"Bathroom" Open Repair Requests

Detailed Reports

School Description Date
Whittier Elementary School FM-200202564 64 2/6/02 (WHITTIER) 1. ASBESTOS ASSESSMENT REQUIRED. GROUND FLOOR/BOYS RESTROOM: WINDOW PANE FALLS OUT OF FRAME; NEEDS TO BE RE-GLAZED. ASBESTOS CODE A-CLEAR FOR REPAIR ON 02/08/02 HORNE ENGINEER: PHILIP CONNOLLY February 6, 2002
Bunker Hill Elementary School FM-200202871 02871 2/12/02 (BUNKER HILL) ASBESTOS ASSESSMENT REQ. 1ST FLOOR/ ROOMS 130, 129, BOYS RESTROOM ON THE 2ND FLOOR PLEASE REPLACE WINDOW PANES IN ROOMS 130, 129, AND BOYS RESTROOM ON THE 2ND FLOOR WEST. CODE A-CLEAR FOR REPAIR BY HORNE ENGINEER (STEPNEN CALDWELL) ON 2/04/02 (CEB) February 12, 2002
Aiton Elementary School FM-200202952 2/13/02 (AITON) ASBESTOS ASSESSMENT REQ. 1ST, 2ND, AND 3RD FLOORS REPLACE BROKEN WINDOW PANES IN THE FOLLOWING AREAS: ROOMS: K-1, K-2, 101 AND 103. ROOMS: 202, 203, 204, 205, 206, 207, 208, LIBRARY, TEACHERS LOUNGE, BOYS AND GIRLS RESTROOMS. ROOMS: 407, 408, 409, 410, AND 411. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/14/02 HORNE ENGINEER: SHERYLL JAMES February 13, 2002
Turner Elementary School FM-200202989 2/13/02 (TURNER) ASBESTOS ASSESSMENT REQ. REPAIR WINDOWS IN CAFETERIA TEACHERS LOUNGE MAIN ROOM AND RESTROOM WINDOWS ARE BEING HELD CLOSED WITH STICKS. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/14/02 HORNE ENGINEER: SHARON VOSS February 13, 2002
Thomas Elementary School FM-200203405 2/25/02 (Thomas) ***Urgent*** 1st Floor/Custodian Closet, Pre-school Boys & Girls Restrooms Need drains in urinals, commodes & sinks unstopped & faucets repaired. February 25, 2002
Woodson High School FM-200204148 0204148 3/8/02 (Woodson, H.D.) Asbestos assessment req. 4th and ground floor/ Lobby girls and boys restroom Install sink back to wall supply line. Leaking and p-trap commode broken at the base. Code A-clear for repair by Horne Egineer on ( Stephen Caldwell ) 3/14/02 (CEB) March 8, 2002
Garfield ES FM-200204133 33 3/8/02 (Garfield) 2nd floor/ Gilrs Bathroom Light fixture in bathroom went completely out. Changed all bulbs and it is still not working. Dont have a ballast. March 8, 2002
Wilkinson ES FM-200204724 724 3/19/02 (Wilkinson) Asbestos Assessment Required 2nd Floor Room 184 [Girls Restroom] Survey, replace or repair cap to the Bradley Basin head. Asbestos Code A - Clear For Repairs On 03/23/02. DCPS Safety - Ronald Edwards (RG 03/25/02) March 19, 2002
Gibbs Elementary School FM-200204785 3/20/02 Gibbs Main roof Repair or replace exhaust fan and missing hood for boys and girls restrooms. Water leaks into bldg. Fan locked because of rust. Fabricate missing hood for exhaust fan. March 20, 2002
Roosevelt High School FM-200205505 505 4/5/02 Roosevelt 1 Asbestos Assessment Reqd. 1st & 2nd Floor Boys & Girls Restrooms 2. Repair/replace wall tiles in the 1st floor girls restroom. 3. Repair hole in the wall behind the hand-basin in the 2nd floor boys restroom. Code A-clear for repair by Honre Engineer ( Sam Ebrahim ) on 4/09/02 CEB April 5, 2002
Hine JHS FM-200206216 4/22/02 Hine First (1st) FLoor -- Girls Restroom 1. Asbestos Assessment Requried. 2. Repair Ceiling - Falling plaster. Safety Hazard. Code A-clear for repair by Horne Engineer by ( Troy Wilcome ) on 4/24/02 ( CEB ) April 22, 2002
Turner Elementary School FM-200206665 4/25/02 (Turner) "As soon as possible" 1. Asbestos assessment required. Through-out building: Repair peeling and falling plaster in the following rooms; #101, 109, boys restroom, old building 1st floor. Girls restroom, 1st floor new building, and room #303 old building. Code A-clear for repair by Horne Engineer by (Bipin Nanavaty ) on 4/26/02 ( CEB ) April 25, 2002
Merritt Middle School FM-200206753 3 4/26/02 1. Asbestos Assessment Reqd. 3rd Floor Boys Gym Toilet 2. Replace damaged floor tiles at the base of the wall of the toilet on the right side of restroom. Asbestos Code A - Clear for repairs on 05/01/02. Horne Engineering - Bipin Nanavaty (RG 05/01/02) April 26, 2002
Park View ES FM-200206836 4/29/02 1. Asbestos assessment required. 2nd floor hallway/near boys restroom and rm. #227: Windows broken in both rooms. Code A-clear for repair by Horne Engineer by (Sherlly James) on 5/02/02( CEB ) April 29, 2002
Reed LC FM-200207254 5/7/02 Reed 1. Asbestos Assessment Reqd. 2nd Floor Male Restrooms in Centers 1 & 2 Reattach partitions to the wall in the 2nd floor male restrooms [centers 1 & 2]. Asbestos Code A - Clear for repairs on 5/8/02 Horne Engineering - Sheryll James (RE - 5/8/02) May 7, 2002
Ketcham Elementary School FM-200207440 0 5/9/02 Ketcham 1. Asbestos Assessment Reqd. 2nd Floor Restroom in Teachers' Lounge Replace missing partition door. POC: Wadsworth Asbestos Code A - Clear for repairs 5/09/02 Horne Engineering, Phillip Connolly (RE - 5/09/02) May 9, 2002
Ketcham Elementary School FM-200207438 8 5/9/02 Ketcham 1st, 2nd & 3rd Floors Boys' & Girls' Restrooms 1. 1st floor girls' restroom: Replace one broken commode. 2. 2nd & 3rd floors boys' restrooms: Replace one removed wall-mounted urinal in each. POC: Wadsworth May 9, 2002
Seaton Elementary School FM-200207761 5/15/02 Seaton 1. Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors 2. There appear to be structural cracks in the following areas [please survey]: Kindergarten classroom; nurse's office; library; rooms 202 & 205; boys restroom; rooms 107, 111, 208, 210 & 211, 215; 300, 302, 303, 305, 307, 308, 310 & 312. 3. The 2nd floor appears to be sinking towards 10th street. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 5/16/02 May 15, 2002
Langdon Elementary School FM-200209573 3 5/15/02 Langdon Asbestos Assessment Required Sink is broken off the wall in the boys bathroom (near Room 126); Montessori Wing. Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. Health and Safety Hazard May 15, 2002
Slowe Elementary School FM-200208231 5/22/02 Slowe All Areas Throughout the Building 66 ballasts throughout the building need to be replaced in time for the summer-school session, as follows: Room 122 (6), Room 126 (20), Room 211 (2), Room 100 (2), Library (10), Second Floor -Old Wing Boys and Girls Restrooms (5), Second Floor -Hallway (5), Kitchen (6). POC: Lewis James May 22, 2002
Smothers ES FM-200209707 07 6/18/02 Smothers 1. Asbestos Assessment Reqd. 3rd Floor boys' Restroom 2. Need assessment of wall behind urinal in the 3rd-floor boys' restroom. POC: M. Mack 576-8046 Pager: 996-6294 Code A-clear for repair by Horne Engineer ( Troy Wilcome ) on 6/19/02 June 18, 2002
Ballou Senior High School FM-200210534 6/27/02 Ballou 1. Asbestos Assessment Reqd. Sub-basement Boys' Restroom 2. There is a door in the ceiling that will not close and there are pipes behind the door that leak and have old decaying insulation. Code A-clear for repair by Horne Engineer ( Sam Ebrahim ) on 07/01/02 DCPS CE Buchanan June 27, 2002
Garnet-Patterson MS FM-200210639 7/1/02 (Garnet-Patterson) ***Urgent*** 1. Asbestos assessment required. 2nd and 3rd floor/Boys bathroom: Students have removed entrance privacy doors from the two (2) bathrooms indicated. Asbestos Code A - Clear for repairs, on 7/02/02 DCPS Safety - R. Edwards (RE- 7/02/02) July 1, 2002
Rudolph Elementary School FM-200212347 7/17/02 (Rudolph) ***Urgent*** Basement/Middle stairway to outside from boys restroom. Four (4) windows broken out and window guards need to be welded. July 17, 2002
Smothers ES FM-200213331 31 7/30/02 Smothers ****Urgent**** 1. Asbestos Assessment Reqd. 3rd Floor Room 303 2. Upgrade electrical outlet from 110v to 220v in room 303 to support a/c unit. 2. 2nd floor science lab ceiling needs to be repaired [plaster ceiling was taken down due to leak which has now been fixed]; 3. Repair 3rd floor ceiling and wall plaster that is coming down in the boys restroom; repair falling ceiling plaster in room 303; 4. Repair ceiling plaster in room 103, 105 & 106. When the plastering in the above areas is complete, the affected ceiling and wall surfaces will require repainting. Asbestos Code A - Clear for repairs on 08/02/02. DCPS Safety - Leroy Minton Jr. ( RG 08/05/02) July 30, 2002
Spingarn High School FM-200213460 8/2/02 Spingarn 1. Asbestos Assessment Reqd. Basement Record Room 2. Repair existing hole in the bathroom ceiling and paint. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) August 2, 2002
Thomas Elementary School FM-200213561 8/5/02 Thomas 1. Asbestos Assessment Reqd. 3rd Floor Room 302 & Girls' Restroom 2. There are wall leaks, source unknown----need to have problem identified and repairs made. Asbestos Code A - Clear for repairs on 08/22/02. DCPS Safety - Leroy Minton Jr. (RG 08/26/02) August 5, 2002
Thomas Elementary School FM-200213562 8/5/02 Thomas 1. Asbestos Assessment Reqd. 1st, 2nd & 3rd Floors/Counselor's Suite, Partitions, Adult Restroom, Exit and Exterior Doors 2. Need an authorization to paint the above listed areas [work to be executed by school staff]. 2. There are wall leaks, source unknown----need to have problem identified and repairs made. Asbestos/Lead Code A-clear for repair by Horne Engineer Sheryll James/Edward Rodriguez On 9/05/02 DCPS Charles E. Buchanan August 5, 2002
Spingarn High School FM-200213770 8/7/02 Spingarn 1. Asbestos Assessment Reqd. Basement/custodian's Office Restroom 2. Repair hole in the ceiling and paint. Asbeastos/Lead code Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) 8/09/02 DCPS Charles Buchanan August 7, 2002
Seaton Elementary School FM-200214036 8/12/02 Seaton 1st Through 3rd Floor Boys' Restroom Remove Bradley basins in boys' restroom from 1st through 3rd floors [No Penetration for the removal]. August 12, 2002
Turner Elementary School FM-200214144 8/13/02 Turner 2nd Floor/Old Wing 1. Three (3) urinals in the boys' restroom are not working; 2. The sink next to the wall supply line leaks; 3. One sink in the girls' restroom is not working; and 4. The toilet next to the wall in the teachers' lounge needs a new spud. August 13, 2002
Turner Elementary School FM-200214139 8/13/02 Turner 1st Floor Boys & Girls' Restrooms/Old Wing 1. Urinals 1, 3 & 5 are not flushing properly and need new flush valves; 2. #6 toilet in girls' restroom is stopped up and needs clearing. August 13, 2002
Whittier Elementary School FM-200214842 8/16/02 Whittier 1. Asbestos Assessment Reqd. 1st Floor Health Suite 2. Plaster bathroom wall. 2. Plaster damaged spot in ceiling. Asbestos/Lead code A-clear for repair by Horne Engineer ( Troy Welcome/Edward Rodriguez ) on 8/20/02 Charles E. Buchanan August 16, 2002
Patricia R Harris Ed Center FM-200215288 8/21/02 Harris P. R. - Patterson 3rd Floor Boys' Room Stairwells Repair or replace light fixture---Tombstone broke. August 21, 2002
Takoma Educational Center FM-200215491 8/23/02 Tokoma Second and Third Floor - Bathrooms - 147,148,126,127,222,221,200 and 199. 1) Minor adjustments needed on the Bradley Basin in the students restrooms. Daniel Hodges - 202-581-7025 H&M Supply Co. Inc August 23, 2002
Thomas Elementary School FM-200216163 8/30/02 (Thomas) 1st FLoor Boys' & Girls' Toilets & 2nd Floor Girls' Restroom (Old Wing) 1. Unstop clogged urinal in boys' restroom; and 2. Unstop toilet in girls' restroom, and 3. Repair sink that needs a trap in the 2nd floor girls' restroom. August 30, 2002
Maury Elementary School FM-200216373 9/3/02 Maury 1st Floor Boys' Restroom Replace cracked urinal, flush valve and stop valve. September 3, 2002
Johnson JHS FM-200216351 9/3/02 Johnson 1st Floor Gym/Coach's Office The restroom sink is leaking in the coach's office. September 3, 2002
Wilson High School FM-200216406 9/4/02 Wilson, W First Floor - Boys and Girls Bathroom - Near 147a and 148a in the Gym Area. 1) Paint Bathrooms. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Eodriguez On 9/05/02 DCPS Charles E. Buchanan September 4, 2002
Stanton Elementary School FM-200217060 9/9/02 Stanton Basement floor girls bathroom fourth toilet not flushing. September 9, 2002
Patricia R Harris Ed Center FM-200217222 9/11/02 Harris P.R. - Patterson 3rd Floor Boys' Room Stairwell #3 Repair or replace two light fisxtures---the light holders broke. September 11, 2002
Reed LC FM-200217228 9/11/02 Reed Ground & 2nd Floors/Clinic by Mens' Room, Art Room, Stairway #4 & Rec. Hallway Girls' Restroom Furnish or replace Halsey-Taylor Mod.#RC8A push-button type for drinking fountain (or kits). Furnish 8 Kohler handles for goose-neck type faucets. September 11, 2002
Slowe Elementary School FM-200217887 9/19/02 Slowe Asbestos Assessment Reqd. 1st Floor Boys' Restroom Replace bathroom partitions. Asbestos Code A - Clear for repairs on 09/20/02. DCPS Safety - Leroy Minton Jr. (RG 09/24/02) September 19, 2002
Ballou Senior High School FM-200218326 9/25/02 Ballou Asbestos Assessment Reqd. Sub-basement Both the male and female restrooms need to be converted for handicapped usage. [NOTE: Contact person on vacation---cannot confirm exactly what is needed until Mr. Sherrod's return.] Asbestos Code A - Clear for repairs on 10/01/02. Horne Engineering - Troy Wilcome (RG 10/02/02) September 25, 2002
Wilkinson ES FM-200218695 695 10/2/02 Wilkinson Second floor - 181 near boys bathroom Need to replace about 20 to 30 floor tile. Damage from water leak. Asbestos Code A-clear for repair by Horne Engineer Sheryll James on 10/08/02 DCPS Charles E. Buchanan October 2, 2002
Amidon Elementary School FM-200218783 10/3/02 Amidon Boys and gym bathrooms Need someone to please come out to replaster the ceiling in boys restroom by the main office have a hole in ceiling and in the gym teachers bathroom bathroom, the ceiling is falling down. Asbestos Code A - Clear for repairs on 10/09/02. DCPS Safety - Leroy Minton Jr. (RG 10/10/02) October 3, 2002
Plummer Elementary School FM-200218801 1 10/3/02 Plummer 1) Third Floor Boys Restroom - Replace (6) missing stall doors and hardware. 2) First Floor Girls Bathroom - Replace (1) miissing stall door and hardware. 3) Replace missing hardware on stall doors in various Restrooms throught out the building where needed. October 3, 2002
Ballou Senior High School FM-200219123 10/9/02 Ballou Stadium - Boy restroom Replace two cracked commodes inside this restroom. This will be site for inter-high playoffs. Asbestos Code A - Clear for repairs on 10/11/02. DCPS-Safety - Leroy Minton Jr. (RG 10/15/02) October 9, 2002
Amidon Elementary School FM-200219147 10/9/02 Amidon Cafe / Gym Need someone to come out to replace the bathroom petitions. They are rusted out and have sharp edges. They are not safe for the kids to be around, could cause a very serious health problem. Please Expedite October 9, 2002
Wilson High School FM-200219504 10/16/02 Wilson,W. First floor rooms 123 and 123A Painting walls in offices and in bathrooms. Paint handrailing in all stairways. Lead & Asbestos Code A - Clear for repairs on 10/17/02. Horne Engineering - Edward Rodrigue (RG 10/21/02) October 16, 2002
Turner Elementary School FM-200220160 10/28/02 Turner First floor - Boys restroom old bldg. Repair falling and peeling ceiling plaster over window. Safety Hazard Asbestos/Lead Code A-clear for repair by Horne Engineer Eward Rodriguez on 10/31/02 DCPS Charles E. Buchanan October 28, 2002
Eastern High School FM-200221003 11/14/02 Eastern Girls Bathroom - Field 1) Repair damaged ceiling inside of this restroom. ( Football Playoffs ) Asbestos Code A- clear for repairs as of 11/18/02 by Horne Engineers Troy Wilcome. November 14, 2002
Patterson ES FM-200221143 200221143 11/18/02 Patterson Second floor Paint restrooms (mens) near doors # 5 and 3. Permit was not issued. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez DCPS Safety on 11/21/02 Charles E. Buchanan November 18, 2002
Woodson High School FM-200221386 11/20/02 Woodson , H.D. First Floor - Girls Restroom Third Floor - Cosmetology Class 1) Re-install (2) sinks that are presently off of the wall. Asbestos Code A - Clear for repairs on 11/2/02. Horne Engineering - Bipin Nanavaty (RG 11/22/02) November 20, 2002
Simon Elementary School FM-200221500 11/21/02 Simon Basement - Boys restroom Hole in wall under sink. Wall tile Asbestos Code A - Clear for repairs on 11/22/02. Horne Engineering - Sheryll James (RG 11/25/02 November 21, 2002
Duke Ellington School FM-200221610 11/25/02 (Ellington) 1. Asbestos assessment required. 2nd Floor/Mens restroom: Paint falling from the ceiling. Lead & Asbestos Code A - Clear for repairs on 11/26/02. Horne Engineering - Edward Rodriguez\Bipin Nanavaty (RG 12/04/02) November 25, 2002
Seaton Elementary School FM-200221669 11/26/02 (Seaton) 1st Floor/Boys bathrooms, exterior door sills. Re-inforce door sill, and door is not closing properly. Asbestos Code A - Cleared for repairs on 12-12-02 (LM/ 12-12-02) Leroy Minton Jr. Safety Office (202) 576-8962. November 26, 2002
Patterson ES FM-200221795 200221795 12/2/02 Patterson, W.B. Third floor - entrance to boys room Replace light holder / tombstone. December 2, 2002
Stanton Elementary School FM-200222027 12/4/02 (Stanton) First floor - boys bathroom Light fixtures need to be repaired. December 4, 2002
Wilkinson ES FM-200222312 12/10/02 Wilkinson Second floor - 181-girls bathroomand 180 boys bathroom Need to repair or replace hand dryer on wall. December 10, 2002
Amidon Elementary School FM-200222736 12/17/02 (Amidon) 1. Asbestos assessment required. 1st Floor/Boys restroom: Repair hole in plaster ceiling which was caused by a water leak that has been repaired. Asbestos Code A-clear for repair by Horne Engineer Bipin Nanavaty DCPS Charles Buchanan on 12/20/02 Lead Code A-clear for repair by Horne Engineer Sheryll James DCPS Charles Buchanan on 12/20/02 December 17, 2002
Turner Elementary School FM-200223331 12/30/02 (Turner) !!!URGENT!!! Old building/3rd Floor: Repair door handle lock to boys restroom door that leads too outside. (Exit door insecure) Also, the following rooms need servicing: Rooms #203, 210, 211. December 30, 2002
Payne Elementary School FM-200224084 1/16/03 Payne Third floor - Boys bathroom Repair or replace flush valves, no water pressure. January 16, 2003
Reed LC FM-200224170 1/17/03 (Reed) 2nd Floor/Learning center #1: Re-cork, or re-seal large glass window to prevent rain from entering around the windows, Near boys bathroom. January 17, 2003
Ferebee-Hope Elementary School FM-200224404 1/23/03 Ferebee-Hope Third floor boys bathroom Repair urinals (broke from vandalism). January 23, 2003
Patricia R Harris Ed Center FM-200224856 1/29/03 (Harris, P.R.) 1. Asbestos assessment required. 1st Floor boys restrooms/Near urinals: Repair masonry block where plumbers opened a hole to effect earlier repair. Code A - clear for repairs as of 3/17/04 Sylvia Grimes January 29, 2003
Garfield ES FM-200225460 2/10/03 Garfield Cafeteria and boys room by cafeteria Repair or replace upright water fountain in cafeteria by kitchen. Snake out two (2) urinals in boys room near cafeteria. Please expedite February 10, 2003
Garfield ES FM-200225462 2/10/03 Garfield Second floor - new wing boys room Replace four broken supply lines ti sinks. Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Tony Marcolin (RG 03/03) February 10, 2003
Turner Elementary School FM-200225603 2/11/03 (Turner) Throughout bldg. Plaster ceilings ; room 109 boys restroom old side, first floor room 100 girls restroom new side, first floor wall under windows room 305 and 307; ceilings rooms 204, 202, 205, 201, 200 and 203. Lead & Asbestos Code A - Clear for repairs on 02/13/03. Horne Engineering - Edward Rodriguez (RG 02/14/03) February 11, 2003
Truesdell Elementary FM-200225547 2/11/03 (Truesdell) Annex/2nd Floor girls restroom: Low water pressure in bradley basin. February 11, 2003
Patricia R Harris Ed Center FM-200225717 2/12/03 (Harris, P.R./Patterson) 3rd Floor/Boys restroom: Sink has been pulled off wall. Staff has shut the water off, and sink has been removed. Please replace sink. Asbestos Code A - Clear for repairs on 02/13/03. Horne Engineering - Sharon Voss (RG 02/14/03) February 12, 2003
Eastern High School FM-200225809 2/13/03 (Eastern) Furnish and install boys urinal in stadium bathroom. Repair leaking pipe in wall behind face bowl in girls stadium bathroom in corner on Constitution Ave. side due to vandalism. Asbestos Code A - Clear for repairs on 02/14/03. Horne Engineering - Sharon Voss (RG 02/19/03) February 13, 2003
Truesdell Elementary FM-200226057 2/24/03 Truesdell First floor girls room Please modify existing girls room partition / stall to accommodate handicapped girl that was injured by vehicle last September. This student walks with the assistance of a walker and also a wheelchair. Asbestos Code A - Clear for repairs on 02/25/03. Horne Engineering - Edward Rodriguez (RG 02/26/03) February 24, 2003
Spingarn High School FM-200226357 2/27/03 Spingarn Basement - custodian and records bathroom Requesting plaster to be fix ceilings in both areas. February 27, 2003
Shepherd ES FM-200226501 3/4/03 Shepherd First floor new wing Roof leak nearest to teacher bathroom, need to be repair. March 4, 2003
Takoma Educational Center FM-200226578 3/5/03 Takoma Gym Repair falling flashing grom gym on the outside doors of restrooms. The flashing is in reuseable condition, needs to be rehang dur to appearance and water that leaks downside of doors damaging the tile on floor. March 5, 2003
Eliot Junior High School FM-200227246 3/18/03 (Eliot) Asbestos Assessment Required. Kitchen: Paint kitchen ceiling, walls windows, office, lockers, restroom, doors, and trim. Lead & Asbestos Code A - Clear for repairs on 03/19/03. Horne Engineering - Edward Rodriguez (RG 03/20/03) March 18, 2003
Hart Middle School FM-200227210 3/18/03 HART !! EMERGENCY !! Basement Level - old Wing Toddler Boys Restroom Across from the Infant Care Center . 1. Replace light fixture that fell from the ceiling inside the toddler boys restroom and repair the ceiling as well . NOTE: This particular restroom is used for the toddlers that attend the infant center . Asbestos Code A - Clear for repairs on 03/18/03. Horne Engineering - Sharon Voss (RG 03/18/03) March 18, 2003
Davis Elementary School FM-200227297 3/19/03 (Davis) New wing-Basement/Boys bathroom: Furnish and install a new sink in boys bathroom, a child broke the old sink off the wall. March 19, 2003
Beers Elementary School FM-200227671 3/26/03 Beers Building # 2 Shelf fallout shelter plumbing is needed. Sink needs repair and principal is asking restroom to be place there. Asbestos Code A - Clear for repairs on 03/26/03. Horne Engineering - Troy Wilcome (RG 03/27/03) March 26, 2003
Smothers ES FM-200228059 4/1/03 Smothers Third floor boys bathroom Two 6" holes in wall need to be plaster, patch and painted. Lead & Asbestos Code A - Clear for repairs on 04/02/03. Horne Engineering - Edward Rodriguez (RG 04/02/03) April 1, 2003
Bunker Hill Elementary School FM-200228068 4/1/03 BUNKER-HILL Second Floor - Restroom 1. Repair ( 3 ) stall doors in the girls restroom . April 1, 2003
Bruce-Monroe Elementary School FM-200228020 4/1/03 Bruce-Monroe Staff restroom center (203) and first floor women restroom in lobby Ceiling need to be plastered and painted. Asbestos Code A - Clear for repairs on 04/02/03. Horne Engineering - Bipin Nanavaty (RG 04/03/03) April 1, 2003
Eastern High School FM-200228502 4/9/03 Eastern Armory basement Repair or replace two (2)panic bars on door it is broken. Replace door chek bathroom door boys across from room 241. April 9, 2003
Payne Elementary School FM-200228501 4/9/03 Payne Second and third floor boys bathroom Repair or replace flush valves on first commode, no water pressure. April 9, 2003
Patricia R Harris Ed Center FM-200228753 4/15/03 Harris, P.R. First, second and third floor, The whole building In restrooms, classrooms, stairwells, hallways and teachers store rooms, the ballast need to be changed. Please respond ASAP April 15, 2003
Patricia R Harris Ed Center FM-200228769 4/15/03 (Harris, P.R.) Ground Floor/Room #6: Partitions have fallen in gym, and big gym restrooms. Please respond as soon as possible. Asbestos Code A - Clear for repairs on 04/17/03. Horne Engineering - Troy Wilcome (RG 04/18/03) April 15, 2003
Garfield ES FM-200228877 4/18/03 Garfield First floor custodial closet 1.) Snake out slop sink , that was snake out before but ha re-occured. Girls bathroom, first floor , new wing. 2.) Unstop third sink, first floor wing health suite main building (real sink). 3.) Unstop real sink, main bldg. 4.) Room 1-G main bldg. snake out toilet. April 18, 2003
Beers Elementary School FM-200329063 4/25/03 Beers Bldg. 2 Shelf fallout shelter plumbing is needed. Sink needs repairing and Principal is asking restroom to be place there. April 25, 2003
Takoma Educational Center FM-200329362 5/2/03 Takoma Second floor room 128 Repair breech in ceiling in girls bathroom. Asbestos Code A - Clear for repairs on 05/05/03. Horne Engineering - Tony Marcolin (RG 05/06/03 May 2, 2003
Kramer Middle School FM-200329499 5/5/03 (Kramer Middle School) Asbestos Assessment Required. 1st Floor/Boys bathroom: Repair ceiling Due to previous leak, ceiling is still very moist, and very large portions have falling down on the bathroom urinals. Asbestos Code A - Clear for repairs on 05/05/03. Horne Engineering - Edward Rodriguez (RG 05/06/03) May 5, 2003
Takoma Educational Center FM-200329663 5/6/03 (Takoma) 3rd Floor/Room #222: Repair broken toilets, and urinals in the boys restrooms May 6, 2003
Garnet-Patterson MS FM-200330504 5/21/03 (Garnet-Patterson) !!!URGENT!!! 1st Floor/Boys bathroom:l Cold water stem broke completely off faucet; water leaking, (Engineer has shut the water off) May 21, 2003
Patricia R Harris Ed Center FM-200330583 5/22/03 Harris, P.R. / Patterson Third floor boys room stairwell 4 Repair partition broke loose from floor tiles. Asbestos Code A - Clear for repairs on 02/22/03. Horne Engineering - Sharon Voss (RG 05/27/03) May 22, 2003
Wilkinson ES FM-200330884 5/29/03 (Wilkinson) Through Out the Building: Fluorescent lights are operating intermittently in the following rooms: 2nd Floor, electrical room, hall corridor, boys bathroom, women restroom,. Room #180, 181,182, and 184. May 29, 2003
Reed LC FM-200330912 5/30/03 Reed, Marie First floor early childhood male restroom Survey and replace missing floor tile (small ceramic tile). Asbestos Code A - Clear for repairs on 06/02/03. Horne Engineering - Sharon Voss (RG 06/02/03) May 30, 2003
Reed LC FM-200330914 5/30/03 Reed, Marie Three male restrooms - center 1 and 3 Re-attach four petitions to walls in male restroms. Asbestos Code A - Clear for repairs on 05/30/03. Horne Engineering - Roger Kager (RG 06/02/03) May 30, 2003
Patricia R Harris Ed Center FM-200330946 5/30/03 (Harris, P.R./Patterson) 3rd Floor Girls bathroom/Stairwell #6: Replace stop valves on two (2) leaking toilets. May 30, 2003
Patricia R Harris Ed Center FM-200331315 6/5/03 Harris, P.R. Ground floor Pre-K Area Boys Restroom Repair the floor (ceramic tile ). Asbestos Code A - Cleared for repairs on 09-10-03 by Leroy Minton Jr. (LM/09-10-03) Safety Office 202-576-8962. Note: Informed by Charles Gross that the water leak was repaired and it was coming from around the wax ring and not from the ceiling. June 5, 2003
Davis Elementary School FM-200331504 6/9/03 Davis Boys bathroom new wing basement Furnish and install a new sink, A child broke the old sink off the wall. Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Tony Marcolin (RG 06/24/03) June 9, 2003
Horace Mann Elementary School FM-200331530 6/10/03 Mann Community Center 1) Replace broken window in the boys Restroom . Note : Approximate - 24" x 35" set in wood frame . June 10, 2003
Ferebee-Hope Elementary School FM-200331576 6/11/03 Ferebee-Hope First floor C-building men's bathroom Remount urinal to wall. Asbestos Code A - Cleared for repairs by Leroy Minton Jr on 06-11-03 (LM/06-11-03) Safety Office 202-576-8962. June 11, 2003
Davis Elementary School FM-200332028 6/18/03 Davis Basement teachers lounge bathroom Repair ceiling, part of the ceiling fell down. Asbestos Code A - Clear for repairs on 06/18/03. Horne Engineering - Bipin Nanavaty (RG 06/19/03) June 18, 2003
Benjamin Banneker Academic HS FM-200332411 6/24/03 Banneker Second Floor 1. Door closure on the boys restroom door is bent and will not close , please repair . Asbestos Code A - Clear for repairs on 06/25/03. Horne Engineering - Sheryll James ( RG 06/26/03) June 24, 2003
Rudolph Elementary School FM-200332391 6/24/03 Rudolph Basement Level 1. Repair and or replace the bradley basin in the boys restroom , water continuously run . 2. Repair and or replace the bradley basin in the girls restroom , no running water . Asbestos Code A - Clear for repairs on 06/24/03. Horne Engineering - Sharon Voss (RG 06/25/03) June 24, 2003
Turner Elementary School FM-200332430 6/25/03 (Turner) 2nd Floor/Girls restroom: Restroom needs three (3) toilet seats, drinking fountains on 2nd floor hallway needs repair or replace; water fountain is broken in teachers lounge, needs to be replaced. June 25, 2003
Thomas Elementary School FM-200332648 6/27/03 Thomas First ,Second & Third Floor 1. Survey, plaster and paint the following areas - # 100, #102, #103, # 106, kitchen, managers office, storage room , #202, #203, #205, #209, landing, girls and boys restrooms, #302,#304 & #306. Lead & Asbestos Code A - Clear for repairs on 07/02/03. Horne Engineering - Edward Rodriguez (RG 07/02/03) June 27, 2003
River Terrace ES FM-200332934 7/1/03 (River Terrace) Asbestos Assessment Required. Plaster work requested in the following areas: 1) ceiling over top of windows in principal's office, main office, counselor's office, nurse's office, teacher's lounge, conference room and resource center (rm#9). 2) ceilings in hallway near library, staff bathroom and boys' restroom near classroom #5. 3) Ceiling outside of classroom #5 and wall in kitchen near entrance door. 4) Holes in ramp wall near classroom #13 Asbestos Code A - Clear for repairs on 11/09/05. Tidewater - Rodney Distance (RG 11/14/05) July 1, 2003
Takoma Educational Center FM-200333030 7/8/03 (Takoma) Third floor -boys restroom blue team area One (1) urinal is stopped up, one (1) toilet is broken. Girls one (1) commode stopped up. Unstop toilets and replace broken toilet. July 8, 2003
Garnet-Patterson MS FM-200333219 7/14/03 Garnet-Patterson First floor boys bathroom Faucet handset (cold water) pop off. Cut water off need to be replace. ASAP July 14, 2003
Ferebee-Hope Elementary School FM-200333403 7/17/03 (Ferebee-Hope) 1st floor Kitchen/Ladies Bathroom: Replace toilet that was broken while unclogging building sewage drain. July 17, 2003
Ferebee-Hope Elementary School FM-200333402 7/17/03 (Ferebee-Hope) D-Building, 1st Floor/Headstart Bathroom: Replace toilet that was broken while unclogging building sewage drain. July 17, 2003
Ferebee-Hope Elementary School FM-200333428 7/18/03 Ferebee -Hope First Floor - Family Services 1. Supply hot and cold water in boys and girls restrooms . July 18, 2003
Hine JHS FM-200333520 7/22/03 Hine Third Floor 1. Plaster ceiling in the girls and boys restroom. Lead & Asbestos Code A - Clear for repairs on 05/14/04. Horne Engineering - Edward Rodriguez/Bjarne Smith (RG 05/14/04) July 22, 2003
Gage-Eckington ES FM-200334613 8/7/03 Gage-Eckington First and second floor throughout building Several restrooms in need of partitions, they were removed and never replace. Boys and girls need their privacy. Thank you URGENT Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering -Ray Agnant (RG 09/12/03) August 7, 2003
Whittier Elementary School FM-200334706 8/8/03 Whittier Basement boys restroom Repair or replace flush valve on urinal and spud. no isolated. August 8, 2003
Turner Elementary School FM-200334909 8/11/03 (Turner) Asbestos Assessment Required. Ceiling peeling in the following rooms: #100, 109, 201, 202, 203, 204, 205, 305, 307, girls restrooms, and new building 1st floor under windows. Lead & Asbestos Code A - Clear for repairs on 08/13/03. Horne Engineering - Edward Rodriguez (RG 08/19/03) August 11, 2003
Bruce-Monroe Elementary School FM-200335019 8/13/03 Bruce-Monroe Throughout building There is paint peeling from ceilings throughout building needs repair as soon as possible. There are so many places where paint is peeling from the ceiling. On all stairwells in many of the bathrooms on 2nd and 3rd floors. Lead & Asbestos Code A - Clear for repairs on 08/21/03. Horne Engineering - Edward Rodrigues (RG 08/22/03) August 13, 2003
Thomas Elementary School FM-200335148 8/13/03 Thomas Second floor girls and boys restroom Survey rehang or replace partition doors. Code A-clear for repair by DCPS Charles Buchanan on 8/14/03 August 13, 2003
Bruce-Monroe Elementary School FM-200335144 8/13/03 Bruce-Monroe Second floor center 201 boys restroom Repair leak in ceiling. Plaster is falling. Asbestos Code A - Clear for repairs on 08/21/03. Horne Engineering - Roger Kager (RG 08/22/03) August 13, 2003
Ballou Senior High School FM-200335213 8/14/03 Ballou First floor Boys restroom Repair ceiling in area damage from restroom above. Asbestos Code A - Clear for repairs on 08/15/03. Horne Engineering - Tony Marcolin (RG 08/18/03) August 14, 2003
Bunker Hill Elementary School FM-200336299 8/26/03 Bunker-Hill Boys Restroom Replace exhaust fans in boys restroom. The smell of urine throughout the Building. The exhaust fan is broken. August 26, 2003
Spingarn High School FM-200336327 8/27/03 Spingarn First floor boys bathroom Requesting hole in ceiling be plaster, due to work that was done on the above floor. Asbestos Code A - Clear for repairs on 08/29/03. Horne Engineering - Troy Wilcome ( RG 09/02/03) August 27, 2003
Davis Elementary School FM-200336577 8/29/03 Davis Basement boys bathroom new wing Furnish and install a new sink, a child broke the old sink off the wall. August 29, 2003
Patricia R Harris Ed Center FM-200336669 9/2/03 Harris, P.R. / Patterson Third floor teachers bathroom Replace stop valve stairwell 6. September 2, 2003
Patricia R Harris Ed Center FM-200336670 9/2/03 Harris, P.R. / Patterson Third floor Boys bathroom Stairwell 4 Repair partition, broke loose from floor tile. Asbestos Code A - Clear for repairs on 09/03/03. Horne Engineering - Troy Wilcome (RG 09/04/03) September 2, 2003
Bruce-Monroe Elementary School FM-200336914 9/5/03 Bruce-Monroe Str. 201/ stairways Plaster work is needed on the East / West South stairways and lobby restrooms ctr. 201 boys restroom. Lead & Asbestos Code A - Clear for repairs on 09/08/03. Horne Engineering Edward Rodriguez (RG09/09/03) September 5, 2003
Stoddert ES FM-200336901 01 9/5/03 Stoddert First floor girls restroom Swinging door in toilet area have been knock down. Need someone to replace door hindges. Health Hazard Code A-clear for repair by DCPS Charles Buchanan on 9/9/03 September 5, 2003
Park View ES FM-200337255 9/11/03 Park View Second floor boys restroom Door need to be replaced, big hole in door. Asbestos Code A - Clear for repairs on 09/15/03. Horne Engineering - Roger Kager (RG 11/18/03) September 11, 2003
Nalle Elementary School FM-200337641 9/16/03 Nalle, J.C. Second floor boys restroom Ceiling damage due to roof leak. Asbestos Code A - Clear for repairs on 10/23/03. Horne Engineering - Sheryll James (RG 10/27/03) September 16, 2003
Emery Elementary School FM-200338258 9/17/03 (Emery) Asbestos Assessment Required. Second floor boy bathroom urinal has a crack need replacement. September 17, 2003
Whittier Elementary School FM-200337824 9/22/03 (Whittier) Asbestos Assessment Required. Old Side/1st Floor: Repair wall in Assist. Principal's restroom; water leaking from the outside. (Possible roof leak) Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Tony Marcolin (RG 10/08/03) September 22, 2003
Beers Elementary School FM-200338044 9/25/03 Beers Roof air vents Three (3) air vents on roof not working. Bathroom in other parts of bldg. Need the circulation. September 25, 2003
Beers Elementary School FM-200338049 9/25/03 Beers First and second floor bldg. # 3 Hallways and restrooms are in need of plastering and painting Bldg. # 2. Restrooms also and classroom ceiling in Bldg. # 2. Lead & Asbestos Code A - Clear for repairs on 09/26/03. Horne Engineering - Edward Rodriguez (RG 09/29/03) September 25, 2003
Beers Elementary School FM-200338045 9/25/03 Beers Second floor building 1 Water is coming through roof hallway by boys and girls bathroom. Contractors are during pipe work also asbestos team. That area needs repair before contractor put up ceiling tile. September 25, 2003
Stevens Elementary School FM-200338943 10/15/03 Stevens First floor bathroom room 5 Need new flooring. Asbestos Code A - Clear for repairs on 10/17/03. Horne Engineering - Edward Rodriguez (RG 10/21/03) October 15, 2003
Langdon Elementary School FM-200339232 10/21/03 (Langdon) !!!VERY URGENT!!! 2nd Floor/Boys Bathroom: Sparks coming from light switch when turned on; boys bathroom, and classrooms are on same circuit, there are no lights in classrooms. *** THIS WORK ORDER BELONGS TO THE ELECTRICAL DEPARTMENT ******** October 21, 2003
Patricia R Harris Ed Center FM-200339817 11/3/03 (Harris, P.R./W.B. Patterson) !!!URGENT!!! 3rd Floor/Stairwell #4: Replace flush valve in teachers bathroom. November 3, 2003
Bancroft Elementary School FM-200340089 89 11/7/03 Bancroft First floor Open space Replace light fixture in the bathroom (girls) near franklin room. Asbestos Code A - Clear for repairs on 11/12/03. Horne Engineering - Tony Marcolin (RG 11/14/03) November 7, 2003
Turner Elementary School FM-200341494 12/12/03 Turner Fire Code Second floor new bldg. Replace door closurer on exit door across from boys restroom broken. Code A-clear for repair by DCPS Charles Buchanan on 12/16/03 December 12, 2003
Turner Elementary School FM-200341609 12/15/03 (Turner) Asbestos Assessment Required. New Side/1st, 2nd, & 3rd: Need paint for painting girls, and boys restrooms. Lead & Asbestos Code A - Clear for repairs on 12/16/03. Horne Engineering - Edward Rodriguez (RG 12/17/03) December 15, 2003
Ketcham Elementary School FM-200341974 12/22/03 (Ketcham) 2nd Floor/Boys Restroom: Partitions in boys bathroom, on 2nd floor, falling; believed to have been torn from wall. Asbestos Code A - Clear for repairs on 12/22/03. Horne Engineering - Tony Marcolin (RG 01/06/04) December 22, 2003
Marshall Educational Center FM-200342179 1/2/04 Marshall Pool Area Check chemicals Check temperature Check bathroom toilet January 2, 2004
Shaed Elementary School FM-200442395 1/8/04 Shaed First floor boys and girls restroom !. Repair one bradley basin in boys room that does not come on. Repair one bradley basin in girls room that does not come on. January 8, 2004
Francis Junior High School FM-200442404 1/8/04 (Francis) Asbestos Assessment Required. 2nd Floor/Girls Restroom: Replaster left side of the restroom over top commode. Asbestos Code A - Clear for repairs on 01/08/04. Horne Engineering - Philp Connolly (RG 01/12/04) January 8, 2004
Roosevelt High School FM-200442564 1/12/04 (Roosevelt) 2nd Floor/Boys Bathroom: Replace ceramic wall tile that was never completed by ADA Contractor. (Grounds) Asbestos Code A - Clear for repairs on 01/13/04. Horne Engineering - Tony Marcolin (RG 01/14/04) January 12, 2004
Stuart-Hobson Middle School FM-200442942 1/20/04 Stuart-Hobson SWecond floor girl bathroom A toilet was leaking and the ceiling in the second floor bathroom has come in. Please repair ceiling. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Edward Rodriguez (RG 01/22/04) January 20, 2004
Nalle Elementary School FM-200442964 1/20/04 Nalle, J.C. Urgent !!! Old Side - Second Floor - Boys Bathroom 1) Big chunk of ceiling fell down in the bathroom and hit student in head. Asbestos Code A - Clear for repairs on 01/20/04. Horne Engineering - Troy Wilcome (RG 01/20/04) January 20, 2004
Garfield ES FM-200443366 1/29/04 Garfield By cafeteria Girls bathroom by cafeteria floor tile needs to be repaired or replaced due to water damage. There is a big hole in the middle of the room. Asbestos Code A - Clear for repairs on 01/30/04. Horne Engineering - Edward Rodriguez (RG 02/02/04) January 29, 2004
Meyer Elementary School FM-200443622 2/2/04 (Meyer) 2nd Floor/Boys Bathroom: Replace broken window. February 2, 2004
Payne Elementary School FM-200443623 2/2/04 (Payne) 1st Floor/Girls Bathroom: Ceiling has fallen in bathroom; repair or replace. Asbestos Code A - Clear for repairs on 03/03/04. Horne Engineering - Troy Wilcome (RG 02/04/04) February 2, 2004
Turner Elementary School FM-200443920 2/10/04 (Turner) !!!VERY URGENT!!! Old Side/1st Floor, Boys Bathroom: Partitions that holds stall doors are hanging off, students could be injured if these heavy partitions fall on one of them. Attention: Duplicate service order submitted, and call of concern came in today. "Partitions need too be removed" Code A-clear for repair by DCPS Chaeles Buchanan on 2/11/04 February 10, 2004
Bowen Elementary School FM-200443979 2/11/04 (Bowen) 1st Floor/Girls Restroom: Repair faucets, and other parts on sink. February 11, 2004
Turner Elementary School FM-200444065 2/13/04 Turner First Floor - Old Building - Boys Restroom 1) Repair or replace stall door. Door has fallen off. Code A-clear for repair by DCPS Charles Buchanan on 2/17/04 February 13, 2004
Johnson JHS FM-200444257 2/19/04 (Johnson) !!!VERY URGENT!!! Basement Level/Managers/Staff Restroom: After flushing toilet, water began too come through floor. (Very large amount of water on floor) February 19, 2004
Garrison ES FM-200444641 41 3/1/04 (Garrison) 2nd Floor/Girls Restroom: Bradley basin will not shut off, shut-off valve not working. March 1, 2004
Davis Elementary School FM-200444587 3/1/04 DAVIS fIRST FLOOR BOYS BATHROOM BY 117 iISTALL SINK BACK ON WALL AND REPLACE DAMAGE FAUCET, SINK KEEPS FALLING OFF WALL. Asbestos Code A- Clear for repairs on 03/01/04. Horne Engineering - Bipin Nanavaty (RG 03/02/04) March 1, 2004
Davis Elementary School FM-200444589 3/1/04 DAVIS Bathroom BOYS BATHROOM new wing Furnish and install a new sink, old broke the old sink off wall. Asbestos Code A- Clear for repairs on 03/01/04. Horne Engineering - Bipin Nanavaty (RG 03/02/04) March 1, 2004
Gibbs Elementary School FM-200444583 3/1/04 Gibbs Outside Rails leading ro boy restroom outside from playground need repairing. March 1, 2004
Turner Elementary School FM-200445082 3/9/04 Turner ( Maintenance T School Blitz ) Rooms - 100,109,201,202,203,204,205,305,307, and First Floor - Girls Bathroom . 1) Scrape and paint ceilings. Approx size - 34'x31' ) Lead & Asbestos Code A - Clear for repairs on 03/10/04. Horne Engineering - Edward Rodriguez (RG 03/12/04) March 9, 2004
Patricia R Harris Ed Center FM-200445168 3/10/04 (Harris) !!!URGENT!!! Main Floor/Girls Locker Room: Two (2) toilets in girls restroom running over, snaking did not reolve the problem. March 10, 2004
Patricia R Harris Ed Center FM-200445336 3/12/04 Harris, P.R. Restrooms and stairwell landings # 7 top floor area student restroom need ballances changed # 6 main floor student restroom also. # 7 restroom for students # 1 restroom need ballances changed. Asbestos Code A - Clear for repairs on 03/15/04. Horne Engineering - Philp Connolly (RG 03/17/04) March 12, 2004
Patricia R Harris Ed Center FM-200445330 3/12/04 (Harris,P.R.) Asbestos Assessment Required. Restroom #7/Top Floor: Power outage due to broken tube, and bad ballast. Asbestos Code A - Clear for repairs on 03/15/04. Horne Engineering - Philp Connolly (RG 03/17/04) March 12, 2004
Brookland Elementary FM-200445320 3/12/04 Brookland Roof Top Repair or replace exhaust fan for boys restroom, exhaust fan motor is burnt out. Name - Power line Volts - 120 PH-1 R.P.M. - 1300 Model - 90DE8X HP-110 CFM - 250 March 12, 2004
Gibbs Elementary School FM-200445373 3/15/04 Gibbs Boys and Girls restroom Replace heating units that are not working and has been urinated on and rotton out and motors are inoperable. March 15, 2004
Gibbs Elementary School FM-200445445 3/16/04 Gibbs Main Building Replace Bearing to shaft. For exhaust fan motors Girls and Boys restroom. Main Building top bottom bearings. March 16, 2004
Benjamin Banneker Academic HS FM-200445484 3/17/04 Banneker Second floor boys restroom Electrician is needed for light fixture. Lights will not come on, fixtures were tested for proper voltage. Looked to have all its power. March 17, 2004
Seaton Elementary School FM-200445500 3/17/04 Seaton URGENT Second floor girls bathroom Replace partition to stall near window. partition is in house. Asbestos Code A - Clear for repairs on 03/18/04. Horne Engineering - Tony Marcolin (RG 03/22/04) March 17, 2004
Seaton Elementary School FM-200445793 3/24/04 Seaton Second floor boys bathroom Repair or replace partition to stall near window. Asbestos Code A - Clear for repairs on 03/25/04. Horne Engineering - Tony Marcolin (RG 03/26/04) March 24, 2004
Woodson High School FM-200445993 3/29/04 Woodson SHS Health Suite 1) Plastering is needed for walls, ceiling in the restrooms,bed/sleeping area. Plaster is falling . Lead & Asbestos Code A - Clear for repairs on 03/29/04. Horne Engineering - Edward Rodriguez (RG 03/30/04) March 29, 2004
Davis Elementary School FM-200446718 4/14/04 Davis First floor boys bathroom by 117 Need plummer to install sink back on wall and replace damage faucet, sink keep falling off wall. Back of sink is damage . April 14, 2004
King M L ES FM-200446791 4/16/04 King, M.L. First floor boys bathroom Need to have floor tile replace around a trap door. Asbestos Code A - Clear for repairs on 04/16/04. Horne Engineering - Roger Kager (RG 04/16/04) April 16, 2004
Eastern High School FM-200446874 4/20/04 Eastern Across from B-37 across from 153 Furnish and install broken face bowl in bathrooms in annex and custodial closet SIMC across from B-37. April 20, 2004
Cardozo High School FM-200447280 4/28/04 Cardozo Ground floor tunnel Replace 3/4 inch galvanized pipe and valve- no water supply to health unit bathrooms sinks and water cooler, Domestic cold water supply pipe. Emergency needed for health services. April 28, 2004
Hine JHS FM-200447413 5/3/04 (Hine) !!!URGENT!!! First Floor/Girls restroom Repair panic bar device lock will open. Asbestos code A - Clear for repairs on 05/04/04. Horne Engineering - Bipin Nanavaty (RG 05/05/04) May 3, 2004
Eastern High School FM-200447447 5/4/04 Eastern Auditorium room 152 stadium back across from B-35 and gym hallway Repair or replace down spouts and roof leaks in above locations wall are damage and getting worse. 1. Down spouts on back of school, 17th St. side of bldg. 2. Repair roof leak in boys bathroom in stadium - damaging ceiling. May 4, 2004
Eastern High School FM-200447758 5/11/04 Eastern Cafeteria doors, Balcony and bathroom door in gym Furnish and install panic bars and missing door knobs. Asbestos Code A - Clear for repairs on 11/21/06. Tidewater - Shamika Parker (RG 11/30/06 ) May 11, 2004
Ferebee-Hope Elementary School FM-200447910 5/13/04 (Ferebee-Hope) !!!EMERGENCY!!! 3rd Floor/Boys Bathroom: Remove, and replace broken urinal. (Students could sustain injury from broken porcelain. May 13, 2004
Thomas Elementary School FM-200447998 5/17/04 Thomas First, second and third floor Survey, plaster and paint the following rooms: Rooms 300, 301, 302, 303, 304, 305, 307 and 309. Rooms 200, 202, 203, 205, 207 and 209. Rooms 100, 101, 102, 103, 104, 105, 106, 107 and 109. Corridors, landings, restrooms counselors suite partitions. Lead & Asbestos Code A - Clear for repairs on 05/18/04. Horne Engineering - Bjarne Smith/Edward Rodriguez (RG 05/19/04) SEE LINKED DOCUMENTS May 17, 2004
Patricia R Harris Ed Center FM-200448230 5/20/04 Harris, P.R. Main floor auditorium Repair the door knob; REstroom in the auditorium lock by stage. Asbestos Code A - Clear for repairs on 05/21/04. Horne Engineering - Philp Connolly (RG 05/24/04) May 20, 2004
Eastern High School FM-200448495 5/26/04 Eastern First Floor - Girls Bathroom 1) Repair wall in bathroom - Wall was broken for plumbers to repair leaking line, cinder block and ceramic tile. May 26, 2004
Bancroft Elementary School FM-200448555 5/27/04 Bancroft Third floor boys bathroom main bldg. Replace trap door. Door not connected to the hinges. Asbestos Code A - Clear for repairs on 05/28/04. Horne Engineering - Philp Connolly (RG 06/01/04) May 27, 2004
Thomas Elementary School FM-200448638 6/1/04 Thomas Through out bldg. Corridor, lobby stairwells and restrooms Survey and upgrade lights. Asbestos Code A - Clear for repairs on 06/02/04. Horne Engineering - Bipin Nanavaty ( RG 03/06 ) June 1, 2004
Bancroft Elementary School FM-200449236 6/10/04 Bancroft First floor boys/girls bathroom primary Patch up hold in the ceiling. Asbestos Code A - Clear for repairs on 06/14/04. Horne Engineering - Bipin Nanavaty (RG 06/15/04) June 10, 2004
Bancroft Elementary School FM-200449223 6/10/04 Bancroft First floor boys bathroom (main bldg.) Re-attach partition railing. Sharp edge may cause someone to get hurt. Asbestos Code A - Clear for repairs on 06/10/04. DCPS Safety - Richard Gibson (RG 06/10/04) June 10, 2004
Turner Elementary School FM-200449499 6/18/04 (Turner) Boys Restroom: Repair urinal next to toilet; there is a hole under the bottom, and water is leaking on the floors. June 18, 2004
Browne Junior High School FM-200449505 6/18/04 Browne EMERGENCY EMERENCY Second and first floor bathroom new side Repair water lines in bathroom, no running water in sinks. HA 005 Plaster White Wall & Ceiling Plaster No Asbestos 705 Brown Coat With HA 005 No Asbestos HA001 pipe insulation white 2" & 10" Block ionsulation Yes Asbestos HA 053 Pipe insulation Gray/Black 4-8 O.D. compressed paper pipe insulation Yes Asbestos Asbestos Code A - Clear for repairs on 01/25/07. Tidewater - Kenny Long (RG 02/22/07) June 18, 2004
Turner Elementary School FM-200449550 6/21/04 (Turner) !!!URGENT!!! 3rd Floor/New Building: Unstop sink in custodian closet next to boys restroom. June 21, 2004
Turner Elementary School FM-200449551 6/21/04 (Turner) !!!URGENT!!! 3rd Floor/Old Building: Repair leaking water fountain in hall next to boys restrooms. June 21, 2004
Ferebee-Hope Elementary School FM-200450688 7/23/04 Ferebee-Hope First floor B-building custodial closet unstop sink was plunged; First floor C-building by custodial closet replace missing urinal; Third floor A-building boys bathroom Replace two (2) urinals (broken). July 23, 2004
Eastern High School FM-200450769 7/26/04 Eastern Across from B-37 and across from 153 Furnish and install broken face bowl - in bathroom in annex and custodial closet sink across from B-37. July 26, 2004
Eastern High School FM-200450759 7/26/04 Eastern Across from B-78, B-42 and B-35 Replace sinks at two (2) bathrooms across from B-78 and B-42. Replace closet custodial sink, replace sink in custodial closet; big hole in it, replace urinal in boys bathroom from B-79- Replace or repair handle tail pipe- leaking water bad. Repaie leaking urinal in boys bathroom from B-79. Men bathroom across from (144) leaking urinal from bacl of both urinals. (creating a bad odor). July 26, 2004
Eastern High School FM-200450741 7/26/04 Eastern Repair defective doors to room 346, 260, and 235. Door to bathroom 356 door closure, room 319, 327, 335, 219, 228 and b-40 defective or door closures. Asbestos Code A - Clear for repairs on 09/08/04. DCPS Safety - Leroy Minton Jr. (RG 09/08/04) July 26, 2004
Davis Elementary School FM-200451130 7/29/04 Davis First and second floor boys and girls bathroom new wing Replace about six (6) faucets in bathrooms that are in bad condition, July 29, 2004
Spingarn High School FM-200451999 8/10/04 Spingarn First floor boys bathroom Requesting hole in ceiling to be plaster, due to work that was done on the above floor. Asbestos Code A - Clear for repairs on 08/17/04. DCPS Safety - Ricardo Eley (RG 08/18/04) August 10, 2004
Spingarn High School FM-200452027 8/10/04 Spingarn Girls restroom by 115 Third floor girls restroom by 313 Requesting stall door to be replaced. Asbestos Code A - Clear for repairs on 08/12/04. DCPS Safety - Richard Gibson (RG) August 10, 2004
Woodson High School FM-200452825 8/18/04 Woodson, HD 7, 6, 5, 4, 3, 2, 1, Plaza and Ground floor restroom Fix or replace exhaust fans in all restrooms. August 18, 2004
Wilson High School FM-200452830 8/18/04 Wilson, W. First floor gym area All bathrooms in the gym area need ventilation. Bathrooms has no windows. August 18, 2004
Wilson High School FM-200452844 8/18/04 Wilson, W. First, second and third floor boys bathrooms Repair walls. tha damage was done due to gutters. The damaged is near the windows. Asbestos Code A - Clear for repairs on 08/25/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) August 18, 2004
Browne Junior High School FM-200452884 8/18/04 Browne Center Third floor Female bathroom students, room 303, 304, 305and 307 Repair classroom doors, the door hits frame when being closed. Asbestos Code A - Clear for repairs on 08/27/04. DCPS Safety - Richard Gibson (RG 08/28/04) August 18, 2004
Ketcham Elementary School FM-200452847 8/18/04 Ketcham Second floor boys restroom (New wing) Ceiling is falling as a result of flooding in third floor restroom, Ceiling may fall any minute. Please have someone come out. Code A -clear for repairs as of 8/31/04 safety Sylvia. August 18, 2004
Ballou Senior High School FM-200453219 8/19/04 (Ballou) Asbestos Assessment Required. SAFTY HAVARD-REPLACE SMALL CERAMIC TILE IN GIRLS RESTROOM 1ST. FLOOR NORTH. Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) August 19, 2004
Ferebee-Hope Elementary School FM-200453030 8/20/04 (Ferebee) !!!VERY URGENT!!! 1st Floor/Boys, and Girls Restroom: Boys faucets are not working, and in the girls bathroom, the toilet is rocking and leaking from wax ring, and flooding the floors. (Mount wax ring) August 20, 2004
Aiton Elementary School FM-200453067 8/20/04 Aiton Second floor boys restroom Ceiling need plastering and painting. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Richard Gibson (RG) August 20, 2004
Ferebee-Hope Elementary School FM-200453149 8/20/04 Ferebee-Hope First floor child and family services mens bathroom Replace faucets on sink. August 20, 2004
Francis Junior High School FM-200453114 8/20/04 Francis Need ballast report: Lights and ballast replacement Room 311 - 2 Room 210 - 3 Room 105 - 8 Room 309 - 1 Room 208 - 4 Room 109 - 9 Room 307 - 6 Room 202 - 5 Room 116 - 8 Room 303 - 1 Room 203 - 3 Room 112 - 1 Room 301 - 4 Boys restroom -2 Room 110 - 7 Room 300 - 3 Room 207 - 2 Library 104 - 5 Room 302 - 1 Room 209 - 10 Teacher lunch room - 1 Room 308 - 1 Room 211 - 2 Kid lunch - 4 Room 310 - 4 Boys gym east 24 lights out Room 312 - 1 120 Vac 60 HZ Rapid start ballast for use with 2 F 40 T 12 Lamps. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Leroy Minton Jr. (RG 08/24/04) August 20, 2004
Garfield ES FM-200453200 8/23/04 Garfield Second floor by room 200 New wing and room 2A Replace doors, bathroom door broken. there is 2 in room 2A. Asbestos Code A - Clear for repairs on 08/30/04. DCPS Safety - Richard Gibson (RG 08/31/04) August 23, 2004
Johnson JHS FM-200453173 8/23/04 Johnson First floor teachers bathroom and Asst. Principals office No lights in bathroom, ballasts gone bad, need ballasts. 277 volts 60 Hertz V-2S34-TP August 23, 2004
Whittier Elementary School FM-200453264 8/24/04 Whittier First floor Special Ed office Survey wall in bathroom, plaster falling from wall. Asbestos Code A - Clear for repairs on 08/26/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) August 24, 2004
Whittier Elementary School FM-200453261 8/24/04 Whittier Second floor nurse office and restroom Replace 3 windows in nurse office high uo and 2 in the nurse restroom. August 24, 2004
Malcolm X ES FM-200453245 245 8/24/04 (Malcolm X) Asbestos Assessment Required. 3rd Floor/Boys Restroom: Repair plaster ceiling that continues to fall. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Richard Gibson (RG) August 24, 2004
Stanton Elementary School FM-200453327 8/25/04 Stanton Second floor boys and girls bathroom Fixtures need replaced. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 25, 2004
Garrison ES FM-200453486 8/27/04 Garrison Second floor west wing boys bathroom Water is leaking behind the wall on urinals. Code A - Cleared for repairs on 08/28/04 by Leroy Minton Jr. (LM/08-28-04) Safety Office (202) 576-8962. August 27, 2004
Garfield ES FM-200453533 8/27/04 Garfield Basement 1) Re-surface Girls Bathroom floor with concrete. August 27, 2004
Cook J.F. Elementary School FM-200453676 8/31/04 Cook, JF First Floor - boys bathroom two partition to the urinals need to be put up. Cole A-clear for repair by DCPS Charles Buchanan on 9/01/04 August 31, 2004
Emery Elementary School FM-200454926 9/10/04 (Emery) Second floor girls bathroom has no water to bradley basin (girls can't wash there hands) Urgent!! September 10, 2004
Terrell Mc ES FM-200454661 9/14/04 Terrell, MC FIRE CODE VIOLATION: UG Breach in the ceiling gym boys bathroom.. Asbestos Code A - Clear for repairs on 09/15/04. DCPS Safety - Leroy Minton Jr. (RG 09/15/04) September 14, 2004
Eastern High School FM-200454607 9/14/04 Eastern Basement Boys Restroom: 1. Missing urinal 2. Leaking urinal 3. Repair or replace shower head. September 14, 2004
Watkins Elementary School FM-200455095 9/20/04 Watkins Fourth floor Boys bathroom the last toilet need flush valve set and teacher bathroom sink need a new faucet set for hot water. Note: Duplicate ( see FM- 200341499 ) September 20, 2004
Beers Elementary School FM-200455099 9/20/04 Beers Emergency Roof Building # 1 second by girls and boys restroom there is a roof leak. Water is coming thru the lights. September 20, 2004
Garnet-Patterson MS FM-200455586 9/24/04 Garnett Patterson Emergency !!! Second Floor - Boys Restroom 1) Replace (2) porcelin sinks that were vandalized and broken off wall. Sinks have very sharp edges, Bathroom shut down. Asbestos Code A - Clear for repairs on 09/24/04. DCPS Safety - Charles Buchanan (RG 09/24/04) September 24, 2004
Kenilworth ES FM-200455854 9/27/04 Kenilworth Second floor girls restroom The light in the restroom will not come on at all needs to be replace. September 27, 2004
Plummer Elementary School FM-200455845 9/27/04 Plummer First floor boys restroom Repair ceiling. Asbestos Code A - Clear for repairs on 09/27/04. DCPS Safety Leroy Minton Jr. (RG 09/28/04) September 27, 2004
Gibbs Elementary School FM-200455830 9/27/04 Gibbs First floor boys restroom Ceiling is peeling in need for repairs. Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/06/04) September 27, 2004
John Burroughs ES FM-200456022 9/29/04 Burroughs Lower level boys and girls restrooms Floor concrete, floor damage real bad need repairing, paint. Code A- clear for repairs as of 10/12/04 safety Sylvia September 29, 2004
John Burroughs ES FM-200456043 9/29/04 Burroughs First floor by boys restroom Wall tiles is missing in front of room # 5, 4 missing. Code A - clear for repairs as of 10/12/04 safety Sylvia. September 29, 2004
Ballou Senior High School FM-200456342 10/1/04 Ballou Sub -B Male and female r/r Restroom need to be handicap accessible. Asbestos Code A - Clear for repairs on 10/06/03. DCPS Safety - Leroy Minton (RG 10/06/04) October 1, 2004
Kimball Elementary School FM-200456385 10/4/04 Kimball New wing teacher restroom basement level The knobs are broken. Asbestos Code A - Clear for repairrs on 10/04/04. DCPS Safety - Richard Gibson (RG) October 4, 2004
Patricia R Harris Ed Center FM-200456450 10/5/04 Harris, P.R. Top floor restroom # 1 and 8 These restrooms need parts to be repaired. The trap need to be replaced in # 1 and the handle assembly or parts of it need to be replaced. Please respond ASAP. October 5, 2004
Patricia R Harris Ed Center FM-200456453 10/5/04 Harris, P.R. First, second, ground and main floor We have ballast that need to be replaced, 10 all together that are in classroom areas and restrooms. 1. Mens teachers ITV room. 2. Men teachers next to the teachers lounge on the ground floor. 3. Womens teachers # b6 on the ground floor. 4. 7 in pool A. Asbestos Code A - Clear for repairs on 10/05/03. DCPS Safety - Leroy Minton (RG 10/06/04) October 5, 2004
Patricia R Harris Ed Center FM-200456468 10/5/04 Harris, P.R. Ground floor big gym boys and girls restroom The partition have fallen down and the tile floor need to be replaced ASAP in boys, and girls partition has fallen and need to be replaced. The kids have no walls between them now. Asbestos Code A - Clear for repairs on 10/05/03. DCPS Safety - Leroy Minton (RG 10/06/04) October 5, 2004
Patricia R Harris Ed Center FM-200456452 10/5/04 Harris, P.R. Ground floor restroom # 3 and # 7 Both of these restrooms have out of order toilets; They will not flush. October 5, 2004
Gage-Eckington ES FM-200457828 11/2/04 Gage-Eckington 1) First Floor-Girls Restroom In the girls restroom there is a hole in the wall. The hole was left after the plummer did some repair work Asbestos Code A - Clear for repairs on 11/02/04. DCPS Safety - Richard Gibson (RG) November 2, 2004
Meyer Elementary School FM-200458040 11/8/04 Meyer 2nd floor bathrooms The partition in the boys bathroom is leanin. May be it wll fall. November 8, 2004
Reed LC FM-200458268 11/15/04 Reed Second floor Male restroom Replace or repair vent in resrtroom door. Code A-clear for repair by DCPS Charles Buchanan on 11/16/04 November 15, 2004
Turner Elementary School FM-200458364 11/16/04 (Turner) THROUGH-OUT THE BUILDING: (1) Second Floor/Boys Restroom: First toilet stopped up (Old side) Girls rest room (New side) first toilet stopped up. (2) Third Floor/Girls Restroom (Old side) last toilet stopped up and (New side) girls restroom fourth toilet stopped. November 16, 2004
Thomas Elementary School FM-200458297 11/16/04 Thomas First, second and third floor Boys, girls, ladies, men, adult restrooms and custodian closet Survey, repair or replace flush valves, traps, sink spuds, vacuum breakers, washers and faucets. Unstop urinals and sinks. November 16, 2004
Patricia R Harris Ed Center FM-200458401 11/17/04 Harris P. R. Ground Floor-Teachers Restroom . Repair toilet in teachers restrroom . Water leaking onto floor area. November 17, 2004
Whittier Elementary School FM-200458883 12/1/04 Whittier First floor special Ed. office Survey wall in bathroom, plaster falling from wall. Asbestos Code A - Clear for repairs on 12/01/04. DCPS Safety - Leroy Minton Jr. (RG 12/01/04) December 1, 2004
Browne Junior High School FM-200459085 12/2/04 BROWNE Second floor Girls restroom (new wing_ Need a door handle. Code A-clear for repair by DCPS Charles Buchanan on 12/03/04 December 2, 2004
Wilkinson ES FM-200459138 12/3/04 Wilkinson URGENT!!!!!!! Second floor 180 - boys bathroom Replace motors for exhaust fans on the roof: G.E. Motor (4) Model# M-5K2HG27772 RPM: 1725 Vlolts:230/460 Amps: 2.2 - 1.1 HP 1/2 V.1.25 Hz.60 S. 14905 SFA 2.4 - 1.2 R.C. Motor Frame: K56H SEP GC74 S - 311P299A Hp: 2 RPM: 1725 Volts: 230/460 Amps: 6.6/3.4 Hz. 60 PH: 3 (1) December 3, 2004
Wilkinson ES FM-200459139 12/3/04 Wilkinson Second floor 180 - boys bathroom and 221 N. Robertson Second floor 184 girls bathroom Need to replace radiator covers that is loose from wall. December 3, 2004
Eastern High School FM-200459153 12/3/04 Eastern Roof Of Boys/Girls Restroom Repair or replace heating unit, (heating Coils) on roof of restrooms on the field. December 3, 2004
Dunbar High School FM-200459346 12/8/04 Boys restroom basement 2B The pipe is leaking. Asbestos Code A - Clear for repairs on 12/08/04. DCPS Safety - Leroy Minton Jr. (RG 12/08/04) December 8, 2004
Wilson High School FM-200500072 1/4/05 Wilson, W. First floor girls and boys locker rooms Repair or replace the Bradley basin in the football team room and the track team room. In the boys locker room, also repair or replace the Bradley basin in girls locker room bathroom. January 4, 2005
Cook J.F. Elementary School FM-200501502 1/5/05 (Cook, J.F.) THE LIGHT IN THE BACK OF THE GIRLS BATHROOM IS OUT. FOUR NEW BULBS IN THE BALANCE IS OUT. January 5, 2005
Shaw JHS FM-200500288 1/11/05 Shaw Second floor boys restroom Change all six ballasts still no lights. January 11, 2005
Browne Junior High School FM-200500364 1/12/05 BROWNE SECOND FL. NEW WING/ TEACHERS RESTROOM REPAIR LIGHTS January 12, 2005
Davis Elementary School FM-200500377 1/12/05 DAVIS FIRST FL.BOYS RESTROOM 104 REPAIR TOILETS AND URINALS January 12, 2005
Coolidge High School FM-200500369 1/12/05 Coolidge Ladies bathroom Toilet leaking from base. January 12, 2005
Coolidge High School FM-200500372 1/12/05 Coolidge Basement girls bathroom Secure loose toilet, replace defective 8" deck mount lavatory faucet, and unstop toilet. January 12, 2005
Nalle Elementary School FM-200500436 1/14/05 Nalle URGENT Second floor boys bathroom Ceiling is leaking. January 14, 2005
Wilkinson ES FM-200500720 1/24/05 WILKINSON SECOND FL. BOYS RESTROOM RM 180 REPAIR CERRAMIC FL. TILE Asbestos Code A - Clear for repairs on 01/24/05. DCPS Safety - Richard Gibson (RG) January 24, 2005
Wilson High School FM-200500851 1/26/05 Wilson, W Hallways & Restrooms -Gym Bldg. Repair 4 convectors in Gym hallways and 2 convectors; One in Girls restroom & one in Boys restroom with univents to provide adequate heating during incumbent weather. January 26, 2005
Benning Elementary School FM-200501218 2/4/05 Benning First Fl. Restroom Repair mixing Valve. February 4, 2005
Ferebee-Hope Elementary School FM-200501455 2/9/05 Ferebee-Hope Fourth fl Girls Bathroom Repair sinks & Remount to Wall Asbestos Code A - Clear for repairs on 02/10/05. DCPS Safety - Richard Gibson (RG) February 9, 2005
Kramer Middle School FM-200501438 2/9/05 Kramer Mens bathroom Need a plummer, water is leaking from somewhere. February 9, 2005
Ferebee-Hope Elementary School FM-200501457 2/9/05 Ferebee-Hope First fl. Boys Restroom Replace Faucet Repair sinks & Remount to Wall February 9, 2005
Patricia R Harris Ed Center FM-200501598 2/14/05 Harris, P.R. Second floor Floor in ladies restroom need to be repaired (tile floor). HA 005 Tile Grout Groy No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 1/17/06 February 14, 2005
Seaton Elementary School FM-200501673 2/16/05 Seaton First floor 009 Tile on bathroom floor in pre-k room, children are pulling up ceramic tile. Safety has alredy been out. HA 009 Tile grout gray with muitti Colored smal floor tile No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 2/17/05 February 16, 2005
Leckie Elementary School FM-200501724 2/17/05 Leckie Thoughout building All teachers restrooms need upgrading, located on all floors. Total of five in all. To have taller commodes, handicap bars to accommodate the older teachers and our handicap teachers. February 17, 2005
Coolidge High School FM-200501737 2/17/05 Coolidge ( High School Bathroom Survey Report ) Throughout Building - Repair All Urinals Ground Floor - Girls - Repair Sink Girls Gym Restroom - Repair faucets and Repair Water Coolers Boys Gym Restroom - Repair Urinals and Repair Water Closets Men's ( Handicapp) - Repair Urinal Boy's Locker Room - Repair Sink and Repair Faucets Nurse's Suite - Men's Room - Replace Handle Kit First Floor - Womens - Replace Water Closet Second Floor - Men's Restroom - Repair Sink, Faucets,Urinals and Replace Water Closets. February 17, 2005
Dunbar High School FM-200501749 2/18/05 Dunbar ( High School Bathroom Survey Report ) Forth Floor - Boys Restroom - Repair Urinal Third Floor - Boys Restroom - Repair Urinal Third Floor - Girls Restroom - Repair Toilet Business Suite - Repair Faucet - No Water Business Suite - Men's - Repair Bradley Basin Ground Floor - Boys - Repair Sink and Faucet Ground Floor - Girls - Repair Faucet and Repair Sink First Floor - Physical Ed - Repair Urinal Custodial - Girls Restroom - Repair Water Closet and Repair Toilet February 18, 2005
Eastern High School FM-200501775 2/18/05 Eastern ( High School Bathroom Survey Report ) First Floor - Boys Restroom - Install Water Closet Seat First Floor - Girls Restroom - Replace (1) Faucet and Install Water Closet Seat First Floor Annex - Girls Restroom - Install (1) Sink With Faucet and Unclog Water Closet First Floor Annex - Boys Restroom - Repair (3) Sets Of Faucets ( loose), Replace (1) Urinal Flush Valve and Unclog (1) Water Closet Gym - Girls Restroom - Repair (1) Set Of Faucet and Replace (1) Water Closet Seat Room B-115 - Handicapp Toilet - Replace All Fixtures Gym Boys Restroom - Repair (1) Set Of Faucets and Unclog (1) Urinal Basement Girl's Restroom - Install (1) Sink With Faucets and Replace (2) Faucet Sets Basement Boys Restroom - Replace (2) Faucet Sets, Install New Urinal and Re-Hang (1) Urinal February 18, 2005
Dunbar High School FM-200501748 2/18/05 Dunbar ( High School Bathroom Survey Report ) Teacher's Restroom - Repair Flush Valve Fifth Floor - Girls Restroom - East and West - Repair Toilet Diaphram Forth Floor - M.E. Area Girls - Repair Toilet Diaphram Forth Floor W - Area Boys - Repair Bradley Basins,Replace Toilet Diaphram Second Floor - Counselor Suite - Repair Sink and Faucet Main Office - No Cold Water Lobby - Boys - Urinal Stopped Up and Need Urinal Diaphram Business Suite - Repair Stopped Up Toilet and Need Flush Valve Girls Gym Hallway - Repair Brabley Basin and Repair Toilet First Armory - Girls Restroom - Repair Toilet and Repair Sink First Floor - Teachers Restroom - No Cold Water First Floor - Girls Restroom - Repair Bradley Basin First Floor - Custodial Room - Repair Urinal Cafeteria - Men's - Repair Sink Fifth Floor - Boys Restroom - Repair Bradley Basins,Water Closet and Urinal February 18, 2005
Dunbar High School FM-200501797 2/20/05 Dunbar ( High School Bathroom Survey Report ) First Floor Custodial Room - Repair Ceiling Fifth Floor Boys Restroom - Repair Hole In Wall Fourth Floor Girls Restroom - Paint Lobby Women Restroom - Repair Wall and Ceiling - Paint Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) February 20, 2005
Wilson High School FM-200501800 2/20/05 Wilson, W. ( High School Bathroom Survey Report ) Second Floor - Boys Restroom - Peeling Plaster Third Floor - Boys Restroom - Peeling Plaster Gym Girls Restroom - Breach Wall To Repair Cold Water On Sink First Floor Girls Restroom - Paint Walls and Ceiling Second Floor - Girls Restroom - Re-Plaster Ceiling and Walls Plaster HA-005 and asscciated brown coat HA 705 have both tasted negative Code A-clear for repair by DCPS Charles Buchanan on 3/7/05 February 20, 2005
Eastern High School FM-200501790 2/20/05 Eastern ( High School Bathroom Survey Report ) Third Floor Boys - Replace Faucets,Replace Urinals - HCFV Leaks and Replace F.C. on Water Closets Third Floor Girls - Water Closet Stooped Up Third Floor Boys - Replace Faucets, Replace Urinals, and Water Closet needs Flush Valve Second Floor Boys - Replace Faucets and Water Closet Clogged Second Floor Girls Restroom - Replace Faucet Second Floor Boys Restroom - Replace (2) Faucets Second Floor Girls Restroom - Replace (2) Faucets First Floor Girls Restroom - Replace (2) Water Closet Flush Valves February 20, 2005
Duke Ellington School FM-200501799 2/20/05 Ellington ( High School Bathroom Survey Report ) Second Floor Womens Restroom - Ceiling Needs To Be Repaired Second Floor Dressing Room - Ceiling Needs To Be Painted Mens Restroom - 206C - Repair Ceiling Ladies Room - 118 D - Repair Wall/ Flaking Plaster Girl Restroom Studio A - Repair Ceiling Above Toilets Code A-clear for repair by DCPS Charles Buchanan on 3/7/05 February 20, 2005
Anacostia Senior High School FM-200501791 2/20/05 Anacostia ( High School Bathroom Survey Report ) Upper Level Girls Restroom - Install (2) Faucets and Install Sink Upper Level Boys Restroom - Install (1) Hand Sink With Faucets Third Floor Boys Restroom - Repair Leaking Traps Third Floor Girls Restroom - Replace Handicap Faucets and Install New Toilet Seat Second Floor Boys Restroom - Replace Faucets in H.C. Lavatory and Replace Flush Valves Second Floor Girls Restroom - Install New Sets Of Faucets First Floor Boys Restroom - Replace Handicap Faucets and Replace Urinal Flush Valves First Floor Girls Restroom - Replace Sink With Faucets and Install Faucets First Floor Boys Restroom - Install P Trap First Floor Gym Girls - Install Faucets February 20, 2005
Anacostia Senior High School FM-200501803 2/20/05 Anacostia ( High School Bathroom Survey Report ) First Floor - Gym Boys - Hole In The Wall Near Entrance HA 019 Plaster white wall plaster NO Asbestos HA 104 Brown coat with HA 019 No Asbestos Code A-clear for repair by DCPS Charles buchanan on 3/1/05 February 20, 2005
Ballou Senior High School FM-200501792 2/20/05 Ballou ( High School Bathroom Survey Report ) First Floor Horse ( Boys) - Install ( 4 ) New Faucets and Handicapp Stall First Floor North Wing ( Boys ) - Install ( 4 ) New Faucets First Floor North Wing ( Girls ) - Install ( 4 ) New Faucets and Install New Water Closets Ballou A Second Floor Girls - Install (1) New Faucet Set and Repair (3) Water Closets First Floor Girls - Install New Faucets and Repair Water Closets Flush Valves February 20, 2005
Eastern High School FM-200501813 2/22/05 Eastern High School - Bathroom Survey Basement Girls Restroom - Replace Stall Door Third Floor - Girls - Replace Missing Stall Door - Second Floor - Boys Restroom - Replace Missing Stall Door Asbestos Code A - Clear for repairs on 02/22/05. DCPS Safety - Richard Gibson (RG) February 22, 2005
Ballou Senior High School FM-200501816 2/22/05 Ballou High School - Bathroom Survey First Floor - Horseshoe ( Boys) - Install Privacy Partition First Floor - North Wing - Girls - Install Stall Door Ballou A First Floor Boys Locker Room - Install New Stall Door and Hardware HA 017 Tile Grout grey No Asbestos Code A-clear for repair by Charles Buchanan on 3/3/05 February 22, 2005
Dunbar High School FM-200501899 2/23/05 Dunbar ( High School Bathroom Survey Report ) Third Floor - East Area - Replace Ceiling Tile Girls Locker Room - Replace Ceiling Tile Third Floor - Boys Restroom - Replace Ceiling Missing Tile Second Floor - Boys Restroom - Replace Missing Ceiling Tile First Floor Parent Center - Replace Missing Ceiling Tile Boys Ground Floor - Replace Ceiling Tile Asbestos Code A - Clear for repairs on 02/23/05. DCPS Safety - Richard Gibson (RG) February 23, 2005
Tyler Elementary School FM-200501929 2/23/05 Tyler Wing Area- Boys Restroom Remount Urinals to the wall Asbestos Code A - Clear for repairs on 02/24/05. DCPS Safety - Richard Gibson (RG) February 23, 2005
Turner Elementary School FM-200501994 2/25/05 Turner First Floor Oldside H.W. Put a door stop behind exit door next to boys restroom; door has knocked the pipe loose with securitylines in it and has shorten out the security alarm system. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) February 25, 2005
Turner Elementary School FM-200501990 2/25/05 Turner Repair ceiling in boys restroom and custodian office, that have been waiting to be repaired for the last three years. Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) February 25, 2005
Patricia R Harris Ed Center FM-200501988 2/25/05 Harris, P.R. Second floor P.R. elem side survey ASAP Fior plumbing, Electric thru out classrooms, bathrooms, hallways and stairways. Code A-clear for repair by DCPS Charles Buchanan on 1/17/06 February 25, 2005
Garnet-Patterson MS FM-200502210 3/3/05 Garnet-Patterson All bathrooms and the auditorium Requesting the floors to be repaired or replace due to cracks and holes, auditroium floor is buckle. HA 770 Tile grout gray, NA, tile grout with 2" X 5" ceramic wall tile (No Asbestos) HA 771 Tile grout gray, NA, tile grout with octagonal ceramic floor tile (No asbestos) Code A-clear for repair by DCPS Charles Buchanan on 3/21/05 March 3, 2005
Patricia R Harris Ed Center FM-200502249 3/4/05 Harris, P.R. Second floor girls bathroom Repair missing floor tile ASAP, Tile is damage due to water damage. HA 005 tile Grout, GTray No Asbestos Code A-Clear for repair by DCPS Charles Buchanan on 3/15/05 March 4, 2005
Patricia R Harris Ed Center FM-200502248 3/4/05 Harris, P.R. Second floor boys / girls bathroom Install partition for privacy in children bathroom. Urgent near stairways # 3, # 4, #5 and #6. HA 005 Tile grout, grout No Asbestos Code A-Clear for repair by DCPS Charles Buchanan on 3/14/05 March 4, 2005
Patricia R Harris Ed Center FM-200502225 3/4/05 Harris, P.R. First floor girls restroom Need electrican to replace or repair electrical light fixtures by stairwell # 8. Plus entrance light fixtures leading into restroom. This area is very dark by security desk when entering the main entrance to blkdg. Visitors and teachers have been complaining. (Safety Hazard) March 4, 2005
Wilson J. O. ES FM-200502330 3/8/05 Wilson, J.O. Room #125 Repair or replace Brick wall in room #125 and also repair wall in Girls Restroom next to room #125. March 8, 2005
Bunker Hill Elementary School FM-200502543 3/11/05 Bunker Hill Girls Restroom Repair leak in Girls Restroom next to Computer Lab March 11, 2005
Patricia R Harris Ed Center FM-200502953 3/18/05 Harris, P.R. / Old Patterson Second floor girls restroom Install ceramic tile in missing areas. Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) March 18, 2005
Langdon Elementary School FM-200502921 3/18/05 Langdon (Notice of Infraction from DCRA on 4/7/05) 1) Safety Office - Evaluated the perimeter of the tunnel area remove asbestos related items as needed. 2) Industrial Mechanic - Pump out tunnel area. 3) Steamfitter - Make the necessary repair to the steam and return line (under boy's bathroom) 4) Safety Office - Reinsulated all return and steam lines. HA 029 Cementitious Filling Gray On Fiberglass pipe insulation No Asbestos HA 035 Cementitious Fitting, Gray On Radiator Fiberglass pipe insulation No Asbestos HA 045 Cementitious Fitting, Gray On Fiberglass pipe insulation No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/30/05 The AMP identified the 12 X 12 floor tile in Lunch room to be asbestos material, but in good condition. HA 008 (AMP 17) Floor tile light brown 12" X 12" (asbestoc-containing in Good condition) HA 009 (AMP 17] Floor Mastic Yes for Asbestos (asbestoc-containing in Good condition) Note: This work request was given a Code A clearence under the condition that there will be no floor penetrations. If floor penetrations become necessary, stop work and secue an asbestos contractor to penetrate floor tile. March 18, 2005
Patricia R Harris Ed Center FM-200502951 3/18/05 Harris, P.R. / Old Patterson Second floor all restrooms boys and girls Install restroom partitions. Asbestos Code A - Clear for repairs on 03/30/05. DCPS Safety - Leroy Minton Jr. (RG 03/30/05) March 18, 2005
Davis Elementary School FM-200503047 3/21/05 (Davis) First floor, Second floor/Ladies restroom in main lobby and restroom across from room 204. Replace or Repair shutoff valves under sinks, custodian was unable to change faucet rosette washer & nutset because shutoffs are frozen. March 21, 2005
Patricia R Harris Ed Center FM-200503119 3/23/05 Harris P R First fl. Teacher's Restroom Please, Repair the Flush Valve Asbestos Code A - Clear for repairs on 03/23/05. DCPS Safety - Richard Gibson (RG) March 23, 2005
Davis Elementary School FM-200503124 3/23/05 Davis Second fl. Girl's Restroom Near Rm 218 Please, Place Wax Ring on Toilet March 23, 2005
Garnet-Patterson MS FM-200503286 3/25/05 Garnet-Patterson Third Floor - Girls Bathroom 1) Replace drain pipe that was removed from under the sink. March 25, 2005
Garnet-Patterson MS FM-200503273 3/25/05 Garnet-Patterson First Floor - Boys Bathroom 1) Repair or replace floor in Bathroom, floor is c