"Boiler" Open Repair Requests

Detailed Reports

School Description Date
Eastern High School FM-200202657 7 2/8/02 (EASTERN) ASBESTOS ASSESSMENT REQUIRED GROUND LEVEL/WALL OUTSIDE BOILER ROOM WATERPROOF THE EXTERIOR WALL OUTSIDE THE BOILER ROOM TO PREVENT WATER FROM GOING INTO THE BOILER ROOM. ASBESTOS CODE A-CLEAR FOR REPAIR ON 02/11/02 HORNE ENGINEER: EDWARD RODRIGUEZ February 8, 2002
Eastern High School FM-200202965 5 2/13/02 (EASTERN) ASBESTOS ASSESSMENT REQUIRED SUB-BASEMENT ;BOILER ROOM FURNISH & INSTALL A METAL DOOR FRAME AND DOOR IN THE STORAGE ROOM IN ORDER TO SECURE EQUIPMENT & TOOLS FROM THEFT. ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/19/02 HORNE ENGINEER: STEPHEN CALDWELL February 13, 2002
Shaw JHS FM-200203733 2/28/02 Shaw Boiler room Replace starter control to hot water system circulating pump that services reheat coils and convectors controls were pulled but never replaced. Westing house, A200MZCX, coil #480v, style 765A842609, 505CB86613, volts 200-230 460/975, CWTEA. February 28, 2002
Shepherd ES FM-200204222 22 3/11/02 Shepherd Boiler room Remove and replace existing outside door of boiler room. This is an old wooden door covered with tine. This door is very poor security. Replace door with new metal door for better security. Asbestos Code A - Clear for repairs on 06/07/02. DCPS Safety - Leroy Minton Jr. (RG 06/10/02) March 11, 2002
Cardozo High School FM-200204638 3/19/02 (Cardoza) **Emergency** Sub-basement/Boiler room office: Repair or replace busted 2 1/2 galvanized copper pipe in the boiler room office; boiler room office is flooded. March 19, 2002
Shaw JHS FM-200204811 3/21/02 Shaw Boiler room and engineers office 1. Asbestos assessment required. 2. Lead paint assessment required. 3. Plaster and patch ceiling area over boilers 1, 2, 3, #1 convecter and in engineers office. "Fire Code Violation" Code A-clear for repair by Horne Engineer ( Edward Rodriguez ) 0n 3/22/02 (CEB March 21, 2002
Backus Middle School FM-200205529 4/8/02 Backus 1. Asbestos Assessment Reqd. 1st Floor Boiler Room 2. Install an outlet to support the new sump pump [will have to use an extension cord otherwise]. 3. Reanchor the ceiling lights which have broken supports. 4. Repair light which is hanging from several exposed wires. These problems could precipitate safety issues. Code A-clear for repair by Honre Engineer (Stephen Caldwell ) on 4/09/02 CEB April 8, 2002
Powell Elementary School FM-200205621 4/9/02 Powell Boiler room Repair or replace pneumatic control valve on steam line that controls the heat to the old side of the bldg., located above the boiler. Valve is in the close position. April 9, 2002
Young Elementary School FM-200206236 4/22/02 Young Boiler room Emergency Replace (6") six inch round duct exhaust from hot water heater. Fumes are being released into building. Unit has been cut off. Jones and Wood Inc - Edward Brent - 202-529-6434 April 22, 2002
Cook J.F. Elementary School FM-200209111 9111 4/24/02 J.F. Cooke Boiler room Electrician needs to hard wire sump pump. April 24, 2002
Amidon Elementary School FM-200206638 4/25/02 Amidon Boiler Room ,classrooms and offices ACM and Lead Abatement. 1) Demolition of boilers and all associated equipment,piping and electrical to same equipment. Change steam traps and valves inside classrooms and offices. Install new boilers,equipment,lights,electrical panels,doors and windows. Plumbing,sinks,hot water heaters and drain. Paint mechanical rooms. New controls,insulation and concrete pads. Poc: Matt Murry - 301-252-5521 Mike Williams - Jacobs Engineering. Permit allowed to be issued, DCPS Safety has evaluated the asbestos abatement scope of work (DCPS Safety-Sheila R.Howard (04-30-02) April 25, 2002
Thomas Elementary School FM-200206697 4/26/02 Navel Thomas Boiler room lavatory Replace waste line flange and commode - boiler room lavatory. Commode was removed during previous unclogging of sewerline. April 26, 2002
Brent Elementary School FM-200206992 5/2/02 Brent Boiler room entrance Unstop floor drain at entrance to boiler room. Area is flooded. May 2, 2002
Thomas Elementary School FM-200207153 5/6/02 Thomas Boiler Room Refurbish condensate system. May 6, 2002
Coolidge High School FM-200207599 99 5/13/02 Coolidge Boiler room Troubleshoot and repair A.O. Smith hot water heater. Unit will not maintain flame long enough to heat the water. May 13, 2002
Simon Elementary School FM-200207740 5/15/02 Simons School (boiler room) Replace motor (#1 sump pump) Marathon - model-3VC14517DR5341-AB P, Ph - 3, HZ - 60, Hp - 2, RPM -1740, V-208/230/406, Code - K , cat #C122 May 15, 2002
Orr Elementary School FM-200208895 6/4/02 Orr Boiler Room Check and replace sump pump, #1&#2 pump will not work. Flooding boiler room. June 4, 2002
Watkins Elementary School FM-200209292 2 6/11/02 Watkins Boiler room 1. Asbestos assessment required. 2. Replace insulation on the inside of the front of the #2 boiler door. Asbestos Code A - Clear for repairs on 06/20/02. Horne Engineering - Bipin Nanavaty ( RG 06/21/02 ) June 11, 2002
Beers Elementary School FM-200210090 6/24/02 Beers Boiler Room Repair or replace sump pump, is no longer working. (No data plate information. June 24, 2002
Rudolph Elementary School FM-200210693 7/2/02 Rudolph Boiler Room 1. Furnish and install missing B&G Hot water domestic circulating pump 2. Correct check valve that is in backword on house return lineto heater (1 1/4" check) 3. Install temperature gauge to supply line out from hot water domestic heater to building, where none exist (1 1/2" supply line) In line pump = Part #M70534; Thermal part #M74799; 3Amps., 115V;1/4 HP; 1725 RPM & 1PH July 2, 2002
Woodson High School FM-200211148 0211148 7/12/02 (Woodson, H.D.) !!!!!Emergency!!!!! Boiler room/Ground floor: Drains stopped up; motors are running on sump and not pumping water out. Plumber on the scene at this time. July 12, 2002
Bowen Elementary School FM-200213333 7/30/02 (Bowen) !!TRIPLE EMERGENCY!! Boiler Room: Water has flooded the boiler room; sump pump not working, sewer ejector pit has gone, and there is a foot or more of water in that area. Water is almost to the burners and hot water tank. July 30, 2002
Reed LC FM-200213352 7/31/02 Reed Boiler room Furnish materials to repair 3 burners on boilers #1, 2 and 3 that were damaged by flood due to sump pump failure. July 31, 2002
Shaed Elementary School FM-200216344 9/3/02 Shaed Unclog floor drain in boiler room September 3, 2002
West Elementary School FM-200216802 9/6/02 West Basement Boiler Room Replace bearing in #2 chill water circulator motor Name-US Elcet. Motor R.P.M 1750 P.H-3 H.P-20 Frame-256T Volts-230/460 Amps-.54-27 September 6, 2002
Seaton Elementary School FM-200217054 9/9/02 Seaton Lower basement - Boiler room Replace burned out breaker number 3. Effect the use of the exhaust fan and all the outlets in the engineers office. September 9, 2002
Wilson High School FM-200217266 9/11/02 Woodrow Wilson Ground Floor Boiler Room Replace No. 2 high pressure condensate pump. Motor-GE, HP- 1/2, V -208/230, PH-3, RPM-1725, Code-L. AMP 2.3-2.2, FR-56J & Time Rating -Cont. No Asbestos in this area. Note:Motor and mechanical end burnt-out September 11, 2002
Backus Middle School FM-200219077 9/24/02 Backus Boiler room Repair electrical conduit behind boilers that control backlights and sump pump, line was broken during abatement. September 24, 2002
Woodson High School FM-200218532 0218532 9/30/02 Repair sheet metal work on the back of # 2 boiler, as per A. Colvin , Boiler Inspector. September 30, 2002
Bruce-Monroe Elementary School FM-200219371 219371 10/11/02 Bruce Monroe Old Building Tunnel Basement Restore electrical service to lighting in tunnel area. Note: engineer cannot work on small boiler properly Asbestos Code A - Cleared for repairs on 04-28-03 by Leroy Minton Jr. (LM/04-08-03) the Safety Office 202-576-8962. October 11, 2002
Hyde Elementary School FM-200219331 10/11/02 Hyde Basement Boiler Room Repair or replace defective programmer on boiler #1. Wiill not operate burner on boiler. Boiler #2. is operational. October 11, 2002
Bunker Hill Elementary School FM-200219308 19308 10/11/02 Bunker Hill Basement 1) Replace cracked boiler sections as per attached scope of work. October 11, 2002
Nalle Elementary School FM-200219528 10/17/02 J.C. Nalle boiler room 1. Replace (2) two gate valves (1) one 90 degree elbow and union on hot water heater located in boiler room. October 17, 2002
Bruce-Monroe Elementary School FM-200219534 219534 10/17/02 Unstop Floor drains in back of the boilers. October 17, 2002
Langdon Elementary School FM-200219705 5 10/21/02 Repair Lochinvar domestic hot water heater in the boiler room, will not ignite October 21, 2002
Walker-Jones EC FM-200219906 10/23/02 Walker Jones Boiler Room P.M Chiller October 23, 2002
Thomas Elementary School FM-200219920 10/23/02 (Nevel) Thomas Boiler Room P.M Multi Stack October 23, 2002
Wilkinson ES FM-200219919 10/23/02 Wilkerson Boiler Room P.M Multi Stack October 23, 2002
Bruce-Monroe Elementary School FM-200219921 219921 10/23/02 Bruce Monroe Boiler Room P.M Multi Stack October 23, 2002
Eaton Elementary School FM-200219944 10/24/02 Eaton Boiler Room - Electric Room Replace boiler emergency switch contactors coil powered for Boilers #1 and #2 30 Amps; made by Cutler-Hammer; No C25DND330; Volts 104-120; 50-60 HZ; 3Ls Work Not Completed October 24, 2002
Coolidge High School FM-200219972 10/24/02 Coolidge Boiler Room Replace leaking 3" inch. hand operated gas valve on #3 boiler gas train line. Note: Gas Leak October 24, 2002
Langdon Elementary School FM-200220335 5 10/30/02 Langdon Exterior of bldg. Unclog exterior drains. Water is running off into the boiler room. October 30, 2002
Woodson High School FM-200220641 11/12/02 H.D Woodson Pool Pump Room Pool R/R condensate return pumps. Boilers are not getting it's return water back, water is dumping on the floor November 12, 2002
Benjamin Banneker Academic HS FM-200221400 00 11/20/02 Banneker Boiler Room Near Custodian Office Ground Floor Repair or replace defective solenoid valve to condensate tank. Boilers are running out off water. Hand feeding boiler at this time. November 20, 2002
Woodson High School FM-200222117 12/5/02 Woodson Boiler Room Boiler #1 Need feed water pump check. Pump leaking. December 5, 2002
Cardozo High School FM-200222397 12/12/02 Cardozo S.H.S. Boiler room Asbestos assessment may be required Replace ruptured 2 1/2 " galvaninzed pipe and tee on the domestic hot water pipe, this pipe supplies water to the south west side of the building. Asbestos Code A - Clear for repairs on 12/20/02. Horne Engineering - Troy Wilcome (RG 12/23/02) December 12, 2002
Shaw JHS FM-200222403 12/12/02 Shaw Boiler Room Boiler #1 need burner adjusted. December 12, 2002
Emery Elementary School FM-200223379 12/31/02 Emery Boiler Room Check Boiler #2, When Boiler goes off on pressure, the alarm comes on. Have to keep resetting Boiler. December 31, 2002
Reed LC FM-200223695 1/10/03 Reed Boiler Room Furnish two (2) mixing valves for hot water tank, TM20; serial #TM20 07029; US. PatS 2970.7703061,195 Leonard mixing valve 3/4". January 10, 2003
Powell Elementary School FM-200223969 1/14/03 Powell Boiler Room Adjust water level at #2 boiler once boiler go into high fire the water level dropes in the boiler. The low water light come on then the flame failure light came on and boiler will not fire back up. You have to reset the burner. January 14, 2003
West Elementary School FM-200224397 1/23/03 West First and ground floor main hallway and cafeteria Main hallway by office going down by boiler room paint is peeling from the ceiling, also in cafeteria ceiling is peeling on first floor. Plaster and paint. Asbestos/Lead Code A-clear for repair by Horne Engineer Edward Rodriguez on 01/27/03 Charles Buchanan January 23, 2003
Shaed Elementary School FM-200224580 1/26/03 Shaed Boiler room Replace missing eye bolts on the house circulating pumps in the boiler . January 26, 2003
Takoma Educational Center FM-200224735 1/28/03 Takoma Boiler Room First Floor Restore electrical service to inline B & G Pump # 7. Electric was lost when contractor was working at site January 28, 2003
Meyer Elementary School FM-200225380 2/7/03 Meyer Boiler room control pannel Replace defective control pannel coil for # 2 boiler February 7, 2003
Takoma Educational Center FM-200225534 2/11/03 Takoma Boiler Room P.M Chiller February 11, 2003
Terrell Mc ES FM-200225544 2/11/03 M.C Terrell Boiler Room P.M Chiller February 11, 2003
Bruce-Monroe Elementary School FM-200225587 2/11/03 Bruce Monroe Boiler Room P.M Chiller February 11, 2003
Reed LC FM-200225509 2/11/03 Reed Boiler Room Repair or replace 6" flue pipe from hot water heater located in boiler room. February 11, 2003
Tyler Elementary School FM-200225563 2/11/03 Tyler Boiler Room P.M Chiller February 11, 2003
Shaed Elementary School FM-200225656 2/12/03 Shaed Boiler Room Basement Furnish HVAC Shop with (3) 5" OSAY Valve and gasket. To replace valve that is letting hot water go into chiller Note: Asbestos assessment needed on insulation Asbestos Code A - Clear for repairs on 04/22/03. Horne Engineering - Bipin Nanavaty (RG 04/23/03) February 12, 2003
Stanton Elementary School FM-200225872 2/14/03 Stanton Boiler Room Repair/Replace leaking automatic water feeder on boiler #3 February 14, 2003
Plummer Elementary School FM-200225829 9 2/14/03 PLUMMER BOILER ROOM NO HOT WATER TO KITCHEN - URGENT 1. Asbestos assessment required for pipe insulation. 2. Repair ruptured pipe on domestic hot water from hot water heater. Asbestos Code A clear for repairs 2/14/03 DCPS Safety R. Edwards (RE) February 14, 2003
Simon Elementary School FM-200226133 2/25/03 Simon Boiler Room Repair or replace sump pump in Boiler Room February 25, 2003
Deal Junior High School FM-200226179 2/25/03 Deal JHS Boiler Room Area Basement Paint Asbestos Assessment Required Correct peeling and falling paint chip problem this could creat unsafe situation Lead & Asbestos Code A - Clear for repairs on 02/26/03. Horne Engineering - Sharon Voss (RG 02/27/03) February 25, 2003
Hyde Elementary School FM-200226311 2/27/03 Hyde Boiler Room Repair or replace solenoid valve for Boiler #2. This valve feed water to the Boiler. February 27, 2003
Hyde Elementary School FM-200226312 2/27/03 Hyde Boiler Room Repair or replace condensate pump controller and pumps,. A) Controller, not working properly B) Pump #1, inoperable C) Pump #2, seal leaking badly February 27, 2003
Langdon Elementary School FM-200226473 3/4/03 Langdon Boiler room Repair Domestic Hot water heater ignite ,Lochinvar hot water boiler March 4, 2003
Langdon Elementary School FM-200226553 3/5/03 LANGDON Ground floor - Boiler Room 1. Repair hot water tank . Note : hot water heater was shut off by Washington Gas , due to gas leak.) March 5, 2003
Meyer Elementary School FM-200226631 3/6/03 Meyer Boiler Room Repair/Replace burned out ID fan motor on boiler #2. March 6, 2003
Ferebee-Hope Elementary School FM-200226673 3/6/03 Ferebee-Hope Boiler Room Repair/Replace Sewage Ejector Pump. March 6, 2003
River Terrace ES FM-200226640 0226640 3/6/03 River Terrace boiler room Make necessary corrections to boilers out on flame failure. March 6, 2003
Woodson High School FM-200226633 3/6/03 H.D. Woodson Boiler Room Repair/Replace burned out univent motor in classroom ,on the second floor. March 6, 2003
Hine JHS FM-200226834 3/11/03 Hine Boiler Room Furnish and install 6" pressure gauge scale 0 - 60 PSI on Boiler #2. March 11, 2003
Thomas Elementary School FM-200226836 3/11/03 THOMAS boiler room Replace relief valve to domestic hot water heater. Watts - regulator Size 3/4in Serial No. 88420 Set 125lbs model - M3 BTU/Hr. 2,070,000 No. 174A March 11, 2003
Clark Elementary School FM-200226935 3/12/03 Clark E.S Boiler Room R/R leaking 2" inch. black pipe discharge line on sump pump. Leaking badly when in operation March 12, 2003
Wilson High School FM-200227184 3/18/03 Wilson,W Boiler Room Repair and repair no. 2 sump pump for boiler room, Sump pump does not remove waste fromsump pump area. March 18, 2003
Brookland Elementary FM-200227213 213 3/18/03 Brookland Boiler room URGENT Repair or replace electronic ignition on the Lochinvar domestic hot water heater in the boiler room unit is down and there is no hot water. March 18, 2003
Coolidge High School FM-200227245 3/18/03 Coolidge Boiler Room Replace motor to Gym convertor heating system. Maraton electric 1755-RPM, volts-200, Fr-256T,SHF-309,60-HZ, NEMA-87.5, AMP-59,Max cap-KVAR-8.0, PH-3,Mod> #PA265, Type TDR,Duty cont. HP-20, Des-B, Code G, Corr AMP-50. March 18, 2003
Ludlow-Taylor ES FM-200227606 3/25/03 Ludlow-Taylor Boiler room Replace domestic hot water circulating pump and motor, located by the pipe tunnel door. 3/4" inlet 3/4'" outlet March 25, 2003
Langdon Elementary School FM-200227911 3/31/03 Langdon Boiler room Replace solenoid makeup valve on the condensate return tank in the boiler room, valve is not holding , and the boiler is filling up with water. March 31, 2003
Wilkinson ES FM-200228360 4/7/03 (Wilkinson) Basement - 2 boiler room Two (2) drains need to be unclogged. April 7, 2003
Slowe Elementary School FM-200228643 4/11/03 Slowe Boiler room (URGENT) Repair ruptured 3/4" copper line over top of the condensate ,line is leaking onto the electrical conduit line. April 11, 2003
Wilkinson ES FM-200228717 4/14/03 Wilkinson Basement boiler room general storage Need to install sump pump, Water is leaking from wall in corner. April 14, 2003
Ferebee-Hope Elementary School FM-200329975 5/9/03 (Ferebee-Hope) Basement boiler room and Computer room: Drains backing up in the boiler room. Drains backing up in Lobby/C-building. May 9, 2003
Bowen Elementary School FM-200330077 5/13/03 Bowen Boiler room - Floor Drains Unstop floor drains in the boiler room ,standing water. May 13, 2003
Gage-Eckington ES FM-200330331 5/19/03 Gage-Eckington Boiler Room Check condenser pump in boiler room. Pump is making loud noise. B&G Pump # 1510 Ser.# 2094399 ID.# 1BAO85 Model # 4BC95 BF RPM 540 GP 65 feet HP 15 PSI 175 May 19, 2003
Reed LC FM-200330795 5/28/03 REPAIR/REPLACE SUMP PUMP OR EJECTOR Repair inoperable sump pump. Boiler room will flood. May 28, 2003
Gibbs Elementary School FM-200331288 6/5/03 Gibbs Boiler room Replace broken Main Gas stop ball cock valve on the main gas line June 5, 2003
Walker-Jones EC FM-200331454 6/9/03 Walker/Jones Boiler room Rplace sumps in the boiler room ,temperary pump will not handle heavy rain storms and the boiler room floods. June 9, 2003
Young Elementary School FM-200331448 6/9/03 Young Roof Boiler Room 1. Install guard rail around smoke stack near cooling tower on roof . Asbestos Code A - Clear for repairs on 06/09/03. Horne Engineering - Tony Marcolin (RG 06/09/03) June 9, 2003
Duke Ellington School FM-200331541 6/10/03 Ellington Boiler room Repair or replace Quincy air compressor in the boiler room June 10, 2003
Woodson High School FM-200331600 6/11/03 Woodson Boiler Room Unstop block drains in boiler room and clean out sump pump. NOTE: One drain is collapsed. Boiler room could flood if not repair. EMERGENCY !!!! June 11, 2003
Woodson High School FM-200331605 6/11/03 Woodson Boiler Room Install vibration eliminator for each sump pump discharge line. June 11, 2003
Turner Elementary School FM-200331916 6/16/03 Turner Boilerroom Reset overload on the motor starter. June 16, 2003
West Elementary School FM-200332032 6/18/03 West Boiler Room Replace feed water regulator on chill water side size 3/4" inlet and outlet ser.#08197 No. #U135B; Range 25-75 regulator will not feed water into the system when needed. June 18, 2003
Woodson High School FM-200332047 6/18/03 Woodson, H.D. Boiler Room Check panel to control for A/C units. Units goes off and on with no indication or reason. The building is not being properly cooled. Note: Building will have summer school starting Monday June 30, 2003. June 18, 2003
Beers Elementary School FM-200332077 6/19/03 Beers Through -Out - Electrical Up -Grade 1. Electrical panel box has old fuses ,. panel box need to changes for a new electrical system , also in the boiler room . Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Tony Marcolin (RG 06/24/03) June 19, 2003
Murch Elementary School FM-200332095 6/19/03 Murch Basement - Boiler Room 1. Ground electrical service in panel box . June 19, 2003
Park View ES FM-200332237 6/20/03 Park View Boiler Room Check sump pump in Boiler Room, Water on floor, No power to pump. June 20, 2003
Kimball Elementary School FM-200332638 8 6/27/03 Kimball Boiler Room 2" inch leaking domestic hot water line in the tunnel near the boiler room. June 27, 2003
Wilkinson ES FM-200332649 6/27/03 Wilkenson Boiler room Repair Condenser pump for A/C unit. June 27, 2003
Tubman Elementary School FM-200332706 6/30/03 Tubman Rear Boiler Room Exterior Ground Level Secure air vent opening (2) where metal louvers are missing. These areas needs to be closed in to prevent possible leak-in and pest rodents and trashs from entering the boiler room. Approx. Opening Size : 5" x 2" and 1" x 3". June 30, 2003
West Elementary School FM-200332691 6/30/03 West Boiler Room Repair or replace chiller. Unit shut down on motor temperature. Note: Building is without windows. June 30, 2003
Stanton Elementary School FM-200333097 7/10/03 (Stanton) Outside Drain: Drain near boiler room is clogged. (Very Urgent) July 10, 2003
Garfield ES FM-200333225 7/14/03 Garfield Boiler Room Unstop 4" leaking roof drain line water leaking in Boiler room brick ceiling,water is going through building. Leak is in room next to hot water heater. Check with Ms. Toon, the Engineer. July 14, 2003
Shaed Elementary School FM-200333245 7/15/03 Shaed Boiler room Repair or replace condenser pump and or motor , possible bearing problems. Motor: Magnetek century H.P 100 ; RPM 1750; Volts 200/208 ; Amps 30/29 ; Ser.# BH5 ; Part # 6355809-01 : Frame S215T : Type ST July 15, 2003
Shaed Elementary School FM-200333783 7/25/03 Shaed Boiler Room Replace sump pump in boiler room. Pumps have gone bad July 25, 2003
Johnson JHS FM-200333956 7/29/03 Johnson Boiler Room Restore electrical service to chiller panel box. One (1) leg is out. July 29, 2003
Woodson High School FM-200334223 8/4/03 Woodson Boiler Room Boiler room drain stop up, water on floor. Please unstop drain. August 4, 2003
Turner Elementary School FM-200334328 8/5/03 Turner Boiler Room Replace city water line in boiler room, leading to domestic tank and to kitchen line, 3/4" line- about 20' long. Line have three different breaks in it. August 5, 2003
Simon Elementary School FM-200334653 8/7/03 Simon Boiler Room Boiler #1 and #2 need chemical cleaning due to scale buildup, lack of treatment.Failed D.C. Inspection. August 7, 2003
Wilson High School FM-200334687 8/8/03 Wilson, W Boiler Room Make necessary repairs to Burnner Corporation Water Conditioning Equipment; Model no. BD-120; Serial No. B-0791000-E & B-0791000-I. No Asbestos in this area August 8, 2003
Davis Elementary School FM-200334712 8/8/03 Davis Boiler Room Seal area around outside coal shute, water enters boiler room each time it rains. August 8, 2003
Wilson High School FM-200334683 8/8/03 Wilson, W Boiler Room Replace missing modulating motor to #2 Burner; Air - Fuel Control Motor. Part No. - M80JAC-3. No Asbestos in this area. August 8, 2003
Ketcham Elementary School FM-200335236 8/14/03 Ketcham Boiler Room Replace electric blow down valve on domestic hot water heater, tank is mark, valve is not holding. August 14, 2003
Langdon Elementary School FM-200335335 8/15/03 Langdon Boiler Room Boiler #2 replace (1) 157-5 pump control and low water cut off. August 15, 2003
Tyler Elementary School FM-200335589 8/18/03 Tyler Boiler room Make adjustment on burners , there is signs incomplete combustion in the combustion chambers, as per the boiler inspector's request. August 18, 2003
Nalle Elementary School FM-200335883 8/20/03 J.C.Nalle Boiler room Replace Domestic hot heater in the boiler room ,unit is rusted out at bottom and leaning to one side. August 20, 2003
Whittier Elementary School FM-200335870 8/20/03 Whittier Boiler Room Unstop floor drain in the AUA indicated also at base of exterior entrance. Engineers attempted to unstop with negative result. Area is continuously flooding. August 20, 2003
Woodson High School FM-200336188 8/25/03 Woodson Boiler Room Repair or replace Hot/Cold dual circulating pump, pump #15 need motor replace and pump #14 has leaking seal. Both pumps are needed for the heating and cooloing of the center core of the facility. August 25, 2003
Ketcham Elementary School FM-200336203 8/25/03 Ketcham Boiler Room Boiler #3 replace L.W.C.O. float, float broken off. Boiler failed isnpection. August 25, 2003
Meyer Elementary School FM-200336390 8/27/03 Meyer Boiler Room Repair or replace circulation pump for hot water. S-M10293 Bell & Gossett M7A794 HP 1/3 Volts 115 August 27, 2003
Langdon Elementary School FM-200336552 8/29/03 Burroughs Boiler Room Re-calibrate gas burners on # 1 and #2 Boilers. Excessive amount of soot. August 29, 2003
Bruce-Monroe Elementary School FM-200336975 9/8/03 Bruce-Monroe Boiler Room Boiler #1,#2 and #3 need calibration of burners at all modulation levels. Note: When burners are not modulating properly, it creats big problems, when cleaning boilers and reduce efficiency. Need to pass D.C. Inspection. September 8, 2003
Hyde Elementary School FM-200337040 9/8/03 Hyde Boiler Room Furnish and install two steam pressure gauges, one for boiler #1 and one for Boiler #2. Calibrated 0 to 30 PSI. Note: Per Boiler Inspector (DC) September 8, 2003
Cook J.F. Elementary School FM-200337319 9/11/03 Cook,J.F. Boiler Room Asbestos assessment required Furnish and install (1) electrical outlet to service sump pump. Pump is currently plugged to extention cord. Fire code violation. Note: 120 Volts required Emergency!!!! Asbestos Code A - Clear for repairs on 09/11/03. Horne Engineering - Edward Rodriguez (RG 09/12/03) September 11, 2003
Coolidge High School FM-200337292 9/11/03 Coolidge Boiler Room Boilers #1 and #2 needs chemical cleaning. September 11, 2003
Bruce-Monroe Elementary School FM-200337473 9/15/03 Bruce-Monroe Boiler Room Unstop six (6) floor drain in Boiler Room. Engineer has attempt to unstop put with no success. September 15, 2003
Meyer Elementary School FM-200337588 9/16/03 Meyer Boiler Room Area 1).Unstop drain at base of exterior stairway to Boiler Room. 2). Also check and correct any drainage.(Floor drain) problems in Boiler Room. Note: Boiler room has a continuous flow of water into it and if drains stop-up, Flooding will follow. September 16, 2003
Francis Junior High School FM-200338057 7 9/25/03 Francis Tunnel leading from Boiler Room Repair and or replace 4" or 6" roof drain line pipe. Pipe is busted and water is leaking on first floor. September 25, 2003
West Elementary School FM-200338061 9/25/03 West Boilers Room Check domestic hot water heater. Temperature well is leaking. September 25, 2003
Key Elementary School FM-200338243 9/30/03 Key Boiler Room Replace bad sump pump #1, Have not work from day one. The company name is Messco- control; Columbia, Md.; Sump pumps Co. Phone No. 301-621-8899 September 30, 2003
Backus Middle School FM-200338404 10/2/03 Backus Boiler Room Boiler #3 Remove two 3/4" plugs from cross tee at top of water column 10/02/2003 08:14 BLK - October 2, 2003
Langdon Elementary School FM-200338425 10/2/03 Langdon First Floor - Boiler Room 1) Re-hang exterior entrance door to Boiler Room. Asbestos Code A - Clear for repairs on 10/03/03. Horne Engineering - Troy Wilcome (RG 10/08/03) October 2, 2003
Stuart-Hobson Middle School FM-200338633 10/8/03 Stuart-Hobson Boiler room and tunnel Repair or rplace lights in the boiler room and tunnel area,the engineer can not provide service to these areas in the dark. This is a safety hazzard. Asbestos Code A - clear for repairs on 10/10/03. Horne Engineering - Bipin Nanavaty (RG 10/22/03) October 8, 2003
Cook J.F. Elementary School FM-200338688 10/9/03 Cook, J.F. Boiler Room Area Repair or replace motor on condensate return tank pump #2 is not operating. Volts: 200-230 Amps: 2.8 S.F. 2.8 Part #135800 Manu: Centry Cat: H 155 HP: 1/2 October 9, 2003
Brent Elementary School FM-200338759 10/10/03 Brent Boiler room URGENT Replace Aquastat on the domestic hot water tank, aquastat set at 130 degree,and the temperture will rise to 170 degrees .(safety Hazzard) Need the electrician to rewire new Hot water heater ,from splice box to heater. October 10, 2003
Barnard Elementary School FM-200338781 1 10/10/03 Barnard Boiler Room Asbestos assessment required Survey and take steps to install a city water line with bib hose type faucet so that water side of boilers can be clean, Non-exist. October 10, 2003
Cook J.F. Elementary School FM-200338822 10/12/03 Cook, J.F. Boiler Room Boiler #1 flame failure. October 12, 2003
Cardozo High School FM-200338835 10/12/03 Cardozo S.H.S. Boiler room Replace 2 1/2 " vlave on domestic hot water pipe. October 12, 2003
Coolidge High School FM-200338872 10/14/03 Coolidge Boiler Room Replace leaking 3 inch gas valve on gas trane in Boiler #3. Butterfly valve. Flanged 4 Blolt ( Norstroms Mfg.) Asbestos Code A - Clear for repairs on 03/23/04. Horne Engineering - Bjarne Smith (RG 04/08/04) October 14, 2003
Bowen Elementary School FM-200338921 10/15/03 Bowen Boiler room Repair # 2 boiler , will not ignite ,cuts off in flame failure. October 15, 2003
Coolidge High School FM-200339429 10/24/03 Coolidge Boiler Room Replace leaking Pilot gas solenoid valve, on burner to Boiler #2. ASCO General #K3A432T 9947 Serial # T160928 PSI Max 1/2 Volts 120/60 110/50 Amps 15 Watts 10 October 24, 2003
Coolidge High School FM-200339430 10/24/03 Coolidge Boiler Room Replace diffusen assembly, nozzle monarch and burner ring refractory work on Iron Fireman burner to Boiler #2. Boiler inoperable. October 24, 2003
Tyler Elementary School FM-200339564 10/28/03 Tyler Boiler Room Boiler #2 replace automatic controls not working. October 28, 2003
Amidon Elementary School FM-200339915 11/5/03 Amindon Boiler room Repair leaking return pump for the # 3 boiler. November 5, 2003
Hine JHS FM-200339967 11/5/03 Hine Boiler Room Unstop floor drain behind Boiler #3 November 5, 2003
Walker-Jones EC FM-200340009 11/6/03 Walker - Jones Boiler Room Boiler #2 Flame failure. November 6, 2003
Takoma Educational Center FM-200340054 11/7/03 Takoma Boiler Room Replace locking bar circulating pump and B&G pump on storage tank. November 7, 2003
Reed LC FM-200340068 11/7/03 Reed Boiler Room A mechanic from the heat shop needs to come and adjust the burners on Boiler #2 and #3. Boiler #2 will cut off if it is put into high fire. Boiler #3 has incomplete combustion. Work order for Boiler #3 was put in during Summer cleaning. November 7, 2003
River Terrace ES FM-200340123 11/10/03 River Terrace Boiler room NO HEAT Repair # 2 burner ,will not start. # 1 burner is down also ( contractors) November 10, 2003
Langdon Elementary School FM-200340235 11/13/03 Langdon Boiler Room Replace 3/4" gate valves located on the hot and cold water supply to service sink in Boiler, At present time there is no water in Boiler Room. November 13, 2003
Raymond Elementary School FM-200340223 3 11/13/03 Raymond Boiler Room Furnish materials to repair Boilers. Fireye combustion control and Programmer E P 160 and Display E D 510 November 13, 2003
Aiton Elementary School FM-200340514 11/20/03 Aiton Boiler roomm Replace 1" leaking relief valve on the dometic hot water tank. November 20, 2003
West Elementary School FM-200340616 11/21/03 West Boiler Room Air Handle Unit #2 Replace inline circulating pump coupling is busted and motor will not run. Name - Taco No. 1610CININO Amp 4.75 Pump will not run. November 21, 2003
Hine JHS FM-200340635 11/21/03 Hine Boiler Room Replace (1) 2 1/2" gas manifold pressure gauge 0 - 15 in H2O on Boiler #3. November 21, 2003
Bunker Hill Elementary School FM-200340649 11/24/03 Bunker Hill Boiler Room Repair or replace domestic hot water heater, water heater is leaking very bad. November 24, 2003
Shaed Elementary School FM-200340727 11/25/03 Shaed Boiler room Repair the air compressor, the does not have any current. November 25, 2003
Whittier Elementary School FM-200340764 11/26/03 Whittier Boiler room Repair or replace air compressor ,motor is locked up Nat Bd # 6003 WP 160 HD 120 year built 1960 November 26, 2003
Aiton Elementary School FM-200340934 12/2/03 Aiton Boiler room Boiler #1 off on flame failure, will not start. December 2, 2003
Slowe Elementary School FM-200340944 12/2/03 Slowe Boiler Room Check pilot on hot water heater, pilot keeps going off. December 2, 2003
Ferebee-Hope Elementary School FM-200341543 12/13/03 Ferebee Hope Boiler Room Basement Boiler #1 will not operate in high fire. Modutrol motor and cam needs to be replace. December 13, 2003
Ferebee-Hope Elementary School FM-200341542 12/13/03 Ferebee Hope Boiler Room Basement Boiler #2 I.D. Fan needs to be repair or replace. Condensate pump needs to be repaired or replace. Boiler will not operate. December 13, 2003
Marshall Educational Center FM-200341547 12/14/03 Marshall Boiler Room Repair or replace the pneumatic control system December 14, 2003
Park View ES FM-200341625 12/16/03 Park View Boiler Room Make necessary repairs to condensate control panel. Asbestos Code A - Clear for repairs on 03/18/04. Horne Engineering - Tony Marcolin (RG 03/22/04) December 16, 2003
Ludlow-Taylor ES FM-200341972 12/22/03 Ludlow-Taylor Boiler room Repair 3/4" copper line on the Dometic hot water heater circulation pump inlet line. December 22, 2003
Ferebee-Hope Elementary School FM-200342106 12/29/03 Ferebee-Hope Boiler Room Boiler #2 Repair or replace self-aligning ball bearing pillow block on I.D. Fan. December 29, 2003
Johnson JHS FM-200342150 12/31/03 Johnson Boiler Room Check domestic hot water heater, not working, no hot water in building. December 31, 2003
Ferebee-Hope Elementary School FM-200442300 1/6/04 (Ferebee-Hope) 1st Floor C-Hall/Near Boiler Room: Replace broken windows. January 6, 2004
Bruce-Monroe Elementary School FM-200442275 1/6/04 Bruce-Monroe Boiler Room Boiler #3 Repair automatic water feeder. January 6, 2004
Tubman Elementary School FM-200442288 1/6/04 Tubman Boiler Room Replace faulty OS&Y valve, approxmately 5" on side of Hot Water Heating circulating pump #2. Valve has broken and will not close. January 6, 2004
John Burroughs ES FM-200442248 1/6/04 Burroughs Boiler room Reconnect Drain under back flow valve, located in the ceiling. January 6, 2004
Coolidge High School FM-200442333 1/7/04 Coolidge Boiler Room Replace leaking mechanical seal on shipco vacuum pump motor on #2 low psi return pump in Boiler Room. Frame: N145JM Motor Magnetek RPM-3450/2850 Cat 159 Part-8-184968-01 Volts-200-230/460 Amps 6.25 PH_3 Asbestos Code A - Clear for repairs on 03/23/04. Horne Engineering - Bjarne Smith (RG 04/08/04) January 7, 2004
Park View ES FM-200442407 1/8/04 PARKVIEW boiler room / mechanical room Repair busted heating coil on AHU. Coil has been isolated. Unit serves the auditorium January 8, 2004
Ludlow-Taylor ES FM-200442518 1/12/04 Ludlow-Taylor Boiler Room Replace starter on Dunham bush chiller. Starter is burnt up. January 12, 2004
West Elementary School FM-200442632 1/13/04 West Boiler Room Check domestic hot water heater, No hot water in Building. January 13, 2004
Thomas Elementary School FM-200442718 1/14/04 N. THOMAS Boiler room Furnish HVAC shop with materials to repair boilers # 1 and 2 January 14, 2004
Johnson JHS FM-200442838 1/16/04 Johnson Jr. Rooms 103, Office- B-Wing, Main office Need electrician to identify circuits for rooms 103, B-Wing office, Main office so Boiler Plant operator can replace the motors. Asbestos Code A - Clear for repairs on 01/21/04. Horne Engineering - Edward Rodriguez (RG 01/22/04) January 16, 2004
Meyer Elementary School FM-200442864 1/16/04 Meyer Boiler room Replace 1" line , valve and couplin on the drain lin behind the #2 boiler . January 16, 2004
Gibbs Elementary School FM-200442898 1/17/04 Gibbs Boiler room Abestos assessment may be required Retube # 1 and 2 boilers COB: Carnal Bradley@202-438-7437 Asbestos Code A - Clear for repairs on 03/22/04. Horne Engineering - Bipin Nanavaty (RG 03/24/04) January 17, 2004
Stanton Elementary School FM-200442899 1/17/04 Stanton Annex Boiler room Exploratory Required Repair ruptured steam line in the ceiling over top of # 2 boiler Asbestos Code A - Clear for repairs on 01/20/04. Horne Engineering - Tony Marcolin (RG 01/20/04) January 17, 2004
Rudolph Elementary School FM-200442936 1/20/04 Rudolph Boiler Room Replace relief valve on Hot Water System, valve is leaking. January 20, 2004
Rudolph Elementary School FM-200442976 1/20/04 Rudolph Basement/Boiler Room Repair or replace expansion tank, has holes in it. Leaking at the bottom. January 20, 2004
Garfield ES FM-200442989 1/20/04 Garfield Boiler Room Repair heat pump in room 108, on/off switch not operating. Mod.# FH884389 Ser.# A231H15DADVL BTU-C-14100 January 20, 2004
Shepherd ES FM-200443107 1/22/04 Shepard Boiler room Furnish Honeywell Modulating Motor Mod.# 9174C1025 90 sec. strock Time sec 30 VA 27 Volts 120 Cycle 50/60 January 22, 2004
Bunker Hill Elementary School FM-200443251 1/27/04 Bunker-Hill Boiler Room Correct Problem that's causing Boiler #2 (old Boiler) to vibrate badly. When burner go into main flame. Note: Possible damper control problems. Urgency !!! January 27, 2004
John Burroughs ES FM-200443324 1/29/04 Burroughs Boiler room Repair domestic hot water heater in the boiler room.( No hot water.) January 29, 2004
Francis Junior High School FM-200443387 1/30/04 Francis Boiler Room Repair leaking 3/4" return line. Urgent !!!! January 30, 2004
West Elementary School FM-200443672 2/4/04 West Boiler room Roof is leaking into boiler room. Please repair. February 4, 2004
Gibbs Elementary School FM-200443805 2/9/04 Gibbs Boiler room Install tap valves on the house pump for chemical treatment February 9, 2004
Woodson High School FM-200443813 2/9/04 Woodson Boiler Room Check and repair pool, pool is off line. February 9, 2004
Garfield ES FM-200443808 2/9/04 Garfield Boiler Room Repair or replace control, programmer and transformer on heating unit. February 9, 2004
Brent Elementary School FM-200443867 2/10/04 Brent Boiler room URGENT Repair or replace sewage injector pump in the boiler room, will not run . Asbestos Code A - Clear for repairs on 02/18/04. Horne Engineering - Edward Rodriguez (RG 02/19/04) February 10, 2004
Kimball Elementary School FM-200444068 2/13/04 Kimball Boiler room Repair sump pumps in the boiler room, # 1 pump will not run in automatic, # 2 pump will not run. February 13, 2004
Eastern High School FM-200444429 2/25/04 Eastern Boiler room Repair or replace air dryer to air compressor. February 25, 2004
Deal Junior High School FM-200444426 2/25/04 Deal Boiler Room Repair or replace broken supply city water feed line for #1 and #2 Boilers pipe leaking very bad. 1" copper pipe -No insulation on pipe. February 25, 2004
Birney Elementary School FM-200444655 3/2/04 Birney Boiler Room Repair or replace safety valve on domestic hot water heater. March 2, 2004
Ferebee-Hope Elementary School FM-200444856 3/5/04 Ferbee-Hope Boiler room Survey and replace circiut breaker for the # 2 condensate pump, the present breaker do not fit in the cabinet. ( safety Hazzard ) Asbestos Code A - Clear for repairs on 03/05/04. Horne Engineering - Sheryll James (RG 03/09/04) March 5, 2004
Turner Elementary School FM-200445086 3/9/04 Turner ( Maintenance T School Blitz ) Exterior - Boiler Room 1) Unstop outside drain by Boiler Room. March 9, 2004
Meyer Elementary School FM-200445392 3/16/04 MEYER ES Replace LWCO on boilers # 1 and 2. (McDonnell # 63) Burners will not shut off under low water condition!!!!!!!! March 16, 2004
Coolidge High School FM-200445398 3/16/04 Coolidge Boiler Room Repair or replace defected burner, Boiler not working. Has only 1 out of 3 Boilers working. March 16, 2004
West Elementary School FM-200445473 3/17/04 West Boiler room Repair or replace Domestic hot water circulating pump, pump is down no hot water to the building. March 17, 2004
Backus Middle School FM-200445474 3/17/04 Backus Boiler room Replace the relief valve on the #1 storage DHW tank, Size 1" set 150 210 psi March 17, 2004
Gibbs Elementary School FM-200445556 3/18/04 Gibbs Boiler Room Boiler #1 leaking tubes. March 18, 2004
Brent Elementary School FM-200445664 3/22/04 Brent Boiler Room Boiler #2 has leaking tubes. March 22, 2004
Shaed Elementary School FM-200445686 3/23/04 Shead Boiler Room Replace (2) 5" OS&Y Valve on condenser side of Chiller. This is to prevent hot water from going into Chiller. March 23, 2004
Gibbs Elementary School FM-200445677 3/23/04 Gibbs Boiler room Replace bad spring coupling on the #1 Domestic hot water heat . March 23, 2004
Gibbs Elementary School FM-200445749 3/24/04 Gibbs Boiler room Furnish (1) B& G series 110 pump for DHW. March 24, 2004
Garnet-Patterson MS FM-200445814 3/25/04 Garnet-Patterson boiler room Boiler #4 repair 2" leaking pipe. Pipe is approximately 12 feet high. March 25, 2004
Ludlow-Taylor ES FM-200445829 3/25/04 Ludlow-Taylor Basement boiler room Need two (2) cinder blocks to level off duplex oil strainer to stop oil leak. March 25, 2004
Barnard Elementary School FM-200446427 7 4/7/04 Barnard Boiler Room Repair or replace computer system to Boilers, computer is down, (signal shows EMS) April 7, 2004
Park View ES FM-200446527 4/8/04 Parkview Boiler Room Unstop floor drain in boiler in front of condensate return pumps. Engineer attempted to unstop with negative results. Urgent !!!!! April 8, 2004
Park View ES FM-200446522 4/8/04 Parkview Boiler Room Repair or replace hot water circulating pump #2. Pump is leaking very badly because of leaking seals. April 8, 2004
Ferebee-Hope Elementary School FM-200446719 4/14/04 Ferebee-Hope Boiler Room Replace pump in Boiler room, Boiler room is flooded. April 14, 2004
Garfield ES FM-200446750 4/15/04 Garfield Boiler Room Replace one leaking tube in Breeching Area as mark. Length of tube = 77 1/2" X 1 1/2" Dia. April 15, 2004
Patricia R Harris Ed Center FM-200446748 4/15/04 Harris, P.R. Boiler Room Survey, repair or replace condesate dryer to air compressor. Air compressor not working. Name: Arrow Pneumatics Inc. Model # A-25 Serial #2902 HP-1/3 Volt-115/1 L.R.A= 35.0 Charge= R-12 19 oz. April 15, 2004
Cardozo High School FM-200446771 4/15/04 CARDOZO boiler room Furnish materials to repair domestic hot water heaters. 2 motors and 2 couplings are needed. S# 1695041 Bell and Gossett, Pump - 60, 1-1/2 A7AB, pump cap, 40 gpm, 50ft, 1 hp, 1800 rpm, B & G AC motor, 1 hp, 1700 rpm, 208-230/460-V., 60hz, 3-ph, 3.8-4.0/2.0 amps., fr 143 TZ, part # M98551. April 15, 2004
Bunker Hill Elementary School FM-200446786 4/16/04 Bunker Hill Boiler Room Repair or replace condensate tank pump control, not working properly. April 16, 2004
Turner Elementary School FM-200446974 4/22/04 Turner Boiler room Repair or replace bearing and shaft on the sewage ejector pump #2. April 23, 2004: Engineer called in to report that the problem is causing back ups in other areas with flooding. (VERY URGENT) April 22, 2004
West Elementary School FM-200447010 4/22/04 West Boiler Room Repair or replace condensor pump. Pump runs for 30 minutes then shut off. Engineer has to reset pump for it to start again. Pump is under contract. April 22, 2004
Thomas Elementary School FM-200447143 4/26/04 Thomas Boiler Room Repiar or replace stand-by pumps and condenser pumps to run A/C unit. Asbestos Code A - Cleared for repairs on 05/17/04 by Cheryl James, Horne Engineering (LM/05-17-04) Safety Office. 202-576-8962. April 26, 2004
Hine JHS FM-200447146 4/26/04 Hine Boiler Room repair or replace condensor pump for cooling tower, inoperable. April 26, 2004
Browne Junior High School FM-200447145 4/26/04 Browne Boiler Room Check multi stack for operation. There is no power coming to them engineer was unable to get unit started. April 26, 2004
Wilson High School FM-200447256 4/28/04 Wilson, W. Boiler Room Asbestos assessment required on pipe and tank Replace serval sections of deteriorated 2 1/2" black iron pipe to condensate tanks on 2nd level of Boiler Room. Asbsesos Code A cleared for repairs 12/03/04 DCPS Safety R. Edwards (R. Edwards 12/29/04 April 28, 2004
Hine JHS FM-200447345 4/29/04 Hine Upper level Boiler Room Repair or replace chill water regulator on #2 Chiller. No data. April 29, 2004
Hyde Elementary School FM-200447433 5/3/04 Hyde Boiler room Water is coming from somewhere in the boiler room and causing a flood. A engineer was here this morning. May 3, 2004
Tubman Elementary School FM-200447446 5/4/04 Tubman EMERGENCY Ground floor boiler room Busted pipe in ceiling. Water is leaking on boiler causing damage to insulation. # Masonary need to repair cinder block wall. Asbestos Code A - Clear for repairs on 05/20/04. Horne Engineering - Edward Rodriguez (RG 05/20/04) May 4, 2004
Walker-Jones EC FM-200447495 5/5/04 Walker-Jones Boiler Room Install compressor in Boiler room. May 5, 2004
Walker-Jones EC FM-200447544 5/5/04 Walker-Jones boiler room Replace safety valve on # 1 boiler May 5, 2004
Takoma Educational Center FM-200447588 5/6/04 Takoma Boiler Room Check domestic hot water heater, no hot water in building. Check circulating pump. May 6, 2004
Terrell Mc ES FM-200447603 5/6/04 Terrell, M.C. Boiler Room Replace 3/4" solenoid valve on water link system. May 6, 2004
Birney Elementary School FM-200447632 5/7/04 Birney Boiler room Check hot water heater,and or pump , low pressure, May 7, 2004
Benjamin Banneker Academic HS FM-200447684 5/10/04 NO HOT WATER - HOT WATER HEATER IN BOILER ROOM May 10, 2004
Turner Elementary School FM-200447680 5/10/04 Turner Unstop air way drain outside boiler room. May 10, 2004
Woodson High School FM-200447819 5/12/04 Woodson Sr high Boiler room Repair sump pump in the boiler room, unit was installed 5/11/04 May 12, 2004
Ferebee-Hope Elementary School FM-200448034 5/18/04 Ferbee-Hope Boiler room Survey and replace 1" copper pipe and pump housing on the domestic hot water tank. May 18, 2004
Seaton Elementary School FM-200448070 5/18/04 SEATON boiler room replace mechanical seals on hot/chill water circulating pump. make: Weinman ser: 178999-2 mod: 464100PI4G-1 Mat. W.P. 175lb GPM:36 FTHD: 6 May 18, 2004
Seaton Elementary School FM-200448067 5/18/04 SEATON boiler room Repair / replace bearings on hot/chill water circulating pump motor # 2 Make US electrical motor rpm 1720 mod E 659A shaft end Brg. 6208-2z ID : U05U105R265M opp end Brg. 6206-2z fram: 21st V - 208-230/460 Fl Amp 30.0/27.2/13.6 ph 3; hp 10 May 18, 2004
Turner Elementary School FM-200448047 5/18/04 Turner Outside Cafeteria Door and Boiler Room Door 1) Drains are stopped up. May 18, 2004
Ketcham Elementary School FM-200448104 5/19/04 Ketcham Boiler room repair or replace broken 2" sump pump discharge line at the back of # 5 boiler in the ceiling over the light fixture. May 19, 2004
Ketcham Elementary School FM-200448103 5/19/04 Ketcham Boiler room Repair or replace domestic hot water circulating pump in the boiler room. May 19, 2004
Langdon Elementary School FM-200448170 5/20/04 LANGDON boiler room Replace 3/4" gate valves located on hot and cold supply water in boiler room. Water is needed to wash out boiler and boiler room. May 20, 2004
Woodson High School FM-200448329 5/23/04 Woodson H.D. Boiler room Repair sump pumps in the boiler room ,pumps are not discharging, 3" of water on the floor. May 23, 2004
Shaed Elementary School FM-200449036 5/23/04 Shaed Boiler Room Unstop floor drain in Boiler Room. Boiler room is flooded. May 23, 2004
Shaed Elementary School FM-200448330 5/23/04 Shaed Boiler room Repair sump pumps in the boiler room , pumps are not discharging, sump pit is full. May 23, 2004
Young Elementary School FM-200448477 5/25/04 Young C. boiler room Repair A/C unit will not cool reads low evaporator pressure. May 25, 2004
Wilson High School FM-200448500 5/26/04 Wilson, W. Boiler Room Boiler #1 and #3 union iron works high pressure need Boil out. Requested by Boiler Inspector. May 26, 2004
Tyler Elementary School FM-200448532 5/27/04 Tyler Boiler room No Hot water Replace Domestic Hot water circulating pump Motor, motor will not turn. B&G 1/4 hp 1725 RPM ph.1 Hz 60 115 volts 3.0 amps cont.rating 40 degre c M74799 Thermal prot. M10532 part # May 27, 2004
Ludlow-Taylor ES FM-200448653 6/1/04 (Ludlow-Taylor) !!!VERY URGENT!!! Basement/Boiler Room: Old bulbs removed, replaced with new, and lights will not come on . (Appears to be an electrical problem) June 1, 2004
Young Elementary School FM-200448679 6/2/04 Young Boiler Room Asbestos assessment required Repair or replace leaking 4" chill water pipe June 2, 2004
Payne Elementary School FM-200448693 6/2/04 Payne Boiler Room Boiler #1 and #2 install pull chain on safety valve. Safety hazard. June 2, 2004
Hart Middle School FM-200448808 6/3/04 Hart Boiler room Repair sump pumps control unit will not operate in automatic mode. June 3, 2004
Cardozo High School FM-200448826 6/3/04 CARDOZO SHS boiler room Replace damaged shaft on domestic hot water circulating pump and motor. Approx. - 44" x 1-1/2" size shaft. June 3, 2004
Kramer Middle School FM-200448875 6/4/04 Kramer Boiler Room Install temperature thermometer on hot water storage tank 0 degree to 200 degrees. Urgent !!!! June 4, 2004
Coolidge High School FM-200448919 6/4/04 Coolidge Boiler Room Repair or replace loose brick work around entrance to fire box on Boiler #1 June 4, 2004
Thomas Elementary School FM-200448858 6/4/04 N.Thomas Boiler room Check and correct loud noise in the condenser pump. June 4, 2004
Woodson High School FM-200448947 6/5/04 Woodson Boiler room Repair sump pump, boiler room is flooded 1" water on the floor. June 5, 2004
West Elementary School FM-200448957 6/6/04 West Boiler Room Repair or replace air compressor #1 motor down. June 6, 2004
Smothers ES FM-200448984 6/7/04 Smothers Bolier room 1. Remove (4) plugs , and (2) bolts on the water column and LWCO of # 1 boiler . 2. Remove (2) plugs , and union on boiler # 2. This is Needed for boiler inspection. June 7, 2004
Turner Elementary School FM-200449054 6/8/04 Turner Boiler Room Repair or replace sewerage injector pump in boiler room. Pump inform: Model #2108VERT Weil Service Pump 2HP 1750 RPM 1 PH 115/208 Volts June 8, 2004
Walker-Jones EC FM-200449214 6/10/04 Walker-Jones Boiler Room Unit will not start, out on High motor temp. June 10, 2004
Woodson High School FM-200449173 6/10/04 Woodson HD Boiler room Cheac and repair sump pumps in the boiler room , the floor has 2' feet of water on it. June 10, 2004
Rudolph Elementary School FM-200449248 6/11/04 Rudolph Boiler Room Repair leaking domestic hot water pipe (size 2") located in ceiling June 11, 2004
Seaton Elementary School FM-200449299 6/14/04 SEATON ES boiler room Repair leaking 1" copper pipe on return domestic hot water line pump. June 14, 2004
Ferebee-Hope Elementary School FM-200449498 6/18/04 Frebee-Hope Boiler room Repair or replace air compressure # 1 and # 2 . June 18, 2004
Turner Elementary School FM-200449481 6/18/04 (Turner) !!!URGENT!!! Basement/Boiler Room: Provide electrical service for sump pumps installed on 06/17/2004. June 18, 2004
Tyler Elementary School FM-200449548 6/21/04 Tyler Boiler Room Replace or repair sump pump in boiler room. Sump stop working. Water is backing up in boiler room. Urgent !!!! June 21, 2004
Brent Elementary School FM-200449661 6/23/04 Brent Boiler Room Replace tubes in boilers. Boiler #2 has 12 tubes leaking. Boiler #1 has 4 tubes leaking. June 23, 2004
Ferebee-Hope Elementary School FM-200449718 6/24/04 Ferebee-Hope Boiler Room Replace control transformer for air compressor, comp. inop. Style: AU50/421 Class: 490 Volts: 50/60 HZ -H260 440/220/110 320182853 June 24, 2004
Duke Ellington School FM-200449812 6/25/04 Ellington Boiler Room Investigate and make repairs to lecking section on boiler #3 Failed D.C.Boiler Inspection. Asbestos Code A - Clear for repairs on 09/27/05. Tidewater - Philp Connolly (RG 09/28/05) June 25, 2004
Payne Elementary School FM-200450109 7/7/04 Payne Boiler Room Repair or replace sump pump and unstop drain. July 7, 2004
Bunker Hill Elementary School FM-200450102 7/7/04 Bunker Hill Boiler Room Remove plug from Boiler #1 and #2 and remove check valve on Boilers. July 7, 2004
Meyer Elementary School FM-200450053 7/9/04 Meyer Basement boiler room A broken window in boiler room need to be replace ASAP. July 9, 2004
Ferebee-Hope Elementary School FM-200450085 7/9/04 Ferebee-Hope Boiler Room Mech. Maintenance Shop In-Stall Electronic bleed off for air compressor. July 9, 2004
Shepherd ES FM-200450105 7/10/04 Shepherd Boiler Room Remove 4" cap from drip line on steam header. Engineering staff attemped to remove with negative result. July 10, 2004
Langdon Elementary School FM-200450158 7/13/04 Langdon Boiler Room Furnish fuses for air handler unit, to use for cooling. July 13, 2004
Peabody Elementary School FM-200450148 8 7/13/04 Peabody Boiler Room Repair or replace sump pump in Boiler Room, pump not working. July 13, 2004
Kramer Middle School FM-200450199 7/13/04 Kramer Boiler Room Boiler #2 remove plug from city make up water line, left hand corner. July 13, 2004
Garrison ES FM-200450414 7/17/04 Garrison Boiler Room Boilers #1 thru #6 remove automatic timers. D.C. Boiler inspector failed boilers. July 17, 2004
Park View ES FM-200450408 7/17/04 Park View Boiler Room Boiler #1 and #5 repair or replace leaking sections. D.C. Boiler Inspector failed boiler. Asbestos Code A - Clear for repairs on 09/27/05. Tidewater - Philp Connolly (RG 09/28/05) July 17, 2004
Park View ES FM-200450405 7/17/04 Park View Boiler Room 1. All boilers - Remove automatic blowdowsn from boilers and aux. equipment July 17, 2004
Roosevelt High School FM-200450420 7/18/04 Roosevelt Boiler Room/Cond. Unit Repair automatic condenser cleaner system . Replace 1/4" tubing and fitting, leaking from freezing. July 18, 2004
Stanton Elementary School FM-200450471 7/20/04 Stanton Boiler Room Repair or replace sump pump, pump is not working. July 20, 2004
Park View ES FM-200450574 7/21/04 Park View Boiler Room Boiler #2 condensate pump has leaking seal. D.C. Boiler Inspector failed boiler. July 21, 2004
Park View ES FM-200450588 7/21/04 Parkview Boiler Room Install, vents, and siphons on the gages of each boiler. July 21, 2004
Shaed Elementary School FM-200450626 7/22/04 Shead Boiler Room Repair or replace sump pumps in boiler room. Pumps failed D.C. Inspection. July 22, 2004
Ludlow-Taylor ES FM-200450604 7/22/04 Ludlow-Taylor Boiler Room Boiler #1 Repair brick work at the rear of boiler on the outside brick. Boilers failed D.C.Inspection. July 22, 2004
Hine JHS FM-200450607 7/22/04 Hine Boiler Room Boiler #2 supply and return line repair or replace two (2) 6" OS&Y shut off valves. Valves not holding. July 22, 2004
Backus Middle School FM-200450676 7/23/04 Backus Boiler Room Replace 1" nipple 1 1/2" long. (1) 1" gate valve need to be replace, valve is leaking. July 23, 2004
Bruce-Monroe Elementary School FM-200450672 7/23/04 Bruce-Monroe Boiler Room Boiler #1 & 2 need calibrated. Boiler failed D.C. Inspection. July 23, 2004
Cardozo High School FM-200450695 7/24/04 Cardozo Boiler Room Repair or replace domestic hot water circulating pump, pump has bad shaft. Boilers failed inspection. July 24, 2004
Cardozo High School FM-200450694 7/24/04 Cardozo Boiler Room Boiler #1 Repair mud drum leaking. Boilers failed inspection. Asbestos Code A - Clear for repairs on 09/27/05. Tidewater - Philp Connolly (RG 09/28/05) July 24, 2004
Stanton Elementary School FM-200450730 7/26/04 Stanton Boiler Room Repair or replace sump pump in Boiler Room. Boiler Room flooded. July 26, 2004
Terrell Mc ES FM-200450753 7/26/04 Terrell, M.C. Boiler Room Repair or replace compressor, Compressor keep cutting off. When compressor goes off, you have to reset it. July 26, 2004
Garrison ES FM-200450851 7/27/04 Garrison Boiler Room Calibrate burner on Boilers #1 thru #4. Boilers failed D.C. Inspection. July 27, 2004
Stoddert ES FM-200450826 7/27/04 Hearst Boiler Room (Tunnel Area) Repair ruptured main steam line 4" or 6"service line. July 27, 2004
Murch Elementary School FM-200450845 7/27/04 Murch Boiler Room Remove master control (timer) on Boilers #1 thru #5. Boilers failed D.C. Inspection. July 27, 2004
West Elementary School FM-200450909 7/28/04 West Boiler Room Repair or replace head on house air compressor, one of the heads are bad. Compressor failed inspection. July 28, 2004
Bunker Hill Elementary School FM-200451074 7/28/04 Bunker Hill ES - Boiler Room Boilers #2 Calibrate burner July 28, 2004
Bunker Hill Elementary School FM-200451075 7/28/04 Bunker Hill ES - Boiler Room Pump-Heating hot water, leaking July 28, 2004
Seaton Elementary School FM-200451069 7/28/04 Seaton ES - Boiler Room Domestic hot water circulating pump leaking July 28, 2004
Bunker Hill Elementary School FM-200451060 7/28/04 Bunker Hill ES - Boiler #2 Replace casing insulating July 28, 2004
Bunker Hill Elementary School FM-200451072 7/28/04 Bunker Hill ES - Boiler Room Boilers #1 &#2 Replace vapor stat July 28, 2004
West Elementary School FM-200450908 7/28/04 West Boiler Room Repair or replace stand by chill water pump, inoperable. Pump failed inspection. July 28, 2004
Gage-Eckington ES FM-200451051 7/29/04 Gage Eckington Boiler room Install Vent valve on boilers # 1&2 July 29, 2004
Walker-Jones EC FM-200451127 7/29/04 Walker-Jones . ES- Boiler Room Boiler #1 & #2 - Callibrate burners July 29, 2004
Spingarn High School FM-200451095 7/29/04 Spingarn- Boiler Room Boiler #3 - Replace refractory on door. July 29, 2004
Rudolph Elementary School FM-200451150 7/30/04 Rudolph Repair gas line leak on boiler # 2. July 30, 2004
Stanton Elementary School FM-200451156 7/30/04 (Stanton) !!!VERY URGENT!!! Outside Boiler Room Door: Drains stopped up, water seeping in-to the building. July 30, 2004
Woodson High School FM-200451233 8/2/04 Woodson, H.D. Boiler Room Asbestos assessment required Repair or replace busted line on domestic hot water heater. Line is approx. 1 1/4". Leaking between nipple and 90. Code A-clear for repair by DCPS Charles Buchanan 8/16/04 August 2, 2004
Savoy Elementary School FM-200451418 8/4/04 Savoy Boiler room Remove automatic blow-down valves on the expansion tank. As Per Boiler Inspector's request. August 4, 2004
Whittier Elementary School FM-200451598 8/5/04 Whittier Outside Boiler Room Unstop outside drain at Boiler Room door. This drain causes the boiler room to flood after each rain. This is a health hazard. August 5, 2004
Stanton Elementary School FM-200451703 8/6/04 Stanton Main Building Boiler room Calibrate Burners, as per boiler inspector's request August 6, 2004
Francis Junior High School FM-200451969 8/10/04 Francis Boiler Room 1. Replace defective inside shut off valve Valves needs to be replaced prior to replacement of new water meters Code A-clear for repair by DCPS Charles Buchanaan on 8/18/04 August 10, 2004
Brookland Elementary FM-200451968 8/10/04 Brookland Boiler Room 1. Replace defective inside shut off valve Valves needs to be replaced prior to replacement of new water meters Code A-clear for repair by DCPS Charles Buchanaan on 8/18/04 August 10, 2004
Coolidge High School FM-200451924 8/10/04 Coolidge - Boiler Room 1. Boilers 1, 2, and 3 Replace obsolute combustion control with new up todate controls August 10, 2004
Eastern High School FM-200452157 8/11/04 Eastern Boiler room Boiler # 3 Re-tube boiler August 11, 2004
Ketcham Elementary School FM-200452369 8/12/04 Ketcham Boiler room Need welder to apply heat to bolts, and clean-out /inspection plate on cast iron sectional boiler so that the part can be removed. August 12, 2004
Kenilworth ES FM-200452321 8/12/04 Kenilworth Boiler room Replace Heat exchanger # 2 in the boiler room ,#1 heat exchanger is down awaiting parts,if repairs are not made there will be no heat Asbestos Code A - Clear for repairs on 10/07/05. Tidewater - Tony Marcolin (RG 10/11/05) August 12, 2004
Kenilworth ES FM-200452318 8/12/04 Kenilworth Boiler room Replace B&G domestic hot water circulating pump in the boiler room. August 12, 2004
Payne Elementary School FM-200452571 8/13/04 Payne ES boiler room Boiler room flooded August 13, 2004
John Burroughs ES FM-200452703 8/16/04 Burroughs Boiler Room Repair domestic hot water heater. Will not lite. No hot water in Building. August 16, 2004
Terrell Mc ES FM-200452696 8/16/04 Terrell,M.C. Boiler room Repair leak in boiler # 2 fire box. August 16, 2004
Nalle Elementary School FM-200452976 8/19/04 Nalle Boiler room Survey and replace leaking 2",3",copper lines and fittings on domestic hot water heater and storage tank. August 19, 2004
Ketcham Elementary School FM-200453179 8/23/04 Ketcham Boiler Room Tap and re-thead holes and studs on water on water side of cast iron Boilers #1,#2,#3,#4 and #5. August 23, 2004
Shaw JHS FM-200453165 8/23/04 Shaw Boiler Room Survey and reset main breaker in boiler room area. Check chiller, will not come on. August 23, 2004
Walker-Jones EC FM-200453231 8/24/04 Walker-Jones Boiler Room Repair or replace domestic hot water heater, tank is leaking. August 24, 2004
Ketcham Elementary School FM-200453297 8/25/04 Ketcham Boiler Room Remove broken bolts from water side of Boiler #1,#2 and #3 August 25, 2004
Gibbs Elementary School FM-200453539 8/27/04 GIBBS ES boiler room Remove boiler tubes that are in the boiler water drum for boiler # 1 and 2. Left by contractor August 27, 2004
Hyde Elementary School FM-200454535 9/14/04 Hyde Boiler Room Check domestic hot water heater, no hot water in building. September 14, 2004
River Terrace ES FM-200454524 9/14/04 River Terrace Boiler room Remove automatic heat timers from boilers ( master controller) September 14, 2004
Eaton Elementary School FM-200454591 9/14/04 Eaton Boiler Room Repair or replace control Breaker Switch for Boiler #1 and #2. Boiler will not start. Type Cutler Hammer 30 Amps 104-120 Volts ID C25DND 330,50-60 HZ September 14, 2004
Hine JHS FM-200454798 9/15/04 Hine Boiler Room Boiler #2 Replace header valve September 15, 2004
Hine JHS FM-200454797 9/15/04 Hine Boiler Room Circulating pumps-replace valves with OS&Y September 15, 2004
Stanton Elementary School FM-200454825 9/16/04 Stanton Boiler Room Boilers #4 out on flame failure. September 16, 2004
Takoma Educational Center FM-200454872 9/16/04 Takoma Boiler Room Reinsulate lining in boiler door on Boilers #1 & #2 September 16, 2004
Orr Elementary School FM-200455078 9/20/04 Orr Boiler Room Unstop floor drain in Boiler Room - Bottom of stairs in front of Boiler #1. September 20, 2004
Ferebee-Hope Elementary School FM-200455076 9/20/04 Ferebee-Hope Boiler Room Boiler #1,#2 and #3 Survey brick work exterior and foundation. September 20, 2004
Meyer Elementary School FM-200455215 9/21/04 MEYER ES boiler room Replace safety relief valve on boiler # 1 - rod connected to pull cable is broken. -1-1/2 inch Valve info: mod 537G01 setting - 30psi, cap - 349700, BTU-hr A94M September 21, 2004
Dunbar High School FM-200455281 9/21/04 Dunbar Boiler Room Boiler #1 Repair refractory in combustion chamber (floor). September 21, 2004
Shaed Elementary School FM-200455507 9/23/04 Shead Boiler Room Boilers #1 repair or replace water leg. Boilers failed D.C. Inspection. Asbestos Code A - Clear for repairs on 09/27/05. Tidewater - Tony Marcolin (RG 09/28/05) September 23, 2004
Gibbs Elementary School FM-200455577 9/24/04 Gibbs Boiler room Install city water line with backflow preventer on all boilers. September 24, 2004
Ferebee-Hope Elementary School FM-200455580 9/24/04 Ferebee-Hope Boiler Room Repair brick setting on outside of exterior of Boilers #1,#2 & #3. September 24, 2004
West Elementary School FM-200455662 9/24/04 West Boiler Room Boiler #1 Repair or replace safety valve. No label or tag on boiler. Handle broken off. September 24, 2004
Reed LC FM-200455949 9/25/04 Reed Boiler Room Repair 2" copper line to sump pump. Stop Boiler Room from flooding. September 25, 2004
Thomas Elementary School FM-200455726 9/27/04 Thomas N Boiler room Correct cause of defective starter control for compressor motor. September 27, 2004
Eastern High School FM-200455882 9/28/04 Eastern Boiler Room Repair or replace modulator control on #2 Boiler,will not run in high fire. September 28, 2004
Adams Elementary FM-200455880 9/28/04 Adams Boiler Room Repair Boiler #3 and #4 out on flame failure. September 28, 2004
Amidon Elementary School FM-200456057 9/29/04 Amidon Boiler room Replace relief valve on hot water tank # 2 : A.O smith, type FVMX-5C: Serie 4 ; Size 3/4" ; Set 150 September 29, 2004
Terrell Mc ES FM-200456016 9/29/04 Terrell, M.C Boiler room Check and correct electrical short problem with boiler # 1, & 2 fuses blow each time boilers are test fired. September 29, 2004
Dunbar High School FM-200456021 9/29/04 Dunbar SHS Mechanical Level Repair damaged refractory for boiler # 1 combustion chamber. September 29, 2004
Beers Elementary School FM-200456190 9/30/04 Beer Boiler Room Check domestic hot water heater and adjust water temperature. September 30, 2004
Beers Elementary School FM-200456431 10/4/04 (Beers) !!!EMERGENCY!!! Boiler Room Tunnel: Plumbers are working in this area; there is no electrical power, which makes it difficult to see how to make repairs. October 4, 2004
Bowen Elementary School FM-200456443 10/5/04 Bowen Boiler Room Replace leaking 2" steam line over switch Board panel. October 5, 2004
Wilson High School FM-200456454 10/5/04 Wilson, W. Boiler Room Boiler #1 repair or replace modulator motor. Need Boiler for hot water for kitchen. October 5, 2004
Aiton Elementary School FM-200457375 10/25/04 Aiton Boiler Room Repair or replace leaking 1" nipple on Boilers. October 25, 2004
Anacostia Senior High School FM-200457805 805 11/2/04 Anacostia Boiler room repair # 1 burner, burner will not start November 2, 2004
Shepherd ES FM-200457888 11/3/04 Shepherd Boiler Room Boiler #2 replace pump switch. November 3, 2004
Rudolph Elementary School FM-200457928 11/4/04 Rudolph Boiler Room Correct the problem of condensate return not keeping pace with the production of stem by the boilers #1 and #2. 1. The boilers operating in low fire are producing steam faster then the condensate returns are being replaced in boilers. 2. There are no pump control devices on boilers. That would call for condensate returns from the return task as the boilers needs it. 3. Condensate return pumps seems to only send water to boilers when it fills high enough to trip the float control. November 4, 2004
Anacostia Senior High School FM-200457906 906 11/4/04 Anacostia Boiler Room Furnish materials to repair Gordon Peatt air flow safety switch 125 V.A rating duty. November 4, 2004
Shaed Elementary School FM-200457934 11/4/04 Shead Boiler Room Repair or replace burnt out motor on air compressor. Location front of #1 Boiler frame 145T HP 2 Volt 208/230 HZ 60 Amp 6.5 2.3 Serial F994 RPM 1725 PH 3 November 4, 2004
Walker-Jones EC FM-200457893 11/4/04 Walker-Jones Boiler Room Repair or replace feed water regulator valve on city water line in Boiler Room, valve is leaking. November 4, 2004
Emery Elementary School FM-200457959 11/5/04 EMERY ES boiler room Investigate gas leak @ hot water heater near boiler # 1 November 5, 2004
Bunker Hill Elementary School FM-200457946 11/5/04 Bunker-Hill Boiler room Repair or replace (heat ) circulating pumps November 5, 2004
Slowe Elementary School FM-200458003 11/8/04 Slowe Boiler room Repair ruptured 3/4" copper line in the ceiling over the condensate tank, ( makeup feed line). November 8, 2004
Nalle Elementary School FM-200458062 11/9/04 Nalle Boiler room- condensate pump room area Repair or replace the lighting in the condensate pump room area. November 9, 2004
Aiton Elementary School FM-200458174 11/10/04 Aiton Boiler Room Repair domestic hot water heater, hot water heater down. No hot water in Building. November 10, 2004
Woodson High School FM-200458195 11/11/04 Woodson Boiler Room Boilers burner need to be calibrated, burning very bad. November 11, 2004
Stuart-Hobson Middle School FM-200458192 11/11/04 Stuart-Hobson Boiler Room Repair 2" return line in tunnel with valve. With 90 degree. Replace all 3/4" lines in tunnel. November 11, 2004
Janney Elementary School FM-200458261 11/15/04 Janney Basement boiler room Install new enter and exit doors . Existing doors are damaged due to FWT. The exit doors are damaged at the bottom, rodents could enter here. Enter door size 73"x31 1/2" frame 1/2 DECP. Exit doors size 83"x38 1/2" frame 1/2" DEPTH. Code A-clear for repair by DCPS Charles Buchanan on 11/16/04 November 15, 2004
Woodson High School FM-200458384 11/17/04 Woodson Boiler Room Repair or replace expansion tank to chiller in back of Boiler Room, tank is leaking at end were bracket is. November 17, 2004
Takoma Educational Center FM-200458609 11/23/04 Takoma Boiler Room Weld 1/2" studs on front exterior of boilers #1 and #2. Replace rope seal on front doors. November 23, 2004
Hine JHS FM-200458641 11/24/04 Hine Boiler room No hot water Repair domestic hot water heater, unit is off on flame failure. Name : Fire Power Burner November 24, 2004
Gage-Eckington ES FM-200458651 11/24/04 Gage-Eckington Boiler Room Repair leaking 3/4"domestic hot water line , leaking in electric control box that has short out heater. November 24, 2004
Terrell Mc ES FM-200458715 11/26/04 Terrell,M.C. Boilerroom Check and repair electrical problem with the circuit breaker box for the pump that heat the kindergarnder area. November 26, 2004
Anacostia Senior High School FM-200458729 729 11/29/04 Anacostia Boiler Room Asbestos assessment reqiured. Replace leaking water leg in rear of boiler #2. Remove 2' up from brick, and from corner to corner. Emergency !!!!! Asbestos Code A - Clear for repairs on 09/20/05. Tidewater - Tony Marcolin (RG 11/03/05) November 29, 2004
Shaw JHS FM-200458728 11/29/04 Shaw Boiler room Repair or replace condensate return pumps , will not run, must hand feed . November 29, 2004
Stuart-Hobson Middle School FM-200458845 11/30/04 Stuart- Hobson Boiler Room Replace safety valve on Boiler #3 November 30, 2004
Shaed Elementary School FM-200458814 11/30/04 Shead Boiler Room Repair or replace circulating pump. Learning Center is cold. November 30, 2004
Smothers ES FM-200458799 11/30/04 Smothers Boiler room Replace 1 1/4" nipple and blow down valve on the front of the boiler , valve will not close, and nipple is leaking., November 30, 2004
Coolidge High School FM-200458923 12/1/04 Coolidge Boiler Room Repair and make operable sump pump located in boiler room. December 1, 2004
Jessie LaSalle Elementary FM-200458864 4 12/1/04 LASALLE Boiler room Investigate and correct problem with no domestic hot water. December 1, 2004
Coolidge High School FM-200458927 12/1/04 Coolidge Boiler Room Repair and make operable Johnson control Panel in boiler room. Used to regulate the pneumatic air devices that control the flow of steam to the heat exchanger for the new gym. December 1, 2004
Coolidge High School FM-200458925 12/1/04 Coolidge Boiler Room Repair or replace leaking tubes in Boiler #1. December 1, 2004
Eastern High School FM-200459156 12/3/04 Eastern Boiler Room Furnish the following materials for staff to eplace leaking ones. 1. 40 feet of 80 gage 2" pipe 2. 40 feet of 80 gage 1 1/2" pipe 3. 40 feet of 80 gage 1" pipe 4. 40 feet of 80 gage 3/4" pipe 5. 40 feet of 80 gage 1/2" pipe December 3, 2004
River Terrace ES FM-200459172 12/6/04 River Terrace Boiler Room (Burner #2) Repair or replace burner #2 off on D8 Purge open and Limit open. Making a high pitch noise. December 6, 2004
Ketcham Elementary School FM-200459457 12/9/04 Kectham Boiler Room Asbestos assessment requested In ceiling over control panel for Boilers- hot water return (HR on pipes) Repair or replace 3/4" pipe (hot water return) 18" long with threaded union. Asbestos Code A - Clear for repairs on 12/10/04. DCPS Safety - Leroy Minton (RG 12/10/04) December 9, 2004
Ketcham Elementary School FM-200459461 12/9/04 Kectham Boiler Room Unstop floor drains at back of Boiler #5 next to hot water tank and in front of Boiler #4 next to electric panel. Water on Boiler Room floor. December 9, 2004
Wilkinson ES FM-200459446 12/9/04 Wilkinson Boiler Room Repair or replace relief valve on Boiler #1. Watts - size 1 1/2", 30 Lbs. BTU 2,900,000 #0618935C Model - M December 9, 2004
Woodson High School FM-200459521 12/13/04 Woodson H.D. Boiler room Boiler #1 and #2 Retubes Asbestos Code A - Clear for repairs on 09/28/05. Tidewater - Tony Marcolin (RG 09/29/05) December 13, 2004
Park View ES FM-200459570 12/14/04 Park View Boiler Room Replace leaking sections in Boilers #1 and #5. December 14, 2004
Woodson High School FM-200459788 12/17/04 WOODSON HD boiler room Replace (4) four butterfly valves - 2 six inch valves - 2 eight inch valves. Replace (4) four control valves - 2 four inch valves - 2 three inch valves. December 17, 2004
Shaed Elementary School FM-200459815 12/19/04 Shaed Boiler Room Check domestic hot water circulating pump, leaking. December 19, 2004
Terrell Mc ES FM-200459816 12/20/04 Terrell, M.C. Boiler Room Repair or replace domestic hot water heater. No hot water in building. December 20, 2004
Walker-Jones EC FM-200459915 12/21/04 Walker/Jones Boiler room Repair # 1 boiler , F.F . all resets have checked. December 21, 2004
Walker-Jones EC FM-200459989 12/22/04 WALKER-JONES boiler room tunnel URGENT URGENT Repair pipe leaks in tunnel, leaks are causing boiler room to flood due to sump pump motor # 2 burnt out. Forward to HVAC shop to repair sump sump motor # 2 December 22, 2004
Roosevelt High School FM-200460027 12/23/04 Roosevelt Rooftop Over DA Tank (Boiler Room) Repair leaking roof, has pit holes in concretes ceiling. (section 8' X 16') Urgent !!!!! Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) December 23, 2004
Roosevelt High School FM-200460061 12/28/04 Roosevelt Boiler Room/Near A/C unit Repair or replace starter control for exhaust fan for Boiler Room. Cutler Hammer - AN16BNO Volts 115 NEMA Size O December 28, 2004
Hine JHS FM-200460088 12/29/04 Hine Boiler Room Repair or replace relief valve on Boiler #2 Valve is leaking. Mfr: Watts Size: 1- 1/2" Mod: M Set: 30 Lb. No.: 740 BTU/HR Rating: 2,900,000 Ser. #98340 Registration #OC1893.5C December 29, 2004
Park View ES FM-200500002 1/2/05 Park View Mechanical Room in Boiler Room Repair or replace old air handler unit. Both shaft and motor are losing a lot of oil, possible bad seals. Urgent !!!!! January 2, 2005
Thomas Elementary School FM-200500062 1/4/05 Thomas N Boiler Room Reconnect broken lead wirers from pump housing motor. ASAP - No Sump pumps working at this time. January 4, 2005
Gibbs Elementary School FM-200500125 1/5/05 GIBBS ES boiler room Hydro test boiler # 1 repairs were completed on boiler shell. January 5, 2005
Rudolph Elementary School FM-200500126 1/5/05 Rudolph Boiler room Repair gas leak on the # 2 boiler . January 5, 2005
Wilkinson ES FM-200500168 1/6/05 WILKINSON ES BOILER ROOM Boiler # 1 replace defective relief valve. Valve is not holding. January 6, 2005
Roosevelt High School FM-200500497 1/16/05 Roosevelt Boiler Room Repair leaking high pressure steam supply line. January 16, 2005
Amidon Elementary School FM-200500528 1/18/05 Amidon Boiler Room Check Boilers #1,#2 & #3, had to reset all boilers. Off on flame failure. January 18, 2005
Park View ES FM-200500652 1/21/05 Park View Boiler Room Repair or replace Burner #4 motor, bearing gone. January 21, 2005
Slowe Elementary School FM-200500692 1/22/05 Slowe Boiler Room Replace pump and motor located on cold water supply to domestic hot water heaters Building has no hot water. Information on pump - B&G, Series 100 D10106197 BNFI Information on motor B&G HP 1 1/2 RPM 1725 PH 1 Cy 60 V 115 Amps 1.75 VPP58UV-724 January 22, 2005
Coolidge High School FM-200500862 1/26/05 Coolidge Boiler Room Repair Boiler #3, boiler not working. No heat in building. January 26, 2005
Miner Elementary FM-200500892 1/27/05 Miner Boiler Room Check Boiler #2 gas trane will not reset, (low gas pressure) Gas Pressure Regulators. January 27, 2005
Brent Elementary School FM-200500917 1/28/05 BRENT ES boiler room Replace coupling B & G pump on domestic hot water tank Coupling is broken, building has no hot water. ser H V 269 Bnf; January 28, 2005
Bunker Hill Elementary School FM-200500957 1/29/05 Bunker Hill Boiler Room Repair Boiler #1, has to keep reset Boiler every other day. January 29, 2005
Watkins Elementary School FM-200500959 1/30/05 Watkins Boiler Room Repair or replace domestic hot water. No hot water in building. January 30, 2005
Ludlow-Taylor ES FM-200500966 1/31/05 Ludlow-Taylor Boiler room Repair DHW heater, will not ignite, January 31, 2005
Wilson High School FM-200500964 1/31/05 Wilson, W Boiler Room Repair 2 " leak on feed water line by Boiler #3. Repair 3" leak on feed water line in pump room. January 31, 2005
Marshall Educational Center FM-200501071 2/1/05 Marshall Boiler Room Repair or replace the starter and on contact to the unit #2 air compresser. It has not ran in 5 years, no one came back to finish working on it. February 1, 2005
Amidon Elementary School FM-200501118 2/2/05 Amidon Boiler Room Repair Boiler , new side gas valve, will not open. February 2, 2005
Murch Elementary School FM-200501200 2/4/05 Murch Boiler Room Repair or replace leaking circulating pumps for domestic hot water February 4, 2005
Wilson J. O. ES FM-200501254 2/6/05 Wilson, J.O. Boiler Room Replace Love Joy Bushing on house pump #3 near sump pump. February 6, 2005
Watkins Elementary School FM-200501237 2/6/05 Watins Boiler Room Repair or replace circulating pumps #1-#2, making loud noise, possible bearing going bad. February 6, 2005
Park View ES FM-200501294 2/7/05 Park View Boiler Room Repair Boiler #2 has closed fuel valve, will not start. Keep going into safety. February 7, 2005
Walker-Jones EC FM-200501392 2/8/05 Walker Jones Boiler Room/Generator Room/Entrance to Tunnel Area. Furnish and install locking mechanism on enterior door (Key alike) and pull handles. These areas must be secured properly. Urgent !!!!! Code A-claer for repair by DCPS Charles Buchanan on 2/16/05 February 8, 2005
Garnet-Patterson MS FM-200501321 2/8/05 Garnet-Patterson Boiler room Requesting a electrican to repair the lights. ASAP February 8, 2005
Browne Junior High School FM-200501429 2/9/05 Browne Boiler Room Repair or replace Heating/hot water circulating pump down. February 9, 2005
Benjamin Banneker Academic HS FM-200501843 2/22/05 BANNEKER boiler room Repair rupture line in tunnel area, 1" x 3/4" x 3/4" February 22, 2005
Marshall Educational Center FM-200501821 2/22/05 Marshall !!!VERY URGENT!!! Boiler room Replace relief valve on # 1and two boiler. Valve will not hold. February 22, 2005
Shepherd ES FM-200501967 2/24/05 SHEPHERD Boiler RM. Replace Two Inch Pnuematic Valve February 24, 2005
Anacostia Senior High School FM-200501972 2/24/05 ANACOSTIA SHS boiler room URGENT HOT!!!!! Hand feeding - Boiler # 1 replace or repair feed water regulator. Only one boiler in operation. February 24, 2005
Marshall Educational Center FM-200502006 2/25/05 Marshall Boiler Room Repair or replace relief valve on Boiler #2 February 25, 2005
Garfield ES FM-200502038 2/28/05 Garfield Boiler Room Replace relief valve on domestic hot water heater. Regtrol 3/4" 114XL, set pressure 150 PSI up to 210 degree max. 100,000 BTU's Watts-Regtrol. No hot water in building. Urgent !!!!! February 28, 2005
Coolidge High School FM-200502066 2/28/05 Coolidge Boiler Room Provide materials to be used for pipe repairs ( Copper Sweated). 6- 3/4" Gate valves 6- 3/4" Unions 6- 3/4 90 Elbows February 28, 2005
Bowen Elementary School FM-200502096 3/1/05 Bowen Boiler Room Replace leaking 1 1/2" line on hot water heater. March 1, 2005
Bowen Elementary School FM-200502094 3/1/05 Bowen Boiler Room Replace leaking 3" steam line in AC Room. March 1, 2005
Wilson High School FM-200502159 3/2/05 Wilson, W Boiler Room Repair or replace #1 sump pump, pump does not remove waste from pit area. March 2, 2005
Bowen Elementary School FM-200502301 3/7/05 Bowen Boiler Room Repair or replace leaking line in Boiler Room. March 7, 2005
Stoddert ES FM-200502421 3/9/05 Stoddert Boiler Room Repair or replace condensate return tank, tank has 1/2" hole located on back side. March 9, 2005
Eaton Elementary School FM-200502651 3/9/05 Eaton Boiler Room Boiler #2 off on falme failure and will not start up. Alarm keep coming on. March 9, 2005
Bunker Hill Elementary School FM-200502471 3/10/05 Bunker Hill Boiler Room Safety Remove low water cut off from boiler room floor. Low water cut off has mercy. Remove two mercury light bug from Boiler room. Code A clear for repair by DCPS Charles Buchanan on 3/14/05 March 10, 2005
River Terrace ES FM-200502475 3/10/05 River Terrace Boiler Room Repair or replace check valve on air compressor in Boiler Room. March 10, 2005
Stoddert ES FM-200502550 3/11/05 Stoddert Boiler Room Repair Boiler, Boiler off on Flame failure. March 11, 2005
Johnson JHS FM-200502580 3/11/05 JOHNSON JHS boile rroom Repair domestic hot water heater, heater is drawing too many amps. March 11, 2005
Eaton Elementary School FM-200502683 3/14/05 Eaton Boiler Room Repair or replace bad starter contractor switch for #1 conden-return pump. March 14, 2005
Turner Elementary School FM-200502632 3/14/05 Turner Need cage over gray electrival box with wires that leading to water meter in boiler room; kids have ripped box from wall; box is outside next to gas meter cage. March 14, 2005
Gibbs Elementary School FM-200502937 3/18/05 Gibbs Boiler Room Repair or replace domestic hot water heater, no hot water in Building. March 18, 2005
Stanton Elementary School FM-200503109 3/23/05 Stanton Boiler Room Repair or replace leaking blow down valve on domestic hot water heater. March 23, 2005
Deal Junior High School FM-200503209 3/24/05 Deal Boiler Room Boiler #2 has leaking tubes. March 24, 2005
Reed LC FM-200503202 3/24/05 Reed Boiler Room Unstop floor drain in Boiler Room between circulating pumps #2 & #3 March 24, 2005
Turner Elementary School FM-200503361 3/29/05 Turner Boiler Room Repair or replace domestic hot water heater. No hot water in Building. March 29, 2005
Payne Elementary School FM-200503350 3/29/05 Payne Boiler Room Repair or replace sump pump in Boiler Room. Pump will not come on. March 29, 2005
Anacostia Senior High School FM-200503375 3/30/05 Anacostia Boiler Room-Bridge Replace 2" copper pipe, coupled into 3" copper pipe both are leaking. March 30, 2005
Whittier Elementary School FM-200503394 3/30/05 Whittier Boiler Room - Tunnel Repair or replace rupture steam leak in tunnel in Boiler Room. March 30, 2005
Anacostia Senior High School FM-200503376 3/30/05 Anacostia Boiler Room Replair feed water, leaking 8' X 10" X 2" Black pipe, 8' X 10" long 2" Diameter. March 30, 2005
Seaton Elementary School FM-200503392 3/30/05 Seaton Boiler Room Replace safety valve on Boiler #1 March 30, 2005
Terrell Mc ES FM-200503509 4/4/05 Terrell, M.C. Boiler room Replace ruptured tubes in # 2 boiler , fire box is filled with water, engineer will drain firebox. April 4, 2005
Duke Ellington School FM-200503548 4/5/05 Ellington Boiler Room Boiler #4 leaking from section April 5, 2005
Tubman Elementary School FM-200503596 4/6/05 Tubman Boiler room Asbestos assessment required on the ceiling Repair ruptured domestic line lecking thruogh the ceiling over the # 2 boiler Repair was complete by DCPS repairmen. April 6, 2005
Kimball Elementary School FM-200503692 4/7/05 Kimball Boiler Room Repair or replace sump pump. Boiler room is flooded. April 7, 2005
Thomas Elementary School FM-200503659 4/7/05 Thomas,N. Boiler room Unclog sump well discharge line, sump water discharge water is re-circulating back into well thruogh a vent line. April 7, 2005
Truesdell Elementary FM-200503680 4/7/05 Truesdell Boiler Room Repair or replace domestic hot water heater, no hot water in Building. April 7, 2005
Gibbs Elementary School FM-200503725 4/8/05 Gibbs Boiler room Repair domestic hot water heater, burner got wet from flood 4/7/05 April 8, 2005
Ballou Senior High School FM-200503749 4/8/05 Ballou Boiler Room Replace (1) one fire tube on Boiler #2. Information: Pacific Steel hot water: Model #122040 April 8, 2005
Shaed Elementary School FM-200503935 4/13/05 Shaed Boiler Room Repair or replace sump pump in Boiler Room. Water in elevator. April 13, 2005
Ferebee-Hope Elementary School FM-200504067 4/14/05 Ferebee-Hope Boiler Room Unstop Boiler Room floor drain. April 14, 2005
Eaton Elementary School FM-200504022 4/14/05 Eaton Boiler Room Repair or replace starter switch on #2 chiller compressor will not start. Type, Trane A/C unit. Information on page 2 for chiller compressor. April 14, 2005
Anacostia Senior High School FM-200504195 4/18/05 Anacostia Boiler Room Installation of domestic gas hot water heater. Present condition allow for water to be heated only by Boiler Operation. April 18, 2005
Bruce-Monroe Elementary School FM-200504170 4/18/05 Bruce-Monroe Boiler Room Repair or replace 3/4" nipple on strainer section of Multi-stack. Leaking badly (Black pipe). April 18, 2005
Beers Elementary School FM-200504226 4/19/05 Beers Boiler room Repair or replace DHW circulating pump in the boiler room. April 19, 2005
Slowe Elementary School FM-200504375 4/21/05 Slowe Boiler Room Repair or replace mechanical seals on all (6) six condensate return motors. Make: Century AO Smith , Cat. #H155, Serial #BW7-185, type SC, Frame K56J, HP 1/2, PH 3, HZ 60/50 RPM 3450/2850, SF 1.60, Volt 208-230/460, Amps SF 2.6/1.3, Part # B-187147-20 April 21, 2005
Browne Junior High School FM-200504418 4/21/05 Browne Boiler Room Replace two circulating pumps in Boiler Room. April 21, 2005
Duke Ellington School FM-200504378 4/21/05 Ellington Boiler Room Repair 3/4" leaking line on pump #3 on A/C unit. Also repair 6" flange on line on chill water side. Replace 1/2" nipple on 4" condenser line on cooling tower. April 21, 2005
John Burroughs ES FM-200504374 4/21/05 Burroughs Boiler Room Replace 1 1/2" valve and nipple on Boiler #2. April 21, 2005
Anacostia Senior High School FM-200504515 4/22/05 Anacostia Boiler Room Replace air flow switch on Boiler #1, will not light off. April 22, 2005
Ballou Senior High School FM-200504578 4/22/05 Ballou Boiler Room Replace or repair leaking rolairtrol air seperator tank also. Install 3/4" gate valve on the air seperator supply line for new chemical. Injection system. (Heating & cooling) Note: Tri-con chemical- treatment for system also abatement needed for fiberglass & rubber installation. Information: Air seperator ID tag rusted beyond recognition. April 22, 2005
Shaw JHS FM-200504587 4/22/05 Shaw Boiler Room Repair and replace domestic hot water heater in Boiler Room. April 22, 2005
Anacostia Senior High School FM-200504519 4/22/05 Anacostia Boiler Room Replace feed water tank, leaking at the bottom. April 22, 2005
Ballou Senior High School FM-200504743 4/26/05 Ballou Boiler Room Repair crack on the rear boiler shell of Boiler #2. Information: Pacific Steel Hot Water Boiler Mod. #122040 Note: Installation has to be tested and removed. April 26, 2005
Ballou Senior High School FM-200504740 4/26/05 Ballou Boiler Room Refractory work needed on entire interior of Boiler #1, including burner hub. Information: Pacific Steel Hot- Water Boiler. April 26, 2005
Bunker Hill Elementary School FM-200504724 4/26/05 Bunker Hill Boiler Room Check feed water pump in Boiler Room. Pump is making a noise. April 26, 2005
Marshall Educational Center FM-200504782 4/27/05 Marshall ,T Boiler room eplace leaking tube in the # 1 boiler. April 27, 2005
Marshall Educational Center FM-200504781 4/27/05 Marshall, T Boiler room Replace the bearing on the air handler for the gym #8 April 27, 2005
Cardozo High School FM-200505024 4/29/05 (Cardozo) Asbestos Assessment Required. sub-basement,boiler room office-replace deterioring and leaking galvanized domestic hot water pipes that are appox. 2-1/2inch dia.,pipes are spraying water,flooding boiler room office. Asbestos Code A - Clear for repairs on 10/20/05. Tidewater - Phlp Connolly (RG 10/21/05) April 29, 2005
Anacostia Senior High School FM-200505031 5/2/05 Anacostia Boiler Room Replace Fire box doors 18 1/2" X 14" - 8" drop in hinge for Boiler #3. Boiler make: Orr and Sambower, model #6791 Year built 1974. Max. working pressure 15 PSI; Heating surface 1323 sq. ft. May 2, 2005
Browne Junior High School FM-200505026 5/2/05 Browne Boiler Room Repair condensate pump in Boiler Room. May 2, 2005
Browne Junior High School FM-200505021 5/2/05 Browne Boiler Room Repair drain line (outside Boiler Room entrance) May 2, 2005
Anacostia Senior High School FM-200505032 5/2/05 Anacostia Boiler Room Replace Thermal Insulation on Boiler #3. Boiler make: Orr and Sambower, model #6791 Year built 1974. Max. working pressure 15 PSI; Heating surface 1323 sq. ft. May 2, 2005
Thomas Elementary School FM-200505094 5/4/05 Thomas,N Boiler room Asbestos assessment required (Thermo isolation) 1) Repace four(4) OS&Y isolation valves on heating and chill water lines, vavles are leaking at th packing glands, unable to stop the leak. Two-(2) 4" OS&Y gate vavles , one each on heating H/W supply and return lines. Two (2) 6" OS&Y gate vavles,one on the chill water supply line from chiller, one on chill water pump discharge line ( isolation valve for the heat exchanger. Asbestos Code A - Clear for repairs on 07/08/05 Tidewater - Carlos Vera (RG 08/18/05) May 4, 2005
Whittier Elementary School FM-200505319 5/10/05 Whittier Outside Boiler Room Unclogged outside drain at bottom of steps at Boiler Room door. May 10, 2005
Aiton Elementary School FM-200505316 5/10/05 Aiton Boiler Room Boilers #1 and #2 has leaking tubes in back. May 10, 2005
Terrell Mc ES FM-200505429 5/12/05 Terrell, M.C. Boiler Room Replace relief valve on H.S. supply line in front of condenser and dual pumps, valve will not hold. Model M #740 Size 1-1/2" 40 Lbs. PSI 3,569,000; OG18935C May 12, 2005
Emery Elementary School FM-200505454 5/13/05 Emery Boiler Room/Roof Repair chiller. Chiller will not come on. May 13, 2005
Benning Elementary School FM-200505666 5/18/05 Benning Boiler Room Check electric in Boiler Room. Had a power surge in Building. Lost a phase in Building. Urgent !!!! May 18, 2005
Gibbs Elementary School FM-200505643 5/18/05 Gibbs Boiler Room Repair or replace domestic hot water heater. No hot water in building. Hot water heater got wet from flood in boiler room. Urgent !!!!! May 18, 2005
Seaton Elementary School FM-200505684 5/19/05 Seaton Boiler Room Repair or replace hot water circulating pump.Pump down on return side. May 19, 2005
Wilson High School FM-200505885 5/24/05 Wilson, W Boiler Room Furnish and pump in 2-55 gallon drums of chemicals to boil out Boiler #2. May 24, 2005
Thomas Elementary School FM-200505973 5/25/05 Thomas Boiler Room Replace pneumatic 3-way mixing acuator that is leaking domatic cold and hot water. Valve size is 2" X 2' X2". Note: No insulation on unions for valve. May 25, 2005
Meyer Elementary School FM-200506055 5/27/05 Meyer Boiler Room Asbestos assessment required on breeching. Area is mark with yellow paint. Boiler #2 leaking tubes. Boiler # 2 boiler jacket has been abased by contractor last year. Do not cut into the breecher lacket in rear of boiler # 2. May 27, 2005
Brent Elementary School FM-200506049 5/27/05 Brent Boiler room Repair or replace refractory in the fire box of # 1 boiler. May 27, 2005
Kramer Middle School FM-200506069 5/27/05 Kramer Boiler Room Replace 2" bottom plug on hot water holding tank. May 27, 2005
Kramer Middle School FM-200506073 5/27/05 Kramer Boiler Room Replace 2" bottom blow down valve on hot water holding tank. May 27, 2005
Webb Elementary School FM-200506201 6/1/05 Webb Boiler room Unclog floor drain behind boilers # 1& 2 , water will not drain. June 1, 2005
Tyler Elementary School FM-200506200 6/1/05 Tyler Boileroom Unclog drain outside of boilerroom door,slow drainage. June 1, 2005
Emery Elementary School FM-200506375 6/6/05 Emery Boiler Room Repair or replace compressor, compressor will not come on. June 6, 2005
Wilson High School FM-200506450 6/7/05 Wilson, W. Boiler Room Remove three (3) heating coils from univents andrepair eight (8) leaks to coils. June 7, 2005
Reed LC FM-200506514 6/8/05 Reed Boilerroom Repair or replace defective cooling tower motor. June 8, 2005
Plummer Elementary School FM-200506528 6/9/05 Plummer Boiler Room Remove old domestic hot water heater from Boiler Room. June 9, 2005
West Elementary School FM-200506541 6/9/05 West Boiler Room Check chiller , chiller down on Hi head pressure. June 9, 2005
Shaed Elementary School FM-200506625 6/11/05 Shaed Boiler Room Repair or replace sump pump, boiler room flooded. June 11, 2005
Duke Ellington School FM-200506633 6/12/05 Ellington Boiler Room Service chiller, Chiller is during the same thing when contractor came last week (nothing). Urgent !!!!! June 12, 2005
Brent Elementary School FM-200506679 6/13/05 Brent Boiler Room Repair 4" leaking split line in ceiling of Boiler Room. June 13, 2005
Eaton Elementary School FM-200506718 6/14/05 Eaton Boiler Room Repair or replace #2 chiller compressor #2 compressor will not start. Bad timer control switch. Type : trane A/C unit. June 14, 2005
Thomas Elementary School FM-200506796 6/15/05 Thomas Boiler room Correct cause of compressore # 3 & # 4 going off line fault (suction) Note: compressors # 1& 2 have the same condition. June 15, 2005
Ludlow-Taylor ES FM-200506802 6/15/05 Ludlow-Taylor Boiler room Service chiller , unit will run , but cuts off on high motor temp. June 15, 2005
Slowe Elementary School FM-200506838 6/16/05 Slowe Boiler Room Tighten up bolts on packing gland on OSY valve. Valve is leaking bad. WD-40 was used. Possible bolts may crack or break. June 16, 2005
Bowen Elementary School FM-200506889 6/17/05 Bowen Boiler Room Repair or replace circulating pumps , pumps making noise. Pump #1 June 17, 2005
Turner Elementary School FM-200506905 6/17/05 Turner Boiler Room Boiler #1 and #2 Remove (7)seven 2" plugs abd (6) six 3/4" plugs, June 17, 2005
Bowen Elementary School FM-200506890 6/17/05 Bowen Boiler Room Repair or replace air compressor tank is not working. June 17, 2005
Walker-Jones EC FM-200506923 6/19/05 Walker Jones Boiler Room System need charging, also pump controls need to be repaired Running manual. June 19, 2005
Clark Elementary School FM-200506930 6/20/05 Clark Boiler Room System need charging. Chiller down. Urgent !!!!!! June 20, 2005
Coolidge High School FM-200506926 6/20/05 Coolidge Boiler Room Reinstall gas regulator valve on boiler #1 June 20, 2005
Garfield ES FM-200506999 6/21/05 Garfield Boiler Room Replace relief valve on domestic hot water heater. Regtrol 3/4" 114XL, set pressure 150 PSI up to 210 degree max. 100,000 BTU's Watts-Regtrol. No hot water in building. Urgent !!!!! June 21, 2005
Peabody Elementary School FM-200507055 5 6/22/05 Peabody Boilerroom Repair or replace mechanical seal on the condensate pump, pump is leaking. June 22, 2005
Shaed Elementary School FM-200507135 6/23/05 Shaed Boiler Room Repair or replace leaking sewage pipe. Pipe is leaking from 90 in boiler room. June 23, 2005
Woodson High School FM-200507137 6/23/05 Woodson Boiler Room Repair or replace chill water pump, need for cooling building. Pumps bearing is bad, also 6" coupling need replacing on 2nd pump. June 23, 2005
Reed LC FM-200507163 6/24/05 Reed Boilerroom Repair or replace defective cooling tower motor. June 24, 2005
West Elementary School FM-200507228 6/27/05 West Boiler #1 Repair or replace safety valves on Boiler #1. Can not test valve do to broken lever. June 27, 2005
Tyler Elementary School FM-200507295 6/30/05 Tyler Boiler Room Extend blow down piping for Low water cutout and city water feeder to floor with an elbow. 8/29/05 - 6/16/05 Per Boiler Inspector June 30, 2005
Turner Elementary School FM-200507304 6/30/05 Turner Boiler Room Boilers #1 and #2 Extend blow down piping for water feeder and Low water cutoff tofloor with an elbow. Per Boiler Inspector Inspected 6/23/05 5 days to call for reinspection. June 30, 2005
Tyler Elementary School FM-200507284 6/30/05 Tyler Boiler Room Boilers #1 and #2 damper is stuck in open position 8/29/05 - 6/16/05 Per Boiler Inspector June 30, 2005
Kramer Middle School FM-200507317 6/30/05 Kramer Boiler Room Boiler #1 one tube leaking. June 30, 2005
Turner Elementary School FM-200507306 6/30/05 Turner Boiler Room Boilers #1 and #2 City water check valve not open. Per Boiler Inspector Inspected 6/23/05 5 days for reinspection June 30, 2005
Coolidge High School FM-200507267 6/30/05 Coolidge Boiler Room Failed #1 boiler need permit for tubes being replaced and a hydrostatic test done 10 days, inspected 5-23-05 Per Boiler inspector June 30, 2005
West Elementary School FM-200507264 6/30/05 West Boiler Room Pipe safety relief valves down to floor drains. (Not safe if valves pop) Per Boiler inspector June 30, 2005
West Elementary School FM-200507266 6/30/05 West Boiler Room Boiler #1 and #2 pipe down bottom blow down to floor drains. Per Boiler inspector June 30, 2005
Ferebee-Hope Elementary School FM-200507427 7/5/05 Ferebee-Hope Boiler Room Plumbing: Supply hot and cold water to sink unable to wash up in case of emergency July 5, 2005
Turner Elementary School FM-200507454 7/6/05 Turner Boiler room Replace (4) 1" blow down lines on L.W.C.O. and city water feeder,extend lines 6" from ground,and replace 1" elbows.(thread pipes on both ends, 32" long for both boiler # 1& 2. July 6, 2005
Gibbs Elementary School FM-200507719 7/13/05 Gibbs Boiler room Preform Hydrostatic test on #1 boiler due to repairs on the shell July 13, 2005
Benning Elementary School FM-200507850 7/14/05 Benning Boiler room Check chiller, unit is not cooling . July 14, 2005
Orr Elementary School FM-200507937 7/18/05 Orr Boiler Room Repair rupture condenser water line in boiler room. July 18, 2005
Ferebee-Hope Elementary School FM-200508054 7/19/05 Ferebee-Hope Boiler Room Replace (1) one tube in Boiler #1 and #2 July 19, 2005
Wilson High School FM-200508047 7/19/05 Wilson, SHS Boiler Room Replace McDonnel #152 pump control and low water cut-off. Max. steam pressure 150 lbs. Pump and cut off circuits-A.C. 1 H.P. 110-220 volts, D.C. 1/4 HP 115 - 230 volts, alarm circuits - A.C. or D.C. 1 amp, 110 volts 1/2 amp 220 volts. July 19, 2005
Bowen Elementary School FM-200508068 7/19/05 Bowen Boiler Room Un stop floor drain and replace leaking p trap on sink in Boiler room. July 19, 2005
Ferebee-Hope Elementary School FM-200508055 7/19/05 Ferebee-Hope Outside Boiler Room Replace anti-freeze hoseon air compressor, compressor out of service. July 19, 2005
Tyler Elementary School FM-200508091 7/20/05 Tyler Boiler Room Repair or replace relief valve on make up water line above H/C water pump. Valve is not holding. Water running on the floor. July 20, 2005
Thomas Elementary School FM-200508208 7/20/05 Thomas Boiler Room Repair leak in damper control sensor port located in waterwall or fire box Boiler #2. Damper control line - exterior of boiler #2 has been tagged. July 20, 2005
West Elementary School FM-200508507 7/25/05 West Air Handler Unit #1- Boiler Room Repair or replace air handler - room starter for Pre-K tested fuses (ok), Starter not pulling in cooling and heating not possible, do to no air flow. (Air handler unit #1) Urgent !!!! July 25, 2005
Horace Mann Elementary School FM-200508704 7/26/05 Mann Boiler Room Repair or replace sump pump, pump will not empty pit. #2 Pump will not run in automatic. Causingmaintenance office to flood. Boiler room flooded and equipment , water is every where. Urgent !!!!! July 26, 2005
Brent Elementary School FM-200508794 7/27/05 Brent Boiler Room Boiler #1and #2 Replace pressure/temperaturegauges Per Boiler Inspector July 27, 2005
Young Elementary School FM-200508805 7/27/05 Young Boiler Room Install chains to test relief valves on all Boilers. Per Boiler Inspector July 27, 2005
Plummer Elementary School FM-200509220 8/1/05 Plummer Boiler Room Repair or replace (2) two mogual base light fixture in Boiler Room. Per Boiler Inspector August 1, 2005
Ludlow-Taylor ES FM-200509302 8/2/05 Ludlow-Taylor Boiler room Repair brick work on the outside of boiler #1 left side rear of the boiler. August 2, 2005
Nalle Elementary School FM-200509296 8/2/05 Nalle Boiler Room Check domestic hot water heater, temperature of water is not holding. August 2, 2005
Woodson High School FM-200509367 8/3/05 Woodson Boiler Room Unclog drain in Boiler Room, Boiler Room is flooded. August 3, 2005
Hine JHS FM-200509383 8/3/05 Hine Boiler room Check and correct cooling problem with chiller only on compressor will operate. August 3, 2005
Gage-Eckington ES FM-200509500 8/4/05 Gage-Eckington Boiler Room Unclog drain in boiler room, drain stop up.Need drain for washing out boilers. Urgent !!!! August 4, 2005
Hine JHS FM-200509672 8/7/05 Hine Boiler Room Repair chiller #1 and #2. Chiller #1 electric line to compressor line was cherry red, cut off current. Chiller #2 compressor #1 will not start Chiller #2 compressor #2 will start but cut off on motor current. August 7, 2005
Ludlow-Taylor ES FM-200509817 8/9/05 Ludlow Taylor Boiler Room Repair or replace domestic hot water heater. No hot water in building. August 9, 2005
Eaton Elementary School FM-200510093 8/11/05 Eaton Boiler room Repair or replace circulating pump for cooling and heating. Name: Armstrong Ser.# 104213 GPM: 70 Pump size:4 Pump cat. 280 Chiller will not run with the pump. August 11, 2005
Reed LC FM-200510075 8/11/05 Reed Boiler room Repair chill water pump motor # 2 & 3 starter pulls in , but pump will not run. August 11, 2005
Johnson JHS FM-200510789 8/19/05 Johnson Boiler Room Asbestos assessment required onpipes in ceiling of boiler room Repair leaking pipe in ceiling Asbestos Code A - Clear for repairs on 08/22/05. Tidewater - Philp Connolly (RG 08/24/05) August 19, 2005
Woodson High School FM-200510993 8/24/05 Woodson Boiler Room Repair chiller, down on Hi motor temp, Both units. Urgent !!!! August 24, 2005
Beers Elementary School FM-200511025 8/24/05 Beers Boiler room Repair chiller,chiller not operating properly. Building hot. Temp. chiller. August 24, 2005
Meyer Elementary School FM-200511305 8/25/05 Meyer Boiler Room Replace (2) two rear hand hole rims -3x4x 1/2. On Boiler #1, Fitzgibbons Boiler. August 25, 2005
Wilkinson ES FM-200511297 8/25/05 Wilkinson Boiler Room Unstop drains in boiler room. Water is always on the floor. Safety harazd !!!! August 25, 2005
Barnard Elementary School FM-200511263 8/25/05 Barnard Boiler Room Survey and repair domestic hot water heater. Heater keeps cutting off. Have to reset every day. Urgent !!!! August 25, 2005
Walker-Jones EC FM-200511547 8/29/05 Walker Jones Boiler Room Repair or replace circulating house stand by pump, not working August 29, 2005
Walker-Jones EC FM-200511532 8/29/05 Walker Jones Boiler Room Repair or replace domestic hot water heater, Heater will not ignite. August 29, 2005
Reed LC FM-200511568 8/30/05 Reed Boiler Room Install new sump pumps and correct discharge piping. August 30, 2005
Stanton Elementary School FM-200511587 8/30/05 Stanton Annex Boiler room Urgent!!!!! Repair falling ceiling over top of the boilers, area is unsafe for the engineers to clean the boilers for inspection. Asbestos Code A - Clear for repairs on 08/31/05. Tidewater - Tony Marcolin (RG 09/01/05) SEE ASSESSMENTS August 30, 2005
Spingarn High School FM-200511642 8/31/05 Spingarn Boiler Room Repair or replace domestic hot water heater, no hot water in building. (1) Holding tank- one for the kitchen (1)for restroom throughout building Boiler are use for heating water for the holding tank Boiler failed DC inspection Urgent !!!! August 31, 2005
Barnard Elementary School FM-200511712 9/1/05 Barnard Boiler Room (Pump #1) Repair or replace cooling tower ciculating motor. Motor making loud noise. Motor information: Suaer E Baldor HP 25 Volts 230/460 Amps 60/30 RPM 1770 Frame 284T Phase 3 Serial F. 1.15, Bearing 6311 Serial # 20110290343 September 1, 2005
Terrell Mc ES FM-200511755 9/2/05 Terrell, M.C. Boiler Room Check domestic hot water heater. Water is not reaching the proper temperature for building use. Urgent !!!!! September 2, 2005
Beers Elementary School FM-200511758 9/2/05 Beers Boiler Room Repalce valve on domestic hot water line, valve is stuck in close position preventing water to flow throughout building, September 2, 2005
Ketcham Elementary School FM-200511789 9/3/05 Ketcham Boiler Room Boilers #1 and #2 Replacment seaction. Asbestos Code A - Clear for repairs on 09/27/05. Tidewater - Tony Marcolin (RG 09/28/05) September 3, 2005
Powell Elementary School FM-200511947 9/6/05 Powel Emergency Under Building-Boiler Room (to get to the leak) Water line leaking under the building very heavy September 6, 2005
Stanton Elementary School FM-200511985 9/7/05 Stanton Main Building Boiler room Repair or replace sump pumps in the boiler room ,pumps do not operate. September 7, 2005
Stuart-Hobson Middle School FM-200512033 9/8/05 Stuart-Hobson Boiler Room Boiler #1,#2 and #3 Replace quick open and slow open main drain line valve. September 8, 2005
Davis Elementary School FM-200512071 9/8/05 Davis Boiler #2,#3 and #4 will not start up. (Lock out) Boiler #2,#3 and #4 out on timer. September 8, 2005
Walker-Jones EC FM-200512195 9/9/05 Walker Jones Boiler Room Repair or replace standard circulation/condensate pump #3. Leaking water badly, cause Boiler room floor to have standing water. September 9, 2005
Walker-Jones EC FM-200512271 9/12/05 Walker/Jones Boiler room Check chiller unit would not , in auto or hand. 9/11/05 September 12, 2005
Emery Elementary School FM-200512374 9/12/05 Emery Boiler Room Boilers #1 and #2 Calibrate burner to burn properly at all modulation levels. Burners are not modulating properly,creating cleaning problems. September 12, 2005
Johnson JHS FM-200512348 9/12/05 Johnson Boiler Room Install nipples and valves for chemical injections on return and suction line on pumps. September 12, 2005
Benning Elementary School FM-200512352 9/12/05 Benning Boiler Room Install nipples and valves for chemical injections on return and suction line on pumps. September 12, 2005
Orr Elementary School FM-200512345 9/12/05 Orr Boiler Room Install nipples and valves for chemical injections on return and suction line on pumps. September 12, 2005
Shaed Elementary School FM-200512449 9/13/05 Shaed Boiler Room Repair or replace broken shaft on condenser pump to cooling tower. Chiller down. Urgent !!!! September 13, 2005
Bowen Elementary School FM-200512466 9/13/05 Bowen Boiler Room Boiler #1 and #2 Calibrate burner to burnt properly at all modulation levels. Per: DC Boiler Inspector. Urgent !!!! September 13, 2005
Amidon Elementary School FM-200512557 9/14/05 Amidon Boiler Room Repair or replace rupture line on Boiler water treatment tank, Size of line is 4" X 3/4" September 14, 2005
Plummer Elementary School FM-200512580 9/15/05 Plummer Boiler room Repair or replace B&G domestic hot water pump in the boiler room September 15, 2005
Shaed Elementary School FM-200512749 9/16/05 Shaed Outside Rear Driveway 1) Put gate up front at Boiler Room driveway. September 16, 2005
Dunbar High School FM-200512756 9/16/05 Dunbar Boiler Room Boiler #2 and #3 Replace leaking tubes. Per DC Boiler Inspection September 16, 2005
Shaed Elementary School FM-200512748 9/16/05 Shaed Outside Rear Driveway 1) Enclose fence over Boiler Room driveway. September 16, 2005
Dunbar High School FM-200512755 9/16/05 Dunbar Boiler Room Boiler #1 Replace bottom of breeching, missing. Per DC Boiler Inspection September 16, 2005
Ludlow-Taylor ES FM-200512686 9/16/05 Ludlow-Taylor Boiler room Service chiller, unit is low on oil and refrigerant September 16, 2005
Backus Middle School FM-200512820 9/19/05 Backus Boiler Room Repair or replace city water regulator on main line, leaking very bad. Urgent !!!! September 19, 2005
Terrell Mc ES FM-200512792 9/19/05 Terrell, M.C. Boiler room Replace leaking tubes or repair crack in # 2 boiler Install a temp. boiler on parkinglot. POC: Tony Law - 359-1929 September 19, 2005
Wilkinson ES FM-200512799 9/19/05 Wilkinson Boiler room Calibrate burner #1 and # 2 Per Boiler Inspector request September 19, 2005
Stuart-Hobson Middle School FM-200512798 9/19/05 Stuart-Hopson Boiler room Replace missing safety valve on the # 2 boiler . September 19, 2005
Shepherd ES FM-200512814 9/19/05 Shepherd Boiler Room Providesteamfitter shop with reduced pressure zone back flow preventer. September 19, 2005
Stanton Elementary School FM-200512996 9/21/05 Stanton Annex Boiler room Reweld metal braces to entrance to boiler room. September 21, 2005
Slowe Elementary School FM-200513093 9/23/05 Slow Boiler Room Repair waste line that is leaking on boiler. September 23, 2005
Nalle Elementary School FM-200513094 9/23/05 Nalle Boiler Room Boiler #2 Repair crack furnace September 23, 2005
Ludlow-Taylor ES FM-200513207 9/27/05 Ludlow-Taylor Boiler Room Repair or replace compression switch on air compressor September 27, 2005
Wilkinson ES FM-200513171 9/27/05 Wilkinson Boiler Room Boiler #2 Calibrate burner September 27, 2005
Thomas Elementary School FM-200513229 9/28/05 N.Thomas Boiler room Repair / Replace condensate return pump and starter controls for boiler #1 Note: #1 boiler is the only boiler approved by DC Boiler inspector. September 28, 2005
Ludlow-Taylor ES FM-200513282 9/29/05 Ludlow-Taylor Boiler Room Investage and correct leak in floor of Boiler Room. Urgent !!! September 29, 2005
Davis Elementary School FM-200513272 9/29/05 Davis Boiler Room Check air compressor, will not come on. Need Electrician Compressor has no power going to unit, need to be rewired. September 29, 2005
Browne Junior High School FM-200513344 10/1/05 Browne Boiler Room Repair and replace heating/cooling circulating pumps October 1, 2005
Coolidge High School FM-200513339 10/1/05 Coolidge Boiler Room Boiler #2 Clear tube pass (Blockage) October 1, 2005
Shaw JHS FM-200513325 10/1/05 Shaw Boiler Room Boiler #1 Leak in combustion chambers DC Per Boiler Inspectoin October 1, 2005
Garnet-Patterson MS FM-200513349 10/1/05 Garnet-Patterson Boiler Room Boiler #4 Leaking over head, coopper line Per DC Boiler Inspector October 1, 2005
Peabody Elementary School FM-200513355 5 10/1/05 Peabody Boiler Room Boiler #3 flame failure October 1, 2005
Kenilworth ES FM-200513373 10/2/05 Keinlworth Boiler room Replace 3/4" black pipe on boiler #1 supply line with copper pipe ( 3/4" elbow, 45, short nipple and union. Remove 2-1/2" nipple by water colum. October 2, 2005
Whittier Elementary School FM-200513426 10/3/05 Whittier Boiler Room Replace basket strainer assembles housing to#51-2 Mcdonnell miller automatic water feeder low water cut off. Broken both at strainer assembly causing it to leak on Boiler #2 Urgent !!!! October 3, 2005
Ludlow-Taylor ES FM-200513389 10/3/05 Ludlow-Taylor Boiler Room Repair or replace domestic hot water heater, no hot water in building October 3, 2005
Patricia R Harris Ed Center FM-200513430 10/3/05 Harris, P.R. Boiler Room Boiler #1 and #2 disconnect box handlers won't disengage for proper operation. Electrican is neede to make repair. Disconnect Data: Bus Bars Braced; 65,000 amp F.O. 12-00086511 Square-D Mod.4 Bus Rating Horizontal-900A Vertical 300A 600 V.A.C. Max. October 3, 2005
Johnson JHS FM-200513475 10/4/05 JOHNSON JHS Boilers # 2 and 3 make correction to fondation cracks, needed to pass annual inspection per boiler inspector Keith Jones October 4, 2005
Deal Junior High School FM-200513515 10/5/05 Deal Boiler Room Boiler #2 Retread hand hole and weld a metal plate over the hand hole that very bad. Urgent !!!!! October 5, 2005
Watkins Elementary School FM-200513529 10/6/05 Watkins Room 417 Repair or replace shaft ,bearing and squirrel cages on heating unit.( shaft is broken, unit is in rhe boiler room) October 6, 2005
Montgomery ES FM-200514224 -200514224 10/22/05 Montgomery boiler room Boiler # 1 will not ignite off burner Boiler # # 1 is scheduled for boil-out October 22, 2005
Roosevelt High School FM-200514409 10/23/05 Roosevelt Boiler Room Repair or replace 2" leaking copper line to city water feed. October 23, 2005
Ferebee-Hope Elementary School FM-200514448 10/23/05 Ferebee-Hope Boiler Room Unstop 6" drain in Boiler Room. Causing Boiler room to be flooded. October 23, 2005
Webb Elementary School FM-200514446 10/23/05 Webb Boiler Room Reepair or replace B&G pumps on domestic hot water tank. Pumps not working. October 23, 2005
Hart Middle School FM-200514492 10/23/05 Hart Boiler Room Replace 1" safety relief valve on Boiler #3. Information: Relief valve size 1" set 60 lbs. Model: M (740) Watts BTU 2,200,000 October 23, 2005
Montgomery ES FM-200514394 -200514394 10/23/05 Montgomery Boiler Room Replace gas valve on Boiler October 23, 2005
Dunbar High School FM-200514323 10/23/05 Dunbar Kitchen Boiler Replace boiler float switch on pump October 23, 2005
Bancroft Elementary School FM-200514428 10/23/05 Bancroft Boiler room Repair or replace and/or over haul house hot water circulating pumps #1 and #2. Pumps have deteriorated and continuously being repaired. Urgent !!! October 23, 2005
Bunker Hill Elementary School FM-200514345 10/23/05 Bunker Hill Boiler Room Replace 1-1/2" leaking copper line to storage tank October 23, 2005
Emery Elementary School FM-200514398 10/23/05 Emery Boiler Room Boiler #2 Repair or replace gas gauge. Gas company indicated there is a leak. Emergency !!!!! October 23, 2005
Amidon Elementary School FM-200514432 10/23/05 Amidon Boiler Room Boiler #3 Repair or replace burner. Burner indicating (3 P Inter-Lock open) October 23, 2005
Draper Elementary School FM-200514451 10/23/05 Draper Boiler Room Replace 3" balck pipe on gas line, line corroderd, (Main gas line) Size: 3' X 3" October 23, 2005
Cook J.F. Elementary School FM-200514401 10/23/05 Cook, J.F. Boiler Room Replace three (3) old light fixture in Boiler Room. Can no longer purchase parlicular bulbs. October 23, 2005
Coolidge High School FM-200514823 10/31/05 Boiler Room - Repair burner on boiler # 1 . Roving Unit - 698-1750 October 31, 2005
Ketcham Elementary School FM-200514902 10/31/05 Roosevelt Mashack Boiler Room Shop- Steamfitting Replace 3/4 inch leaking return line in ceiling in front of # 5 boiler October 31, 2005
Park View ES FM-200514819 10/31/05 Boiler Room - Repair burner on # 4 boiler. Roving Unit - 698-1750 October 31, 2005
Shaed Elementary School FM-200515354 11/10/05 Shaed Boiler Room Replace 1 1/2" hose to circulating pump. Hose is leaking. November 10, 2005
River Terrace ES FM-200515330 11/10/05 River Terrace Boiler room Replace pneumatic controls on the heat exchanger. November 10, 2005
Ferebee-Hope Elementary School FM-200515392 11/14/05 Ferbee-Hope Boiler room Repair boiler # 3 ,burner cuts out in flame failure. November 14, 2005
Park View ES FM-200515388 11/14/05 Parkview Boiler room Repair gas line on # 2 boiler, will not run. November 14, 2005
Ferebee-Hope Elementary School FM-200515393 11/14/05 Ferbee-Hope Boiler room Repair circulating pump # 1 & #2 packinking glands and bolts. November 14, 2005
Janney Elementary School FM-200515440 11/15/05 Janney Boiler Room Replace sump pumps in boiler room. Flooded boiler room. November 15, 2005
Nalle Elementary School FM-200515465 11/15/05 Nalle Boiler Room Repair or replace rupture city water line to hot water side line approx. 1" and 1/2" November 15, 2005
Kramer Middle School FM-200515445 11/15/05 Kramer Boiler Room Boiler #3 bottom blowdown valve is inoperative, needs to be replace. Emergency !!! November 15, 2005
Thomas Elementary School FM-200515491 11/16/05 Thomas Boiler room Locate and repair link in the fire box of # 2 boiler. November 16, 2005
Ketcham Elementary School FM-200515489 11/16/05 Ketcham Boiler room Replace all cracked cast iiron sections on boiler # 5. November 16, 2005
Watkins Elementary School FM-200515539 11/17/05 Watkins Boiler room Repair Burner # 1 , cut off on flame failure. November 17, 2005
Whittier Elementary School FM-200515586 11/18/05 WHITTIER boiler room NO HOT WATER!!!!!! Repair or replace domestic hot water heater. will not ignite. November 18, 2005
Garnet-Patterson MS FM-200515605 11/20/05 Garnet-Patterson Boiler Room Repair or replace leaking nipple on return line. November 20, 2005
Stoddert ES FM-200515606 11/20/05 Stoddert Boiler Room Repair or replace Boiler, will not come on. Boiler will not do anything. November 20, 2005
Deal Junior High School FM-200515647 11/21/05 Deal Boiler Room Repair or replace leak in the leaking very bad by hand hole area. Boiler not in use leaking very bad. New November 21, 2005
Kimball Elementary School FM-200515612 11/21/05 Kimball Boiler Room Repair or replace two vacuum pumps on the vacuum tank are leaking. Seal is gone. Baldor motor; HP 3; RPM 3450; Volts 200 HZ 60; AMPS 9.1; HP 3 November 21, 2005
Rudolph Elementary School FM-200515616 11/21/05 Rudolph Boiler Room Repair or replace vacuum pump and return pump for the Boilers. Urgent !!!! November 21, 2005
Slowe Elementary School FM-200515683 11/22/05 Slowe Boiler Room Boiler #3 Remove bolts from boiler water side November 22, 2005
Coolidge High School FM-200515688 11/22/05 Coolidge Boiler Room Boiler #3 replace leaking tubes November 22, 2005
Brent Elementary School FM-200515690 11/22/05 Brent Boiler Room Repair or replace ejector pump. Pumps not working. Need pumps so boiler room will not be flooded. November 22, 2005
Bowen Elementary School FM-200515712 11/23/05 Bowen Boiler Room Replace bleeder valve over top of pumps. Water side of building has no heat. November 23, 2005
Langdon Elementary School FM-200515767 11/25/05 Langdon Boiler Room Repair or replace leaking condensate tank. November 25, 2005
Smothers ES FM-200515771 11/25/05 Smothers Boiler room Repair or replace steam leak in tunnel November 25, 2005
Kenilworth ES FM-200515763 11/25/05 Kenilworth Boiler Room Repair or replace regulator on city water line November 25, 2005
Park View ES FM-200515768 11/25/05 Parkview Boiler Room Replace domestic hot water circulating pump motor. November 25, 2005
Bunker Hill Elementary School FM-200515773 11/26/05 Bunker Hill Boiler Room Repair or replace house air compress. Bad motor. November 26, 2005
Bunker Hill Elementary School FM-200515774 11/26/05 Bunker Hill Boiler Room Repair or replace (house) heting circulating pump #2. Shaft will not rotate. November 26, 2005
Whittier Elementary School FM-200515780 11/27/05 Whittier Boiler Room Repair or replace line to sump pump. Line has came lose. November 27, 2005
Park View ES FM-200515844 11/29/05 Parkview Boiler room Unstop floor drains in the boiler room November 29, 2005
Simon Elementary School FM-200515992 12/2/05 Boiler room. Replace sump pump in boiler room. December 2, 2005
Reed LC FM-200516022 12/3/05 Reed Boiler Room Repair or replace condensate pump. Pump not working properly. Urgent !!!!! December 3, 2005
Benjamin Banneker Academic HS FM-200516021 12/3/05 Banneker Boiler Room Repair or replace condensate return pump. Control is not working properly, sometime. Urgent !!!! December 3, 2005
Bancroft Elementary School FM-200516052 12/5/05 Bancroft Boiler Room Repair or replace float switch to condensate return tank. Not working properly. Urgent !!!! December 5, 2005
Reed LC FM-200516060 12/5/05 Reed Boiler Room Replace mechancial seals for hot water cirulating pumps.#1,#2 and #3. Replace bearings for each pump, ASAP December 5, 2005
Malcolm X ES FM-200516098 12/6/05 Malcolm X Boiler Room Boiler #3 and #4 issue relief valves. Continuos dripping. Name: Watts Serial #01390 #740 Model #M Size 1-1/4" Set -50 Lbs. BTU 3,075,000 December 6, 2005
River Terrace ES FM-200516261 12/10/05 River Terrace Boiler Room Repair or replace leaking return pump, (pump #1) December 10, 2005
Wilkinson ES FM-200516279 12/11/05 Wilkinson Boiler room Replace programmer on Boiler #1 No heat in Building. December 11, 2005
Park View ES FM-200516442 12/14/05 Parkview Boiler Room Repair gas line leaks on generator, and Boilers #2 and #3 Cited by Washington Gas. Note: Boilers 2 of 5 operating. Urgent !!!!! December 14, 2005
Langdon Elementary School FM-200516467 12/14/05 Langdon Boiler Room Repair or replace vacuum pump, not working. Serve Cafeteria and stairway conventor. Urgent !!!! December 14, 2005
Eastern High School FM-200516573 12/15/05 Eastern Mechanical Room Furnish and install (3) low pressure condensate return tanks in order to bring back condensate to boiler feed tank. Tank do not work, condensate empties into drains. This means Boilers taking more city water . Information: Manuf: Hoffman Type: WC Simples Watchman WC8-208 Urgent !!!!! December 15, 2005
Roosevelt High School FM-200516575 12/15/05 Roosevelt Boiler Room- Entrance Need key cut to Boiler Room Entrance. For Mr. Roy Daniels December 15, 2005
Bowen Elementary School FM-200516637 12/16/05 Bowen Boiler Room Repair 2" rupture steam line leaking over top of Multistack system in the Boiler Room. December 16, 2005
Bowen Elementary School FM-200516635 12/16/05 Bowen Boiler Room Repair rupture copper line 3/4",Leaking from hot water tank. December 16, 2005
Raymond Elementary School FM-200516627 12/16/05 Raymond Boiler room Repair or replace exhaust fan in the boiler room December 16, 2005
Benjamin Banneker Academic HS FM-200516809 12/20/05 Banneker Boiler Room Repair or replace in line circulating pumps (2) for domestic hot water. Bad coupling. Urgent !!!! December 20, 2005
Ferebee-Hope Elementary School FM-200516793 12/20/05 Very Urgent: Repair or replace lights in engineers + custodian office area, boiler rm., gymnasium, and lunchroom. December 20, 2005
Park View ES FM-200516873 12/22/05 Parkview Boiler Room Repair or replace McDonnell Miller water feeder/low water cut off 51-2 HD December 22, 2005
Ferebee-Hope Elementary School FM-200516863 12/22/05 Ferbee-Hope Boiler Room Repair or replace #2 Boosteer pump motor. Model #9K254TTDR7026B HP 15 Frame 254T Type 1735 Serial #912743 Volts 230/460 Amp 40/20 Cycle 60 December 22, 2005
Ferebee-Hope Elementary School FM-200516864 12/22/05 Ferbee-Hope Boiler Room Repair or replace eyebolts and packing on #1 H.W. Circulating pump. December 22, 2005
Shaed Elementary School FM-200516948 12/28/05 Shaed Boiler Room Repair or replace Boiler #2. Boiler is going out on flame failure daily. Only Boiler approved to operate. Urgent !!!! December 28, 2005
Ferebee-Hope Elementary School FM-200516963 12/28/05 Ferbee-Hope Boiler Room Repair Boiler #3 going out on flame failure. Boiler #2 need to be repair going out on flame failure. Urgent !!!! December 28, 2005
Draper Elementary School FM-200517013 12/29/05 Draper Boiler Room Repair or replace domestic hot water heater, will not stay lit. Urgent !!!! December 29, 2005
Terrell Mc ES FM-200517214 1/7/06 Terrell, M.C. Boiler room Repair Boiler # 2 , Cuts off on flame failure. January 7, 2006
Benjamin Banneker Academic HS FM-200517245 1/8/06 Banneker Boiler room Repair or replace condensate return pump # 3 unit is leaking from seals.( loosing returns) January 8, 2006
Tyler Elementary School FM-200517254 1/9/06 Tyler Boiler room Replace soleniond valve on condensate make up line, valve stuck open January 9, 2006
Hyde Elementary School FM-200517271 1/9/06 Basement & Second floor. Repair or Replace utility sink in basement area across from boilerroom, also Repair or Replace utility sink in custodial closet on second floor. January 9, 2006
Garfield ES FM-200517252 1/9/06 Garfield Boiler Room - Behind Boiler Ceiling Replace Bell & Gossett Centifugal pump, leaking continuously. Size: P.D.35S MZ Mod. # 105089 Ser. # 1124817 Motor- HP 1/2 RPM 1725 HZ 60 Volts 115/230 Amp 6.0/3.0 S.F. 125 S.F. Amp 7.0/3.5 C. Rating 40 F Thermal Protection M74791 Part # M80066 Pump is used to serve auditorium, music room, library and restroom near Boiler Room. January 9, 2006
Ketcham Elementary School FM-200517266 1/9/06 Ketcham Boiler Room Repair or replace air compressor, not working. January 9, 2006
Terrell Mc ES FM-200517352 1/11/06 TERRELL, M.C. boiler room URGENT NO HEAT IN SCHOOL!!!!! ASBESTOS ASSESSTMENT REQUIRED Replace mud legs on boilers # 1 and 2 . School has NO HEAT URGENT Asbestos Code A - Clear for repairs on 01/11/06. Tidewater - Roger Small ( RG 01/12/06) January 11, 2006
Rudolph Elementary School FM-200617393 1/13/06 Rudollph Entrance to boiler room. Repair or replace light at the entrance to the boiler room, area is dark. January 13, 2006
Randle-Highlands ES FM-200617427 1/17/06 Randle Highland Boiler room Replace leaking relief valve on the # 5 boiler. Model # M3, 174 A, Size: 3/4, Set 80 lb., BTU/HR Rating 1,400,000 January 17, 2006
Ferebee-Hope Elementary School FM-200617512 1/18/06 Ferebee-Hope Boiler room Provide parts and materials to repair burner on Boiler #1. January 18, 2006
Wilkinson ES FM-200617507 1/18/06 Wilkinson Storage Area - (Inside of Boiler Room) Investigate concrete floor in back storage room. Floor is about to collapse. Safety Hazard !!!!! If assist. needed contract Mr. B. Shaw Cell #202-438-6537 Asbestos Code A - Clear for repairs on 01/18/06. Tidewater - Philp Connolly (RG 01/24/06) January 18, 2006
Brent Elementary School FM-200617648 1/20/06 Brent Boiler Room Repair or replace 4" drain line in Boiler Room. Water running down on Boiler room floor, from kitchen sink. Has odor. Urgent !!!! January 20, 2006
Burrville Elementary School FM-200617693 1/23/06 Burrville Boiler room Replace Pneumatic controls on both Heat Exchangers and calbrate to work inconjuntion with outside air temperture controls to resolve the over heating of hot water heating system. January 23, 2006
Ludlow-Taylor ES FM-200617747 1/23/06 Ludlow-Taylor Boiler Room Repair or replace I,D, Fan for Boiler #1, bad motor. January 23, 2006
Whittier Elementary School FM-200617975 1/27/06 WHITTIER boiler room Repair circulating pump # 1 located in boiler pump room. Pump will not start-up. Note: Both pumps are needed to properly heat building (new side). January 27, 2006
Peabody Elementary School FM-200617998 1/29/06 Peabody Boiler room Check and make adjustments on the pump controls,and condensate return pumps, pumps are not putting returns back in boilers. January 29, 2006
Whittier Elementary School FM-200618002 1/30/06 Whitter Boiler Room Repair condensate ,and circulating pump in the boiler room. January 30, 2006
Ross Elementary School FM-200618100 1/31/06 "Urgent" Asbestos Assessment Required. Basement Level, Boiler room. Repair falling ceiling in boiler room asap! Need 1 piece of sheet rock 4' x 8'. Asbestos Code A - Clear for repairs on 02/01/06. Tidewater - Carlos Vera (RG 02/09/06) January 31, 2006
Dunbar High School FM-200618063 1/31/06 Dunbar Boiler Room Sump pump not working. Need electrician. Emergency !!!!!!! January 31, 2006
Ferebee-Hope Elementary School FM-200618169 2/1/06 Ferebee-Hope Boiler Room & Computer Lab Unstop all floor drains in Boiler room. Unstop floor drain computer Lab. Urgent !!!! February 1, 2006
Montgomery ES FM-200618240 2/3/06 Montgomery Boiler Room Furnish McDonnel & Miller Boiler Control. (Auto water feeder) 515-2M Urgent !!!!! February 3, 2006
Nalle Elementary School FM-200618257 2/3/06 Nalle Boiler room Replace High velocity domestic hot water circulating pump in the boiler room. February 3, 2006
Woodson High School FM-200618349 2/6/06 Woodson, H.D. Boiler Room Replace (4) four bucket traps in Boiler Room. February 6, 2006
Hyde Elementary School FM-200618302 2/6/06 Hyde Boiler room Replace stopped up condensate return line to boilers # 1 and # 2 about 7 feet of 1- 1/2'' or 2' pipe. No returns to boilers. February 6, 2006
Bell High School FM-200618408 2/7/06 Bell Boiler Room Repair or replace two hot water circulating pump and motor. February 7, 2006
Ferebee-Hope Elementary School FM-200618496 2/8/06 Ferebee-Hope Boiler Room Replace vacuum return pumps February 8, 2006
Benjamin Banneker Academic HS FM-200618431 2/8/06 Banneker Boiler room Repair ruptured 3/4" return line in tunnel behind boiler. February 8, 2006
Malcolm X ES FM-200618426 2/8/06 Malcolm X Boiler room Replace B&G domestic hot water circulating pump February 8, 2006
Thomas Elementary School FM-200618536 2/9/06 Thomas Boiler Room Repair Boiler #1, when boiler comes on get a smell of gas. No Boilers, No heat in building. February 9, 2006
Adams Elementary FM-200618550 2/10/06 Adams Boiler Room Repair or replace Boiler #2 off on flame failure. February 10, 2006
Slowe Elementary School FM-200618563 2/13/06 Slowe Boiler room 1. Repair leaking condensate pump # 1 ,#2, & # 5 , bad mechanical seals. 2. Repair float switch on the # 6 condensate pump, pump runs continuously. February 13, 2006
Macfarland Middle School FM-200618647 2/14/06 MacFarland Boiler Room Repair or replace five (5) inch outside stem & Yolk gate valve that heats girl side of MarFarland, stem is broken from gate, February 14, 2006
Wilson High School FM-200618780 2/17/06 Wilson, W. Boiler Room Replace two (2) sections of 2-1/2" blackiron pipe to stop leaks on high pressure boiler drain lines. February 17, 2006
Tyler Elementary School FM-200618848 2/21/06 Tyler Boiler room Repair or replace leaking automatic timer flush unit for house pump.( ATF-EA-1.5) February 21, 2006
John Burroughs ES FM-200618845 2/21/06 Burroughs Boiler Room Asbestos assessment required on line. Repair or replace rupture return line behind condensate return tank. Urgent !!!1 February 21, 2006
Beers Elementary School FM-200618852 2/21/06 Beers Boiler Room Repair or replace #1 leaking condensate return pump. Leaking bad. Urgent !!!! February 21, 2006
Ludlow-Taylor ES FM-200619065 2/23/06 Ludlow Taylor Boiler Room Repair or replace leaking 1" flange for hot water circulating pump at the rear of hot water storage tank. February 23, 2006
Woodson High School FM-200619101 2/26/06 Woodson Boiler Room Repair or replace leaking condensate tank. Leaking at the bottom. Urgent !!!!! February 26, 2006
Hine JHS FM-200619107 2/27/06 Hine Boiler room Make adjustments heater or burners so that unit will not ignite roughly February 27, 2006
Murch Elementary School FM-200619188 2/28/06 Murch Boiler Room Repair or replace domestic water regulator valve 1-1/2" watts (Type) 0092M2 Valve is leaking bad causing damage to Boiler Room floor and grate concern to principal. Emergency !!!!! February 28, 2006
River Terrace ES FM-200619493 3/6/06 River Terrace Boiler room Replace ruptured cold water line in the ceiling of the boiler room over top of the boiler. March 6, 2006
Smothers ES FM-200619453 3/6/06 Smothers Boiler room Survey and make repairs on main city water line in the boiler room, the line is leaking. March 6, 2006
Kramer Middle School FM-200619703 3/9/06 Kramer Boiler Room Replace 2-1/2" copper line over hot water holding tank correctly. Per Mr. Critchlow Urgent !!!!! March 9, 2006
Burrville Elementary School FM-200619687 3/9/06 Burrville Boiler Room Replace pressure switch on air compressor. March 9, 2006
Gage-Eckington ES FM-200619685 3/9/06 Gage Eckington Boiler Room Repair or replace domestic hot water heater. Engineer try to reset heater, did not come on. March 9, 2006
Stanton Elementary School FM-200619961 3/15/06 Stanton Main Buildind Boiler room Repair domestic hot water heater , located in the boiler room, polit will not stay lit . March 15, 2006
Nalle Elementary School FM-200619997 3/16/06 Nalle Boiler room` Replace mechanical seals on Taco circulating pump , Model # FE2508E2FIELOA , GPM 70, Head 7o ft. RPM 1760 Motor H.P. 7.5 Impdim 8. March 16, 2006
Slowe Elementary School FM-200620071 3/20/06 Slowe Boiler room Survey and make all repairs on the condensate return pumps, pumps working correctly, possible problem float or float switches. March 20, 2006
Ludlow-Taylor ES FM-200620153 3/21/06 Ludlow-Taylor Boiler Room Repair or replace domestic hot water heater, no hot water in building March 21, 2006
Montgomery ES FM-200620152 3/21/06 Montgomery Boiler Room Repair Lochinvar Booster heater for domestic hot water. Heater has to be reset every morning resulting in low hot water temperature. March 21, 2006
Ferebee-Hope Elementary School FM-200620178 3/22/06 Ferebee-Hope Boiler Room Repair or replace Boiler #3, off flame failure. March 22, 2006
River Terrace ES FM-200620171 3/22/06 River Terrace Boiler room and through-out the building Repair pneumatic controls to operate outside air damper controls. (THIS IS A ASTHMATIC BUILDING) March 22, 2006
Ferebee-Hope Elementary School FM-200620260 3/23/06 Ferebee-Hope Boiler Room Replace two vaccum pump motor's. Model #56T170518A HP 5/8 PH 3 Volts 230/460 Type is Duty cont 40 1,25 March 23, 2006
Emery Elementary School FM-200620237 3/23/06 Emery Boiler room Repair burners # 1 & # 2 Flame failure. March 23, 2006
Eastern High School FM-200620252 3/23/06 Eastern Boiler Room Furnish and install (2) each Boiler feed water pumps. Feed pumps are not operating properly causing improper water flow to boilers Info: Industrial Steam Inc. Model: J25-672 Ser: F77-058B GPM-60 TDH: 300 Urgent !!!!! March 23, 2006
Truesdell Elementary FM-200620280 3/24/06 Truesdell Boiler Room Asbestos assessment required line. Repair or replace leaking 3" valve from header, over burner for Boiler #1. Urgent !!!!!! Asbestos Code A on 03/28/06 Tidewater - Roger Small (RG 03/30/06) March 24, 2006
Truesdell Elementary FM-200620284 3/24/06 Truesdell Boiler Room Asbestos assessment required line. Repair or replace inoperaable safety valve on Boiler #1 Valve information: 15 PSI, Size 2"x 2", Capacity 2500 Note: This repair can not be made unless approved by DC Boiler Inspector though Mr. B. Shaw or Mr. Rice. (Breeching) Asbestos Code A on 03/28/06 Tidewater - Roger Small (RG 03/30/06) March 24, 2006
Ludlow-Taylor ES FM-200620288 3/24/06 Ludlow Taylor Boiler Room Repair leaking flange on domestic hot water circulating pump, 2" line March 24, 2006
Wilkinson ES FM-200620412 3/28/06 Wilkinson Boiler room Repair leaking flang on the domestic hot water heater discharge line, at the pump. March 28, 2006
Patricia R Harris Ed Center FM-200620521 3/29/06 Harris,P.R. Boiler Room Multistack s being installed, need to have control tied into Seamans (Energy Management System) which is located in boiler room, so that both cooling and heating can be controlled and monitored from Boiler Room. March 29, 2006
Meyer Elementary School FM-200620479 3/29/06 Meyer Boiler Room Repair or replace #4 heating hot water pump and motor. March 29, 2006
Marshall Educational Center FM-200620533 3/30/06 Thurgood Marshall Boiler room Repair the domestic hot heater ,unit will not ignite March 30, 2006
Orr Elementary School FM-200620697 3/31/06 Orr Boiler Room door Repair or replace key pad lock on Boiler Room door. March 31, 2006
Gibbs Elementary School FM-200620958 4/5/06 Gibbs Boiler Room Repair or replace domestic hot water circulating pump. No hot water in building. Urgent !!!!! April 5, 2006
Johnson JHS FM-200621040 4/6/06 Basement-Unstop lavatories on the basement level in the custodian foreman and boiler plant operator offices. Toilet backs up when the commodes are flushed. (Very Urgent) April 6, 2006
Gage-Eckington ES FM-200621024 4/6/06 Gage-Eckington Boiler Room Repair or replace (2) Butterfly valves. 2-1/2" on condenser strainer. Urgent !!!! April 6, 2006
Whittier Elementary School FM-200621091 4/7/06 Whittier Boiler Room Repair discharge line to sump pump, line came loose. Urgent !!!! April 7, 2006
Woodson High School FM-200621163 4/11/06 Basement - Boiler Room - Repair or replace locked up shaft on A/C condenser water pump. Re: No A/C April 11, 2006
Woodson High School FM-200621164 4/11/06 Basement - Boiler Room - Repair or replace defective refrigerant compressor on #1 A/C chiller. Re: No A/C April 11, 2006
Woodson High School FM-200621165 4/11/06 Basement - Boiler Room - Repair or replace condensate pumps and controls on condensate tank ( storage) Re: No heat. April 11, 2006
Kramer Middle School FM-200621309 4/13/06 Basement- Boiler Room Repair lock on door next to custodial office. They cannot lock it at all. April 13, 2006
West Elementary School FM-200621361 4/14/06 West Boiler Room Repair or replace stand-by pump for cooling system. Control problem shut stand-by pump off, when chill water pump is on. Urgent !!!!! April 14, 2006
Hart Middle School FM-200621522 4/19/06 Hart Mechanical Room #1 (Tank Room) Replace (2) two flow meters on the gas fired hot water boiler (Hot Water-Heater) - Domestic Information: Flow mter BA6001502555/0022/C PRS 2416 HW Boiler Domestic - Lochinvar Mod # CWO985 PH Ser# 1004351 April 19, 2006
Bowen Elementary School FM-200621544 4/20/06 Bowen Boiler Room Send electrician to determine why there is no electric currect to domestic hot water heater. Urgent !!!! April 20, 2006
Shaw JHS FM-200621643 4/24/06 Shaw Boiler Room Repair or replace motor to Lochinvar Booster domestic hot water heater No hot water in building April 24, 2006
Shaw JHS FM-200621782 4/26/06 Shaw Boiler Room Replace coupling on B&G circulating pump to domestic hot water heater Urgent !!!!! April 26, 2006
Reed LC FM-200621807 4/26/06 REED LC boiler room Urgent No Hot water due to flue gas leak Repair leaking flue on hot water heater. April 26, 2006
Woodson High School FM-200621878 4/27/06 Woodson Boiler Room Repair or replace circulating pumps for domestic hot water heater. No hot water in building Urgent !!!!! April 27, 2006
Raymond Elementary School FM-200621949 4/28/06 Raymond Boiler Room Repair or replace chiller. Freon leak on unit. (Bad) Urgent !!!! April 28, 2006
Thomson Elementary School FM-200621913 0621913 4/28/06 Thomson Boiler room Replace condenser pump motor and loop pump motor that over heated and burnt out. NEEDED FOR COOLING. April 28, 2006
Brookland Elementary FM-200621948 4/28/06 Brookland Boiler Room Repair or replace light system in boiler room. Several of the light cabinets are not working. April 28, 2006
Whittier Elementary School FM-200621932 4/28/06 Whitter Boiler Room Replace air compressor in boiler room. This equipment is opsolite it has been down since 11/26/03 Old work no. FM-2003340764 This is needed for our pneumatic on the new side of the building. April 28, 2006
Ketcham Elementary School FM-200621960 5/1/06 Ketcham Boiler Room All (6) six feed water pumps and motors needs to be replace, leaking badly. Century A/C motor A.O. Smith Cat. #H155 Part # 8-187147-20 Type SC HP-1/2 HZ 60-50 Amp 2.6 Time Cont Code M May 1, 2006
Barnard Elementary School FM-200622078 5/2/06 Barnard Boiler Room Repair or replace hot water heater #1, unit will not reset or start. (Problem coming from stack, water coming from rain, stack has no sheild on roof.) Urgent !!!!! May 2, 2006
McKinley Technology High FM-200622116 5/2/06 McKinley Boiler Room Provide scope to purchase and install and each booster heaters to maintain hot water temperature levels for holding tanks, supplying the main building and also the gym. May 2, 2006
Brookland Elementary FM-200622108 5/2/06 Brookland Boiler Room Repair or replace domestic hot water tanks A.O.Smith 50 gallon tanks. There are two tanks leaking from bottom. Urgent !!!! May 2, 2006
Ferebee-Hope Elementary School FM-200622166 5/3/06 Ferebee Hope Boiler Room Repair coupling on #1 Chill water pump. Leaking. May 3, 2006
Ballou Senior High School FM-200622165 5/3/06 Ballou Boiler Room Install (1) one domestic hot water heater, Boiler Note: The removal of condemn Boiler #4 is required for the new Hot Water Boiler (Heater), Piping and platform is in place. May 3, 2006
Ferebee-Hope Elementary School FM-200622173 5/3/06 FEREBEE-HOPE boiler room URGENT Building has no windows Repair or replace chiller. Continuously shuting down on low evaporator refrigerate temperature. May 3, 2006
Cleveland Elementary School FM-200622185 5/4/06 Cleveland Boiler Room Repair or replace leaking 3" hot water supply line over top of boiler #2 up in ceiling. Urgent !!!!! May 4, 2006
Wilkinson ES FM-200622178 5/4/06 Wilkinson BOILERROOM Asbestos assessment required. Replace (2) 6" Butterfly valves for the stand-by pump the is used for the condenser pump.The main condenser pump is down(FM-200332649) May 4, 2006
Woodson High School FM-200622237 5/5/06 Woodson,H.D. Boiler room Repair domestic hot water heater # 1 , and #2 will not ignite. May 5, 2006
Benning Elementary School FM-200622247 5/5/06 Benning Boiler room Restore power to chiller control panel, no power to oil sump heaters. May 5, 2006
Thomas Elementary School FM-200622327 5/8/06 Thomas Boiler Room Repair leaking mechanical seal on Stand-by pump. May 8, 2006
Dunbar High School FM-200622283 5/8/06 Dunbar Boiler room Pelace leaking coil in air handler unit # 6, can not be repaired. May 8, 2006
Thomas Elementary School FM-200622325 5/8/06 Thomas Boiler Room Replace two defective Butterfly Isolation valves for stand-by pump. Valve size is (six) 6 " May 8, 2006
Shaed Elementary School FM-200622441 5/10/06 Shaed Boiler room Replace broken 3/4" PVC line to the chemical feeder for the boiler. May 10, 2006
Thomas Elementary School FM-200622412 5/10/06 Thomas Boiler room Replace 1-1/4" ASCO solenoid dump valve on the modular chiller, valve stuck open position May 10, 2006
Janney Elementary School FM-200622411 5/10/06 Janney Boiler room Repair or replace sump pump , unit has power but will not run. May 10, 2006
Leckie Elementary School FM-200622593 5/12/06 Leckie Boiler Room Main Condensate tank line behind ground floor univent coils near wall needs to be unclogged continuiusly backs up causing water on classroom floor. Classrooms: #14;#21;#30;#24 Approx. Size 1-1/2" May 12, 2006
Truesdell Elementary FM-200622660 5/15/06 Boiler Room The light fixture is rusted and hanging from the ceiling wires. A new light fixture is needed. Asbestos Code A - Clear for repairs on 05/17/06. Tidewater - Shamika Parker (RG 05/18/06) May 15, 2006
McKinley Technology High FM-200622659 5/15/06 Basement Level, Boiler Room. Replace leaking mechanical seal to primary boiler pump # 1. May 15, 2006
McKinley Technology High FM-200622661 5/15/06 Basement Level, Boiler Room. Replace defective DDC control actuator valve does'nt obey open command. Unit modle name Belimo Boiler # 4 May 15, 2006
Green Elementary School FM-200622771 5/16/06 Green Boiler Room Repair or replace sump pump in Boiler Room. Boiler Room is flooded. Urgent !!!!! May 16, 2006
Patricia R Harris Ed Center FM-200622689 5/16/06 Harris, P.R. Boiler Room Upgrade lighting system from murcury vapor lighting to flourscent lamp tubes. Present lighting system does not provide proper lighting in the Boiler Room. Electric survey is needed. Safety Hazard. May 16, 2006
Eaton Elementary School FM-200622765 5/16/06 Eaton Boiler Room Repair or replace circulating pump for HVAC . MFR= Armstrong- Mod - 4030 Serial-104210 HP 1.5 RPM 1750 Pump size 2D. Motor MFR- Morathon MOD - LVC145TTDR7926ACW Type - TDR Volts - 200; Amps 5.5 Phase 3 RPM-1745 Cy 60 Urgent !!!!! May 16, 2006
Orr Elementary School FM-200622797 5/17/06 Orr Boiler Room Unstop floor drain behind Boiler #1. So Boiler can be drained and cleaned. Urgent !!!!! May 17, 2006
Whittier Elementary School FM-200622884 5/17/06 1st Floor- Steps Leading to the Boiler Room Repair 2" waste line in stairway. May 17, 2006
Ketcham Elementary School FM-200623006 5/19/06 Ketcham Boiler room Replace leaking sections in the # 3 boiler. May 19, 2006
Ketcham Elementary School FM-200623004 5/19/06 Ketcham Boiler room 1. Need welder to help remove cross tees and or plugs from boilers 1,2,3,4,and 5 boilers. 2. Please extend blow down lines to drains from low water cut off , automatic water feeder on boilers # 1,2,3,4,and 5 . This needed for boiler inspections. May 19, 2006
Ketcham Elementary School FM-200623007 5/19/06 Ketcham Boiler room Replace safety valve on boiler # 3 Name: Conbraco Size: 1-1/4 X 1-1/2" 15 psi 1200/lbs. Hr. 13-213 May 19, 2006
Raymond Elementary School FM-200623306 5/25/06 Raymond Boiler Room Repair or replace heating /cooling house circulating pump, that leaking badley (stand by) when in operation. Urgent !!!! May 25, 2006
Ronald H. Brown MS FM-200623904 6/6/06 Brown, Ron (Roper) Boiler room Check electrical panel for service dor Temp. chiller. June 6, 2006
Hine JHS FM-200623902 6/6/06 Hine Boiler room No hot water Repair domestic hot water heater, unit is off on flame failure. June 6, 2006
Leckie Elementary School FM-200623995 6/7/06 Leckie Principal and Main Officeand Boiler Room Install new dryer for proper operation serving pneumatic system and remove old unit and discard. Replace (2) two 1/2" copper sweat valves on chiller return line. Supply and return lines 1/2" June 7, 2006
Wilkinson ES FM-200624049 6/8/06 Wilkinson Boiler room Repair or replace compressor # 1 on modual #1 and compressor # 16 on modual # 8, compressors will not stay on. June 8, 2006
Randle-Highlands ES FM-200624050 6/8/06 Randle Highland Boiler room Repair leaking mechanical seal on the condenser pump for the chiller. June 8, 2006
Thomas Elementary School FM-200624215 6/12/06 Thomas Boiler Room Prepare and perform hydrostatic test on boiler #1. Leaking tubes has been replaced. June 12, 2006
Brookland Elementary FM-200624241 6/13/06 Brookland Boiler Room Unstop drain by domestic hot water heater in Boiler Room. Water on Boiler Room floor. Urgent !!!! June 13, 2006
Bunker Hill Elementary School FM-200624345 6/14/06 There is a ruptured pipe in the boiler room. 1- 1/2" copper ninety on domestic hot water line. Water has been turn off for repairs. June 14, 2006
Langdon Elementary School FM-200624646 6/22/06 Langdon Boiler room Repair leaking gas supply line to the domestic hot water heater, line is leaking close to the wall. June 22, 2006
Browne Junior High School FM-200624804 6/26/06 Outside drain backing up into boiler room causing cafeteria to flood. June 26, 2006
Kramer Middle School FM-200624718 6/26/06 Kramer Boiler Room Repair or replace sump pump is not working. Urgent !!!!! June 26, 2006
Benning Elementary School FM-200625086 6/30/06 Benning Boiler room Unclog floor drains , needed to flush boilers out for inspections June 30, 2006
Beers Elementary School FM-200625082 6/30/06 Outside- Near Library Drain outside window well; it is causing mosquitos and flooding in the boiler room. June 30, 2006
Thomas Elementary School FM-200625101 7/2/06 Thomas Boiler Room Furnish (4) four linch dia. by 34" in length black pipe-threaded on both ends. Furnish (4) four 1" - 45 degree elbows Materials will be used in AWF and LWCO Blow down lines- Annual Boiler Inspection. July 2, 2006
Ketcham Elementary School FM-200625241 7/5/06 Ketcham Boiler room Remove large clean-out plugs from the front of boiler # 1 & # 2. July 5, 2006
Houston Elementary School FM-200625310 7/6/06 Houston Boiler room Calibrate burner on the boiler # 1 , Boiler had a large amount of soot the tubes and fire side when it was opened for cleaning, unit did not run during the heating season, . July 6, 2006
Ronald H. Brown MS FM-200625432 7/7/06 Boiler Room Pump Area There is a sewage back-up, that is leaving feces and black sewage. The pump room will need to be cleaned and sanitized. Code A-clear for repair by DCPS Charles Buchanan on 6/10/06 July 7, 2006
Kramer Middle School FM-200625413 7/7/06 Kramer Boiler Room Repair or replace domestic hot water heater, damage from flooded boiler room. No hot water in building. Urgent !!!!! July 7, 2006
Aiton Elementary School FM-200625446 7/8/06 Aiton Boiler room URGENT!!!!!!!! Replace damper door on the breeching ,cast aluminum frame is broken ( 19- 15/16" in. Dai.) July 8, 2006
Slowe Elementary School FM-200625587 7/12/06 Slowe Boiler Room Check and repair #1 sump pump, When sump pump #1 comes on it turns off both sump pumps. When sump pump #2 is on, it OK, for pump #2 only can run. July 12, 2006
Plummer Elementary School FM-200625593 7/12/06 Plummer Boiler Room Boiler #1 replace feed-water valve Boiler #2 replace safety valve Per DC Boiler Inspector July 12, 2006
Woodson High School FM-200625699 7/14/06 Woodson Boiler Room Open boiler drain with a new access hole for cleaning scale. July 14, 2006
Woodson High School FM-200625700 7/14/06 Woodson Boiler Room Repair refractory on Boiler #1 July 14, 2006
Benning Elementary School FM-200625721 7/16/06 BENNING BOILER RM URGENT Check and resolve problem with chiller unit. Continues to surge, chill water temperature only at 57 degrees setpoint is at 46 degrees. School has no windows July 16, 2006
Bruce-Monroe Elementary School FM-200625733 7/17/06 First Floor - Principal's Office - ( Break-In ) Repair or Replace door and ceiling tile. Also need welders to repair exterior grate leading from the parking lot to the boiler room & the metal panel over the exterior entry door to boiler room. Asbestos Code A - Cleared for repairs on 08/02/06 by Tidewater/Carlos Vera (LM-08/02/06) Safety Office 202-576-8962. July 17, 2006
Wilson High School FM-200625735 7/17/06 WILSON W. Furnish (2) two pressure controls for boilers. July 17, 2006
Browne Junior High School FM-200625884 7/18/06 1st Floor- Boiler Room Exit door needs to be rehung. It will not close correctly. July 18, 2006
Reed LC FM-200625892 7/19/06 Reed Boiler Room Repair or replace domestic hot water in boiler room. No hot in building. July 19, 2006
Duke Ellington School FM-200625927 7/19/06 Ellington Boiler Room Repair or replace leaking sections in boilers #3 and #5 July 19, 2006
Terrell Mc ES FM-200625981 7/20/06 Terrell, MC Boiler Room Check chiller and compressor, Only 2 out of 10 compressor is working Urgent !!!!!! July 20, 2006
Woodson High School FM-200626193 7/24/06 Woodson Boiler Room Repair or replace chill water circulating pump #10 and #11. These pumps serve the auditorium and Gym area. July 24, 2006
Cardozo High School FM-200626389 7/26/06 Boiler Room/Leaking galvanized and carper pipes on the hot water heater July 26, 2006
Eaton Elementary School FM-200626396 7/26/06 Eaton Boiler Room Calibrate burners #1 and #2. To burnt properly at all modulation levels July 26, 2006
Deal Junior High School FM-200626397 7/26/06 Deal Boiler Room Boiler #2 Repair or replace leaking section in rear below hand hole. July 26, 2006
Garfield ES FM-200626434 7/26/06 GARFIELD boiler room Request refractory for manhole access doors # 1 and # 2 boilers at back of the fire box July 26, 2006
Coolidge High School FM-200626462 7/27/06 Coolidge Boiler Room Install french drain on boiler room floor in order to divert flood washer to drains in boiler room, July 27, 2006
Coolidge High School FM-200626463 7/27/06 Coolidge Outside Boiler Room Unstop down spout drains and window well drain next to boiler room. Drains backing up causing flooding in boiler room. July 27, 2006
Truesdell Elementary FM-200626448 7/27/06 Truesdell Boiler Room Repair or replace light in Boiler Room entrance. Possible bad balances in fixture. Two (2) fixtures. July 27, 2006
Marshall Educational Center FM-200626478 7/28/06 MARSHALL THURGOOD boiler room Make repairs to the existing pnuematic system. The pnuematic system is operating 50 %. July 28, 2006
Thomas Elementary School FM-200626504 7/28/06 THOMAS Neval boiler room Repair / Replace Flourescent light fixtures. Note: Constant safety hazard exist (water on floor) July 28, 2006
Wilkinson ES FM-200626492 7/28/06 WILKINSON boiler room Chiller failure due to possible dirty heat exchangers Clean heat exchangers July 28, 2006
Reed LC FM-200626493 7/28/06 Marie REED L.C boiler room Chiller failure due to possible dirty heat exchangers Clean heat exchangers July 28, 2006
Bancroft Elementary School FM-200626521 7/30/06 Bancroft Boiler Room Repair or replace float control for cond. return tank. Continuously adding water daily. July 30, 2006
Roosevelt High School FM-200626659 8/1/06 Roosevelt Boiler Room/Boiler Feed Pump Grunfos pump - 7-1/2 HP; Motor: volts -460 HZ 60; #3 Pump not working-no pressure. August 1, 2006
Benning Elementary School FM-200626663 8/1/06 BENNING boiler room Replace burner cone refractory on boiler # 1 August 1, 2006
Francis Junior High School FM-200626628 8/1/06 Francis Boiler room Repair or replace sump pump, pump is making loud noise. August 1, 2006
Duke Ellington School FM-200626674 8/2/06 Ellington , D boiler room Replace leaking cast iron sections in boilers # 3 & # 5 August 2, 2006
Bruce-Monroe Elementary School FM-200626728 8/3/06 Bruce-Monroe Boiler Room Boiler #1 and #2 repair or replace ID fan. Bearing problems. Urgent !!!!! August 3, 2006
Backus Middle School FM-200626725 8/3/06 Backus Boiler Room Repair or replace relief valve on Hot Water Storage Tank #2 August 3, 2006
Bruce-Monroe Elementary School FM-200626727 8/3/06 Bruce-Monroe Boiler Room Repair or replace Circulating pump #3. Lock up August 3, 2006
Beers Elementary School FM-200626854 8/5/06 Beers Boiler room Repair replace condensate pump # 2 bad mechanical seals. August 5, 2006
Wilson High School FM-200626855 8/5/06 Wilson, W. Boiler Room Replace 2-1/2" leaking welded short nipple on fed water supply line to #1 feed water pump. August 5, 2006
Shaw JHS FM-200626858 8/5/06 SHAW kitchen Replace condensate return pumps for # 4 boiler. August 5, 2006
Wilkinson ES FM-200626926 8/7/06 Boiler # 1 & 2 - Replace leaking tubes. August 7, 2006
Kramer Middle School FM-200627002 8/8/06 Basement - Boiler Room - Replace 2" gate valve on bottom blow down discharge lines, boilers # 2 and # 3, inoperative. August 8, 2006
Kramer Middle School FM-200627001 8/8/06 Basement - Boiler Room - Replace gate valve for hot water holding tank, not holding. August 8, 2006
Young Elementary School FM-200627175 8/10/06 Basement - Boiler Room - Install a booster Draft Fan to assist removal of combustion gas from hot water heater. August 10, 2006
Benning Elementary School FM-200627177 8/10/06 Basement - Boiler Room - Correct problem with water coming into Boiler Room at the base of the building,causing the Boiler Room to flood. Boiler Room has no sump pump. Asbestos Code A - Clear for repairs on 08/11/06. Tidewater - Thomas Johnson (RG 08/11/06) August 10, 2006
Hyde Elementary School FM-200627332 8/12/06 Hyde Boiler Room Boiler #1 Repair or replace possible crack section August 12, 2006
Ferebee-Hope Elementary School FM-200627411 8/14/06 Ferebee-Hope Boiler room Unstop all floor drain , contractor installing summp , and floor drain are clogged. August 14, 2006
Hart Middle School FM-200627526 8/14/06 Boiler Room - Boilers # 2 and # 3 - Leaking tubes. August 14, 2006
Woodson High School FM-200627567 8/15/06 Woodson Boiler Room Repair or replace sump pump. Pump stop working. Urgent !!!! August 15, 2006
Woodson High School FM-200627655 8/15/06 Boiler # 1 and # 2 - Calibrate burners August 15, 2006
Woodson High School FM-200627650 8/15/06 Boiler Room - Boilers # 1 - Replace leaking tubes. August 15, 2006
Woodson High School FM-200627651 8/15/06 Boiler Room - Boilers # 1 - Repair refractory in combustion chamber. August 15, 2006
Meyer Elementary School FM-200627733 8/16/06 Boiler # 1 - Replace (2) rear and (1) hand hold rim. August 16, 2006
Brookland Elementary FM-200627763 8/16/06 Boiler Room - Calibrate # 1 Burner, Calibrate # 2 Burner. (Per DCRA Inspector, Keith Jones). August 16, 2006
Brent Elementary School FM-200627728 8/16/06 Boiler Room - Replace leaking drain line in ceiling over boilers. Asbestos Code A - Clear for repairs on 08/18/06. Tidewater - Kenny Long (RG 08/22/06) August 16, 2006
Spingarn High School FM-200627842 8/17/06 Spingarn Boiler Room Repair or replace domestic hot water heater. August 17, 2006
Browne Junior High School FM-200627825 8/17/06 Tunnel Under Boiler Rm. - Repair 2in. Hot Water Line Leak. August 17, 2006
Marshall Educational Center FM-200627822 8/17/06 Marshall Boiler Room Contractor - Under Warrant Compressor #11 and #12 Low on refrigerant August 17, 2006
Houston Elementary School FM-200627919 8/18/06 Boiler Room- Replace cut of valve; it is not being completely cut off. August 18, 2006
Truesdell Elementary FM-200627902 8/18/06 Boiler Room - Outside Door - The top lock does not lock at all. It is needed for Building Security and Safety. August 18, 2006
Truesdell Elementary FM-200627906 8/18/06 Boiler Room - Replace (2) or all light fixtures in the Boiler Room. They are needed for better light to work by. There are (6) fixtures and there are only (3) working. Due to rusted out chain one light is hanging and is a safety hazard. August 18, 2006
Whittier Elementary School FM-200627899 8/18/06 Boiler Room - Repair or replace sump pumps. There is a temporary connection now that comes apart all year. August 18, 2006
Whittier Elementary School FM-200627901 8/18/06 Boiler Room - Back Door - Repair back door lock , this door does not lock with the key. There is only a slide bolt to lock the Boiler Room and Building. You can not enter from the outside. August 18, 2006
Draper Elementary School FM-200627892 8/18/06 Draper Boiler room Replace tubes in # 2 boiler, set-up for hydro. August 18, 2006
Burrville Elementary School FM-200627967 8/21/06 Boiler Room - Boilers # 1 Replace leaking tubes and repair foundation. August 21, 2006
Cardozo High School FM-200628137 8/22/06 Basement - Boiler Room - Repair # 1 Boiler, burner will not start , no pilot flame.. August 22, 2006
Draper Elementary School FM-200628217 8/24/06 Draper Boiler Room Check and correct problem to domestic hot water heater, no hot water going throughout Building Replace 2" valve on 1st floor to hot water supply line. Urgent !!!! August 24, 2006
School WW High School FM-200628227 8/24/06 Basement level, Rooms 001, 002, 003, Boys' restroom, Girls Restroom and Boiler Room. Remove peeling paint , plaster and paint the walls & ceiling in the areas listed above on the basement level. Lead Code B Asbestos Code A - Clear for repairs on 08/28/06. Tidewater - Roger Small (RG 09/07/06) SEE ASSESSMENTS August 24, 2006
Raymond Elementary School FM-200628310 8/25/06 Old Boiler Room - Repair or Replace B&G in-line circulating pump for domestic H/W heater. Pump is leaking badly. August 25, 2006
Eastern High School FM-200628314 8/25/06 Sub-B Cafeteria Kitchen - Unstop all boiler tubes in Boiler # 1 due to acid cleaning. August 25, 2006
Woodson High School FM-200628268 8/25/06 Woodson Boiler Room Replace condensate return system for boilers #1 and #2 August 25, 2006
Bruce-Monroe Elementary School FM-200628311 8/25/06 Boiler Room - Repair or Replace domestic H/W heater. Unit is being reset daily. August 25, 2006
Bruce-Monroe Elementary School FM-200628494 8/30/06 Boiler Room - Repair or Replace Chiller. Chiller indicating high head pressure. Note - Engineer cleaned strainers on both sides of system and check cooling tower. August 30, 2006
Burrville Elementary School FM-200628476 8/30/06 Burrville Boiler Room Remove both safety valves and cup off and reinstall after hydrostaties is performed on Boiler #1 August 30, 2006
Bunker Hill Elementary School FM-200628629 8/31/06 Bunker Hill Boiler Room Check and correct domestic hot water the building. No hot water in building. Polit keep going out. Urgent !!!!! August 31, 2006
Wilkinson ES FM-200628595 8/31/06 WILKINSON BOILER ROOM Replace city make-up feed water regulator. Will not regulate constant water pressure to close loop system. URGENT. Appears regulator was tamper with. No. U5B, Model JM2, SET S.D Range 25-75 August 31, 2006
Hart Middle School FM-200628626 8/31/06 Hart Boiler Room Check and correct domestic hot water throughout the building. No hot water in building Urgent !!!!! August 31, 2006
Johnson JHS FM-200628618 8/31/06 Basement, Kitchen Area. No hot water in kitchen, check water heater in boiler room. August 31, 2006
Noyes Elementary School FM-200628680 9/1/06 Basement - Boiler Room - # 2 chiller is low on it's refrigerant charge and it needs to be serviced . ASAP. - 134-A refrigerant. September 1, 2006
Coolidge High School FM-200628679 9/1/06 Ground Floor - Boiler Room - Repair and make operable (2) hot water circulating pumps for the new Gym heating system.Pumps located in Boiler Room. Both needs magnetic starters to be replaced. Type - Klockweiz - Moeller D1/2-22/22 Na Ph 3 amp 60 Max fuse 200 size fuse - 80 amp. September 1, 2006
Garfield ES FM-200628726 9/2/06 Garfield Boiler Room Check sump pump #4motor and shaft not working. Engineer replace (3) three fuses for #3 sump pump now working. Mod# SVB56T17D890A Frame 56C-6 PH-3 HZ 60 Type TS RPM 1725 HP 1/2 208/230 CRN-R 15 Class RK-5 AMPS 200,000 Volts or Less 250 September 2, 2006
Marshall Educational Center FM-200628810 9/6/06 Marshall Boiler Room Repair or replace breaker panel which has water coming throw it fromroof drain line when it rains. 480 volts. September 6, 2006
Eaton Elementary School FM-200628836 9/6/06 Eaton Boiler Room Repair or replace #1 and #2 chiller not working, timer control box broken, on #2. #1 Chiller compressor need replacing completely. Urgent !!!!! September 6, 2006
Woodson High School FM-200628944 9/7/06 Woodson Boiler Room Replace condensate system for Boiler #1 and #2 September 7, 2006
Cleveland Elementary School FM-200628942 9/7/06 Cleveland Boiler Room Repair or replace house circulating hot water pump (Green pump). Pump down. Urgent !!!!! September 7, 2006
Eastern High School FM-200628919 9/7/06 Sub B - Cafeteria-Kitchen - Replace both water softners systems in Boiler room. Both softners are leaking and float assemblys need replacing. System is vital to the operation of the plant. Info - Bruner Corperation September 7, 2006
Shaw JHS FM-200628949 9/7/06 Shaw Boiler Room Replace boiler feed pumps #1 and #2 Located in pump pit. Asbestos Code A - Clear for repairs on 03/20/07. Tidewater - Kenny Belton (RG 03/21/07) September 7, 2006
Wilson J. O. ES FM-200629120 9/11/06 Wilson, J.O. Boiler room Replace B& G spring coupling on the DHW circulating pump. September 11, 2006
Dunbar High School FM-200629174 9/12/06 Dunbar Boiler Room Repair or replace exhaust fan on roof near Boiler Room September 12, 2006
West Elementary School FM-200629229 9/13/06 West Boiler Room Boilers #1,#2 & #3 Repair damage sheet metal jacket Per DC Boiler Inspector September 13, 2006
Kelly Miller MS FM-200629226 9/13/06 Boiler # 1 & 3 perform hydro. test September 13, 2006
Harris, C.W. ES FM-200629362 9/13/06 1st Floor- Roomos 143, 144, 146, 149, Near 111, and Hallway near Boiler Room Repair roof leaks above these areas. Asbestos Code A - Clear for repairs on 09/15/06. Tidewater - Thomas Johnson (RG 09/18/06) September 13, 2006
Kelly Miller MS FM-200629252 9/13/06 Boiler # 1 perform hydro. test September 13, 2006
Bowen Elementary School FM-200629237 9/13/06 Boiler # 2 burner calibration. September 13, 2006
Bancroft Elementary School FM-200629558 9/15/06 Ground Floor- Hallway (near boiler room) Furnish and install 4 light fixtures. September 15, 2006
Murch Elementary School FM-200629524 9/15/06 Murch Boiler Room Repair or replace burner on Boiler #5. Will not start. September 15, 2006
Tubman Elementary School FM-200629591 9/18/06 Basement - Boiler Room - Replace missing wall mounted sink, need to wash up when in the Boiler Room. Asbestos Code A - Clear For Repairs On 09/21/06. Tidewater - Thomas Johnson ( RG 09/25/06) September 18, 2006
Beers Elementary School FM-200629638 9/18/06 Bldg. 2 - Old Boiler Rm. - Sub pump is not working, causing outside drain to be stopped up. Lots of standing water and mosquitoes are growing. September 18, 2006
Montgomery ES FM-200629669 9/19/06 Montgomery Exterior Entrance to Boiler Room Unstop drain at base of steps to boiler room. Engineer attempted to unstop with negative result. Note: At present about 18" of water in outside airway and backing up into boiler room. Urgent !!!!!! September 19, 2006
Slowe Elementary School FM-200629658 9/19/06 Slowe Boiler Room Repair or replace domestic hot water heater. #1Hot water been turn off since March 03 by Merton #2 Hot water heater not working AOSmith; model # BTR-197110 Booster pump not working Make: B&G 1725 Rpm PH 1 HP-13 Volts 115 Amps 175. No hot water in Building. Urgent !!!!! September 19, 2006
McKinley Technology High FM-200629742 9/20/06 Chiller Room, Boiler Room. 1.) Repair or replace leaking mechanical seal chillwater secondary pumps#2 and #3. 2.) Repair or Replace leaking boiler hotwater secondary pump mechanical seal #2. September 20, 2006
Spingarn High School FM-200629699 9/20/06 Boiler Room - Repair refactory to boiler # 4 firebox cleanout opening and square cleanout plug. September 20, 2006
Wilkinson ES FM-200629860 9/22/06 WILKENSON boiler room URGENT!!!!! 2nd request Replace approximately 6-8 foot section of cast iron storm drain that is cracked in leaking unto boiler room floor. drain line located in between boilers 1 and 2. September 22, 2006
Turner Elementary School FM-200629864 9/22/06 TURNER Boiler room Repair or re-direct existing collapse floor drain line in boiler room, cause boiler room to flood. September 22, 2006
Reed LC FM-200629876 9/22/06 Boiler Room - Repair or Replace boiler # 1. Parts removed from boiler to repair # 2 and # 3. September 22, 2006
Simon Elementary School FM-200629902 9/24/06 Simon Boiler Room Boiler #2 leaking tubes DC Boiler Inspection September 24, 2006
Shaw JHS FM-200629911 9/24/06 Shaw Boiler Room Boiler #2 Need refractory work with combustion chamber DC Boiler Inspector September 24, 2006
McKinley Technology High FM-200629895 9/24/06 McKinley Boiler Room Boiler #1 Failed need mechanical seals on pumps Boiler #4 Failed need actuator DC Boiler Inspector September 24, 2006
Houston Elementary School FM-200629906 9/24/06 Houston Boiler Room Boiler #1 Need refractory work in fire box DC Boiler Inspector September 24, 2006
Eliot Junior High School FM-200629928 9/25/06 Eliot Roof drains over the boiler room Unstop roof drains over top of the boiler room September 25, 2006
McKinley Technology High FM-200629940 9/25/06 Basement, Boiler Room. Repair or Replace leaking mechanical seal boiler # 1. September 25, 2006
Roosevelt High School FM-200629947 9/25/06 Remove pedistle pumps from the boiler room. September 25, 2006
Coolidge High School FM-200629938 9/25/06 Boiler Room/Leak - Cemical tank September 25, 2006
Burrville Elementary School FM-200630021 9/26/06 Burrville Boiler Room Repair or replace burnt out starter coil to condenser pump September 26, 2006
Draper Elementary School FM-200630138 9/27/06 DRAPER boiler room Replace light fixtures in boiler room. Inadequate lighting to complete repairs to boilers SCHOOL WILL HAVE NO HEAT IF FIXTURES CAN NOT BE REPAIR. September 27, 2006
Kramer Middle School FM-200630132 9/27/06 KRAMER boiler room Boiler # 3 repair refractory around fire door per boiler inspector. September 27, 2006
Kramer Middle School FM-200630135 9/27/06 KRAMER boiler room Boiler # 1 replace safety valve September 27, 2006
Stuart-Hobson Middle School FM-200630139 9/27/06 HOBSON S boiler room Retube boiler # 1 September 27, 2006
Plummer Elementary School FM-200630174 9/27/06 1st Floor- Boiler Room Re-align restroom door. September 27, 2006
Stuart-Hobson Middle School FM-200630140 9/27/06 HOBSON S boiler room Replace safety valve boiler # 2 September 27, 2006
Kenilworth ES FM-200630137 9/27/06 Kenillworth Merchanical Room Boiler #1 repair or replace automatic make up feed switch, switch not working properly. Also Boiler #2 replace bulb on control panel for power on. September 27, 2006
Thomas Elementary School FM-200630144 9/27/06 THOMAS N. Boiler # 2 leaking draft port in firebox September 27, 2006
Wilson High School FM-200630221 9/28/06 Wilson, W. Boiler Room Replace defective firerye programmer to burner #2 September 28, 2006
Thomas Elementary School FM-200630218 9/28/06 Thomas Boiler Room Boiler #1 Replace leaking tube. Boiler #1 Replace defective 1-1/2" gate valve on Bottom Blowdown line. September 28, 2006
Rudolph Elementary School FM-200630259 9/29/06 Boiler Room - Repair or replace feed water regulator for circulating hot water. Water is being added to system all the time, causing relief to pop valve. September 29, 2006
Rudolph Elementary School FM-200630275 9/29/06 Rudolph Boiler Room Repair or replace feed water regulator and stop valve, on hot wtaer circulating side for heating, line is located in upper level of boiler room. Relief valve is popping when pressure raises. September 29, 2006
Eastern High School FM-200630310 10/2/06 Sub - Basement - Cafeteria-Kitchen - Replace both water softners systems in Boiler Room. Both softners are leaking and float assemblys needs replacing. System is vital to the operation of the plant. Info9: Bruner Corperation.. October 2, 2006
Cook J.F. Elementary School FM-200630313 30313 10/2/06 Basement - Boiler Room - Boiler # 1 needs replaced a MC donald flush out float chamber, model # 51 -2 35 PSI. October 2, 2006
Shaw JHS FM-200630307 10/2/06 Ground Floor - Boiler Room - Replace 1" blow down line on water column and pipe to drain on Boiler # 4. Replace 1 1/4 blow down line on Boiler # 3 on pipe to drain. October 2, 2006
Dunbar High School FM-200630311 10/2/06 Replace low water cut off S1S feeder on boiler # 2 and # 3 Boiler. Replace low water cut off on # 2 Boiler. October 2, 2006
Kenilworth ES FM-200630365 10/3/06 Kenilworth Boiler room Repair or replace flue pipe to hot water heater,pipe has a hole in it. October 3, 2006
Benning Elementary School FM-200630356 10/3/06 Benning Boiler room unstop floor drains in the boiler room, floor has 3" inches water on the floor, and no where to drain. October 3, 2006
Ronald H. Brown MS FM-200630409 10/3/06 Repair ruptured steamline in boilerroom. Note: The boilerroom is flooding. October 3, 2006
Langdon Elementary School FM-200630381 10/3/06 Basement - Boiler Room /Tunnel Area - Repair or replace ruptured 2" condensate line as soon as possible. October 3, 2006
Langdon Elementary School FM-200630482 10/5/06 First Floor - Boiler Room - Repair or adjust entrance door to Boiler Room. Asbestos Code A - Clear for repairs on 10/06/06 Tidewater - Tony Marcolin (RG 10/10/06) October 5, 2006
Eastern High School FM-200630493 10/5/06 Eastern Boiler Room Repair or replace defective pump/motor. Boiler feed water pump. GE Motor/pump;Model #5K215J153 FV HP-15; RPM 3515 PH 3 FR-215TCZ A-40.6 V-200 October 5, 2006
Eliot Junior High School FM-200630547 10/6/06 Eliot Boiler Room Boiler #1 Lockout and flame failure October 6, 2006
Takoma Educational Center FM-200630584 0630584 10/6/06 Replace ballasts in the following classroom areas: Learning Center, Hallways, Electrical Closet, Gym, Boiler Room, 2, 55, 73, 65, 113C, 124BC, 167, 169, 160, 101, 195, 196CD, 226, 235. October 6, 2006
Stanton Elementary School FM-200630629 10/10/06 STANTON boiler room Replace 2 " blowdown line and valve to boiler # 2. Valve is corrode and will not hold October 10, 2006
Ketcham Elementary School FM-200630611 10/10/06 KETCHAM ES boiler room Repair boiler # 3 water leaking from combustion chamber at bottom. October 10, 2006
Brookland Elementary FM-200630669 10/11/06 Boiler Room - Repair or replace low water cut off not responding to test mode. Model # 750 - McDonnell and Miller Replace altitude gauge on # 2 Boiler. Replace 2 inch sight glass on # 1 Boiler. October 11, 2006
Hendley Elementary School FM-200630694 10/12/06 Hendley Boiler room Repair or replace blend pump on # 4 boiler , pump will not run. October 12, 2006
Thomas Elementary School FM-200630719 10/12/06 Boiler Room - Re-tap 1 1/4 inch well let for water wall on Boiler # 2. October 12, 2006
Roosevelt High School FM-200630680 10/12/06 Building # 3 - Basement Filteration Room - Repair boiler for swimming pool. Boiler was damaged by flood. October 12, 2006
Woodson High School FM-200630766 10/13/06 Woodson,H.D. Boiler room Emergency!!!!!!! Repair or repalce burnt out sump pumps, the drop- in pumps are are not working, water is rising over the floor. October 13, 2006
Bancroft Elementary School FM-200630757 10/13/06 Boiler Room - Calibrate burner on Boiler # 2. properly. Per DCRA Boiler Inspector. October 13, 2006
West Elementary School FM-200630814 10/16/06 West Boiler Room Repair or replace bad leaking pump for chill water return and hot water for HV/AC. Leaking very bad water all over the floor in Boiler Room area. Urgent !!!!! October 16, 2006
Stoddert ES FM-200630801 10/16/06 Stoddert Boiler Room Repair or replace condensate return tank. Selenioed valve has been taken apart and need to be replace ASAP. Difficulties feeding water to boiler. October 16, 2006
Truesdell Elementary FM-200630846 10/17/06 Truesdell Boiler Room Repair or replace light or fixture flourescent fell off wall (ceiling). Bad connectors. October 17, 2006
Savoy Elementary School FM-200630892 0630892 10/17/06 Savoy Boiler Room Unclogged floor drain by #3 condenser pump and behind Boiler #2 Boiler room will be flooded if not corrected October 17, 2006
Ferebee-Hope Elementary School FM-200630877 10/17/06 F. HOPE boiler room Repair sump pump boiler room is flooding. Urgent!!! October 17, 2006
Eliot Junior High School FM-200630894 10/17/06 Eliot Boiler Room Boiler #2 and #3, are not gotting return water and are cutting off on low water October 17, 2006
Johnson JHS FM-200630896 10/17/06 Johnson Boiler Room Repair #1 circulating pump drain line. October 17, 2006
Rudolph Elementary School FM-200630857 10/17/06 Rudolph Boiler Room Repair or replace vacuum pump for condensate tank. Seal is bad, leaking real bad. October 17, 2006
Cardozo High School FM-200630904 10/17/06 Boiler Room - Steam Leak Asbestos Code A - Clear For repairs on 10/31/06. Tidewater - Shamika Parker (RG 11/01/06) October 17, 2006
Rudolph Elementary School FM-200630855 10/17/06 Rudolph Boiler Room Repair or replace automatic water feeder on boilers not shutting burner off. October 17, 2006
Marshall Educational Center FM-200630917 10/18/06 Boiler Room - Flood October 18, 2006
Eaton Elementary School FM-200630923 10/18/06 Eaton Boiler Room Boiler #2 Repair or replace burn out control Breaker circuit breaker. Boiler will not start, inside the control box. October 18, 2006
Adams Elementary FM-200630938 10/18/06 Adams Boiler Room Repair or replace broken stud (1) to plates on side of Boiler $4. October 18, 2006
Nalle Elementary School FM-200630915 10/18/06 Nalle Boiler Room Replace light fixture in tunnel by condensate pump. No lights in the area for engineer to check equipment. October 18, 2006
Ketcham Elementary School FM-200630929 10/18/06 Ketcham Boiler Room Replace bad motor-Marathoy House Pumps #1 (one) Cat. #E955 HZ - 60 HP 7.5 Model # 7VN213TTF40Z6BDL Fr. 213T PH-3 RPM 1760 V-208-230-460 Type TFR FLAZ1620/10 SF 1.15 October 18, 2006
Eliot Junior High School FM-200630943 10/18/06 Eliot Boiler Room Repair or replace condensate return tank. Tank is leaking badly in front and back of it. October 18, 2006
Spingarn High School FM-200631060 10/20/06 Spingrarn Boiler Room Boiler #2 Replace ruptured tube(s) October 20, 2006
Brookland Elementary FM-200631108 0631108 10/20/06 Brookland Boiler Room Repair or replace motor and circulating pump for air handle unit in Boiler Room ceiling. Bell and Gossett; Part# M80082 HZ 60 RPM 1725 HP-3/4 Volts 115/230 SF 1.25 Thermal Prot. M74492 Cont. Rating 40 October 20, 2006
Rudolph Elementary School FM-200631083 10/20/06 Rudolph Upper Boiler Room Replace feed water regulator and stop valve, for hot water side of building. Urgent !!!!! October 20, 2006
Shaw JHS FM-200631141 10/23/06 Shaw Boiler Room Survey and repair pneumatic control system throughout building. Reconnect and by-pass dampers, return air dampers and out side air damper. October 23, 2006
Shaw JHS FM-200631142 10/23/06 Shaw Boiler Room Fabricate hood covers for 3 exhaust fans. October 23, 2006
Cook J.F. Elementary School FM-200631283 31283 10/23/06 The waste pipe in the boiler room needs repairing. The pipe leaks. October 23, 2006
Slowe Elementary School FM-200631265 10/24/06 Slowe Boiler Room Repair burners on boilers #1, #3 and #5 October 24, 2006
Johnson JHS FM-200631186 10/24/06 Johnson Boiler Room Unclog drain in Boiler Room near chiller. Water is on floor from blowing down boilers. October 24, 2006
Ketcham Elementary School FM-200631331 10/25/06 Ketcham Boiler Room Sump pump #2 Repair or replace bearing, bearing are gone. October 25, 2006
River Terrace ES FM-200631329 329 10/25/06 R. Terrace Boiler Room Boiler #1 Repair or replace automatic water feeder, Repair or replace returm pump seal. October 25, 2006
Spingarn High School FM-200631307 10/25/06 Spingarn Boiler Room Repair or replace Burnt controls to Boiler #1. No electric power to part of the Boiler Room. Boiler #1 caught on fire. Emergency !!!! October 25, 2006
Slowe Elementary School FM-200631286 10/25/06 Slowe Boiler room Repair or replace condensate pumps seals, Pumps#1,#2,#3,#4,#5,and #6 Engineer has to hand feed Boilers October 25, 2006
Ketcham Elementary School FM-200631410 10/26/06 KETCHAM # 5 feedwater pump leaking badly need to replace or flange off. Losing boiler water. October 26, 2006
School WW High School FM-200631370 10/26/06 School Without Walls Boiler Room Repair or replace pump #2. Condensation unable to run properly. October 26, 2006
Cleveland Elementary School FM-200631424 10/26/06 Cleveland Boiler Room Repair or replace ID Fan on Boiler #2. Replace pump #1 that supply the house. Need (2) two pumps to operate properly. October 26, 2006
Tyler Elementary School FM-200631372 10/26/06 Boiler Room - Replace sump pump October 26, 2006
Cardozo High School FM-200631665 10/27/06 CARDOZO - SUB- BASEMENT,BOILER ROOM. REPLACE THERMOSTATIC STEAM TRAP ON MAIN STEAM PIPE -1 INCH INLET AND 1 INCH OUTLET ,BODY APPOX. 5INCHES X 5 1/2 INCHES . October 27, 2006
West Elementary School FM-200631475 10/29/06 West Boiler Room Repair or replace bad return pump that service Kgn size of building. Pump is leaking real bad. Adding fresh water to system. October 29, 2006
Reed LC FM-200631490 10/30/06 Reed Boiler Room Boiler #3 replace leaking tubes. Need to heat building October 30, 2006
Jessie LaSalle Elementary FM-200631491 10/30/06 LaSalle Boiler Room Repair or replace circulating pump #2, not working Pump #1 has never been install, still on the floor. Urgent !!!!! October 30, 2006
Slowe Elementary School FM-200631552 10/31/06 Slowe Boiler Room Replace 4" Valve and line on return chill water . Leaking very bad,also corrosion October 31, 2006
Woodson High School FM-200631568 10/31/06 Boiler Room - Pump water out of flooded boiler room. Pump problem. Approx: 18" of water on floor. October 31, 2006
Ludlow-Taylor ES FM-200631553 10/31/06 Ludlow-Taylor Boiler Room Install lights fixture in Boiler Room ,very poor. Lights need to be Lower for replacing bulbs. Safety Issue October 31, 2006
Ludlow-Taylor ES FM-200631554 10/31/06 Ludlow-Taylor Boiler Room Replace OSY valve with stem, with wheel and chain - Hard to turn. October 31, 2006
Ludlow-Taylor ES FM-200631555 10/31/06 Ludlow-Taylor Boiler Room Boiler #1 replace ID fan, do not operator. Baldock 35-356-520 56 -516C 1/3 115/230V 1700 VARI Spd 60-1 October 31, 2006
Benning Elementary School FM-200631542 10/31/06 Benning Boiler Room Replace blow down on Boiler #2 October 31, 2006
Ludlow-Taylor ES FM-200631557 10/31/06 Ludlow-Taylor Boiler Room Install sink in boiler room for engineer to wash hands from repairs. Have to go to the first floor to clean up. Also needed for flushing eyes if needed. Safety Issue October 31, 2006
Nalle Elementary School FM-200631621 11/1/06 Nalle Boiler Room Replace light fixture in tunel by condensate pump. Need light for checking equipment November 1, 2006
Raymond Elementary School FM-200631602 11/1/06 Basement - Drain by boiler #1 is clogged. November 1, 2006
Truesdell Elementary FM-200631627 11/1/06 Boiler Room - Replace or repair hot water circulating pump Asbestos Code A - Clear for repairs on 11/03/06. Tidewater - Carlos Vera (RG 11/07/06) November 1, 2006
Cook J.F. Elementary School FM-200631617 31617 11/1/06 Cook, J. F. Boiler Room Boiler #1 Repair or replace automatic water feeder and low water cutoff . November 1, 2006
Ronald H. Brown MS FM-200631582 11/1/06 Ron Brown Boiler room Resolve issue of boiler # 2, and # 4 over firing and over heat the front and rear out-side covers of the boilers. November 1, 2006
Houston Elementary School FM-200631711 11/2/06 HOUSTON boiler room - Replace sump spumps and sewage injectors. November 2, 2006
Simon Elementary School FM-200631647 11/2/06 Boiler Room - Boiler # 2 repair leaking tubes. November 2, 2006
Johnson JHS FM-200631644 11/2/06 Boiler Room - Boiler # 2 fire box slope. November 2, 2006
Eliot Junior High School FM-200631705 11/2/06 ELIOT boiler room - Boiler # 1 burner calibration November 2, 2006
Hine JHS FM-200631640 0 11/2/06 Hine Boiler room Replae Relief valve on # 1 Boiler ( 30psi, 1-1/2", Model# M No740) November 2, 2006
Terrell Mc ES FM-200631676 11/2/06 TERRELL, M.C. Boiler room Repair sump pump, pump is inoperable. boiler room will flood. November 2, 2006
Ketcham Elementary School FM-200631753 11/2/06 KETCHAM Boiler # 1 will not shut off when checking safeties or low water condition - LWCO or AWF. Burner will not shut down. November 2, 2006
Patricia R Harris Ed Center FM-200631643 11/2/06 Harris, P.R. Boiler Room Boiler #2, Replace feed water regulator or return valves November 2, 2006
Stanton Elementary School FM-200631748 11/2/06 STANTON Boiler room Pipe low water cut off and automatic water makeups directly to drain on boilers 1 & 2 Also pip feed water tank overflow to drain. November 2, 2006
Ludlow-Taylor ES FM-200631646 11/2/06 Boiler Room - Boiler # 2 leaking mud legs. November 2, 2006
Truesdell Elementary FM-200631745 11/2/06 TRUESDELL Boiler # 1 awaiting scope November 2, 2006
Clark Elementary School FM-200631701 701 11/2/06 CLARK boiler room - Repair leaking tubes boiler # 2 November 2, 2006
Stanton Elementary School FM-200631749 11/2/06 STANTON Boiler room Replace steam traps though-out building, returns are come back at 200 degrees. November 2, 2006
Stanton Elementary School FM-200631751 11/2/06 STANTON Boiler room Hot water holding tank is about to collapse, bottom of legs rusting out. Only two legs supporting weight of 250 gallon tank. November 2, 2006
Wilson High School FM-200631743 11/2/06 WILSON SHS Boiler # 2 will not stay on line November 2, 2006
John Burroughs ES FM-200631696 11/2/06 BURROUGHS boiler room Replace sump pumps November 2, 2006
Park View ES FM-200631773 11/3/06 Boiler Room - Basement - Condensate pump leaking and makes noise when running. November 3, 2006
Park View ES FM-200631774 11/3/06 Boiler Room - Basement - Sump pumps discharge line spray water when running. Repair line. November 3, 2006
Coolidge High School FM-200631770 11/3/06 Ground Floor - Boiler Room - Repair or replace leaking 3 " elbow locate on DA tank feed line. November 3, 2006
Burrville Elementary School FM-200631758 11/3/06 Burrville Boiler Room Boiler #1 flame failure, will not come on. November 3, 2006
Park View ES FM-200631772 11/3/06 Boiler Room - Basement - All floor drains are clogged. November 3, 2006
Stuart-Hobson Middle School FM-200631759 11/3/06 Stuart- Hobson Boiler room Survey and repair condensate return tank, the float or solenoid valve is sticking causing , the tank over fills November 3, 2006
Montgomery ES FM-200631792 11/5/06 Montgomery Boiler Room Boiler #1 Flame failure. Only Boilers working November 5, 2006
Montgomery ES FM-200631803 11/5/06 Montgomery Boiler Room Remove adhesive used to seal manhole gasket on top of Boiler #2. New manhole gasket will not seal properly,because of old adhesive. Engineer attemped to remove with negative results. November 5, 2006
Ronald H. Brown MS FM-200631816 11/6/06 Ron.Brown Boiler room Check and correct problem with condensate pump and or pump control will not work in automatic not feeding water back to the boilers. November 6, 2006
Plummer Elementary School FM-200631804 11/6/06 Plummer Boiler room Check and correct no power to burner # 2. November 6, 2006
Shaw JHS FM-200631854 11/6/06 Shaw Boiler Room Boiler #1 Replace open air flow switch. November 6, 2006
Kimball Elementary School FM-200631872 11/7/06 Kimball Outside entrance to boiler room Repair or replace outside light by the boiler room, ( parking lot area), light bulb was changed but will not come on. November 7, 2006
Lafayette Elementary School FM-200632021 11/8/06 Lafayette Boiler Room Unstop clogged drain in Boiler Room beside condensate tank. Engineer attempted to unstop with negative results. Urgent !!!! November 8, 2006
Aiton Elementary School FM-200632029 11/8/06 Aiton Boiler room Repair or repack the # 1 circulating pump . November 8, 2006
Aiton Elementary School FM-200632026 11/8/06 Aiton Boiler room Replace the eye bolts on the #2 hot water heating pump. November 8, 2006
Eaton Elementary School FM-200632032 11/8/06 Eaton Boiler Room Repair or replace Boiler #1 emergency contactor (5) five coil power switch for # 1 Boiler 30 amps, made by Cutle-Hammer, #C 26 DND 330 Volts, 102-120-50-60 Hz. 3Ls. Boilers not working #1 and #2 Urgent !!!!! November 8, 2006
Park View ES FM-200632046 11/8/06 Parkview Boiler Room Repair or replace return condensate line to the condensate tank station leaking. Urgent !!!!! November 8, 2006
Beers Elementary School FM-200632000 11/8/06 Beers Boiler room Repair # 1 boiler , will not start, lock out high fire. November 8, 2006
Whittier Elementary School FM-200632045 11/8/06 Whitter Boiler Room Repair or replace sumo pump discharge line leaking. November 8, 2006
Meyer Elementary School FM-200632267 11/13/06 MEYER- BOILER ROOM ,BOILER # 1 , REPLACE LEAKING TUBES.TUBES ARE LEAKING IN REAR OF BOILER . November 13, 2006
Bancroft Elementary School FM-200632219 11/14/06 Replace 1/2" relief valve on feed water side of Boiler #3 and (6) 1/2" gate valves on assembly. November 14, 2006
Brookland Elementary FM-200632220 0632220 11/14/06 Repair or replace safety releif valve, leaking not seating on Boiler #1. Certifield by watts regulator Serial #01390 Model #M174A 2" 30lbs BTU3815000 November 14, 2006
Adams Elementary FM-200632222 11/15/06 Repair steam leak on radiator in the lavatory on the stairs leading to the boiler. 3/4" line. Urgent ! November 15, 2006
Ronald H. Brown MS FM-200632256 11/16/06 Repair boiler #4 no power, will not come on November 16, 2006
Eastern High School FM-200632238 11/16/06 Sub Basement, Boiler Room. Repair hot water booster (Lochinvar) in the boiler room for domestic hot water in building. It's possibly the solenoid valve. Note: No domestic hot water! November 16, 2006
Ludlow-Taylor ES FM-200632250 11/16/06 Ludlow Taylor - Boiler Room - Repair or replace house air compressor(Motor binding). Compressor, needed for pneumatic controls. Motor Information: Make: Magnet, Volts:230-480, RPM: 1745, Amps: 42-21, HP: 1.5, HZ: 60 November 16, 2006
Hart Middle School FM-200632248 11/16/06 Gas leak at the gas meter by the boiler rm. November 16, 2006
Ferebee-Hope Elementary School FM-200632330 11/20/06 Boiler Rm. - Boiler #2 Frame Failure, Replace Low Pressure Gas Switch November 20, 2006
Ferebee-Hope Elementary School FM-200632317 11/20/06 FEREBEE-HOPE BOILER ROOM Repair rupture 2" discharge line on sump pump. November 20, 2006
Benjamin Banneker Academic HS FM-200632376 11/21/06 Boiler Room - Repair or replace defective sump pump. Pump causes boiler room to flood. November 21, 2006
Adams Elementary FM-200632392 11/21/06 Basement - Boiler Rm. (Lavatory) - Repair steam leak on a radiator on the stairs leading to the boiler, this is a 3/4" line. November 21, 2006
Cleveland Elementary School FM-200632361 2361 11/21/06 Boiler Room - No power to boilers and pumps.. ( Building has no heat ). November 21, 2006
Beers Elementary School FM-200632399 11/21/06 Repair or replace 1-1/4" leaking check valve on boiler #1 November 21, 2006
Rudolph Elementary School FM-200632358 11/21/06 Boiler Room - Boiler # 1 flame failure. ( Building has no Heat ) November 21, 2006
Brookland Elementary FM-200632415 0632415 11/22/06 Boiler Room - Repair lochinvar hot water heater, Ignitor failure - check amp draw. Model - # CWN0645PM Serial Number - B013264 BTU -650,000 November 22, 2006
Kimball Elementary School FM-200632410 11/22/06 Boiler Room - Repair or replace 3/4 inch feed water valve on condensate tank. November 22, 2006
Beers Elementary School FM-200632419 11/22/06 Boiler Room - Repair or replace leaking butterfly valve on chill water filter system. November 22, 2006
Shaw JHS FM-200632414 11/22/06 Boiler Room - Replace 3" by pass valve on condensate return line located at accuator valve to Boiler # 1 valve not holding causes excess return to over fill boilers. November 22, 2006
Beers Elementary School FM-200632409 11/22/06 Boiler Room - Weld pin holes in silo strainers # 2 and # 3 at the bottom of each strainer. Installation has already been removed from both strainers. November 22, 2006
Hart Middle School FM-200632406 11/22/06 Boiler Room - Repair leaking domestic water 4" line located by Boiler # 1. Asbestos Code A - Clear for repairs on 11/22/06. Tidewater - Carlos Vera (RG 11/22/06) November 22, 2006
Hine JHS FM-200632411 1 11/22/06 Boiler Room - Boiler # 2 leaking on the back through the short nipple connection. November 22, 2006
Hyde Elementary School FM-200632593 11/26/06 Stoddert - Urgent - Boiler Room - Correct gas smell problem. Strong smell when burner start-up in boiler room. Only one boiler on site. November 26, 2006
Shaw JHS FM-200632542 11/27/06 Boiler Room - Gas leaking around gas train on Boiler # 1. November 27, 2006
Ketcham Elementary School FM-200632545 11/27/06 Basement - Boiler Room - Air compressor down. Robertshaw model # 310 - size 3 1/2 + 2 X 2 1/2 Mr. Barksdale said do not run needed for pneumatic in open space. Send to Steamfitting - Per Curtis Emerson. November 27, 2006
Leckie Elementary School FM-200632540 40 11/27/06 Ground Floor - Boiler Room - Boiler # 1 has (2) tubes leaking and identified by engineer. November 27, 2006
Tyler Elementary School FM-200632586 11/28/06 Boiler Room - Replace sump pump in boiler, pump is burnt out. November 28, 2006
Randle-Highlands ES FM-200632568 11/28/06 Boiler Room - Repair boiler # 3, blend pump leaking mechanical seal. November 28, 2006
Seaton Elementary School FM-200632589 11/28/06 Boiler Room - Boiler # 1 needs fire box refactory work. November 28, 2006
Hart Middle School FM-200632565 11/28/06 Boiler Room - Repair pin hole leak in the expansion tank. Send to Steamfitting - Per Curtis Emerson. November 28, 2006
Miner Elementary FM-200632736 11/30/06 HVAC shop - Boiler # 2 replace bad gas pressure regulator November 30, 2006
Johnson JHS FM-200632735 11/30/06 Electrician- To replace exterior floodlights Existing lights are off timer or burnt out. No Security lights on rear of building at boiler room entrance. November 30, 2006
Payne Elementary School FM-200632726 6 11/30/06 Boiler Room - Remove temporary portable electrical box from panel November 30, 2006
Benning Elementary School FM-200632746 12/1/06 Boiler Room - Pump out flooded Boiler Room floor. December 1, 2006
Benning Elementary School FM-200632803 12/4/06 Basement - Boiler Room - Repair or replace Boiler # 2, safety relief valve. watts valve Mode M, size 1 - 1/4 lb, set 30 lbs - # 740 December 4, 2006
Bruce-Monroe Elementary School FM-200632810 12/4/06 Boiler Room - Repair or replace domestic hot water heater. Will not lite off. No domestic hot water in building. December 4, 2006
Brookland Elementary FM-200632874 0632874 12/5/06 Basement Boiler Room - Hot water circulating pump # 1. Replace fuses in convector pump #1. Little fuses, Class RK5,Time Delay Element Fuse,FLNR 20,250 vac or less. December 5, 2006
Montgomery ES FM-200632877 12/5/06 Boiler Room - Repair or replace 11/2 inch steam trap on heat exchange. Trap appears to be bad. Problems heating areas in building, possibly because of trap. December 5, 2006
Hine JHS FM-200632871 1 12/5/06 Basement - Boiler Room - Replace or replace sump pumps close to the air compressor, one on the left not working. December 5, 2006
Benjamin Banneker Academic HS FM-200632908 12/6/06 Boiler Room - Float assembly needs to be replaced in sump pumps. Boiler Room keeps flooding. December 6, 2006
Cook J.F. Elementary School FM-200632972 32972 12/7/06 Boiler Room - Repair or replace sump pump. Control works in hand setting . Unit has a high water alarm. Note - Boiler Room flooded this morning. December 7, 2006
Horace Mann Elementary School FM-200632977 -200632977 12/7/06 Repair or replace boiler # 3, continously being reset. Bad gas regulator. December 7, 2006
Dunbar High School FM-200633057 12/8/06 Repair broken drain pipe on 5MW in front of the stairs, the drain is in the boiler rm. December 8, 2006
Hart Middle School FM-200633264 12/11/06 Hart- Boiler room Repair or replace burner # 2,will not start, Flame failure. (HVAC SHOP) December 11, 2006
Ferebee-Hope Elementary School FM-200633281 12/11/06 Boiler #2 keep going off on low water,Return not coming back to boiler. No heat on UDC side. HVAC Shop December 11, 2006
Thomas Elementary School FM-200633292 2 12/12/06 N.Thomas - Boiler room Replace 3/4" leaking blow down valve and nipple on condensate return line drain (Steamfitting Shop) December 12, 2006
Browne Junior High School FM-200633216 12/13/06 Boiler Room. Repair or replace ruptured 5" waste line that is badly leaking in the boiler room asap! December 13, 2006
Montgomery ES FM-200633279 12/14/06 Replace F+ T Steam Trap In Boiler Room December 14, 2006
Kelly Miller MS FM-200633441 12/20/06 Ground Floor - Boiler Room - Replace rusted eyebolt and nut on 6 inch main os & y supply line valve for # 3 boiler. December 20, 2006
Tyler Elementary School FM-200633528 12/21/06 Tunnel in the boiler room, Replace 3/4" valve on water line, leaking at the valve, house will have to be dropped to make repairs. December 21, 2006
Thomas Elementary School FM-200633543 3 12/27/06 Boiler Room - Replace two defective sump pumps for permanent use. Temporary sump pump and leaking discharge line now exist. Asbestos Code "A" cleared fro repairs 12/29/06 Tidewater December 27, 2006
Thomas Elementary School FM-200633542 2 12/27/06 Boiler Room - Complete installation of wiring for condensate return pumps (2) that were installed by contrractor. Pumps are inoperable. Asbestos Code "A" cleared for repairs 12/29/06 Tidewater December 27, 2006
Deal Junior High School FM-200633566 12/28/06 Boiler Room - R/R 2" line over water heater. Asbestos Code A - Clear for repairs on 12/29/06. Tidewater - Roger Small (RG 01/03/07) December 28, 2006
Garfield ES FM-200633664 1/4/07 Boiler Room - Seal electrical panel located in the Boiler Room , water enters panel box from out side when it rains. January 4, 2007
Garfield ES FM-200633645 1/4/07 Boiler Room - Replace 2 way seleniod valve on condensate system. January 4, 2007
Lincoln Middle School FM-200633649 1/4/07 Entrance Door to Building and Boiler Room Door - Furnish ( 1 ) key each. January 4, 2007
Dunbar High School FM-200633644 1/4/07 2 B Mechanical Room - Requesting the installiation of a union between the main water line that suplies the boiler with water and the small steam boiler for the kitchen Asbestos Code A - Clear for repairs on 01/05/07. Tidewater - Shamika Parker (RG 01/09/07) January 4, 2007
Deal Junior High School FM-200633688 1/5/07 Boiler Room - Replace the circulating pump to hot water heater. January 5, 2007
Leckie Elementary School FM-200633681 81 1/5/07 Boiler Room - Remove vent line off house combination circulating pump # 2, badly corroded and unable to remove without stripping threads. Pump is leaking hot water excessively @ 180 F. January 5, 2007
Thomas Elementary School FM-200633733 3 1/8/07 Boiler Room - Correct cause of burner # 3, goes out on lockout auto. ( 3P interlock open ). January 8, 2007
Langdon Elementary School FM-200633836 -200633836 1/8/07 HVAC to check gas valve on boiler # 1 valve makes loud chattering noises when boiler goes through cycle on. January 8, 2007
West Elementary School FM-200633915 1/10/07 Boiler Room - Repair or replace badly deteriorated in-line circulating pumps (2). Leaking badly from mechanical side. January 10, 2007
Whittier Elementary School FM-200633889 1/10/07 Boiler Room - Repair or replace automatic water feeder to # 1 Boiler. Boiler has to be hand feed. January 10, 2007
Dunbar High School FM-200633913 1/10/07 Boiler Room - Repair boiler feed pump. January 10, 2007
Marshall Educational Center FM-200633936 1/11/07 Marshall Boiler Room Replace leaking tubes in Boiler #1 January 11, 2007
Bancroft Elementary School FM-200633932 1/11/07 Boiler Room Is Flooded January 11, 2007
Roosevelt High School FM-200633933 1/11/07 Roosevet Boiler Room Repair or replace low water cutoff on Boiler #3, Will not shut Boiler off when blowing down. January 11, 2007
Kramer Middle School FM-200633974 1/12/07 Boiler room - replace inoperable soloniod valve on condensate storage tank January 12, 2007
Hart Middle School FM-200633955 1/12/07 URGENT- Boiler Room - boiler # 2 replace malfunctioning gas valve, valve continously sticks causing boiler flame failure. January 12, 2007
Hart Middle School FM-200633956 1/12/07 URGENT- Boiler Room -boiler # 1 repair brick work on back of boiler gases of combustion seeping through brick work beside beam January 12, 2007
Hart Middle School FM-200633958 1/12/07 URGENT- Boiler Room -boiler # 2 replace (leaking) relief valve on boiler. Ser# 97170, Mod. M, No.740, Size 2in 2"X2-1/2", Set 60lbs, BTU/HR 8,875,000 January 12, 2007
Hart Middle School FM-200633971 1/12/07 URGENT- Boiler Room -Repair / replace leaking expansion tank and supply line to tank January 12, 2007
Hart Middle School FM-200633972 1/12/07 URGENT- Boiler Room - Repair or replace inoperable sump pump motors boiler room floods. January 12, 2007
Hart Middle School FM-200633973 1/12/07 Boiler Room - Unclog boiler room utlities sink water overflows on to floor. January 12, 2007
Kramer Middle School FM-200633976 1/12/07 Boiler room - Boiler # 3 replace automatic city water feeder. January 12, 2007
Benning Elementary School FM-200633978 1/15/07 Repair or replace leaking tubes or leaking water leg on the # 1 boiler , the fire box has water in it. January 15, 2007
Harris, C.W. ES FM-200634040 634040 1/15/07 C.W.Harris Exterior of building Furnish and install roof gutter and down spouts above entrance door to boiler room area, rain water ponds on the roof then drain over entrance.( Needed to eliminate safety and health hazzards.) January 15, 2007
Roosevelt High School FM-200634006 1/16/07 Boiler Room - Replace make-up valve 1 1/4 " for deaerator and stem is defective not feeding water in at perfect rate. Spray Master - model, smp-45,capacity - 45,000 - Deaerator - serial dg - 8244, year - 1999 Deaerator feed water for McFarland JHS and Roosevelt. January 16, 2007
Roosevelt High School FM-200634007 1/16/07 Boiler Room - McFarland - Repair domestic hot water heater. Heater will not come on. ( Electronic Gas Valve ). January 16, 2007
Webb Elementary School FM-200634002 1/16/07 Boiler room. Repair or replace Hot water circulation pumps. January 16, 2007
Roosevelt High School FM-200634008 1/16/07 Boiler Room - Window Well outside Boiler Room Entrance - Unstop drain line in catch basin. Drain stoppage causing water to flood office in Boiler Room. January 16, 2007
Ballou Senior High School FM-200633984 1/16/07 Boiler room - south tunnel Install 3/4" gas (shut-off) valve and 3/4" nipple on 3/4" gas line. Note: Emergency - Safety hazard Washington Gas - RED TAGGED VALVE 1-11-07. January 16, 2007
Stanton Elementary School FM-200634037 1/17/07 Basement - Boiler Room - Boilers # 1 and # 2 feedwater pumps not working , hand feeding # 1 using auxiliary pump on # 2. Feed water tank motor: Magneter- Century a/c motor h.p. 1/2 volts 104/208 amps. 7.0/3.5 rpm 1725 amb - 40 sf 1025 time-cont code L fr-j56j * All three (3) need to be replaced. ( hz60 ). January 17, 2007
Hine JHS FM-200634017 7 1/17/07 Boiler room URGENT!!!!!!! Repair Domestic hot water heater in the boiler room ,heater is over firing and is badly sooted up. Possible cause bad gas pressure regulator. January 17, 2007
Smothers ES FM-200634070 70 1/18/07 Boiler room Repair or replace float switch on the sump pump , switch does not operate properly ,the boiler room is flooded each morning. January 18, 2007
Gibbs Elementary School FM-200634113 1/19/07 Boiler Room - Replace hot water heater January 19, 2007
Reed LC FM-200634114 1/19/07 Basement - Boiler Room - Ruptured tube inside of the hot water drum of # 2 hot water boiler. Kewanee, Low Pressure Hot Water Circulating System. January 19, 2007
Brent Elementary School FM-200634126 4126 1/20/07 Boiler room Repair Burner # 1 , burner starter coil is chaddering during ignition. January 20, 2007
Ferebee-Hope Elementary School FM-200634135 1/22/07 Boiler room Repair Burners # 1, and # 3 , when burner are placed in automatic they cuts off and must be reset , (PTFI) is the reading on the programmer. January 22, 2007
Raymond Elementary School FM-200634181 0634181 1/23/07 Boiler Room - Replace pressure regulator + 1/2 inch bypass valve on city water line to hot water system ( heating ). January 23, 2007
Amidon Elementary School FM-200700601 1/23/07 Amidon-Boiler Room (Air Conditioning Area)-Repair or replace leaking 2" steam line. Send Steam Fitter to correct. January 23, 2007
Raymond Elementary School FM-200634179 0634179 1/23/07 Boiler Room - Calibrate burner on # 1 boiler. ( Keeps going out on flame failure). January 23, 2007
Montgomery ES FM-200634183 1/23/07 Boiler Room - Replace heat exchanger. January 23, 2007
Ketcham Elementary School FM-200634177 1/23/07 Basement - Boiler Room - Unstop all drains 1" of water is on floor. January 23, 2007
Meyer Elementary School FM-200634270 1/24/07 Boiler Room - Boiler # 1 - Replace leaking tubes. January 24, 2007
Ronald H. Brown MS FM-200634235 1/24/07 Boiler Room - Boiler # 4 and # 6 need blower motors. January 24, 2007
Stanton Elementary School FM-200634241 1/24/07 Boiler Room - Boiler # 2 - Replace feed water pump. ( using auxillary pump ). January 24, 2007
Benjamin Banneker Academic HS FM-200634282 1/24/07 Boiler Room - Condensate tank solenoid valve need replacing, not sending water back to the boiler. January 24, 2007
Cook J.F. Elementary School FM-200700619 00619 1/24/07 J. F. Cook- Exterior of Building-Existing vent line is located below 2nd.floor windows, but needs to be extend above the roof. Occassionally the gas smell comes in the school building through the open classroom windows from gas dump valves in boiler room. January 24, 2007
Hart Middle School FM-200634258 1/24/07 Boiler Room - Boiler # 1 - Repair brick work. January 24, 2007
Hart Middle School FM-200634237 1/24/07 Boiler Room - Boiler # 2 - Repair or replace gas valve. January 24, 2007
Marshall Educational Center FM-200634269 1/24/07 Boiler Room - Boiler # 1 - Replace leaking tubes. January 24, 2007
Montgomery ES FM-200634271 1/24/07 Boiler # 2 - Replace man hole ring. January 24, 2007
Harris, C.W. ES FM-200634236 634236 1/24/07 Boiler Room - Boiler # 3 flame failure. January 24, 2007
Leckie Elementary School FM-200634266 66 1/24/07 Boiler Room - Boiler # 1 - Replace leaking tubes. January 24, 2007
Amidon Elementary School FM-200634233 1/24/07 Boiler Room - Boiler # 2 flame failure. January 24, 2007
Ludlow-Taylor ES FM-200634268 1/24/07 Boiler Room - Boiler # 2 - Replace leaking mud legs. January 24, 2007
Adams Elementary FM-200634232 1/24/07 Boiler Room - Repair or replace electric valve and or float ball. January 24, 2007
Garnet-Patterson MS FM-200634281 81 1/24/07 Boiler Room - Bad steam trap on header line valve. January 24, 2007
Brightwood Elementary School FM-200700617 617 1/24/07 Brightwood- Boiler Room-Replace missing sections of supply and blowdown line to flash tank. Send STEAM FITTER to correct. January 24, 2007
Ferebee-Hope Elementary School FM-200634247 1/24/07 Boiler Room - Boiler # 2 flame failure. January 24, 2007
Reed LC FM-200634289 1/24/07 Boiler Room - Repair or replace boilers # 1 and # 3. One leaking tube in each boiler. January 24, 2007
Reed LC FM-200634302 1/24/07 Boiler Room Repair or replace house air compressor #2 unit contenously running when in operation. Note: Other air compressor, has a bad head. Urgent !!!! January 24, 2007
Peabody Elementary School FM-200634239 1/24/07 Boiler Room - Boiler # 3 - Repair pump control. January 24, 2007
Ronald H. Brown MS FM-200634359 1/26/07 Boiler Room Repair or replace Boiler #5 off on flame failure. January 26, 2007
Roosevelt High School FM-200700029 1/29/07 Boiler Room - Replace Zoeller sump pump. Pump not working need to remove blow down water from boilers. Pumps water out of boiler room. January 29, 2007
Cleveland Elementary School FM-200700036 0036 1/29/07 Boiler #1 off on flame failure. January 29, 2007
Kramer Middle School FM-200700019 1/29/07 Boiler room - Replace temperature gauges on domestic hot water storage tank and domestic hot water heater. January 29, 2007
Beers Elementary School FM-200700063 1/29/07 Boiler Room - Bathroom - Repair valve, when flushed water leaks out onto the floor. January 29, 2007
Stuart-Hobson Middle School FM-200700101 1/31/07 Boiler room Replace 3" nipple on bottom blow down on the # 3 boiler , O.S.&Y. Valve and quick opening valve are not holding, loosing water from boiler. January 31, 2007
John Burroughs ES FM-200700142 2/1/07 Boiler Room - Repair condensate return pumps. February 1, 2007
Horace Mann Elementary School FM-200700194 -200700194 2/2/07 Boiler Rm. - Repair leaking steam pipe. Water has flooded the boiler room floor and is 2" to 3" deep. Also repair or replace the defective sump pump. Boilers need to be shut down to stop the hot water from leaking. Asbestos Code A - Clear for repairs on 02/12/07. Tidewater - Tony Marcolin (RG 02/15/07) February 2, 2007
Brookland Elementary FM-200700165 0700165 2/2/07 Basement - Boiler Room - # 2 boiler down - Blower fan housing is not working . Causes the burner to go into safety lockout. Trips breaker out send boiler into safety and shuts boiler down. Will not run. # 1 boiler on line and running. February 2, 2007
Horace Mann Elementary School FM-200700197 -200700197 2/3/07 Boiler Room Repair or replace condensate return pump for Boiler #1and #2. Problem with starter February 3, 2007
Horace Mann Elementary School FM-200700198 -200700198 2/3/07 Boiler Room Repair or replace Boiler #1 and #3 Flame failure Note: Boiler #2 has pump problems February 3, 2007
Janney Elementary School FM-200700253 253 2/5/07 Boiler Room Repair or replace gas regulator on hot water heater regulator has to be reset after each cycle. February 5, 2007
Brightwood Elementary School FM-200700252 252 2/5/07 Boiler Room Install exhaust fan in boiler room. Fan has not been finish being put in. February 5, 2007
Moten Elementary School FM-200700205 2/5/07 Boiler room - URGENT need immediate response - 1 of 2 boilers are down and boiler # 1 will only operator in lo fire. boiler # 2 down for tube replacement. February 5, 2007
Duke Ellington School FM-200700291 2/6/07 Boiler Room Repair or replace leaking bleed off valve on condensate pump #2. February 6, 2007
Ferebee-Hope Elementary School FM-200700321 2/7/07 Boiler room - No 3 boiler off line continously shut off in flame failure, no prepurge. February 7, 2007
Aiton Elementary School FM-200700318 2/7/07 Boiler room Repair Boiler # 1, will not start. February 7, 2007
West Elementary School FM-200701427 27 2/7/07 The lock on the boiler room door needs to be repaired (door not secure) February 7, 2007
Savoy Elementary School FM-200700323 0700323 2/7/07 Boiler room - Circulating pump # 2 is seiged and will not run February 7, 2007
Rudolph Elementary School FM-200700351 2/8/07 Boiler Room Flooding with about 1-1/2" of water. Sump pumps inoperable. February 8, 2007
Garfield ES FM-200700527 2/8/07 Boiler room - replace house system feed valves: reducing valve mod. B7-12, 225df max temp, 125psi max press. , (2) two gate valves, 1 bypass valve, and replace nipples, unions, and caps. February 8, 2007
Ballou Senior High School FM-200700343 2/8/07 Boiler Room Repair or replace bearing assembly on ID Fan for Boiler #2. February 8, 2007
Brightwood Elementary School FM-200700342 342 2/8/07 Boiler Room Repair or replace return pumps for Boiler #1.Pumps not working February 8, 2007
Plummer Elementary School FM-200700383 2/9/07 Boiler room Repair boiler # 2 , will not start ,off on lock-out. February 9, 2007
Rudolph Elementary School FM-200700406 2/9/07 Boiler Room Repair or replace Boiler #2. Leak in fire box. Hot !!!! February 9, 2007
Orr Elementary School FM-200700475 2/13/07 boiler room - Repair all exhaust fan motor units for proper air ventilation. February 13, 2007
Garnet-Patterson MS FM-200700546 46 2/15/07 Boiler Room- Repair or replace Boilers #1,#2 and #5 off on flame failure. February 15, 2007
Stevens Elementary School FM-200700530 30 2/15/07 Ground Floor - Boiler # 2 will not come on. February 15, 2007
Bruce-Monroe Elementary School FM-200700543 2/15/07 Old Building Gym Basement Boiler Room (Tunnel) Repair or replace steam leak on supply line approx. 1-1/2". The section may be approx. (2 ft long) Can't be isloted. February 15, 2007
Kimball Elementary School FM-200700532 2/15/07 Boiler Room - Repair or replace Boiler #1, damper is not closing. Has to close damper manually February 15, 2007
Garfield ES FM-200700542 2/15/07 Boiler room- Emergency request to have boiler room interior door lock changed and exit door near library lock installed to match. February 15, 2007
John Burroughs ES FM-200700531 2/15/07 Boiler Room - Repair or replace rubber hose line to hot water circulating pump. February 15, 2007
Draper Elementary School FM-200700583 2/16/07 Boiler room - Repair or replace leaking condensate return tank. Tank is cracked and leaking. February 16, 2007
Orr Elementary School FM-200700582 2/16/07 Boiler room - weld kindle bar over boiler to install relief pull chains February 16, 2007
Johnson JHS FM-200700581 2/16/07 Boiler room - weld kindle bar over boiler to install relief pull chains February 16, 2007
Terrell Mc ES FM-200700590 2/17/07 Boiler room - Replace ignition modular to domestic hot water heater will not ignite. February 17, 2007
Ferebee-Hope Elementary School FM-200700591 2/18/07 Boiler Room - Repair or replace hot water Lochinvar heater, no hot water in building February 18, 2007
River Terrace ES FM-200700643 643 2/20/07 First Floor - Water pump leaking excessive amount of water in boiler rm. - Circulating return pump #P1 leaking. IFC 110.1 Asbestos Code A - Clear for repairs on 02/21/07. Tidewater - Roger Small (RG 02/21/07) February 20, 2007
Duke Ellington School FM-200700709 2/21/07 Boiler Room - Repair or replace inoperatable blower motor on Boiler #2. Building needs (3) boilers to proper heating on cold days. Note: Boilers #3 and #5 has leaking sections. Urgent !!!! February 21, 2007
Thomas Elementary School FM-200700656 6 2/21/07 Boiler Room - Repair or replace discharge line on sump pump. Line leaks badly when discharge water. Urgent !!!! February 21, 2007
Hendley Elementary School FM-200700743 2/22/07 Outside a exterior drain leading to the boiler room on the backside of the building is flooding the boiler room February 22, 2007
King M L ES FM-200700774 2/22/07 Boiler room - Repair / replace # 1 pump will not run. February 22, 2007
King M L ES FM-200700772 2/22/07 Boiler room - Floor drain behind boiler # 2 and floor drain by secondary pumps 1 and 2 need snaked out. February 22, 2007
Green Elementary School FM-200700780 80 2/22/07 boiler room - Repair sump pump # 1 not working # 2 seems to have problem with float. boiler room has been flooded twice this week. February 22, 2007
Stuart-Hobson Middle School FM-200700806 2/23/07 Repair boiler #3 - Off on false flame - will not start. Only operating boiler February 23, 2007
Eaton Elementary School FM-200700831 2/24/07 Boiler Room - Repair Honeywell control valves for heating and cooling. Pneumatic valves will not open. 4 Black control valves on the panel door, not working. Urgent !!!!! February 24, 2007
Leckie Elementary School FM-200700835 35 2/24/07 boiler room - Request steam shop to install (2) two 3/4" tap with valves into chemical loop. February 24, 2007
Anacostia Senior High School FM-200700830 2/24/07 Boiler room - Replace hot water circulation pump for tank B&G booster pump 116 hp 1725rpm 1hp 60cy Series HV BNFI MOO February 24, 2007
Randle-Highlands ES FM-200700826 6 2/24/07 Boiler room URGENT!!!!!!!!!! Correct cause of inoperatable VAHU #2 Heating air fan motor ,upon start-up blows numerous fuses (AJT 40 40 amps 600VAC ) unit service about 16 class rooms. February 24, 2007
Benjamin Banneker Academic HS FM-200700875 2/26/07 Boiler Room - Repair boiler #1 & #2 flame failure February 26, 2007
Park View ES FM-200700841 2/26/07 Boiler Room - Unclog floor drains, there was a flood over the weekend. February 26, 2007
Kenilworth ES FM-200700907 2/27/07 Basement - Remote condensate pumps(Not in the boiler room) - URGENT!!!!!!! Repair or replace condensate pumps, circuit break continues to trip. Need electrician service or replace breaker for condensate pumps, breaker # 5 will not reset, February 27, 2007
Ketcham Elementary School FM-200700937 2/27/07 Basement Exit Light Out (Boiler Room) Old Wing. - Two exit lights are old type and are not working. Install two new lights. February 27, 2007
Hyde Elementary School FM-200700966 2/28/07 Boiler room Repair #2 boiler will not run. February 28, 2007
Beers Elementary School FM-200700962 2/28/07 Boiler room Repair or replace 1-1/4" check valve on boiler # 1. February 28, 2007
Brightwood Elementary School FM-200701034 034 3/2/07 Boiler Room - Repair Boiler #3 off on P3 interlock open. Will not come on. March 2, 2007
Eastern High School FM-200701036 3/2/07 Boiler Room - Replace 3-1/2 ' ft x 2" feed water line. Weld 3-1/2 ' ft x 2" pipe and elbow on feed line. This is needed for boiler operations. March 2, 2007
Brightwood Elementary School FM-200701039 039 3/2/07 Basement - Boiler Room - Repair or replace condensate pumps for Boiler # 1. Motor will not come on to supply returnes to Boiler # 1. Condensate pump and motor # 3 and 4. March 2, 2007
Horace Mann Elementary School FM-200701066 -200701066 3/4/07 Boiler Room - Replace sump wall with the correct pump. For the sump well. Temp small pump do not pump all the water out. Flooding the Boiler Room area. March 4, 2007
Janney Elementary School FM-200701064 064 3/4/07 Boiler Room- Replace temp sump pump with the correct sump pump to pump out all the water out of the sump can not pump keep flooding Boiler Room area. Urgent !!! March 4, 2007
Leckie Elementary School FM-200701085 85 3/5/07 Boiler room - Replace 2" check valve leaking (copper sweat) on domestic HW storage tank. March 5, 2007
Benning Elementary School FM-200701079 3/5/07 Basement/Free standing water from ground and wall in boiler room (half of foot of water. - Water is approximately 1 inch deep. Sump pump pit does not have a pump installed and is full of water. March 5, 2007
Leckie Elementary School FM-200701083 83 3/5/07 boiler room - Repair or replace ceiling unit heater has damaged heat coils. March 5, 2007
Key Elementary School FM-200701160 0 3/6/07 Fire Pump Room and Boiler Room Repair or replace sump pumps control, Elec-panel fuse controls, pumps will not come on, in the Fire Pump Room; Sump pump Injection; Also the Boiler Room sump pump injection tank. Repair or replace both panel box fuses control box. Urgent !!!! March 6, 2007
Murch Elementary School FM-200701159 3/6/07 Boiler Room - Repair or replace electric panel fuse box controls for sump- pumps to operate pump will not come on, to pump water out. Urgent !!!! March 6, 2007
Eastern High School FM-200701230 3/7/07 Furnish and Install a Sulfate Tank and Pump Set-Up for Boiler Treatment. Current Treatment of (340) Tri-Con does not provide adequate Sulfite Chemicals to Properly Treat Boilers. March 7, 2007
Wilkinson ES FM-200701272 3/8/07 Boiler room - An electrician is neededto re-wire the RAF# 17 March 8, 2007
Montgomery ES FM-200701463 3/8/07 Boiler Room/Repair or replace condensate return system. - Condensate return pump #2, Contenously feeding water. Condensate return pump #1, Bad sails. Condensate return tank has no automatick make up water devices. Asbestos Code A - Clear for repairs on 03/13/07. Tidewater - Roger Small (RG 03/14/07) March 8, 2007
Ludlow-Taylor ES FM-200701257 01257 3/8/07 Location: Boiler rooms air compressor continuos runs and will not shut down. Air compressor continously runs and will not shut off at all. Attempted to pull relief valve and still continues to run. March 8, 2007
Simon Elementary School FM-200701265 3/8/07 Boiler room - Replace 2" blowdown valve rear of boilers # 1 and 2 valve is not holding. March 8, 2007
Burrville Elementary School FM-200701395 5 3/9/07 Boiler Room Repair the condensate pumps, pumps will not put water back in the boilers March 9, 2007
Stanton Elementary School FM-200701491 3/12/07 Boiler room - Correct problem with boiler #2 makes excessively loud noise when in operation. March 12, 2007
King M L ES FM-200701462 3/12/07 Boiler room - URGENT - Repairs are needed immediately - Both heating hot water circulating primary pump # 1 and secondary pump are inoperable, will not run. Needed to heat bldg. March 12, 2007
Shaed Elementary School FM-200701577 0701577 3/12/07 Boiler Room. Repair or replace lock knob that fell completely off the door. March 12, 2007
Stanton Elementary School FM-200701493 3/12/07 Boiler room - Repair domestic hot water tank supports are rusted out. Only two supports remain to support DHW tank. March 12, 2007
Woodson High School FM-200701533 3/12/07 Boiler Room - Air compressor Check and repair air compressor keep tripping on overload. March 12, 2007
Rudolph Elementary School FM-200701542 3/12/07 Location: In front of Boiler leading to Boiler room. Fix or replace lights at the front door entering the boiler room. * Dark and can not see* (Emergency ) March 12, 2007
Truesdell Elementary FM-200701546 3/12/07 Location: Rear of Boiler Room Replace busted steam line in ceiling, leaking. March 12, 2007
Bancroft Elementary School FM-200701575 75 3/12/07 Boiler Room - R/R sump pump March 12, 2007
Shaed Elementary School FM-200701552 0701552 3/12/07 Boiler Room. Repair or replace electrical heaters on sump pump the existing heaters keep making the breaker trip. March 12, 2007
Stanton Elementary School FM-200701495 3/12/07 Boiler room - Repair (3) feedwater pumps - Magnetak Cat. - part 8-165-780-40, HP 1/2, volts 104-208, amps:7.0-3.5, RPM 1725, Time Cont. code L, Hz 60 March 12, 2007
Rudolph Elementary School FM-200701545 3/12/07 Location: Boiler Room Replace busted water line in ceiling. (very bad leaking). March 12, 2007
Woodson High School FM-200701531 3/12/07 Boiler Room - Air compressor Repair or replace leaking line at manifold head. March 12, 2007
Adams Elementary FM-200701518 -200701518 3/12/07 Boiler Room- Repair or replace condensate pump #1. Model #P48K2EB7; Ser. #1EO1; Volts 200/400;KW 37; HP 1/2; PH 3; CODE P; RPM 3450; FR 48Y; HZ-60; Amp 3.3/1.65; SF 1.90; Insul-Class B; AMB 50 degrees C; Time rating - cont.; Type P. Name: A.O. Smith Corp. Note: The seals are leaking and the impeller is making noise when pump cuts on and start pumping condensate back into the boiler. March 12, 2007
Green Elementary School FM-200701662 62 3/13/07 Boiler room - URGENT!!!! Complete installation of sump pumps, contractor started on repairs several months ago and has not return to complet repairs. March 13, 2007
Wilkinson ES FM-200701663 3/13/07 Boiler room - Repair rupture (2") line on domestic hot water tank blowdown line. March 13, 2007
Draper Elementary School FM-200701659 3/13/07 Boiler room - Boiler # 1 Repair leaking tubes March 13, 2007
Simon Elementary School FM-200701661 3/13/07 Boiler room - Repair or replace both sump pumps (motors) will not run. March 13, 2007
Simon Elementary School FM-200701660 3/13/07 Boiler room - Boiler # 2 Repair leaking tubes March 13, 2007
Ferebee-Hope Elementary School FM-200701658 3/13/07 Boiler room - Repair boiler # 2 cam was removed off modular March 13, 2007
Ferebee-Hope Elementary School FM-200701657 3/13/07 Boiler room - Repair both vaccum return pumps. March 13, 2007
Eastern High School FM-200701842 3/15/07 Boiler Room: Install exhaust fan in the basement March 15, 2007
Park View ES FM-200701821 3/15/07 Location: Boiler Room Replace fireye on # 3 Boiler (It was transferred to # 4 Boiler). March 15, 2007
Janney Elementary School FM-200701848 848 3/15/07 Boiler Room - Check domestic hot water heater, no hot water in building. March 15, 2007
Coolidge High School FM-200701937 3/15/07 Boiler room: Repair/or replace #1 high pressure return pump in boiler room. Motors works, pump end is malfunctioning, will not pump. March 15, 2007
Brightwood Elementary School FM-200702055 055 3/16/07 Location: Boiler Room Repair or Replace feed water regulator for condensate return tank make-up feed. March 16, 2007
Kramer Middle School FM-200702159 159 3/19/07 Room 4: Repair/ replace lock on custdian/Boilerroom door. March 19, 2007
Montgomery ES FM-200702171 3/19/07 Boiler Room - Furnish and install new lock for boiler room door keyed to master key, inside entrance door. Urgent !!!! March 19, 2007
Moten Elementary School FM-200702086 3/19/07 Boiler room Repair Boiler # 2 ,off on open purge 3-P ,Run ITLK March 19, 2007
Bell High School FM-200702170 3/19/07 Boiler Room - Entrance doors (3) - 2 on 3rd Floor and 1 on 2nd Floor. Furnish and install new locks on above doors keyed alike (6), do not duplicate stamp Urgent !!!!! March 19, 2007
Burrville Elementary School FM-200702089 9 3/19/07 Boiler room Repair or replace condensate return pumps, pumps are not pumping condensate back to the boilers, pit will over flow if not corrected. March 19, 2007
Stuart-Hobson Middle School FM-200702208 3/20/07 Basement Floor - Furnish change key to exterior Boiler Room door / or replace lock and furnish change key. March 20, 2007
Eastern High School FM-200702237 3/20/07 Location: Sub-Basement Room: Boiler Room Water proof and resurface driveways outside boiler room, rain is damaging wall & running on electrical conduits, & electrical control panels. Fire Code Violation March 20, 2007
Thomas Elementary School FM-200702288 8 3/21/07 Boiler room Check and correct problem with # 1 boiler continuously cutting off on (PTIF) March 21, 2007
John Burroughs ES FM-200702314 3/21/07 Location: Boiler Room Replace safety valves on boilers 1 & 2 . 15 psi Boiler # 1 sizes 1 1/2" x 2" and 2" x 2". Boiler # 2 sizes 1 1/2" x 2" and 2"x 2". March 21, 2007
Montgomery ES FM-200702448 3/22/07 Boiler Room - Repair or replace condensate return system: a) Condensate returnpump #2 continously feeding water. b) Condensate return pump #1, bad seala. c) Condensate return tank, has no automatic make-up water device. Urgent !!!!! March 22, 2007
Johnson JHS FM-200702425 702425 3/22/07 Boiler room and back parking lot area - 1. Unclog boiler room and areaway drains. 2. Second request to unclog cooling tower drains. March 22, 2007
Bell High School FM-200702415 3/22/07 Boiler Room - Boiler #1 Repair or replace leaking sectional (Cast Iron) Right side near rear. March 22, 2007
Bell High School FM-200702417 3/22/07 Boiler Room - Boiler #1 Repair refactory work needed. March 22, 2007
Hart Middle School FM-200702436 3/22/07 Boiler room- URGENT - HURLEY CONTRACTOR HAS MADE ATTEMPTS TO REPAIR BOILER # 2 BOILER WILL NOT LITE OFF, STAYS IN PRGE CYCLE. - CONTRACTORS FROM HURLEY, JONES & WOODS. March 22, 2007
Tyler Elementary School FM-200702511 11 3/26/07 Boilerroom Repair sump pump , pit is over flowing. March 26, 2007
Stevens Elementary School FM-200702606 06 3/27/07 Boilerroom: Replace blowdown line on low water cut off and #2 Boiler in boilerroom. March 27, 2007
Beers Elementary School FM-200702608 3/27/07 Boiler Room - Repair or Replace circulating pump # 2, leaking seals. March 27, 2007
Moten Elementary School FM-200702727 3/28/07 Boiler room - Replace leaking mechanical seals to heating hot water circulation pump # 1. March 28, 2007
Randle-Highlands ES FM-200702728 8 3/28/07 Ground floor, Staff Restroom. Water sounds like it boiling beneath restroom floor, need plumbers to assess and repair. March 28, 2007
Tyler Elementary School FM-200702763 63 3/29/07 Boiler Room - Repair or replace submersible pump for well in Boiler Room is not working. Need pump to stop Boiler Room from flooding. Urgent !!!!! March 29, 2007
Duke Ellington School FM-200702847 3/30/07 Boiler Room: Repair/or replace burner on Boiler #3 Note: Motor and other part removed from burner to repair other boilers. March 30, 2007
Gibbs Elementary School FM-200702896 4/2/07 Boiler Room - Repair or replace leaking pipe on cooling tower. April 2, 2007
Brent Elementary School FM-200702895 2895 4/2/07 Boiler Room - Repair or replace Ruptured 3/4" city water line to cooling tower. April 2, 2007
Cleveland Elementary School FM-200702914 2914 4/2/07 Roof - Repair or replace 3/4" feed water regulator valve to Boiler on roof. Emergency !!!! April 2, 2007
Walker-Jones EC FM-200702979 2979 4/3/07 Boiler Room Breeze way- Repair rupture 1" copper feed water line to cooling tower. April 3, 2007
Duke Ellington School FM-200702975 4/3/07 Boiler Room - Repair or replace McDonell Miller automatic water feeder (N-51-2) on Boiler #2. Leaks in area of linkage. April 3, 2007
Walker-Jones EC FM-200702981 2981 4/3/07 Boiler Room -Asbestos assessment may be required. Remove insulation from standby pump. Repair and replace circulating stand by pump. Stand by pump is leaking badly, pump is needed for A/C for building. April 3, 2007
Gage-Eckington ES FM-200703094 94 4/4/07 Basement/Exposed Wiers (hallway to Boiler Room) (2000) IFC 605.1 April 4, 2007
Langdon Elementary School FM-200703087 -200703087 4/4/07 Exterior boiler room - URGENT- Exterior door lock to boiler room can not insert key all the way into lock. (something broken off in lock) April 4, 2007
Peabody Elementary School FM-200703104 4/4/07 Location: Outside Driveway /At the top of the boiler room. A vechicle knocked down metal rail on the side of the boiler room. Steps-Welders---A Safety Concern April 4, 2007
John Burroughs ES FM-200703298 298 4/5/07 Boiler Room. Repair or replace failed sump pump, boiler room is flooding. April 5, 2007
Bunker Hill Elementary School FM-200703350 350 4/5/07 Boiler Room - Circulating pumps #1and #2 will not come on. No heat on hot water side of Building. April 5, 2007