repair hole. Clifton C. Purks, III Code & Compliance Officer (202) 576-6049 HA 018 Wall board white drywall No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/23/06 | |
| Anacostia Senior High School | FM-200618192 1/30/06 Asbestos Assessment Required. The following rooms have severe plaster damage do to roof leaks:boys bathroom 3rd fl.,301,312,307,306,201,239,202,209,231,121,222,126,cafeteria,1st&2nd fl. inner walls,and 3rd fl. hall ceiling Lead & Asbestos Code A - Clear for repairs on 03/08/06 Tidewater - Roger Small (RG 03/10/06) | |
| Woodson High School | FM-200618114 2/1/06 Repair locks on the teacher's restroom on the 6th floor and the queen house door on the 7th floor. | |
| Merritt Middle School | FM-200618178 2/2/06 Very Urgent Repair the water supply line that is damaged on the Third Floor in the Boys Restroom-West Asbestos Code A - Clear for repairs on 02/02/06 Tidewater - Philp Connolly (RG 02/08/06) | |
| Backus Middle School | FM-200618319 2/6/06 Emergency: Investigate and repair the leak on the third fl. girls shower/locker room, the main pipe is leaking down to the kitchen bathroom on the second floor creating mildew on the wall. Asbestos Code A - clear for repairs on 02/08/06. Tidewater - Philp Connolly (RG 02/09/06) SEE ASSESSMENTS | |
| Slowe Elementary School | FM-200618363 2/7/06 First Floor-Girls' Restroom Re-plaster ceiling, plaster is falling from the ceiling. Asbestos Code A - Clear for repairs on 02/08/06. Tidewater - Philp Connolly (RG 02/09/06) | |
| Ludlow-Taylor ES | FM-200618404 2/7/06 Second Floor-Girls Restroom Lights are out-only three lights are working-the restroom is dark Note: Not bulbs | |
| Coolidge High School | FM-200618411 2/7/06 Replace 2 sinks in the girls restroom on the second floor (broken). Replace 2 sinks in the boys restroom on the ground level (broken). | |
| Ballou Senior High School | FM-200618501 2/8/06 Second & Third floor, Boys', Gils' and teachers' restrooms. 1.) Replace flush valves on toilets in boys' and girls' restrooms on 3rd floor. 2.) Replace flush valves on toilet(s) in Second floor teacher's lounge. | |
| Ballou Senior High School | FM-200618553 2/10/06 r/r flush valves in boys restroom 2nd floor on/A wing | |
| Birney Elementary School | FM-200618579 2/13/06 BIRNEY ES 3rd floor Urgent!!!! Repair ruptured fan coil on third floor near girls restroom coil can not be isolated. | |
| Stuart-Hobson Middle School | FM-200618741 2/16/06 Urgent Replace leaking urinal on the third floor in the boys restroom | |
| Raymond Elementary School | FM-200618800 2/17/06 First floor, Old Wing/Boys' Restroom. 1.}Toilet not flushing, repair or replace. 2.) Sink needs to be replaced. 2.) Urinal pipe needs replacing because it is leaking. Note: The leak from the urinal is causing a flood. | |
| Jessie LaSalle Elementary | FM-200618941 2/21/06 Asbestos Assessment Required. "Urgent" Ground Floor, Cafeteria Area/Boys' Restroom. Furnish and install tile on the wall around urinals. Asbestos Code A - Clear for repairs on 02/24/06. Tidewater Roger Small (RG 02/27/06) | |
| Terrell Mc ES | FM-200618933 2/21/06 Asbestos Assessment Required. AT M. C. TERRELL - WATER FROM ROOF LEAK CAUSING PLASTER TO FALL DOWN ONTO FLOOR IN BOYS' BATHROOM IN KINDERGARTEN AREA. (SCHOOL IS CLOSING PLEASE CLOSE OUT ) Note: School did not close. DSE 9/21/06 Lead & Asbestos Code A - Clear for repairs on 03/07/06 Tidewater - Roger Small (RG 03/08/06) | |
| John Burroughs ES | FM-200618975 2/22/06 Roof leaking in boys restroom. Account #: no | |
| King M L ES | FM-200618955 2/22/06 First Floor-Boys Restroom Repair the #3 toilet, it will not flush. | |
| Miner Elementary | FM-200618944 2/22/06 First Floor-Rms. 148 and 134 12 faucets are needed in the boy's and girl's restrooms | |
| Hearst Elementary School | FM-200619056 2/23/06 First Floor-Staff Restroom-Replace toilet with a handicap toilet | |
| Raymond Elementary School | FM-200619138 2/27/06 Easter Break Repair or replace waste line, runs out side of wall, first and second floors east wing boys and girls restrooms. Asbestos Code A - Clear for repairs on 03/03/06 Tidewater - Thomas Johnson (RG 03/07/05) SEE ASSESSMENTS | |
| Macfarland Middle School | FM-200619158 2/27/06 MacFarland Boys Restroom Locker Room Asbestos assessment required on floor. Repair or replace rupture line in floor of Boys restroom in Locker room. Emergency !!!!! Asbestos Code A - Clear for repairs on 02/27/06 Tidewater - Samuel May (RG 03/01/05) SEE ASSESSMENTS | |
| McKinley Technology High | FM-200619223 2/28/06 Please repair small tilefloor/grout in girls restroom in cafeteria. Asbestos Code A - Clear for repairs on 03/01/06 Tidewater - Thomas Johnson (RG 03/02/05) | |
| West Elementary School | FM-200619193 2/28/06 Very Urgent First Floor-Men's and Ladies Restroom in the Main Lobby Investigate and repair electrical problem with the light fixtures. New bulbs where put in and it still does not work. | |
| Park View ES | FM-200619233 3/1/06 Girls Restroom-Replace lavatory faucets with spout handicap and supply lines | |
| Park View ES | FM-200619230 3/1/06 Third Floor-Boys Restroom Replace lavatory sink , And Associated Hard Ware | |
| Park View ES | FM-200619232 3/1/06 First Floor-Girl's Restroom 1) Replace two 110 sloan flush valves 2) Replace two 1 1/2"x1 1/2" spuds | |
| Merritt Middle School | FM-200619312 3/2/06 Gym-Boy's Restroom Water Supply Is Leaking. | |
| Takoma Educational Center | FM-200619323 3/2/06 First Floor-#16 Install a handicap railing in the Health Suite Restroom-for the sick who may need grasp when in need for support in the invent of falling Asbestos Code A - Clear for repairs on 03/03/06 Tidewater - Thomas Johnson (RG 03/07/05) | |
| Bowen Elementary School | FM-200619576 3/7/06 First floor, Learning Center I. "Emergency" Replace ballasts in girls' and boys' restroom, the lights are out in both restrooms. | |
| Cardozo High School | FM-200619600 3/7/06 Ground floor, Room 11 & Third floor, Girls' Restroom. Repair or Replace locks from the aforementioned areas. Note: These areas cannot be secured. | |
| Dunbar High School | FM-200619772 3/13/06 Dunbar Kitchen Woman Restroom Repair or replace rupture supply line or return line in Kitchen woman restroom near toilet leading to the wall unit. | |
| Shaw JHS | FM-200620042 3/16/06 URGENT:Boys restroom 7th grade house repair/replace light switch due to vandalisim by students. SAFETY HAZARD!!! NO LIGHTS.3/16/06 | |
| Amidon Elementary School | FM-200620064 3/17/06 Very Urgent Second Floor-Boy's Restroom Re-mount sink to the wall Note: Water was cut off. | |
| Hine JHS | FM-200620058 3/17/06 Very Urgent 3rd Fl.-Girls Restroom Repair bad circuit breaker-no lights | |
| Hine JHS | FM-200620107 3/20/06 Ground Floor-Boys Restroom Repair spuds to toilets | |
| Hine JHS | FM-200620097 3/20/06 Third Floor-Corridor by boys restroom Replace porcelin drinking foutain by boys restroom | |
| Hine JHS | FM-200620099 3/20/06 Third & Fourth Floor-Boys Restroom Hand sink not working. | |
| Hine JHS | FM-200620105 3/20/06 First Floor-Woman Restroom-Lobby Repair spuds to toilets | |
| Hine JHS | FM-200620106 3/20/06 First Floor-Corridor by Boys Restroom Repair knob to the water cooler | |
| Hine JHS | FM-200620108 3/20/06 Ground-Exterior Boys Room Repair leaking faucets to hand sink. | |
| Horace Mann Elementary School | FM-200620134 3/21/06 Very Urgent First Floor-Boys Restroom-Repair or Replace partition, its down Asbestos Code A - Clear for repairs on 03/23/06. Tidewater - Kenny Long (RG 03/24/06) | |
| River Terrace ES | FM-200620123 3/21/06 -Cold water line needs to be replaced in girls restroom near office. Asbestos Code A - Clear for repairs on 03/24/06. Tidewater - Tony Marcolin (RG 03/30/06) SEE ASSESSMENTS | |
| River Terrace ES | FM-200620125 3/21/06 -Patch hole in boys bathroom near room #23. Asbestos Code A - Clear for repairs on 03/24/06. Tidewater - Tony Marcolin (RG 03/30/06) | |
| Eastern High School | FM-200620209 3/22/06 Basement floor, Girls' Restroom & Second floor, Boys' Restroom. 1.) Furnish & Install partition door on girls' restroom on basement floor across from room B-78. 2.) Furnish & Install partition door on boys' restroom on second floor across from room 242. | |
| Wilkinson ES | FM-200620278 3/23/06 First floor, Room 181/ Girls' Restroom. Repair or Replace flush valve, the commode will not flush. | |
| Johnson JHS | FM-200620333 3/24/06 Basement, Second & Third Floors. "Urgent" 1.) Basement floor, unstop toilet in custodian's office on basement level. 2.) Second floor, remount sink on wall in boys' restroom & unstop custodian's slop sink in second floor custodian's closet. 3.) Third floor, unstop sink in teachers' restrooom & unstop custodian's slop sink in third floor custodian's closet. | |
| Beers Elementary School | FM-200620522 3/29/06 Asbestos Assessment Required. Bldg. 3, First floor, Boys' Restroom. Repaint walls and ceiling because the paint is peeling. Lead & Asbestos Code A - Clear for repairs on 03/30/06. Tidewater - Carlos Vera (RG 03/31/06) | |
| Beers Elementary School | FM-200620523 3/29/06 Bldg. 3, Second floor, Girls' Restroom. 1.) Repair or Replace loose hot water faucet on sink. 2.) Repair or Replace loose toilet because water is seeping from the bottom. | |
| Reed LC | FM-200620495 3/29/06 Basement-Engineer Office Restroom Unstop the face basin with a K-50 | |
| Beers Elementary School | FM-200620503 3/29/06 Bldg. 3 First floor, Girls' & Boys' Restrooms. "Urgent" 1.) Girls' restroom repair loose fixtures. 2.) Boys' restroom remount loose sink to wall. Asbestos Code A - Clear for repairs on 03/30/06. Tidewater - Carlos Vera (RG 04/03/06) | |
| Cook J.F. Elementary School | FM-200620550 3/30/06 Very Urgent First Floor-Pre-K Room Repair or replace light fixture in the restroom. | |
| Patricia R Harris Ed Center | FM-200620630 3/30/06 Asbestos Assessment Required. Second floor, Boys' Restroom "Emergency" Repair ruptured supply line in ceiling. Note: The boys' restroom is flooding. Asbestos Code A - Clear for repairs on 03/30/06. Tidewater - Tony Marcolin (RG 03/31/06) SEE ASSESSMENTS | |
| Powell Elementary School | FM-200621051 4/4/06 On the playground near the ramp the drain pipe fell from the wall causing the 1st fl restroom wall to moisten and plaster to come down. Asbestos Code A - Clear for repairs on 05/02/06. Tidewater - Thomas Johnson (RG 05/04/06) | |
| Deal Junior High School | FM-200621109 4/7/06 Second Floor-Boys Restroom By 205-Re-Hang (3) Partition/Doors. Asbestos Code A - Clear for repairs on 04/12/06 Tidewater - Shamika Parker (RG 04/13/06) | |
| Marshall Educational Center | FM-200621107 4/7/06 Cafeteria Bathroom-Entry door need to be replaced. Asbestos Code A - Clear for repairs on 04/14/06. Tidewater - Kenny Long (RG 04/18/06) | |
| Ferebee-Hope Elementary School | FM-200621140 4/10/06 First, Third, and Fourth Floor-Boys Restroom-Control Valves | |
| Brookland Elementary | FM-200621200 4/11/06 Second floor, Girls' & Boys Restroom. Repair or Replace control sto Second floor, Boys' & Girls' Restrooms. Repair or Replace broken control stops. | |
| Simon Elementary School | FM-200621170 4/11/06 Install 186 flush valves-Third Floor-Restrooms | |
| Simon Elementary School | FM-200621172 4/11/06 Rehang wall mount water cooler-Third Floor By Boy's Rm. | |
| Simon Elementary School | FM-200621173 4/11/06 Install (2) wall hung toilets-Second Floor, Restroom | |
| Simon Elementary School | FM-200621185 4/11/06 Ground Floor-Boys Restroom-Plaster hole in the ceiling due to the repairs of a leak. Lead & Asbestos Code A - Clear for repairs on 04/19/06. Tidewater - Roger Small/Shamika Parker (RG 04/20/06) | |
| Miner Elementary | FM-200621271 4/12/06 First Floor-148 - Lights are not working in (boy's restroom). | |
| Eaton Elementary School | FM-200621305 4/13/06 Second Floor-Teacher's Restroom #209, west side-R/R broken door hinge. | |
| Marshall Educational Center | FM-200621369 4/14/06 Second floor,Custodian Closet/Stage #3. Repair or Replace lock on the door of boys' restroom . Note: The door will not lock. | |
| Simon Elementary School | FM-200621444 4/18/06 Asbestos Assessment Required. Ground floor, Girls' Restroom. Repair or Replace falling ceiling. The dust from the falling plaster ceiling is health hazard. Note: The Pre-K and Kindergarden children are being exposed to this debris. Asbestos Code A - Clear for repairs on 04/19/06. Tidewater - Shamika Parker (RG 04/20/06) | |
| Simon Elementary School | FM-200621445 4/18/06 Asbestos Assessment Required. Ground floor, Girls' Restroom. Repair large hole in wall underneath the hand basin. This restroom is frequented by Pre-K and Kindergarden student. Note: This is a entry way for rodents and other pests causing this to be a safety hazard. Asbestos Code A - Clear for repairs on 04/19/06. Tidewater - Shamika Parker (RG 04/20/06) | |
| Hart Middle School | FM-200621518 4/19/06 2nd Floor & 3rd Floor (OLD WING) They need new keys for the girls bathrooms. | |
| Woodson High School | FM-200621572 4/20/06 Basement-Boy's Restroom: Repair or replace the broken lock on the door. | |
| Patterson ES | FM-200621556 4/20/06 Girls and Boys Restroom on All Floors, Also Rms. 123 and 223-Service the sinks in these locations, the water will not stop running, they have automatic shut off censers. Note: The custodian shut the water off and need to have them serviced. | |
| Slowe Elementary School | FM-200621639 4/24/06 1st Floor- Girls Bathroom A student was sitting on the sink and it broke off of the wall. The water is running uncontrollably. | |
| Browne Junior High School | FM-200621745 4/25/06 1st & 2nd Floors- Restrooms (Old Wing) The walls and ceilings need to be plastered. Asbestos Code A - Clear for repairs on 04/26/06. Tidewater - Samuel May (RG 04/26/06) | |
| Benning Elementary School | FM-200621764 4/25/06 2nd Floor- Pre-Kindergarten (Ms. Penn's Room) The cut-off valve does not work. Both toilets in the bathroom are disconnected from the floor. | |
| Ballou Senior High School | FM-200621851 4/26/06 Furnish & Install two (2) hand sinks in girls restroom -1st. floor north near #120. | |
| Ballou Senior High School | FM-200621956 4/27/06 Survey:boys restroom(north) 1st.floor-replace spud on tiolet and urinal used by student(urgent)also girls. | |
| Cardozo High School | FM-200621904 4/27/06 2nd Floor- Girls Bathroom (across from Room 212) The waste line is leaking through the wall. | |
| Eastern High School | FM-200621896 4/27/06 Room 327 can't be secured, kids vandalizing classroom, also the boy's bathroom across from B79 lock cant be opened. | |
| Aiton Elementary School | FM-200621920 4/28/06 2nd Floor- Boys Restroom A toilet is leaking; the wax ring and flange bolts need to be replaced. | |
| Beers Elementary School | FM-200621997 5/1/06 1st Floor- Cafeteria/Kitchen The paint is peeling in the kitchen, storage room, and restroom of kitchen. Lead & Asbestos Code A - Clear for repairs on 5/09/06. Tidewater - Roger Small (RG 05/10/06) SEE ASSESSMENTS | |
| Murch Elementary School | FM-200622135 5/2/06 1st & 2nd Floors Replace wax gasket in Boys & Girls Bathroom Clean out sink drains in | |
| Shaw JHS | FM-200622208 5/3/06 URGENT:Students restroom repair or replace faucet and toilet. | |
| Merritt Middle School | FM-200622155 5/3/06 3rd Floor- Girl's Bathroom The sink is broken off of the wall. | |
| Merritt Middle School | FM-200622156 5/3/06 3rd Floor- Boy's & Girl's Bathroom Both bathrooms need locks. | |
| Emery Elementary School | FM-200622200 5/3/06 Men bathroom across from the main office staff and students are getting locked in bathroom .Door knob is off. | |
| Ross Elementary School | FM-200622175 5/3/06 Basement First urinal in the boy's restroom needs to be repaired. | |
| Brookland Elementary | FM-200622193 5/4/06 3rd Floor- Boys Bathroom The flush valves are leaking on two toilets. | |
| Bancroft Elementary School | FM-200622239 5/5/06 Men's Bathroom Change light socket, sparks are flying from outlet receptacle. | |
| Brookland Elementary | FM-200622300 5/8/06 3rd Floor- Boys Bathroom 2 Toilets are leaking 2nd Floor- Girls Bathroom 3 Toilets are leaking. | |
| Brookland Elementary | FM-200622374 5/9/06 2nd Floor and Ground Floor- Girl's Bathrooms There is no water. | |
| Savoy Elementary School | FM-200622385 0622385 5/9/06 First Floor-Boy's & Girl's Restroom (north end of building): 2 Toilets are stopped up, tried plunging but did not succeed. | |
| Amidon Elementary School | FM-200622425 5/10/06 1st & 2nd Floors- Gym Area Bradley basins need to be repaired in the boys and girls bathrooms. | |
| Amidon Elementary School | FM-200622430 5/10/06 1st & 2nd Floors- Bathrooms Toilet and urinal bowls need to be repaired. | |
| Brookland Elementary | FM-200622455 5/10/06 3rd Floor- Boys & Girls Bathrooms Water Basin is broken. | |
| West Elementary School | FM-200622431 5/10/06 Ground Floor- Main Office Principals restroom needs a new faucet. | |
| West Elementary School | FM-200622434 5/10/06 Ground Floor- Pre Kindergarten Boys and Girls restroom sinks are clogged. | |
| West Elementary School | FM-200622439 5/10/06 1st Floor- Boys Restroom near gym Toilets are not working and water will not stop running. Parts are missing, one is clogged, and sewage gas is coming through drain. | |
| West Elementary School | FM-200622440 5/10/06 Ground Floor- Girls & Boys Bathrooms Both bathrooms need handicap faucets. | |
| Merritt Middle School | FM-200622446 5/10/06 3rd Floor- Girls Bathroom Door will not lock or unlock properly. | |
| Merritt Middle School | FM-200622445 5/10/06 3rd Floor- Boys Bathroom Door will not lock or unlock properly. | |
| Hart Middle School | FM-200622470 5/11/06 1st Floor- Boys Bathroom Replace and rehang urinal. There is a hole in the wall from when a previous plumber removed the urinal and never reinstalled a new one. | |
| Eastern High School | FM-200622482 5/11/06 Basement- Girls Bathroom (across from room B-77) Furnish and install partitions. | |
| Smothers ES | FM-200622656 5/15/06 1st Floor- Boys Bathroom There is a busted pipe under the sink (drain pipe). No water is leaking. | |
| Gibbs Elementary School | FM-200622757 5/16/06 1st & 2nd Floor- Boys & Girls Bathrooms Restrooms need light covers fabricated or fixtures; there is a risk for burn. Ballasts maybe? | |
| Wilkinson ES | FM-200622881 5/17/06 2nd Floor- Girls Bathroom Radiator needs to be repaired/replaced. It is coming of the wall, also need an radiator cover on it due to kids might get burn by it | |
| Malcolm X ES | FM-200622877 5/17/06 Second Floor-Boy's Restroom: Repair or replace the urinal that is out of service. | |
| Patricia R Harris Ed Center | FM-200622932 5/18/06 2nd Floor- Boys Restroom Remount sink to wall; bracket needs to be replaced. Asbestos Code A - Clear for repairs on 05/19/06. Tidewater - Kenny Long (RG 05/22/06) | |
| Stuart-Hobson Middle School | FM-200623033 5/19/06 2nd Floor- Boys Bathroom Urinal on 3rd floor was stopped up, causing an overflow. It is causing the ceiling to leak badly in the 2nd Floor Boys Bathroom. Ceiling has peeling paint and it is spreading. Asbestos Code A - Clear for repairs on 05/22/06 Tidewater - Samuel May (RG 05/25/06) | |
| Orr Elementary School | FM-200623029 5/19/06 3rd Floor- Boys Bathroom Sink needs to be remounted. | |
| Reed LC | FM-200623092 5/22/06 1st Floor- Principal's Office Restroom Replace 1 deck mounted faucet, trap, & drain. The faucet runs nonstop and the drain line is leaking. | |
| Gage-Eckington ES | FM-200623302 5/24/06 First & Second Floor/Boy's & Girl's Restroom - Replace flush valves due to wear and tear-Will not flush properly, unable to change/none on site. | |
| Gibbs Elementary School | FM-200623291 5/24/06 2nd Floor- Girls Restroom Commode is running nonstop. | |
| Gibbs Elementary School | FM-200623290 5/24/06 3rd Floor- Boys & Girls Restroom Commode is running nonstop. | |
| Gibbs Elementary School | FM-200623289 5/24/06 1st Floor- Restroom in Kitchen Commode is running nonstop. | |
| Simon Elementary School | FM-200623275 5/24/06 1st Floor- Boys Restroom Remount sink;a child was sitting on it and broke it from the wall. When using the other basins, water comes from this pipe causing a flood. There is no water in this bathroom at all; it was shut off. | |
| Gage-Eckington ES | FM-200623359 5/25/06 First Floor-Boy's Restroom, Urinals need to be snaked, when flushed one side runs in the next toilet. | |
| Backus Middle School | FM-200623353 5/25/06 3rd Floor- Girls Bathroom (in gym) A broken cut-off valve is leaking down to the kitchen from the gym. It is destroying the ceiling. | |
| Gage-Eckington ES | FM-200623418 5/26/06 2nd Floor- Boys Bathroom The window's plexi-glass is falling out. Asbestos Code A - Clear for repairs on 05/31/06. Tidewater - Samuel May (RG 06/01/06) Mr. A Thomas @ 671-1160 faxed over a second request on 7/20/06, Note: (Dangerous) Kids are able to fall out of the window if they just happen to touch the window. | |
| Patterson ES | FM-200623540 5/30/06 Through-Out Entire Building, All Restroom. No running water in restrooms. Note: Malfunctioning sensors on faucets. | |
| Burrville Elementary School | FM-200623689 6/1/06 First Floor/Teachers Restroom - Busted Pipe To The Sink - Water Leaking | |
| Truesdell Elementary | FM-200623820 6/5/06 2nd Floor Annex- Girl's Bathroom Bradley Basin Sink is not working. Water is leaking onto the floor | |
| Eastern High School | FM-200623844 6/5/06 First & Second floor, Front Hall Ladies' Restroom. 1.) Repair or Replace leaking spud in (second stall & fourth stall). 2.) Repair or Replace leaking stems on sink (1) sink (2) on the left hand size. | |
| Eastern High School | FM-200623836 6/5/06 First & Second floor, Front Hall Ladies' Restroom. Repair or Replace leaking spud in (second stall & fourth stall). | |
| Eastern High School | FM-200623826 6/5/06 Basement level, Girls' Restroom/ Across from rooms B-77 & B-79. Furnish & Install partition doors in girls' bathroom on basement level. Asbestos Code A - Clear for repairs on 06/08/06. Tidewater - Carlos Vera (RG 06/09/06) | |
| Eastern High School | FM-200623877 6/5/06 Second floor, Back Hall Ladies' Restroom. 1.) Repair or Replace leaking spud in stall #1. 2.) No hot water in sink on left hand side. | |
| Johnson JHS | FM-200623947 6/6/06 1st Floor- Main Office (Principal's Bathroom) Unstop the toilet and replace the flush valve. | |
| Johnson JHS | FM-200623946 6/6/06 Basement- Custodial Office Urinal in the bathroom leaks water all over the floor. | |
| Browne Junior High School | FM-200623940 6/6/06 Gymnasium/Teacher Restroom - Need Door Check | |
| Rudolph Elementary School | FM-200624324 6/14/06 Basement- Boys Bathroom Ceiling needs to be re-plastered because of a leaking roof. Lead & Asbestos Code A - Clear for repairs on 06/19/06. Tidewater - Roger Small/Thomas Johnson (RG 06/21/06) | |
| Eastern High School | FM-200624553 6/20/06 Make lock repairs in the following areas: - replace doorknob on the 2nd Floor south booth - repair lock cylinder on auditorium doors, and boys bathroom across from B-79 - make keys for room 324, and 230 - repair key knob lock on choir room door - make a key for B-02 office - repair lock on classroom door room 327 - change locks on room 164 & 165 - make keys for room 825 | |
| Francis Junior High School | FM-200624668 6/22/06 First Floor/Boy's Restroom - Replace Partition, Handicap Toilet. Asbetos Code A = Cleared for repairs on 06/30/06 by Tidewater (LM/06-30-06) Safety Office 202-468-6269. | |
| Marshall Educational Center | FM-200624681 6/23/06 Mezzanine/Womens Bathroom Water Leaking Thru Electric Fixtures Asbestos Code A - Clear for repairs on 06/26/06. Tidewater - Thomas Johnson (RG 07/03/06) | |
| Marshall Educational Center | FM-200624754 6/26/06 First Floor/Emergency lights broken - Boy's Bathroom | |
| Rudolph Elementary School | FM-200624854 6/27/06 Lower Floor- Boys Bathroom The ceiling plaster is down because of the rain. Lead & Asbestos Code A - Clear for repairs on 07/05/06. Tidewater - Roger Small (RG 07/05/06) SEE ASSESSMENTS | |
| Hearst Elementary School | FM-200624881 6/27/06 Second Floor/Boy's Restroom & Rm. 208A - First Floor/106 & Boy's Restroom: There is roof leaks in the above areas, and water floods the floor every time it rains, Repair or replace gutters and downspouts. | |
| Wilson High School | FM-200624883 6/27/06 Wilson, W Girls Restroom - Gym Repair leaking heating heating coils to univent | |
| Kramer Middle School | FM-200624935 6/28/06 Basement- Boys Restroom/Kitchen Repair holes in both ceilings. Asbestos Code A - Clear for repairs on 07/03/06. Tidewater - Carlos Vera (RG 07/05/06) | |
| Gibbs Elementary School | FM-200624958 6/28/06 1st Floor- Boys Bathroom The commode is leaking non-stop. | |
| Brent Elementary School | FM-200625078 6/29/06 1st Floor- Principal's Office The lights above the principal's desk, closest to the bathroom wall, was sparking and smoking. | |
| Miner Elementary | FM-200625089 6/30/06 1st Floor- Room 134 Restroom The stall door is breaking. | |
| Raymond Elementary School | FM-200625099 7/1/06 First floor, Old Wing/ Girls' toilet. Repair leaking univent in girls' restroom. | |
| Maury Elementary School | FM-200625201 7/3/06 First Floor/Girls Bathroom: Repair or replace sink. | |
| Jefferson JHS | FM-200625273 7/5/06 2nd Floor- Girl's Bathroom Repair/replace 3 toilets. | |
| Jefferson JHS | FM-200625263 7/5/06 2nd Floor- Boy's Bathroom The sink fixtures are broken and need replacing. | |
| Truesdell Elementary | FM-200625332 7/6/06 First Fl. Main Bldg./Boy's Restroom - 4 toilet's not working & 1 Urinal | |
| Truesdell Elementary | FM-200625331 7/6/06 First Fl. Main Bldg./Girls Restroom - 1 toilet's not working | |
| Truesdell Elementary | FM-200625333 7/6/06 Second Floor Annex/Boy's Restroom - 1 toilet not working & 3 Urinal's | |
| Truesdell Elementary | FM-200625334 7/6/06 Second Floor Annex/Girl's Restroom - 1 toilet not working | |
| Truesdell Elementary | FM-200625336 7/6/06 First Floor Annex/Girl's Restroom - 3 toilet's not working | |
| Kenilworth ES | FM-200625437 7/7/06 1st Floor- Kitchen Replace sink inside the restroom kitchen. | |
| Kenilworth ES | FM-200625440 7/7/06 1st Floor- Health Suite Room 129 The faucetes need to be replaced inside the restrooms . | |
| Ross Elementary School | FM-200625523 7/11/06 Basment- Boys Restroom Install partitions between urinals. Asbestos Code A - Clear for Repairs on 07/13/06. Tidewater - Tomy Marcolin (RG 07/21/06) SEE ASSESSMENTS | |
| Ross Elementary School | FM-200625521 7/11/06 Basement- Bathrooms Girls Restroom- 1st Toilet near the door will not flush 3rd, 4th, % 5th Toilets need to be replaced with automatic flusher or handle Boys Restroom- 2nd Toilet needs manual flushing handle 1st & 3rd Toilets have malfunctioning automatic flushers; replace with manual handles. | |
| Bowen Elementary School | FM-200625560 7/11/06 First floor, Boys' Restroom/Learn Center 1. Replace knobs on water faucets on sinks. Note: Due to the issue with knobs students are unable to wash their hands. | |
| Ross Elementary School | FM-200625614 7/12/06 Top Floor- Teacher's Bathroom Two hot water faucets need to be repaired/replaced. Note: When water is turned on, the water runs constantly | |
| Truesdell Elementary | FM-200625677 7/14/06 Second Floor (annex)/Girls Restroom - One toilet is not working. | |
| Truesdell Elementary | FM-200625674 7/14/06 First Floor (main bldg.)/Girls Restroom - One toilet is not working. | |
| Truesdell Elementary | FM-200625676 7/14/06 Second Floor (Annex)/Boy's Restroom - 1 toilet and 3 urinals are not working. | |
| Truesdell Elementary | FM-200625678 7/14/06 First Floor (annex)/Girls Restroom - 3 toilets are not working. | |
| Truesdell Elementary | FM-200625675 7/14/06 First Floor (main bldg.)/Boy's Restroom - 4 toilets and 1 urinal not working. | |
| Truesdell Elementary | FM-200625679 7/14/06 First Floor (annex)/Boy's Restroom - 1 urinal and 1 toilet not working. | |
| Benning Elementary School | FM-200625781 7/17/06 Main Floor- Women's Bathroom in the Office Sink needs a cut-off valve for the hot-water. | |
| Burrville Elementary School | FM-200625751 7/17/06 2nd Floor- Boy's Bathroom Boy's bathroom needs caulk around the sink. | |
| Burrville Elementary School | FM-200625749 7/17/06 2nd Floor- Girl's Bathroom The toilet needs a ring. | |
| Burrville Elementary School | FM-200625750 7/17/06 2nd Floor- Girl's Bathroom Remount sink. Asbestos Code A - Clear for Repairs on 07/20/06. Tidewater - Shamika Parker (RG 07/21/06) | |
| Burrville Elementary School | FM-200625764 7/17/06 2nd Floor- Boy's Bathroom Seal is needed around the urinal. | |
| Burrville Elementary School | FM-200625762 7/17/06 2nd Floor- Boy's Bathroom Urinal needs to be mounted back on the wall. A wax ring is needed and the toilet needs a spud. | |
| Gage-Eckington ES | FM-200625873 7/18/06 Second Floor/Nurses Restroom - Flush valve is leaking on toilet, when flushed it causes a small puddle on the floor. | |
| Gage-Eckington ES | FM-200625870 7/18/06 First Floor/Girl's Restroom - Across From Elevator: Three toilets are clogged and need to be snaked, it's causing flooding in the restroom. Also there is one toilet leaking from the joints leading to the toilet bowl. | |
| Reed LC | FM-200626090 7/20/06 2nd Floor- Female Restroom Repair door vents. Asbestos Code A - Clear for repairs on 07/25/06. Tidewater - Carlos Vera (RG 07/26/06) | |
| Whittier Elementary School | FM-200626051 7/20/06 1st Floor- Hallway (by Girl's Restroom- Old Side) Repair/replace water fountain. Water leaks from the bottom of the unit. | |
| Truesdell Elementary | FM-200626058 7/20/06 Plaster is falling from the walls on the Second Fl./Boy's Restroom Lead & Asbestos Code A - Clear for repairs on 07/28/06. Tidewater - Roger Small/Carlos Vera (RG 08/04/06) | |
| Reed LC | FM-200626095 7/20/06 2nd Floor- Female Restroom Re-align restroom door in Learning Center #3. | |
| Gage-Eckington ES | FM-200626077 7/20/06 Repair flush valves & unstop toilets in Main Lobby's Boys Bathroom. | |
| Reed LC | FM-200626091 7/20/06 2nd Floor- Male Restroom Re-attach 1 partition to the wall. Asbestos Code A - Clear for repairs on 07/25/06. Tidewater - Carlos Vera (RG 07/26/06) | |
| Kelly Miller MS | FM-200626112 7/21/06 Boy's Restrooms; Second (1) & First Floors (4), Girl's Restroom; First Floor (3) - Need to have sinks re-anchored in these restrooms. | |
| Turner Elementary School | FM-200626120 7/21/06 First floor, Boys' Restroom. Replaster ceiling, this damaged was caused by a leaking pipe. Asbestos Code A - Cleared for repairs on 08/02/06 by Tidewater/Kenny Long (LM-08/02/06) Safety Office 202-576-8962. Lead-Based Paints Code A - Cleared for repairs on 08/02/06 by Tidewater/Roger Smalls (LM-08/02/06) Safety Office 202-576-8962. | |
| Beers Elementary School | FM-200626283 7/24/06 1st Floor- Principal's Office Restroom sink is leaking from the fixtures and trap. | |
| Benning Elementary School | FM-200626265 7/24/06 2nd Floor- Teacher's Bathroom Need a new check valve. | |
| Thomas Elementary School | FM-200626319 7/25/06 Room #101 - ceiling tile missing - Restroom located in room #101 plaster ceiling above window. Approximately 1' by 2' area. Asbestos Code A - Cleared for repairs on 08/02/06 by Tidewater/Kenny Long (LM-08/02/06) Safety Office 202-576-8962. | |
| Brookland Elementary | FM-200626338 7/25/06 1st Floor- Kitchen Restroom Repair/replace faucet. | |
| Birney Elementary School | FM-200626373 7/26/06 Third Floor/Girl's Restroom - Repair or replace door Asbestos Code A - Clear for repairs on 07/28/06. Tidewater - Kenny Long (RG 08/04/06) | |
| Meyer Elementary School | FM-200626424 7/26/06 Bathroom sink backed up; water pools in bowl and drains extremely slow | |
| Gage-Eckington ES | FM-200626470 7/27/06 Second Floor/Teachers Restroom (Women) - Replace flush valve, will not flush properly. | |
| Cardozo High School | FM-200626489 7/27/06 1st floor nurse office, bathrooms ( 2 ), replace domestic cold and hot water faucets ( 4 ) | |
| Brookland Elementary | FM-200626520 7/28/06 Repair/Replace the faucets in the following locations: * Cafeteria/Ladies Restroom * 1st Floor/Security Restrooom | |
| Brookland Elementary | FM-200626519 7/28/06 Make the following repairs on the 1st Floor: * Pre-K Boys Restroom- repair flush valve * Kindergarten Girls Restroom- repair flush valve * Hallway- repair water fountain, the pressure is low. | |
| Aiton Elementary School | FM-200626532 7/31/06 1st Floor- Pre- K 2 Restroom Replace partitions in the classrooms' restroom. Asbestos Code A - Clear for repairs on 08/03/06. Tidewater - Kenny Long (RG 08/04/06) | |
| Aiton Elementary School | FM-200626531 7/31/06 1st Floor- Pre- K 1 Restroom Replace partitions in the classrooms' restroom. Asbestos Code A - Clear for repairs on 08/03/06. Tidewater - Kenny Long (RG 08/04/06) | |
| Harris, C.W. ES | FM-200626639 8/1/06 5/6 Wing- Boys Restroom Replace wax ring on toilet; it is leaking from the bottom. | |
| Aiton Elementary School | FM-200626662 8/1/06 Roof- Repair exhaust fan for the restrooms. It is making a lot of noise, so it was turned off. | |
| Harris, C.W. ES | FM-200626632 8/1/06 1st Floor- Teacher's Restroom Replace wax ring on toilet. The toilet is leaking from the bottom. | |
| Reed LC | FM-200626699 8/2/06 2nd Floor- Female Restroom Re-align door near Stairway #4. | |
| Reed LC | FM-200626702 8/2/06 2nd Floor- Female Restroom Repair door vent (near Stairwell #4) Asbestos Code A - Clear for repairs on 08/04/06. Tidewater - Thomas Johnnson (RG 08/07/06) | |
| Reed LC | FM-200626698 8/2/06 2nd Floor- Male Restroom Repair door vent. Asbestos Code A - Clear for repairs on 08/04/06. Tidewater - Thomas Johnnson (RG 08/07/06 | |
| Reed LC | FM-200626696 8/2/06 2nd Floor- Learning Center 2 Re-attach two partitions to restroom wall. (near stairwell #3) Asbestos Code A - Clear for repairs on 08/04/06. Tidewater - Thomas Johnnson (RG 08/07/06 | |
| Woodson High School | FM-200626721 8/2/06 6th Floor- Boys Bathroom Repair/replace urinal. | |
| Reed LC | FM-200626694 8/2/06 2nd Floor- Learning Center 2 Re-attach two partitions to restroom wall. (near stairwell #2) Asbestos Code A - Clear for repairs on 08/04/06. Tidewater - Thomas Johnnson (RG 08/07/06 | |
| Reed LC | FM-200626701 8/2/06 2nd Floor- Learning Center 2 Re-align 2 doors: Mr. Anthony's door and male restroom doors. | |
| Browne Junior High School | FM-200626842 8/4/06 2nd Floor- Boys Restroom Plaster and paint ceiling. Lead & Asbestos Code A - Clear for repairs on 08/07/06. Tidewater - Roger Small (RG 08/08/06) | |
| Browne Junior High School | FM-200626841 8/4/06 1st Floor- Boys Restroom Plaster and paint ceiling. Lead & Asbestos Code A - Clear for repairs on 08/07/06. Tidewater - Roger Small (RG 08/08/06) SEE ASSESSMENTS | |
| Savoy Elementary School | FM-200626877 0626877 8/7/06 Second Floor/Boy's Restroom - Repair flush valve & Unclog urinal. | |
| Takoma Educational Center | FM-200626889 8/7/06 1st Floor- Early Childhood (Universal Bathroom) Re-attach partitions to the wall. Asbestos Code A - Clear for repairs on 08/08/06. Tidewater - Kenny Long (RG 08/09/06 ) | |
| Wilkinson ES | FM-200627146 8/9/06 First Floor/Custodian Restroom Commode Keeps Running, May Be The Flush Valve. | |
| Garfield ES | FM-200627186 8/10/06 1st Floor- Male Bathroom Replace broken window. Asbestos Code A - Clear for repairs on 08/14/06. Tidewater - Roger Small (RG 08/15/06) | |
| Wilkinson ES | FM-200627309 8/11/06 1st Floor- Near Gym Install 3 bradley basins in the Boys & Girls Restrooms. | |
| West Elementary School | FM-200627428 8/11/06 All wax rings in the Learning Center bathrooms need to be changed. (The total number of bathrooms is 4). The urinals hanging off the walls. | |
| Turner Elementary School | FM-200627323 8/11/06 Ground Floor- Cafeteria Kitchen Plaster/paint entire boy's bathroom. Asbestos Code A - Clear for repairs on 08/22/06. Tidewater - Roger Small/Shamika Parker (RG 08/24/06) | |
| Wilson J. O. ES | FM-200627610 8/15/06 Install 4" Closet Flange On Toilet, Boy's Restroom-First Floor. | |
| Hendley Elementary School | FM-200627743 8/16/06 3rd Floor- Girl's Bathroom Repair all toilets; they are leaking from the spuds. | |
| Hendley Elementary School | FM-200627745 8/16/06 2nd Floor- Boy's Bathroom Repair urinals; the second and third urinals from the wall are leaking from the bottoms. | |
| Francis Junior High School | FM-200627758 8/16/06 2nd Floor- Room 215 Replace p-trap in the bathroom. | |
| Beers Elementary School | FM-200627854 8/17/06 Second Floor/Building 3-Boy's Restroom - The sinks in the boys restroom may need some repairs (1) J. Joint split need to be replaced also the sink needs to be unclogged. | |
| Beers Elementary School | FM-200627873 8/17/06 First Floor/Building 3-Boy's Restroom - The sink is hanging from the wall, make the necessary repairs. | |
| Beers Elementary School | FM-200627872 8/17/06 First Floor/Building 3-Girl's Restroom - Loose fixtures need to be repaired. | |
| Garfield ES | FM-200627858 8/17/06 1st Floor- Girl's Bathroom - 1 sink needs new supply line - repair/replace 2 spuds on toilets. | |
| Beers Elementary School | FM-200627898 8/18/06 Second Floor/Building 3-Girl's Restroom - Sink has a loose hot water fixture and loose toilet, water seeping from bottom. | |
| Gibbs Elementary School | FM-200627913 8/18/06 1st Floor- Teacher's Restroom Repair leaking sink. | |
| Gibbs Elementary School | FM-200627912 8/18/06 2nd Floor- Girl's Bathroom Repair toilets, water is running. | |
| Garnet-Patterson MS | FM-200628024 24 8/21/06 First floor, Boys' Restroom. Replace broken hot & cold water faucets on the sink. Note: The school staff were able to isolate the leak by shutting the water off. | |
| Bancroft Elementary School | FM-200627961 8/21/06 Ground/P.E. Boy's Bathroom (main bldg.) - Repair ceiling that has crumbling plaster. Asbestos Code A - Clear for repairs on 08/22/06. Tidewater - Roger Small/Carlos Vera (RG 08/24/06) SEE ASSESSMENTS | |
| Ludlow-Taylor ES | FM-200628011 8/21/06 1st Floor- Health Suite Bathroom Repair bathroom door; it is dragging and cannot be opened. Asbestos Code A - Clear for repairs on 08/22/06. Tidewater - Thomas Johnson (RG 08/24/06) | |
| Wilkinson ES | FM-200628196 8/23/06 2nd Floor- Boys Bathroom Replace flush valve. | |
| Kramer Middle School | FM-200628251 8/24/06 Assistant Principal Restroom/Replaster the wall and ceiling due to water damage Lead Code B Asbestos Code A - Clear For Repairs On 09/09/06 SEE ASSESSMENTS Tidewater - Carlos Vera (RG 09/21/06) | |
| School WW High School | FM-200628227 8/24/06 Basement level, Rooms 001, 002, 003, Boys' restroom, Girls Restroom and Boiler Room. Remove peeling paint , plaster and paint the walls & ceiling in the areas listed above on the basement level. Lead Code B Asbestos Code A - Clear for repairs on 08/28/06. Tidewater - Roger Small (RG 09/07/06) SEE ASSESSMENTS | |
| Harris, C.W. ES | FM-200628407 8/28/06 1st Floor- Restrooms Plaster and paint classrooms. Lead & Asbestos Code A - Clear for repairs on 09/01/06 Tidewater - Roger Small/Shamika Parker (RG 10/10/06) SEE ASSESSMENTS | |
| Truesdell Elementary | FM-200628390 8/28/06 3rd Floor- Girl's Restroom Repair/replace bradley basin. | |
| Takoma Educational Center | FM-200628336 0628336 8/28/06 Gym Area- Girls Bathroom 3rd Floor- Room 200 Replace ballasts; materials are on premises. | |
| King M L ES | FM-200628361 8/28/06 Lobby/ Boys Restroom- Repair urinal. 1st & 2nd Floors- Repair water coolers. | |
| Ferebee-Hope Elementary School | FM-200628453 8/29/06 Ground Floor/Head Start Rm. Boy's + Girl's Restrooms In The Yellow Hall. Restrooms are out of service due to a blockage in the line. When toilets are flushed the water comes up in other areas. | |
| Davis Elementary School | FM-200628524 8/30/06 Install radiator covers in the following locations: Room 100, 101. 203, 204, Boys & Girls Restrooms (Old-Side). | |
| Beers Elementary School | FM-200628507 8/30/06 First Floor-Boy's Restroom/Paint peeling, need plaster and paint (larg areas) Lead & Asbestos Code A - Clear for repairs on 08/31/06. Tidewater - Roger Small (RG 09/05/06) SEE ASSESSMENTS | |
| Walker-Jones EC | FM-200628525 8/30/06 Second floor, Teacher's Lounge/Ladies Restroom. Repair leak in roof above second floor teacher's lounge women' restroom. Note: This leak is near a light fixture.. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Tony Marcolin (RG 09/07/06) | |
| Hart Middle School | FM-200628489 8/30/06 Second floor, Old Bldg./Boys' Restroom & Teacher's Lounge. 1.) Repair (3) urinals in the boys' restroom. 2.) Repair toilet in teacher's lounge. | |
| Garrison ES | FM-200628669 8/31/06 Boys and Girls Bathrooms Remove bradley basins and replace with sinks. Water runs all day and night. Note: Something needs to be done about this problem asap! | |
| Truesdell Elementary | FM-200628666 8/31/06 1st Floor- Girls Restroom Secure sinks to wall. Asbestos Code A - Clear for repairs on 09/05/06. Tidewater - Thomas Johnson (RG 09/08/06) | |
| Shepherd ES | FM-200628659 8/31/06 Basement- Girls Bathroom Replace ballasts for 2 F40T8 flourescent light fixtures. | |
| Powell Elementary School | FM-200628716 M-200628716 9/1/06 1) On the 2nd floor restroom near room 213 the faucet has a pen hole in it and water is coming out. (2)Also on that same floor in the teachers lounge the washer under neath the sink is no good causing water to leak out. | |
| Birney Elementary School | FM-200628705 9/1/06 First, Second & Third floors. Repair or Replace broken window panes in the following areas: First floor-Assembly Hall (5) Second floor-Room 213 (6), Room 208 (2) Third floor-Hallway (2), Room 302 (2), Room 304 (2), Room 308 (5) and Replace (2) broken windows in Girls' restroom on the old side. Asbestos Code A - Clear for repairs on 09/05/06. Tidewater - Kenny Long (RG 09/06/06) SEE ASSESSMENTS | |
| Powell Elementary School | FM-200629542 M-200629542 9/5/06 In the girls restroom on the 1st floor the faucet needs to be replace because the hot & cold water handles are broken. Also the sink near the window bracket that holes it up is broke and the sink is about to fall down. (2) On the 2nd floor girls restroom on both sinks the faucets need to be replace. | |
| Meyer Elementary School | FM-200628881 9/6/06 Second floor, Boys' Restroom. Repair leaking roof, water is pouring through the ceiling causing it to collaspe. Lead & Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Roger Small/Thomas Johnson (RG 09/11/06) SEE ASSESSMENTS | |
| Nalle Elementary School | FM-200628861 9/6/06 Second floor, Boys' Restroom/Main Bldg. Repair leaking roof, this leak is causing the entire restroom to flood. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Carlos Vera (RG 09/11/06 | |
| Young Elementary School | FM-200628926 9/7/06 1st & 2nd Floors- Bathrooms Repair/replace doors on both Boys & Girl's bathrooms. Asbestos Code A - Clear for repairs on 09/08/06. Tidewater - Thomas Johnson (RG 09/13/06) | |
| Eastern High School | FM-200628901 9/7/06 Sub - Custodian's Locker Room - Repair roof leak in custodian women's restroom. Ceiling collapsed, walls and lockers are deteriorating. Ceiling lights are in danger of shorting out because of the water. | |
| Malcolm X ES | FM-200628911 9/7/06 2nd Floor- Boys Bathroom Repair urinal. | |
| Tubman Elementary School | FM-200628895 9/7/06 Lower Level - Engineer Office Bathroom - Supply hot and cold water to Bathroom, Repair or replace any inoperable fixtures in Bathroom. Note - This unhealthy condition has existed for years and must be corrected.ASAP. | |
| Bancroft Elementary School | FM-200629005 9/8/06 Top Floor- Hallway (near girls bathroom) Repair leaking spigot and supply line on water fountain. | |
| Merritt Middle School | FM-200629142 9/11/06 1st, 2nd, & 3rd Floors- Repair/replace faucets and valves in bathrooms. | |
| Ferebee-Hope Elementary School | FM-200629179 9/12/06 Troubleshoot and possibly repair plumbing problem. There is a bad odor coming from all bathrooms. | |
| Bancroft Elementary School | FM-200629223 9/12/06 1st Floor- Girls & Teacher's Bathroom Replace water damaged ceiling. Asbestos Code A - Clear for repaors on 09/14/06. Tidewater - Kenneth Belton (RG 09/18/06) | |
| Bancroft Elementary School | FM-200629219 9/12/06 Top Floor- Girls Bathroom Replace water fountain with a water cooler. | |
| Eaton Elementary School | FM-200629224 9/12/06 3rd Floor- Room 305 Boys Restroom Repair/replace slop sink. | |
| Young Elementary School | FM-200629718 9/12/06 Toilet in restroom is unstable. Repair is needed ASAP. URGENT, | |
| Turner Elementary School | FM-200629288 9/13/06 Third Floor/Boy's Restroom - Replace Toilet, Its Broken, A Flush Valve Is Also Needed. | |
| Turner Elementary School | FM-200629349 9/13/06 1st Floor- Girl's Bathroom (old side) Install stall partitions. Asbestos Code A - Clear For Repairs On 06/26/06. Tidewater - Thomas Johnson (RG 09/28/06) | |
| Barnard Elementary School | FM-200629284 9/13/06 First Floor/Lobby - Women's Bathroom - The First Stall Has A Heavy Constant Leak From The Fush Valve, Repair or Replace. | |
| Montgomery ES | FM-200629358 9/13/06 LCI/Women's Restroom- Repair sink. | |
| Bruce-Monroe Elementary School | FM-200629485 9/14/06 1st Floor- Main Office Staff Restroom Sink needs to be snaked out. | |
| Patterson ES | FM-200629481 9/14/06 1st Floor- Room 123 There is no water in this bathroom. | |
| Patterson ES | FM-200629480 9/14/06 2nd Floor- Boys Bathroom Repair 2 sinks that are leaking. | |
| Wilkinson ES | FM-200629475 9/14/06 2nd Floor- Water Fountain (near girls restroom) Replace cut-off valve. | |
| Wilkinson ES | FM-200629477 9/14/06 1st Floor- Kitchen Restroom/Room 126 Replace door closer. Asbestos Code A - Clear For Repairs On 09/19/06 Tidewater - Roger Small (RG 09/21/06) | |
| Jefferson JHS | FM-200629484 9/14/06 Basement- Kitchen Restroom Repair/replace light fixture. | |
| Montgomery ES | FM-200629588 9/15/06 1st Floor- LC 1/Men's Bathroom Repair lock. | |
| Montgomery ES | FM-200629585 9/15/06 1st Floor- LC 1 Repair sink in boys bathroom. | |
| Montgomery ES | FM-200629587 9/15/06 1st Floor- LC 1/Women's Bathroom Repair leaking toilet. | |
| Gibbs Elementary School | FM-200629545 9/15/06 1st Floor- Boys & Girls Restrooms Unlock doors. | |
| Payne Elementary School | FM-200629618 9/18/06 Girl's Restroom (Lobby Area) - Repair the ceiling due to a condensation leak that was repaired, plaster is falling light fixture needs to be replaced. Asbestos Code A - Clear for repairs on 09/18/06. Tidewater - Kenny Long (RG 09/19/06) | |
| Kenilworth ES | FM-200629673 9/19/06 Second Floor/Girl's Restroom - Sink is hanging off the wall, the water was cut off. | |
| Bancroft Elementary School | FM-200629667 9/19/06 1st Floor- Teacher's Bathroom Repair leaking ceiling; when it rains, the ceiling leaks. Asbestos Code A - Clear For Repairs On 09/19/06 Tidewater - Shamika Parker (RG 09/21/06) | |
| Gibbs Elementary School | FM-200629688 9/19/06 1st- Boys Bathroom No lights. | |
| King M L ES | FM-200629671 9/19/06 Flush valves are needed in the following locations: - 1st Floor/Boys & Girls Restrooms - 3rd Floor/Boys Restrooms | |
| Hine JHS | FM-200629955 9/25/06 3rd Floor- Gym/Ladies Restroom Secure toilet to the floor. Asbestos Code A - Clear For Repairs On 06/26/06. Tidewater - Tony Marcolin (RG 09/28/06) | |
| Ballou Senior High School | FM-200629988 9/25/06 Staff Bathroom- Repair cold water fixture; water leaks from the fixture. | |
| Walker-Jones EC | FM-200629946 9/25/06 First Floor/Boy's Restroom - Leaking toilet in the second stall. | |
| Hine JHS | FM-200629965 9/25/06 3rd Floor- Hallway near Men's Restroom Install water cooler. Asbestos Code A - Clear for repairs on 09/26/06. Tidewater - Tony Marcolin (RG 10/20/06) | |
| Walker-Jones EC | FM-200629943 9/25/06 Second Floor/Boy's Restroom - Urinal cracked and leaking. | |
| Hine JHS | FM-200629954 9/25/06 2nd Floor- Girls & Boys Bathrooms (B Wing) Repair urinals and toilets. | |
| Eastern High School | FM-200630041 9/26/06 Provide keys for the following areas: - 322, 226, 239, 167, Bathroom keys, Auditorium (key is broken off in the lock). | |
| Davis Elementary School | FM-200630198 9/27/06 1st Floor- Room 101 Bathroom Repair bolts on toilets. | |
| Randle-Highlands ES | FM-200630090 9/27/06 No Water In The Restrooms (Boy's + Girls) On All Floors. | |
| Wilkinson ES | FM-200630194 9/27/06 2nd Floor- Room 180/Boys Restroom Repair/replace exhaust fan. | |
| Plummer Elementary School | FM-200630174 9/27/06 1st Floor- Boiler Room Re-align restroom door. | |
| Eaton Elementary School | FM-200630204 9/28/06 Third Floor/#314-Girl's Restroom (east side) - R/R The Partition that fell off the wall. Asbestos Code A - Clear for repairs on 09/29/06. Tidewater - Carlos Vera (RG 10/02/06) | |
| Whittier Elementary School | FM-200630213 9/28/06 (new side) - Roof - Need Assessment, roof water is leaking in girls restroom when it rain Asbestos Code A - Clear for repairs on 09/26/06. Tidewater - Kenny Belton ( RG 10/02/06) | |
| Coolidge High School | FM-200630216 9/28/06 3rd Floor- Boys Bathroom Repair sink; it is hanging off of the wall. | |
| Spingarn High School | FM-200630219 9/28/06 Third Floor - Boy's Restroom - Unstop Sink. | |
| Coolidge High School | FM-200630217 9/28/06 2nd Floor- Teachers Bathroom Repair sink; it is hanging off of the wall. | |
| Coolidge High School | FM-200630297 9/29/06 Ground Floor- Boys Bathroom Replace missing sink. | |
| Coolidge High School | FM-200630299 9/29/06 Ground Floor- Girls Bathroom Replace knobs on faucet. | |
| Coolidge High School | FM-200630300 9/29/06 Ground Floor- Security Bathroom Repair leaking pipes in the ceiling. Asbestos Code A - Clear for repairs on 10/03/06 Tidewater - Shamika Parker (RG 10/05/06) | |
| Coolidge High School | FM-200630302 9/29/06 1st Floor- Girls Restroom Repair ruptured line. | |
| Rudolph Elementary School | FM-200630274 9/29/06 1st Floor- Room 104 Snake out urinal in the bathroom. | |
| Coolidge High School | FM-200630301 9/29/06 1st Floor- Girls Restroom Replace sink. Asbestos Code A - Clear for repairs on 10/03/06 Tidewater - Shamika Parker (RG 10/05/06) SEE ASSESSMENTS | |
| Harris, C.W. ES | FM-200630390 10/3/06 2nd Floor- Boys Restroom Replace flush valve and wax ring on urinal. | |
| Harris, C.W. ES | FM-200630395 10/3/06 2nd Floor- Boys Restroom Replace wax ring on toilet. | |
| Harris, C.W. ES | FM-200630396 10/3/06 1st Floor- Teacher's Bathrooms Replace wax ring on toilets. | |
| Coolidge High School | FM-200630424 10/3/06 3rd Floor- Teachers Bathroom Repair/replace a broken toilet. | |
| Coolidge High School | FM-200630423 10/3/06 2nd Floor- Teachers Bathroom Repair/replace a broken toilet. | |
| Coolidge High School | FM-200630421 10/3/06 2nd Floor- Mens Bathroom Replace missing flush valves. | |
| Truesdell Elementary | FM-200630467 10/4/06 Second floor, Boys' Restroom. Assess and repair lights. Note: The custodial staff has already checked the panel box and changed the light bulbs, still no change. | |
| Harris, C.W. ES | FM-200630473 10/4/06 1st Floor- Restrooms Plaster and paint restrooms. Lead & Asbestos Code A - Clear for repairs on 10/06/06 Tidewater - Roger Small (RG 10/10/06) SEE ASSESSMENTS | |
| Montgomery ES | FM-200630445 10/4/06 1.) Replace bradley basins in 2nd floor nw boys' & girls' restrooms. 2.) Remount (2) wall hung sinks . | |
| Shaed Elementary School | FM-200630513 10/5/06 2nd Floor- Boys Restroom Repair urinal that is leaking from the wall mount. | |
| Wilkinson ES | FM-200630519 10/5/06 1st Floor- Room 99 Main Office Bathroom Replace handle kit for a toilet that is leaking. | |
| Ferebee-Hope Elementary School | FM-200630520 10/5/06 2nd Floor- Outside of the Girls Restroom Repair/replace wall outlet. | |
| Woodson High School | FM-200630582 10/6/06 7th Floor- Girls Restroom Repair brick wall. | |
| Woodson High School | FM-200630583 10/6/06 7th Floor- Girls Restroom Re-attach hand sink. | |
| Wilkinson ES | FM-200630592 10/10/06 Second Floor - 117 Corridor in front of restroom - Repair 10 fluorescence light fixtures. | |
| John Burroughs ES | FM-200630597 10/10/06 First Floor - New Wing - Hole in wall by Boy's Restroom Asbestos Code A - Clear for repairs on 10/10/06 Tidewater - Carlos Vera (RG 10/12/06) | |
| Barnard Elementary School | FM-200630686 10/12/06 First Floor - Girl's Restroom - The last toilet is spraying and leaking water from the flush valve. | |
| Duke Ellington School | FM-200630710 10/12/06 Second Floor - Teachers Lounge (women restroom) - Sink has no running water | |
| Park View ES | FM-200630704 10/12/06 2nd Floor- Boys Restroom near Room #231 Repair 3 toilets, 3 urinals, and 2 sinks. | |
| Spingarn High School | FM-200630817 10/16/06 Second Floor - Assistant Principal Restroom - Scrape and paint wall and ceiling. Asbestos Code A - Clear for repairs on 10/23/06. Tidewater - Roger Small\Shamika Parker (RG 10/24/06) SEE LINKED DOCUMENTS | |
| Spingarn High School | FM-200630807 10/16/06 Third Floor - Girl's Restroom - Snake out sinks | |
| Winston EC | FM-200630864 10/17/06 First Floor - Replace cabinet under sink outside boy's restroom #131 Asbestos Code A - Clear for repairs on 10/19/06. Tidewater - Roger Small (RG 10/23/06) | |
| Woodson High School | FM-200630870 10/17/06 Interior wall in girls' restroom. Repair masonry wall so that sink can be reattached to to wall. Note: The students are unable to wash their hands. Asbestos Code A - Clear for repairs on 10/19/06. Tidewater - Roger Small (RG 10/24/06) | |
| Winston EC | FM-200630856 10/17/06 First Floor - Ladies Restroom - Replace oval sink Asbestos Code A - Clear for repairs on 10/17/06. Tidewater - Shamika Parker (RG 10/19/06) | |
| Watkins Elementary School | FM-200630902 10/17/06 Boy's Bathroom - Repair (2) Sinks | |
| Walker-Jones EC | FM-200630830 0830 10/17/06 Second Floor - Boy's + Girl's Restrooms - Install locks and provide keys for security reasons. | |
| Plummer Elementary School | FM-200630842 10/17/06 Second Floor - Girl's Restroom - Replace wax ring on toilet | |
| Winston EC | FM-200630863 10/17/06 First Floor - Replace counter top outside boy's restroom #111 Asbestos Code A - Clear for repairs on 10/19/06. Tidewater - Roger Small (RG 10/23/06) SEE LINKED DOCUMENTS | |
| Garrison ES | FM-200630838 10/17/06 First Floor - Girl's Restroom (east wing) - Toilet stopped up. | |
| Cardozo High School | FM-200630947 10/18/06 First Floor - Boy's Restroom - Re-mount sink to the wall, it's hanging off the wall | |
| Kramer Middle School | FM-200630927 10/18/06 First Floor Corridor Rm. 115 - Sewage smell in the wall next to the boy's restroom lockers 216-224 Asbestos Code A - Clear for repairs on 10/20/06. Tidewater - Kenney Long (RG 10/24/06) | |
| Payne Elementary School | FM-200631055 10/20/06 First Floor - New Wing Boy's Bathroom - Repair or replace the flush valve on the toilet and wax ring. | |
| Watkins Elementary School | FM-200631073 10/20/06 Replace faulty bradley basins on the third and fourth floor boy's restrooms. | |
| Watkins Elementary School | FM-200631089 10/20/06 Replaster and paint the ceiling in the following areas: Second Floor - Boy's + Girl's Restroom, Third Floor Boy's Restroom. Asbestos Code A - Clear for repairs on 10/23/06. Tidewater - Roger Small\Shamika Parker (RG 10/25/06) | |
| Payne Elementary School | FM-200631056 10/20/06 Second Floor - Old Building - Girl's Bathroom - Unstop sink. | |
| John Burroughs ES | FM-200631169 10/23/06 First Floor - Lower Level - Boy's Restrooms - Sink washer went bad on the faucet water keep running. | |
| Savoy Elementary School | FM-200631168 0631168 10/23/06 Second floor, Boys' Restroom. Rehang urinal on the wall. | |
| John Burroughs ES | FM-200631170 10/23/06 First Floor - Main Building - Boy's Restroom - Drywall panel broke off the wall need repair. Asbestos Code A - Clear for repairs on 10/24/06. Tidewater - Aaron Gholson (RG 10/26/06) | |
| Emery Elementary School | FM-200631282 10/23/06 Bathroom sink water need to hotter to wash hands. | |
| Kramer Middle School | FM-200631147 10/23/06 First Floor - Boy's Restroom (rm. 115) - Pipe busted in the wall. | |
| Wilson J. O. ES | FM-200631157 10/23/06 First Floor - Girl's Restroom - Repair the hole in the wall. Asbestos Code A - Clear for repairs on 10/24/06. Tidewater - Thomas Johnson (RG 10/26/06) | |
| King M L ES | FM-200631269 10/24/06 First floor, Boys' Restroom. Replace (2) flush valve on commodes # 1 & 2 stalls. | |
| Payne Elementary School | FM-200631243 10/24/06 Second Floor - Boy's Restroom - Low water pressure to toilets | |
| Payne Elementary School | FM-200631239 10/24/06 First Floor - Girl's + Boy's Restroom near Custodian Office - Replace one toilet seat in each bathroom. | |
| Hart Middle School | FM-200631279 10/24/06 Replace broken and leaky flush valves in the following areas: 1.) Second floor, Teachers' Lounge restroom, girls' restroom and gymnasium girls' restroom. | |
| Wilkinson ES | FM-200631267 10/24/06 First Floor - Kgn. Boy's Restroom #15 - Repair or replace door closer, slams shut hard. | |
| Payne Elementary School | FM-200631242 10/24/06 Third Floor - Girl's Restroom - Replace 13 toilet seats. | |
| Langdon Elementary School | FM-200631317 -200631317 10/25/06 First Floor - Boy's Restroom - Sink is off the wall | |
| Miner Elementary | FM-200631336 10/25/06 First floor, Boys' Restroom. Replace broken commde, there are sharp & jaggered pieces exposed. Note: This restroom has been shutdown. | |
| Wilkinson ES | FM-200631303 10/25/06 First Floor - Rm. 177 Corridor near Boy's Restroom - Repair or replace push button on the water fountain, it is stuck and will not release, had to cut the water off. | |
| Wilkinson ES | FM-200631306 10/25/06 First Floor - 28 Girls Restroom (kgn. area) - Repair or replace fluorescence light fixtures, will not come on | |
| Bancroft Elementary School | FM-200631378 10/26/06 Ground Floor - P.E. Bathroom (main bldg.) - Repair crumbling plaster in ceiling near light fixture. Lead & Asbestos Code A - Clear for repairs on 10/27/06. Tidewater - Roger Small (RG 10/31/06) SEE LINKED DOCUMENTS | |
| Aiton Elementary School | FM-200631361 10/26/06 Fourth Floor - Girl's + Boy's Restrooms - Replace broken/cracked window/door glass Asbestos Code A - Clear for repairs on 10/27/06. Tidewater - Kenny Long (RG 11/01/06) | |
| Meyer Elementary School | FM-200631396 10/26/06 Second Floor - Boy's Restroom - Repair hole in the ceiling Lead & Asbestos Code A - Clear for repairs on 10/27/06. Tidewater - Roger Small (RG 10/31/06) SEE LINKED DOCUMENTS | |
| Aiton Elementary School | FM-200631359 10/26/06 First Floor - Girl's + Boy's Restrooms - Replace broken/cracked window/door glass Asbestos Code A - Clear for repairs on 10/27/06. Tidewater - Kenny Long (RG 11/01/06) | |
| Aiton Elementary School | FM-200631360 10/26/06 Second Floor - Girl's + Boy's Restrooms - Replace broken/cracked window/door glass Asbestos Code A - Clear for repairs on 10/27/06. Tidewater - Kenny Long (RG 11/01/06) | |
| Garrison ES | FM-200631345 10/26/06 Second Floor - Girl's Restroom (west wing) - Unclog Toilet | |
| Garrison ES | FM-200631346 10/26/06 Second Floor - Boy's Restroom (west wing) - Urinal leaking from the wall | |
| Meyer Elementary School | FM-200631393 10/26/06 First Floor - Kitchen Restroom - Replace diaphragm in kitchen toilet. | |
| Miner Elementary | FM-200631349 10/26/06 Second Floor - Girl's Restroom 237 - Light is not working | |
| Wilson High School | FM-200631456 10/27/06 First Floor - Boy's Restroom - Repair or replace cracked hand washing sink | |
| Patterson ES | FM-200631455 631455 10/27/06 First Floor - Girl's & Boy's Bathroom - Repair partition, it broke from the wall. Asbestos Code A - Clear For repairs on 10/27/06. Tidewater -Cornell Parks (RG 11/01/06) | |
| Bowen Elementary School | FM-200631459 10/27/06 Repair the toilets and urinals in the boy's & gir's restrooms on the firs and second floor. | |
| Montgomery ES | FM-200631489 10/30/06 Multiporpuse Room 1 - Day Care Area - Boy's And Girl's Restrooms - Need Flush Valves Replaced, Toilets Keep Running | |
| Jessie LaSalle Elementary | FM-200631534 10/30/06 Second floor, Boys' & Girlss restrooms. Repair leaking toilets and unstop specified toilets. | |
| Kenilworth ES | FM-200631519 10/30/06 First Floor - Women + Men Restroom - Sewage is backing up from toilets when flushed. | |
| Meyer Elementary School | FM-200631572 10/31/06 Second Floor - Boy's Restroom - There is a leak that caused the ceiling to collaps to the First Floor - Boy's Bathroom and know it's leak down into the Basement. Asbestos Code A - Clear for repairs on 11/01/06. Tidewater - Shamika Parker (RG 11/07/06) | |
| Meyer Elementary School | FM-200631573 10/31/06 First Floor - Boy's Restroom - Repair the ceiling due to a leak that caused the ceiling to collasp. Lead & Asbestos Code A - Clear for repairs on 11/01/06. Tidewater - Roger Small/Shamika Parker (RG 11/07/06) SEE LINKED DOCUMENTS | |
| Kramer Middle School | FM-200631584 11/1/06 Basement - Girl's Restroom - toilet is leaking from the flush vale - cut off valve is not working. | |
| Davis Elementary School | FM-200631732 11/2/06 Second Floor - Girls Restroom by 204 - Repair broken bolts to the first and fifth toilets, they are loose form the floor. Also replace frozen valves to the sinks | |
| Browne Junior High School | FM-200631791 11/3/06 Boys' & Girls' Restroom, New Wing. Repair & Replace pull plates & handles on doors. | |
| Ferebee-Hope Elementary School | FM-200631970 11/7/06 U.D.C. - Boy's Restroom - Repair or replace sink, it's leaking. | |
| Ludlow-Taylor ES | FM-200631982 11/7/06 Second Floor - Boy's Restroom - Unstop middle stool | |
| Johnson JHS | FM-200631909 11/7/06 First Floor - Boy's Restroom - First urinal leaks, repair or replace | |
| Bancroft Elementary School | FM-200631950 11/7/06 First Floor - Teacher's Restroom (yellow fl.) - Replace faucet on sinks, no running water | |
| Thomas Elementary School | FM-200632007 11/8/06 1st, 2nd & 3rd Floors - Exit Doors & Boy's Restrooms - Survey and repair or replace door closers. | |
| Hart Middle School | FM-200632090 11/9/06 First & Second floor, Boys' & Girls' Restrooms. 1.) Unstop entire battery of urinals & commodes in both boys' restrooms. 2.) Unstop entire batterry of commodes in both girls' restrooms. Note: These urinals and commodes are backing up and smelling. | |
| Truesdell Elementary | FM-200632088 11/9/06 Second Floor - Annex - Girl's Restroom - Bradley basin is not working. | |
| Truesdell Elementary | FM-200632087 11/9/06 First Floor - Girl's Restroom - Sinks are loose from the wall | |
| Truesdell Elementary | FM-200632084 11/9/06 Annex - Girl's & Boy's Restrooms - R/R lights-ballasts | |
| Truesdell Elementary | FM-200632074 11/9/06 First Floor - Girl's & Boy's Restroom - R/R lights-ballasts | |
| Barnard Elementary School | FM-200632106 11/9/06 First and Second Floor Girl's + Boy's Restrooms - Install locks on the stall doors | |
| Barnard Elementary School | FM-200632110 11/9/06 First & Second, Boys' Restroom. Replace wax rings, because water is shooting from the bottom of commodes. | |
| Kenilworth ES | FM-200632171 11/12/06 Boys' Restroom on the third floor hot water faucet needs to be replaced. | |
| Kenilworth ES | FM-200632170 11/12/06 Girls' Restroom on the third floor faucet needs to be replaced. | |
| Kenilworth ES | FM-200632176 11/12/06 Boys' Restroom on the 2nd floor new side- Urinal needs a flush valve. | |
| Kenilworth ES | FM-200632175 11/12/06 2nd Floor on the new side-Boys' restroom hot water faucets need replacing. The middle sink needs to be snaked. | |
| Kenilworth ES | FM-200632177 11/12/06 Girls' Restroom on the 2nd floor (old side) and Room 104 ceiling paint is peeling-needs to be plastered. Lead & Asbestos Code A - Clear for repairs on 12/08/06. Tidewater - Roger Small/Shamika Parker (RG 12/12/06) | |
| Shaw JHS | FM-200632266 11/13/06 URGENT: Unstop four tiolets girls restroom 2nd fl blue house. | |
| Bowen Elementary School | FM-200632162 11/14/06 First & Second Floor - Boy's & Girl's Restroom -Repair toilets and flush valves | |
| Stanton Elementary School | FM-200632194 11/14/06 Girl's restroom second floor Urgent steam leaking from 1/2" line girls restroom 2nd floor. Can not be isolated. Asbestos assessment may be required. | |
| Dunbar High School | FM-200632183 11/14/06 Basement - Boy's & Girl's Restroom (Rms. 1, 2 + 3) - Repair toilets | |
| Young Elementary School | FM-200632157 11/14/06 Second Floor - Boy's Restroom - Repair urinal, water is leaking from the back | |
| Gage-Eckington ES | FM-200632203 11/15/06 Second floor, Boys' Restroom. Repair broken windom frame, so that the glass that fell out can be resecured asap! Note: This is a safety hazard. | |
| Garfield ES | FM-200632272 11/15/06 Second Request- Replace circulating pump and actuator. No heat to auditorium, music room, library, restrooms | |
| Patterson ES | FM-200632223 632223 11/16/06 Second Floor - Boy's Restroom - Repair toilet it won't flush. | |
| Eastern High School | FM-200632284 11/17/06 Football Field - Men's Restroom - Repair toilets | |
| Eastern High School | FM-200632282 11/17/06 Football Field - Ladies Restroom - Repair or replace door Asbestos Code A - Clear for repairs on 11/21/06. Tidewater - Shamika Parker (RG 11/30/06 ) | |
| Eastern High School | FM-200632280 11/17/06 Football Field - Exterior Wall Of Restroom - Remove Grafitti | |
| Ballou Senior High School | FM-200632278 11/17/06 First Floor - Men's Restroom - Toilets Backing up | |
| Hart Middle School | FM-200632294 11/17/06 New Wing Basement - Girl's Restroom - Toilet Leaking From The Bottom. | |
| Eastern High School | FM-200632309 11/17/06 Third floor, Boys' Restroom across from room 349. Replace broken commode, because the pipes are exposed and could cause serious damage or injury. | |
| Tubman Elementary School | FM-200632347 11/20/06 First Floor - Boy's Restroom - Repair 2 urinals | |
| Nalle Elementary School | FM-200632341 11/20/06 First Floor - New Side - Girl's Restroom - Broken Ceramic Floor Tiles, Replace. Asbestos Code A - Clear for repairs on 11/22/06. Tidewater - Shamika Parker (RG 11/30/06 ) | |
| Kimball Elementary School | FM-200632522 11/24/06 First Floor - Boy's Restroom (north side) - Repair ceiling due to water damage. Asbestos Code A - Clear for repairs on 11/27/06. Tidewater - Shamika Parker (RG 12/01/06 ) | |
| Eastern High School | FM-200632491 11/24/06 Third Floor - Girl's Restroom - Furnish and install stall doors Asbestos Code A - Clear for repairs on 12/07/06. DCPS Safety - Richard Gibson (RG) | |
| Spingarn High School | FM-200632515 11/24/06 Basement - Custodian Office - Repair the ceiling in the bathroom. Asbestos Code A - Clear for repairs on 11/28/06. Tidewater - Kenny Long (RG 12/01/06 ) SEE LINKED DOCUMENTS | |
| Eastern High School | FM-200632490 11/24/06 Basement - Girl's Restroom - Furnish and install stall doors Asbestos Code A - Clear for repairs on 11/27/06. DCPS Safety - Richard Gibson (RG) | |
| Eastern High School | FM-200632492 11/24/06 Second Floor - Boy's Restroom - Furnish and install stall doors Asbestos Code A - Clear for repairs on 11/27/06. DCPS Safety - Richard Gibson (RG) | |
| Kimball Elementary School | FM-200632509 11/24/06 South Wing - Girls Restroom - Cracked Commode & Bad Wax Ring - R/R | |
| Kimball Elementary School | FM-200632513 11/24/06 Second Floor - Boy's Restroom - Check and repair commode, it's leaking. | |
| Draper Elementary School | FM-200632541 11/27/06 Repair running toilet in third floor girls' restroom, the water cannot be turned off to this toilet consequently the auditorium and the cafeteria on the lower level are flooding. | |
| Young Elementary School | FM-200632719 11/27/06 Need plumber to fix urinal, bathroom water is coming from the back. | |
| Brightwood Elementary School | FM-200632602 602 11/28/06 Replace broken gooseneck faucets on sinks in second and third floor boys' restrooms in the main building. Note: Injuries can occur from the jaggered edges of the broken faucets. | |
| Kimball Elementary School | FM-200632606 11/29/06 North Building - Girl's Restroom - Ceiling has paint peeling. Lead & Asbestos Code A - Clear for repairs on 12/01/06. Tidewater - Roger Small/Shamika Parker - (RG 12/05/06) | |
| Kimball Elementary School | FM-200632609 11/29/06 North Building - Teacher's Restroom - Check and R/R cold water faucet, it's not working. | |
| Ballou Senior High School | FM-200632689 11/29/06 Sub-B Restrooms - Replace the hot and cold faucets. | |
| Davis Elementary School | FM-200632635 11/29/06 Install radiator covers for old steel radiators in the following areas - Room 100, 101, 203, 204, Boy's Bathroom by rooms 102 & 202, and the Girl's Restroom by rooms 104 & 204 | |
| Cleveland Elementary School | FM-200632638 2638 11/29/06 First Floor - Room 106 & 120 - No running water in restroom sink | |
| Janney Elementary School | FM-200632648 11/29/06 First Floor - Outside Demoundable #3 - Pipe burst under the demoundable, there is no water in the bathroom. | |
| Kimball Elementary School | FM-200632608 11/29/06 North Building - Teacher's Restroom - Replace partition doors Asbestos Code A - Clear for repairs on 12/01/06. Tidewater - Shamika Parker - (RG 12/05/06) | |
| Kimball Elementary School | FM-200632605 11/29/06 North Building - Room 102 Restroom - Ceiling has paint peeling. Lead & Asbestos Code A - Clear for repairs on 12/01/06. Tidewater - Roger Small/Shamika Parker - (RG 12/05/06) | |
| Hine JHS | FM-200632672 2 11/29/06 First Floor - Health Suite - Restrooms A & B - Plaster ceilings in restrooms Asbestos Code A - Clear for repairs on 12/04/06. Tidewater - Kenny Long (RG 12/21/06) | |
| Hine JHS | FM-200632673 3 11/29/06 First Floor - Girl's Restroom - Replace entrance lock to door. | |
| Malcolm X ES | FM-200632666 11/29/06 Second & Third Floors - Boy's Restroom - Replace the latrine | |
| Wilkinson ES | FM-200632692 11/29/06 Second Floor - Girl's Restroom - Repair hole under bradley basin Asbestos Code A - Clear for repairs on 12/04/06. Tidewater - Shamika Parker - (RG 12/06/06) | |
| Garfield ES | FM-200632678 11/29/06 First Floor - Bathrooms (Boy's) - Replace nuts + washers on 12 faucets, faucets are leaking bad, also 4 supply lines needed. | |
| Wilkinson ES | FM-200632695 11/29/06 First Floor - Boy's Restroom - Gym Area - Install locks on restroom door (both entrance doors) | |
| Simon Elementary School | FM-200632718 11/30/06 First Floor - Boy's Bathroom - Urinal Backing Up. | |
| Eastern High School | FM-200632765 12/1/06 Third Floor - Girl's Restroom - R/R door due to vandelism, door may fall Asbestos Code A - Clear for repairs on 12/04/06. Tidewater - Kenny Long - (RG 12/06/06) | |
| Kimball Elementary School | FM-200632795 12/4/06 Middle Bldg. Boy's Restroom - Two urinals are not working. | |
| Kimball Elementary School | FM-200632794 12/4/06 Middle Bldg. Boy's Restroom - R/R broken commode | |
| Whittier Elementary School | FM-200632787 12/4/06 First Floor - Special Ed. Restroom - Repair hot water faucet | |
| Kimball Elementary School | FM-200632800 12/4/06 Middle Bldg. Girls Restroom - No hot water. | |
| Kimball Elementary School | FM-200632799 12/4/06 Middle Bldg. Girls Restroom - Partitions not closing properly | |
| Kimball Elementary School | FM-200632796 12/4/06 Middle Bldg. Boy's Restroom - Two faucets are not working | |
| John Burroughs ES | FM-200632964 12/6/06 Lower Level - Boy's Restroom - Water runs to the sink faucets, the washer may be gone bad. | |
| Wilkinson ES | FM-200632971 12/6/06 First Floor - Kindergarten Boy's Bathroom - Sink is leaking from underneath, there is a bucket under the sink. | |
| Bruce-Monroe Elementary School | FM-200632918 12/6/06 First Floor - Kitchen, Principal & Staff Restroom - Repair sink | |
| Coolidge High School | FM-200632941 12/6/06 Second Floor - Boy's Bathroom - Sink off wall, water running onto the floor, can't completely isolate. | |
| Barnard Elementary School | FM-200633049 12/8/06 First Floor - Boy's Restroom - First and second stalls are not working properly, check and repair | |
| Stoddert ES | FM-200633076 0633076 12/11/06 First Floor - Girl's Restroom - R/R sink, it's hanging off the wall. | |
| Woodson High School | FM-200633201 12/13/06 7th Floor - Girl's Bathroom - Sink off the wall | |
| Woodson High School | FM-200633202 12/13/06 4th Floor - boy's Bathroom - R/R flush valves | |
| Woodson High School | FM-200633204 12/13/06 3rd Floor - Girl's & Boy's Bathroom - R/R Flush Valves | |
| Ferebee-Hope Elementary School | FM-200633190 12/13/06 Third & Fourth Floors - Teacher's Restroom - Check and make repairs, no water. | |
| Woodson High School | FM-200633203 12/13/06 3rd Floor - Men Teacher's Bathroom - R/R toilet, it's broken | |
| Peabody Elementary School | FM-200633214 12/13/06 Basement - Boy's Bathroom - Repair leaking toilets, there is water around the base | |
| Woodson High School | FM-200633207 12/13/06 3rd Floor - Boy's Bathroom - Sink off the wall | |
| Meyer Elementary School | FM-200633200 12/13/06 First Floor - Health Suite - Repair Restroom Faucet | |
| Ferebee-Hope Elementary School | FM-200633189 12/13/06 Third Floor - Boy's Restroom - Check and repair urinal | |
| Marshall Educational Center | FM-200633299 12/14/06 First Floor - Boy's Bathroom (Stage 1) - Unclog sink | |
| Kimball Elementary School | FM-200633310 12/14/06 1st floor boys restroom by Main Office in the south bldg: Shut off water supply and repair urinal which was kicked on the wall. Water is pouring oout of the pipe and flooding the building.. | |
| Davis Elementary School | FM-200633271 12/14/06 First & Second Floors - Goy's & Girl's Bathroom - Re-ancher or seal about nine sinks back to the wall | |
| Davis Elementary School | FM-200633269 12/14/06 First Floor - Room 101 Bathroom - Repair toilet it's loose from the floor. | |
| Davis Elementary School | FM-200633266 12/14/06 First Floor - Room 101 Bathroom - Repair hole beside radiato due to a broken pipe Asbestos Code A - Clear for repairs on 12/15/06. Tidewater - Shamika Parker (RG 12/20/06) | |
| Browne Junior High School | FM-200633268 12/14/06 Second Floor - Boy's Bathroom - Urinals & commode backing up. | |
| Marshall Educational Center | FM-200633288 12/14/06 First Floor - Girl's Bathroom - Toilet in handicap stall needs to be repaired. | |
| Marshall Educational Center | FM-200633298 12/14/06 First Floor - Staff Bathroom - Repair toilet | |
| River Terrace ES | FM-200633335 335 12/15/06 ground Floor - Outside of rm. 23 & Boy's Restroom - Complete unfinnished drywall work, metal corner beads exposing sharp edges. Middle side wall facing the ramp. Asbestos Code A - Clear for repairs on 12/19/06. Tidewater - Kenny Belton (RG 12/21/06) | |
| Barnard Elementary School | FM-200633322 12/15/06 Second Floor - Girl's Restroom - Replace flush valves on 4 commodes. | |
| Ferebee-Hope Elementary School | FM-200633330 12/15/06 Second Floor - Men's Restroom - Check & r/r urinal | |
| Roosevelt High School | FM-200633343 12/15/06 Basement - Boy's Bathroom (near ROTC) - Repair hole in ceiling, Plaster & Paint Walls and Partitions. Asbestos Code A - Clear for repairs on 12/26/06. Tidewater - Shamika Parker (RG 01/16/07) | |
| Merritt Middle School | FM-200633356 12/15/06 Gym - Girl's Bathroom - Sink missing off the wall. | |
| Roosevelt High School | FM-200633342 12/15/06 Basement - Boy's Bathroom (near ROTC) - Bathroom off line, plumbers needed (total renovation) | |
| Roosevelt High School | FM-200633415 12/19/06 Roosevelt Room # 204, 203, 157, Girls' Restroom #1, ROTC Basement Boys' Restroom and Sprinkler Room/Electrical Room. Repair or replace ruptured coil in the following areas: Room # 204, 203, 157, Girls' Restroom #1, ROTC Basement Boys' Restroom and Sprinkler Room/Electrical Room. Note: See linked document. | |
| Maury Elementary School | FM-200633432 432 12/19/06 First floor, Boys' Restroom. Repair cracked ceiling plaster is falling every where. Lead & Asbestos Code A - Clear for repairs on 12/27/06. Tidewater - Roger Small/Shamika Parker (RG 01/04/07) | |
| Patricia R Harris Ed Center | FM-200633443 12/20/06 First Floor - Stairwell 4/Girl's Bathroom - Sink off the wall, can't shut the water off. | |
| Young Elementary School | FM-200633462 12/20/06 First Floor - Staff Ladies Restroom - R/R sink, it leaks from the bottom. | |
| Noyes Elementary School | FM-200633479 12/21/06 Second Floor - Boy's Restroom - Replace broken faucet. (8" deep spread gooseneck spout). Second Request was called in on 1/26/07 | |
| Coolidge High School | FM-200633520 12/22/06 Second Floor - Frank Williams Ctr. - Requesting to have wax rings replaced around the toilet in the Boy's & Girl's Restrooms. | |
| Lincoln Middle School | FM-200633595 12/27/06 The sinks in the girls restroom on the 3rd floor are falling off the walls. | |
| Birney Elementary School | FM-200633559 12/28/06 First Floor - Boy's Bathroom - Requesting to have a faucet Repaired or replaced, the water will not cut off. | |
| Birney Elementary School | FM-200633561 12/28/06 First Floor - Boy's Bathroom - Requesting to have lights Repaired or replaced Asbestos Code A - Clear for repairs on 12/29/06. Tidewater - Tony Marcolin (RG 01/04/07) | |
| Miner Elementary | FM-200633654 1/4/07 Second Floor - Boy's & Girl's Restroom (Green Side) - Repair faucet, the kids have no water to wash hands | |
| Eaton Elementary School | FM-200633684 1/5/07 Second Floor - Teacher's Restroom - R/R control/stop valve, toilet is leaking very badly. Toilet can't be used. | |
| Wilkinson ES | FM-200633722 1/8/07 Second Floor - 180 Boy's Restroom - Requesting to have 2 sets of fluorescent light fixtures replaced, the area is dark. | |
| Meyer Elementary School | FM-200633819 1/8/07 Second Floor - Teacher's Restroom - Requesting the diaphragm and stop valve on the toilet be replaced. | |
| Ross Elementary School | FM-200633870 0 1/9/07 Basement floor, Girls' Restroom. Toilet is running constantly causing the toilet to overflow all over the floor flooding this restroom. Note: The staff shut this toilet off but it needs to be repaired asap! | |
| Nalle Elementary School | FM-200633856 1/9/07 Basement - Boy's Bathroom - Replace trap on sink | |
| Smothers ES | FM-200633901 01 1/10/07 First & Third Floor - Boy's Bathroom -1 urinal in each bathroom is hanging off the wall (broken brackets) | |
| Hendley Elementary School | FM-200634054 1/17/07 Basement - Head Start Rm. 5 - Replace faucets in 2 bathrooms, the faucets will not cut off water just continues to run. | |
| King M L ES | FM-200634046 1/17/07 First Floor - Girl's Restroom - No lights, may be circuit breaker or balances. | |
| Oyster Elementary School | FM-200634100 100 1/18/07 Third floor, Boys' Restroom. Water is leaking from the base and shut off valve of commode. | |
| Randle-Highlands ES | FM-200634160 0 1/22/07 First Floor - Outside of Boy's & Girl's Restrooms - Water leaking from the ceiling (cold water), unsure of what the cause is. The water is not gushing out but dripping. Check and make the repairs Asbestos Code A - Clear for repairs on 01/23/07. Tidewater - Arron Gholson (RG 01/24/07) | |
| River Terrace ES | FM-200634210 210 1/23/07 First floor, Boys Restroom/Primary Side. No lights in restroom all ballasts need to replaced asap! | |
| Harris, C.W. ES | FM-200634195 634195 1/23/07 Boys' Restroom on 3/4 Wing. Replace broken toilet asap, there are jaggered edges exposed. | |
| Seaton Elementary School | FM-200634306 1/24/07 Second Floor - Girl's Restroom - elbow pipe where the sink was removed is leaking every time sink on the other side of the restroom is used. | |
| Hearst Elementary School | FM-200634296 1/24/07 First floor, Boys & Girls Restroom, Rooms 102, 104, 99, 100 Install/reinstall radiator pipe covers to prevent students from getting burnt code A-clear for repor by DCPS Charles Buchanan on 1/26/07 | |
| Hyde Elementary School | FM-200700605 1/24/07 The sink in the kindergarten restroom is not working. Water has been shut-off to that sink. Therefore the toilet has been closed. The sink needs to be replaced. | |
| Woodson High School | FM-200634330 1/25/07 Fifth Floor-Teachers Bathroom & Room 412 - Replace the door glass, areas cant be secured. Note:Need wire mesh glass asap glazing team. Asbestos Code A - Clear for repairs on 01/25/07. Tidewater - Shamika Parker (RG 01/31/07) | |
| Nalle Elementary School | FM-200634380 1/26/07 Repair or replace as required inoperable exhaust fans in all restrooms. | |
| Randle-Highlands ES | FM-200634372 2 1/26/07 First floor, Corridor. Repair ruptured pipe in ceiling of first floor corridor between boys' & girls' restrooms | |
| West Elementary School | FM-200700013 1/29/07 First Floor - Requesting to have the faucet in the custodial closet replaced, also faucet outside of the restroom (not working) | |
| Beers Elementary School | FM-200700063 1/29/07 Boiler Room - Bathroom - Repair valve, when flushed water leaks out onto the floor. | |
| Shaw JHS | FM-200700076 1/29/07 Second floor, Girls Restroom. Unstop (4) commodes. | |
| West Elementary School | FM-200700014 1/29/07 Ground Floor - Restroom near Pre-K - Requesting the replacement of the faucet, hot water runs continuously. | |
| Marshall Educational Center | FM-200700027 1/29/07 Second Fl. - Boy's Bathroom - Exposed wires hanging from ceiling due to vandalism. A light fixture was pulled down from the ceiling. | |
| West Elementary School | FM-200701098 98 1/29/07 The lights in the mens and womens bathrooms in the first floor lobby are not operational. | |
| Woodson High School | FM-200700128 1/31/07 4th Fl. Teacher's Bathroom - Stairwell 4 - Unit vent pipe leaking Asbestos Code A - Clear For Repairs On 02/02/07. Tidewater - Shamika Parker (RG 02/05/07) | |
| Jessie LaSalle Elementary | FM-200700193 2/2/07 First Floor - Boy's Bathroom - Replace flush valve & handle on the 3rd urinal, it's leaking | |
| Ballou Senior High School | FM-200701418 2/6/07 r/r pop-up faucet in principal restroom-water will not shut off. | |
| Barnard Elementary School | FM-200700303 2/6/07 2nd Floor Girls restroom - Repair leaking shutoff valve to sink. Cannot isolate the leak. | |
| Johnson JHS | FM-200700358 2/8/07 First floor, Boys' Restroom. Ruptured domestic pipe. Note: House water was shutted off in order to isolate leak. | |
| Malcolm X ES | FM-200700389 2/9/07 Second floor, Girls' Restroom. Replace missing door, this restroom is wide open. | |
| Browne Junior High School | FM-200700444 2/12/07 In room 111, and boys the boys bathroom on 2nd floor no lights. The breakers are all on. | |
| Moten Elementary School | FM-200700437 2/12/07 1st Floor Custodian Office bathroom is flooding .The trap has an hole in it | |
| Stuart-Hobson Middle School | FM-200700506 2/13/07 Broken steam pipe in boys bathroom on 1st floor | |
| Woodson High School | FM-200700544 2/15/07 7th floor bathroom toilet wont flush 7th girl's bathroom no water in sink that was just installed 5th floor men's teachers bathroom toilet leaking on floor 4th floor girls bathroom middle toilet not working 4th floor boy's bathroom urinal will not flush 3rd floor men's bathroom toilet not working 3rd floor men's toilet not flushing 3rd floor women's teachers bathroom not working | |
| Ludlow-Taylor ES | FM-200700539 00539 2/15/07 On the 1st floor on hole is in the boys restroom, needs to be plastering/painting Lead & Asbestos Code A - Clear for repairs on 02/26/07. Tidewater - Shamika Parker (RG 02/28/07) | |
| Bunker Hill Elementary School | FM-200700563 2/16/07 Second Floor - West Wing, Boy's Restroom - Replace cut off valve to sink and place a knob on the sink. | |
| Tubman Elementary School | FM-200700571 2/16/07 1st floor all girls bathroom toilet needs to be repair it is coming from the base and over flowingf | |
| Truesdell Elementary | FM-200700720 2/21/07 On the first floor Girls bathroom cannot shut of the valve the the bathroom is flooding | |
| Tyler Elementary School | FM-200700683 83 2/21/07 Second Floor - Boy's Bathroom - Replace wax ring on (2) urinals. | |
| Bunker Hill Elementary School | FM-200700673 2/21/07 First floor, Stairwell leading to cafeteria & Boys' restroom. 1.) Strong smell of smoke coming from light fixture in staiwell leading to cafeteria. 2.) No lights in boys' restroom on first floor. Note: The panel box has already been checked. | |
| Marshall Educational Center | FM-200700741 2/22/07 Kindergarten Area Bathrooms/Girl's & Boy's - Sinks are clogged in all 4 bathrooms | |
| Kimball Elementary School | FM-200700729 2/22/07 Second Floor (South Wing) - Girls Restroom - Toilet stoped up, waste smell | |
| Kimball Elementary School | FM-200700728 2/22/07 First Floor (middle building) - Head Start Restroom - New light fixtures are neded, no lights. | |
| Hart Middle School | FM-200700906 2/26/07 1st Floor bys's restroom - Unclog darin line for urinal. Water is backing up and out of the drain pipe where a urinal was located. Restroom had to be closed-off. | |
| Marshall Educational Center | FM-200700928 2/27/07 Before & After Care Office Restroom. Repair or replace domestic hot water line in the wall Asbestos Code A - Clear for repairs on 02/27/07. Tidewater - Kenny Long (RG 02/27/07) | |
| Randle-Highlands ES | FM-200701048 8 3/2/07 1st Fl. Room 2109; Water leaking from the ceiling, bathroom over head (check and make repairs) | |
| Johnson JHS | FM-200701130 3/5/07 4th Fl. - Men's Restroom - Light fixture was pulled from the wall, exposed wires over sink. | |
| Powell Elementary School | FM-200701741 M-200701741 3/6/07 In the restroom on the new side of the building near rm. 113 the 5th toilet shut off value need to be replaced | |
| Backus Middle School | FM-200701198 3/7/07 First Floor girls restroom toilet pipe is leaking, | |
| Backus Middle School | FM-200701233 3/7/07 3rd Floor urinal in box restroom pipe are leaking. | |
| Benjamin Banneker Academic HS | FM-200701284 3/8/07 FLOOR: 1ST ROOM: MAIN OFFICE RESTROOM 1ST FLOOR MAIN OFFICE REST ROOM IS OUT OF ORDER -TOILET IS LEAKING FROM THE SHUT OFF VALVE AND CAUSES A FLOOD IN THE RESTROOM. | |
| Young Elementary School | FM-200701281 3/8/07 2nd fl. Girl's Restroom - Water leak in ceiling near electrical - Water damage caused by roof leak. Plaster ceiling area damaged measures approximately 4 by 8 feet. Asbestos Code A - Clear for repairs on 03/09/07. Tidewater - Kenny Long (RG 03/13/07) | |
| Walker-Jones EC | FM-200701318 1318 3/8/07 First floor, Mens' & Ladies Restrooms. Toilets are backing up, there appears to be a stoppage in the main line that services these restrooms.. | |
| Kelly Miller MS | FM-200701386 1386 3/8/07 Remove toilet partition out of the boy's & girl's restroom on the first floor gym lobby; Replace partition Asbestos Code A - Clear for repairs on 03/16/07. Tidewater - Tony Marcolin (RG 03/20/07) | |
| Emery Elementary School | FM-200701310 3/8/07 First floor, Mens' Restroom. Toilet is backing up. Second Request: Unstop commodes, water backing up into sink. By Mr. Dreher | |
| Adams Elementary | FM-200701432 -200701432 3/9/07 3rd Floor/Boy's Restroom; Wall and ceiling damage from roof leak. F-110.1.1 - Plaster wall and ceilings, possible clogged gutters and drains. Lead & Asbestos Code A - Clear for repairs on 03/12/07. Tidewater - Shmaika Parker (RG 03/14/07) | |
| Adams Elementary | FM-200701419 3/9/07 3rd Floor/Girls Bathroom has severe ceiling wall damage due to roof leak. F-110.1.1 Asbestos Code A - Clear for repairs on 03/12/07. Tidewater - Shmaika Parker (RG 03/14/07) | |
| Bell High School | FM-200702814 3/9/07 Girl Restroom on the first floor, The second stall door is off the hinges. | |
| Marshall Educational Center | FM-200701549 3/12/07 Location: Boys Gym Bathroom Boys gym bathroom partitions are rusting and need to be replaced. | |
| Walker-Jones EC | FM-200701570 1570 3/12/07 Snake main line to two restrooms. | |
| Young Elementary School | FM-200701522 3/12/07 Location: Kindergarden Area Request for a locksmith to put locks on the girls and boys bathroom in kindergarden. | |
| Jefferson JHS | FM-200701492 3/12/07 Gym/Boy's Bathroom - Water leaking wall behind urinal down into girl's bathroom by music room. Asbestos Code A - Clear for repairs on 03/12/07. Tidewater - Roger Small (RG 03/14/07) | |
| Jefferson JHS | FM-200701512 3/12/07 Basement Level/Boys' Restroom, B19. Repair or replace ruptured pipe in the ceiling, there is a constant flow of water through the ceiling. Note: There is the presence of mold on the ceiling. Asbestos Code A - Clear for repairs on 03/13/07. Tidewater - Roger Small (RG 03/15/07) | |
| Slowe Elementary School | FM-200702823 23 3/12/07 LOCKSMITH NEEDED TO REKEY MASTER KEY TO OPEN 5 DOORS IN NURSES OFFICE. STUDENJTS GO INTO BATHROOMS AND LOCK THEMSELVES INSIDE TO HIDE FROM STAFF. THIS IS AN EMERGANCY REQUEST PLEASE RESPOND ASAP. LOCKSMITH NEEDS TO MAKE 3 ADDITION MAIN CLASSROOM KEYS. | |
| Garfield ES | FM-200701591 3/13/07 First floor, Principal's Restroom. Replace leaky and corroded 2" drain line asap! | |
| Shaed Elementary School | FM-200701585 0701585 3/13/07 1st thru 3rd Floor - Replace faucets in all restrooms | |
| Woodson High School | FM-200701646 3/13/07 Location: Sixth (6) Floor Boy restroom Faucet can not be shut off water is running continiously. | |
| Cardozo High School | FM-200701790 3/14/07 Third Flloor Boy's Restroom: Door entrance to boy's restroom need door catch replace. | |
| Rudolph Elementary School | FM-200701675 3/14/07 Recreation/Restroom - Unclog Toilet | |
| Woodson High School | FM-200701773 3/14/07 Location: 3rd Floor Girls bathroom Request for plummer to fix leaking toilet in the Girls Bathroom. | |
| Hart Middle School | FM-200701672 3/14/07 Location: Basement New Wing ----(No Locks on Door) Girls Bathroom -Boys Bathroom -Custodian Closet Location: Basement Old Wing Custodian closet (No Lock on Door) Woodshop (Lock Broken) Location: 2nd Floor New Wing , Classroom 221 (Cylinder keeps spinning, can not lock door) | |
| Hart Middle School | FM-200701755 3/14/07 2nd Floor/Boy's Bathroom; Stop valve not holding, water is leaking from it. | |
| Jessie LaSalle Elementary | FM-200701746 3/14/07 Exposed wires on 3rd floor ladies restroom an single light fixtures needs to be replaced | |
| Powell Elementary School | FM-200701886 M-200701886 3/15/07 Second floor,Boys' Restroom & Teachers' Lounge Near Room 200. Replace J traps on sinks that are badly corroded and leaking. | |
| Lincoln Middle School | FM-200702908 3/15/07 Boys restroom on 3rd door knob needs to be replaced. Also, the door closure is broken | |
| Birney Elementary School | FM-200701846 3/15/07 First FloorTeacher Bathroom: Repair/or replace hardware for door. | |
| Wilkinson ES | FM-200702031 3/16/07 Location: Room: 59, 1ST Floor, Girls Restroom in the gym area Need to replace door knob on door. Can not open from the inside. "Fire Code Violation" | |
| Reed LC | FM-200701983 3/16/07 Location: Male Restrooms Please survey and enlarge the entrance doors to accomdate the students wheel chairs. 1st, 2nd and ground FL. Restrooms. Asbestos Code A - Clear for repairs on 03/22/07. Tidewater - Tony Marcolin (RG 03/26/07) | |
| Davis Elementary School | FM-200702008 3/16/07 2nd Fl/boy's Bathroom (by 219) - Need a plumber to repair urinal by toilet, re anchor sink, and repair drain. 1 toilet will not flush and the shut off valve does'nt work. Sink is coming loose from the wall and leaks. | |
| Patterson ES | FM-200701994 701994 3/16/07 2nd Floor/Boy's Bathroom; 2 sinks not working leaking - Girl's Bathroom 1 sink & 1 toilet's not working. | |
| Patterson ES | FM-200701996 701996 3/16/07 3rd Floor/Boy's Bathroom; No water to sinks & 1 Urinal not working. | |
| Browne Junior High School | FM-200702025 3/16/07 Boy's Restroom, New Wing by Rm. 231; Replace flush valve | |
| Brent Elementary School | FM-200702033 2033 3/16/07 1st Fl/Corridor near Boy's Restroom; Replace 2 broken electrical outlets | |
| Spingarn High School | FM-200702026 6 3/16/07 Basement: Custodian Restroom: Install a shut-off vavle to water off on the sink | |
| Johnson JHS | FM-200701998 3/16/07 Location: 3rd Floor Mens Bathroom (Very Urgent) Sink Clogged up and can not wash their hands. | |
| Cooke H.D. Elementary School | FM-200702011 02011 3/16/07 Custodian Office/Replace light fixtures in the restroom | |
| Ferebee-Hope Elementary School | FM-200702006 702006 3/16/07 Location: 1st 1Floor girls restroom. Repair toilet water running continously. (Flush Valve) | |
| Webb Elementary School | FM-200702193 3/19/07 141B & Boy's Bathroom (first floor NE end) - Unclog toilets | |
| Stanton Elementary School | FM-200702181 3/19/07 Location: 1st Room: 107 Ceiling falling in bathroom due to busted heater coil in the room above. Lead & Asbestos Code A - Clear for repairs on 03/20/07. Tidewater - Roger Small (RG 03/21/07) | |
| Patterson ES | FM-200702145 702145 3/19/07 Third Floor: Replace door louver on third floor girl;s bathroom. | |
| Patterson ES | FM-200702150 702150 3/19/07 Third Floor Girl's restroom and 2nd floor boy's: Repair/replace bathroom door's in the above listed area. | |
| Nalle Elementary School | FM-200702190 3/19/07 First floor, Girls' Restroom. Repair cinder block wall. | |
| Wilkinson ES | FM-200702127 702127 3/19/07 1st Fl/Kgn. Area-Girls Restroom - Repair 2nd sink on the left P-trap is leaking. | |
| Wilkinson ES | FM-200702129 702129 3/19/07 1st Fl/Girls Restroom (Gym Area) - Repair or replace fluorenscent light fixture will not come on, changed bulbs "still not working" | |
| Wilson J. O. ES | FM-200702197 2197 3/19/07 1st Fl/Boy's Restroom - Replace ballast, also plugs don't work | |
| Lincoln Middle School | FM-200702962 3/19/07 Girl's restroom door handle on the first floor needs to be replaced | |
| Kramer Middle School | FM-200702199 199 3/19/07 Location: First Floor Room: Girls restroom Drain pipe under sink has rusted. Emergency, Main Restroom. | |
| Bell High School | FM-200702965 5 3/20/07 The first floor restroom partition is broken. The partition is in the custodial closet. | |
| Stanton Elementary School | FM-200702279 3/20/07 Room 107: Repair/replace bathroom door, top hinge has separated from the door. Asbestos Code A - Clear for repairs on 03/21/07. Tidewater - Roger Small (RG 03/22/07) | |
| Aiton Elementary School | FM-200702221 3/20/07 Location: 3rd Floor Girls Restroom Replace the hold flush valve sweat kit operations. | |
| Aiton Elementary School | FM-200702219 3/20/07 Location: 2nd Floor Girls Restroom Replace broken shut off valve. Toilet constantly running. Urgent. | |
| Aiton Elementary School | FM-200702211 3/20/07 Location: 1st Floor Boys bathroom Reset two toilets. | |
| Truesdell Elementary | FM-200702277 3/20/07 Girl 's restroom: Replace the bradley basin with regular sink in the girl's restroom | |
| Merritt Middle School | FM-200702274 3/20/07 First, Second, and Third Floor Restrooms: Re-key all the above listed gril's and boy's restroom, unable to secure. | |
| Tyler Elementary School | FM-200702394 94 3/21/07 First Floor: Replace doors on first floor boys and girls restroom. Asbestos Code A - Clear for repairs on 03/22/07. Tidewater - Carlos Vera (RG 03/26/07) | |
| Clark Elementary School | FM-200702348 348 3/21/07 Location: 3rd Floor Teachers staff bathroom No running water in the toilet or sink. | |
| Aiton Elementary School | FM-200702291 3/21/07 2nd Fl/Boy's Restroom - Replace cut off valve, the toilet is running. | |
| Reed LC | FM-200702443 3/22/07 Through-out all Restroom: Repair/or replace main hot water heater to provide hot water to all restroom. Note: Kitchen are have hot water. | |
| Birney Elementary School | FM-200702473 3/23/07 First floor teacher's restroom: Water is leaking from the ceiling Asbestos Code A - Clear for repairs on 03/26/07. Tidewater - Tony Marcolin (RG 03/27/07) | |
| Maury Elementary School | FM-200702461 461 3/23/07 Third floor, Restroom in room # 6. Repair or replace knob lock that has come off on the inside of the restroom. Note: This door cannot be opened trapping a teacher in the restroom. | |
| Moten Elementary School | FM-200702477 3/23/07 Location: 3rd Floor Boys bathroom Request to repair sink that was pulled off of the wall. Sink off from the wall. Water squirting everywhere flooding the room. Asbestos Code A - Clear for repairs on 03/26/07. Tidewater - Aaron Gholson (RG 03/27/07) | |
| Garnet-Patterson MS | FM-200702532 32 3/26/07 Second floor, Boys' Restroom. 1.) Repair (2) commodes & (1) urinal that are running continuously. 2.) Repair or replace single deck mount faucets on (2) sinks , these faucets have been pulled away from the sinks. | |
| Kenilworth ES | FM-200702529 3/26/07 First floor boy's restroom- Old Wing: Replace broken shatter window in boy's restroom, area is completely open to the outside. | |
| Ballou Senior High School | FM-200702977 77 3/26/07 service:male and female rest- rooms on 1st floor main bldg. as listed tiolets sinks and urinal not working for students "URGENT"RESTROOMS HAVE BEEN SHUT DOWN. | |
| Houston Elementary School | FM-200702512 3/26/07 Location: Girls and Boys Restroom 1st and 2nd Floor Survey 1st and 2nd floor toilet, urinal, faucet that need to be repaired. Urgent In the restroom office wing side, boys 4 urinal are not working Urgent | |
| Browne Junior High School | FM-200702696 702696 3/28/07 Location: Boys restoorm across from room 209 Replace broken light fixtures in the boys restroom. It is completly dark in the restroom. | |
| Randle-Highlands ES | FM-200702728 8 3/28/07 Ground floor, Staff Restroom. Water sounds like it boiling beneath restroom floor, need plumbers to assess and repair. | |
| Murch Elementary School | FM-200702740 3/29/07 Location: 1st Floor Girls restroom Request to repair big plaster chips are falling from the ceiling. Lead & Asbestos Code A - Clear for repairs on 03/30/07. Tidewater - Roger Small (RG 04/02/07) | |
| Moten Elementary School | FM-200702783 3/29/07 Second Floor Newside boy's restroom: Re-hinge the urinal in the new boy's restroom. | |
| Johnson JHS | FM-200702797 702797 3/29/07 4th Floor Men's Bathroom: Replace ballast in the bathroom. | |
| Moten Elementary School | FM-200702772 3/29/07 Second Floor girl's bathroom: Replace the missing window in the girl's bathroom. Asbestos Code A - Clear for repairs on 04/02/07. Tidewater - Shamika Parker (RG 04/03/07) | |
| Kelly Miller MS | FM-200702816 2816 3/30/07 Location: Hallway and boys and girls restroom Install tamper proof light switches. Total (19) | |
| Burrville Elementary School | FM-200702821 1 3/30/07 2nd Floor kitchen/first floor girls and boys bathroom: Adjust the doors at the above listed location , so children can open and close the door properly. | |
| Powell Elementary School | FM-200702974 M-200702974 4/3/07 1st Fl/Restroom near rm. 113 - Shut off valve behind panel is leaking. water is leaking down from behind the wall. Contractors are replacing floor tile and can't complete until the leak is repaired | |
| Birney Elementary School | FM-200702991 4/3/07 1st Fl/Teacher's Bathroom; Replace or repair the lock on the door. | |
| Birney Elementary School | FM-200702992 4/3/07 Basement/Teacher's Bathroom; Toilet will not flush, valve may need to be replaced. | |
| Birney Elementary School | FM-200702993 4/3/07 Basement/Boy's Bathroom; Urinal will not flush, valve may need to be replaced. | |
| Birney Elementary School | FM-200702994 4/3/07 Basement/Girl's Bathroom - Toilet needs to be unclogged | |
| Birney Elementary School | FM-200702995 4/3/07 Basement/Teacher's Bathroom - Replace to repair lock on door. | |
| Harris, C.W. ES | FM-200702978 702978 4/3/07 2nd Fl/Teacher's Prep Room - Replace entry lock handle, Teacher's are getting locked in the restroom. | |
| Turner Elementary School | FM-200703068 4/4/07 2nd & 3rd Fl/ Boy's Restroom - R/R shut off valves also the pipe connected. In the attempt for Mr. Gaston to replace the shut off valves it was discovered that the screws where stirpped. The water to the urinals is shut off. | |
| Tubman Elementary School | FM-200703333 4/5/07 Location: 1st Floor, Boys restroom Repair two urinals. |