| School |
Description |
Date |
| Park View ES |
FM-200203169 169 2/20/02 (Park View) ***Urgent*** Asbestos Assessment Required Roof Area Above Room 115 Repair roof leak above room 115 which is causing damage to the classroom walls. Roofer need to go through ceiling in classroom to make repairs. LEAD & ASBESTOS CODE A-CLEAR FOR REPAIR NO 2/21/02 HORNE ENGINEER: ROGER KAGER |
February 20, 2002 |
| Gibbs Elementary School |
FM-200204513 3/15/02 (Gibbs) Asbestos Assessment Required 3rd Floor Practice Room 119 There is leaking through the ceiling of Practice Room 119, resulting from a fan cover missing on the roof allowing water to come in. POC: Mr. Manigan Code A-clear for repair by Horne Engineer ( Sheryll James ) 0n 3/20/02 (CEB) |
March 15, 2002 |
| Cardozo High School |
FM-200204623 3/18/02 (Cardozo) Roof Over 3rd Floor Room 314 Repair leak, leaking through the ceiling below into Room 314 and seeping around the electric light fixtures. Code A-clear for repair by Horne Engineer ( Stephen Caldwell ) 0n 3/20/02 (CEB) |
March 18, 2002 |
| Spingarn High School |
FM-200204739 3/19/02 (Spingarn) Urgent 1. Asbestos assessment required. 1st Floor auditorium: Repair existing roof leak; water has badly damaged ceiling inside the auditorium. Code A-clear for repair by Horne Engineer ( Z Mahmood ) on 3/25/02 (CEB) |
March 19, 2002 |
| Gibbs Elementary School |
FM-200204785 3/20/02 Gibbs Main roof Repair or replace exhaust fan and missing hood for boys and girls restrooms. Water leaks into bldg. Fan locked because of rust. Fabricate missing hood for exhaust fan. |
March 20, 2002 |
| Benning Elementary School |
FM-200204872 2 3/22/02 Benning Repair drain on the roof which has a crack in it, allowing water to leak through to the ceiling lights on the floor below. POC: Mrs. Lloyd |
March 22, 2002 |
| Eastern High School |
FM-200204931 3/26/02 Eastern Choral Rehearsal Room and Adjoining Office 1. Asbestos Assessment Required. 2. Approximately 100 square feet of plaster damage from previously leaking roof, could be replaced with plaster under layment board and 1/8" skin coat. Scaf- folding required because damage is on upper portion of walls. Damaged plaster will continue to flake and fall off wall, harming computer equipment and putting particles in the air. Safety Hazard. Asbestos Code A - Clear For Repairs On 03/26/02. Horne Engineering - Troy Wilcome (RG 03/27/02) |
March 26, 2002 |
| Turner Elementary School |
FM-200206432 4/24/02 (Turner) ***Very Urgent*** Outside exit door ceiling roof: Roof leak, Concrete coming apart and falling in custodial office; Code A-clear for repair by Horne Engineer by ( Sheryll James ) on 4/25/02 ( CEB ) |
April 24, 2002 |
| Amidon Elementary School |
FM-200206764 4/29/02 Amidon ****Urgent**** 1st Floor Multi-purpose Room A leak from the roof, over the multi-purpose room, is flooding the floor. Code A - Clear for repairs on 04-29-02 by Horne Engineering / Bipin Nanavarty. Leroy Minton Jr. Safety Office 202-576-8962. |
April 29, 2002 |
| Maury Elementary School |
FM-200207060 5/3/02 Maury Roof Over1st Floor East Multi-Purpose Room Repair leak on the roof over the multi-purpose room. |
May 3, 2002 |
| Tyler Elementary School |
FM-200207046 5/3/02 Tyler Lower Level Roof Unstop roof drain above the kitchen. Water is leaking into the cafeteria manager's office. |
May 3, 2002 |
| Benjamin Banneker Academic HS |
FM-200207068 68 5/3/02 Banneker Roof Above Room 305 The roof is leaking above room 305 on the 3rd floor [the problem was looked at, but no one returned]. |
May 3, 2002 |
| Cook J.F. Elementary School |
FM-200207405 7405 5/8/02 Cooke, J.F. !!! Urgent !!! 1. Asbestos Assessment Required. 2. Roof is leaking and donot know where the water is coming from. It is leaking down in the Cafeteria ceiling. Asbestos Code A - Clear for repairs on 05/08/02. Horne Engineering - Stephen Caldwell (RG 05/09/02) |
May 8, 2002 |
| Bowen Elementary School |
FM-200208742 5/31/02 (BOWEN) ****Very Urgent**** Exterior/Roof Section Over Cafeteria There is water standing and leaking from the area of roof over the cafeteria. The problem is ongoing and needs to be addressed so the large pieces of falling plaster ceiling in the cafeteria can be repaired [Ref: FM-200124473]. |
May 31, 2002 |
| Eastern High School |
FM-200209695 6/17/02 (Eastern) 1. Asbestos assessment required. 3rd Floor/Hallway ceiling: Roof leak coming through ceiling; area located across from room #330 and 337. Code A-clear for repair by Horne Engineer ( Bipin Nanavaty ) on 06/20/02 |
June 17, 2002 |
| Coolidge High School |
FM-200216065 65 8/28/02 Coolidge/Frank Williams Center ***Urgent**** Roof leak is coming through the gym ceiling when it rains, and causing a leaking problem in room 316. The cause of the roof leak has not been identified. The fall school session starts on next Tuesday and we would like the problem not to expand into other areas. |
August 28, 2002 |
| Truesdell Elementary |
FM-200216118 8/29/02 (Truesdell) !!Emergency) 3rd Floor/Hallway: Ceiling leaking from roof leak, causing large portions of ceiling tile to fall. |
August 29, 2002 |
| Coolidge High School |
FM-200216149 49 8/29/02 (Coolidge) ***Urgent*** Front side of building/3rd Floor: Water leaking from roof down in-to room #309. |
August 29, 2002 |
| Coolidge High School |
FM-200217183 83 9/10/02 Coolidge Back hallway Roof leak from drain on roof. |
September 10, 2002 |
| Montgomery ES |
FM-200219305 -200219305 10/11/02 (Montgomery) Roof to 2nd floor: Stairwells filled with water, leaking from roof drain; water is running over the flashing. |
October 11, 2002 |
| Draper Elementary School |
FM-200219298 10/11/02 Draper 1) Repair roof leak that causes water to leak into the cafeteria/kitchen. |
October 11, 2002 |
| Davis Elementary School |
FM-200219423 10/15/02 Davis Outside roof - Vent cover over auditorium Repair roof leak, it is leaking from vent cover over auditorium. Asbestos Code A-clear for repair on 10/16/02 by DCPS Charles E. Buchanan |
October 15, 2002 |
| Johnson JHS |
FM-200219418 10/15/02 Johnson Basement area near cafeteria Roof leak affecting area below. Asbestos Code A - Clear for repairs on 10/16/02. Horne Engineering - Sheryll James (RG 10/17/02) |
October 15, 2002 |
| Ludlow-Taylor ES |
FM-200219516 10/16/02 (Ludlow-Taylor) !!!URGENT!!! 1st Floor/Small roof: Leaking over exit leading to playground. |
October 16, 2002 |
| West Elementary School |
FM-200219519 10/16/02 (West) !!!URGENT!!! 1st Floor Basement/Pre-K and learning center: Repair roof in the above locations. While raining, the roof leaks very badly. |
October 16, 2002 |
| West Elementary School |
FM-200219453 10/16/02 West Learning center and back stairwell Learning center and back stairwell by gym roof leaks and ceiling tile is falling. Roof was installed four years ago call the corp eng. Asbestos Code A - Clear for repairs on 10/18/02. Horne Engineering - Edward Rodrigue (RG 10/21/02) |
October 16, 2002 |
| Johnson JHS |
FM-200219512 10/16/02 Johnson Roof Caulk skylights water is leaking around frame entering building. Flooding stairwell and corridor. |
October 16, 2002 |
| Aiton Elementary School |
FM-200219549 10/17/02 Aiton Fourth floor - Rooms 407 and 408 Roof is leaking in rooms 407 and 408. Asbestos Code A - Clear for repairs on 10/16/02. Horne Engineering - Philp Connolly (RG 10/21/02) |
October 17, 2002 |
| Eastern High School |
FM-200219784 10/22/02 (Eastern) !!!URGENT!!! Repair roof leak - overhead stage area leaking badly. Asbestos Code A - Clear for repairs on 10/22/02. Horne Engineering - Sharon Voss (RG 10/25/02) |
October 22, 2002 |
| Hendley Elementary School |
FM-200220348 8 10/30/02 Hendley Third Floor - Room 302 Roof Leak |
October 30, 2002 |
| Johnson JHS |
FM-200220390 10/31/02 Johnson First floor - Auditorium area Roof leak, which has damage the plaster ceiling. |
October 31, 2002 |
| Ferebee-Hope Elementary School |
FM-200220592 11/1/02 Ferebee-Hope Main Roof Pent House Repair or replace flance around floor drain. Water leaking on the top 4th floor. |
November 1, 2002 |
| Eastern High School |
FM-200221224 11/18/02 Eastern Mechanical room Repair roof leak above mechanical room third floor. Possible gutter replacement is needed. This should be expeditiously to stop further damage to auditorium. |
November 18, 2002 |
| Cardozo High School |
FM-200221253 11/19/02 Cardozo Roof - rear steps by girls gym southeast side Repair roof leak that deteriorated plaster walls and ceiling causing plaster to fall. |
November 19, 2002 |
| Garfield ES |
FM-200221268 11/19/02 Garfield D wing - demountable room 107 Roof leaking in room 107 causing ceiling tiles to fall and soaking carpet. Asbestos Code A - Clear for repairs on 08/31/05. Tidewater - Tony Marcolin (RG 09/01/05) |
November 19, 2002 |
| Cardozo High School |
FM-200221239 11/19/02 Cardozo By girls gym rear steps- south east side Repair plaster walls and ceiling that has fallen from roof leak. Asbestos Code A-clear for repair by Horne Engineer Sheryll James DCPS Safety on 11/21/02 Charles E. Buchanan |
November 19, 2002 |
| Coolidge High School |
FM-200221465 11/21/02 Coolidge Roof Leak 1) Roof leaking in room 304 and 320. |
November 21, 2002 |
| Benjamin Banneker Academic HS |
FM-200221468 68 11/21/02 Banneker Third floor Above ceiling in hall 300/305 Roof is leaking, the plaster is falling in chunk's. Soon to become a hole in the roof. |
November 21, 2002 |
| Cardozo High School |
FM-200221932 12/3/02 Cardozo Roof -over girls gym Repair roof drain, drain holding water on roof that is leaking into girls gym. Tried taege plunger no results. Repair roof over girls gym. |
December 3, 2002 |
| Nalle Elementary School |
FM-200222618 12/4/02 (Nalle) The roof design has caused the traps for the train to shut down because of the granules washing into the trap. Because of the problem with the roof the auditoriun ceiling leaks and the cafeteria ceiling leaks. Account #: 288 Asbestos Code A-clear for repair by Harne Engineer Edward Rodriguez on 12/19/02 DCPS Charles E. Buchanan |
December 4, 2002 |
| Spingarn High School |
FM-200222140 12/6/02 Spingarn Rooms - 311,317 and 319 1) Repair roof leaks. |
December 6, 2002 |
| Gibbs Elementary School |
FM-200222410 12/12/02 First Floor - Main Lobby and Cafeteria - Roof Leak Second Request was called in on 2-20-07 Ceiling tiles are starting to fall |
December 12, 2002 |
| Eastern High School |
FM-200222501 12/13/02 Eastern Roof - Gym 1) Repair roof leaks in several locations. |
December 13, 2002 |
| Shepherd ES |
FM-200222510 12/13/02 Shepherd Second floor - New wing Roof leaking from second floor down to the first floor storage, nearest to the library. |
December 13, 2002 |
| Thomas Elementary School |
FM-200222600 12/16/02 Thomas Third floor -room 304 Plaster has falling because of roof leak. Please plaster and paint. Lead & Asbestos Code A - Clear for repairs on 12/16/02. Horne Engineering - Edward Rodriguez (RG 12/18/02) |
December 16, 2002 |
| Thomas Elementary School |
FM-200222691 12/17/02 Thomas Third floor - roof Repair roof over room 304. Water has leaked threw and knocked plaster out of ceiling. |
December 17, 2002 |
| Eastern High School |
FM-200223137 12/26/02 Eastern Roof Leaking in the following areas: 1) Gym Area 2) First Floor - Auditoriun Stage 3) Classroom 153 ( ceiling) 4) Third Floor - 337 - office and classroom 5) Corridor across from room 330 - Leaking from lights. |
December 26, 2002 |
| Moten Elementary School |
FM-200223559 1/6/03 (Moten) 1st Floor: Leaking from roof area, water coming down ceiling,. (Alcove area) |
January 6, 2003 |
| Marshall Educational Center |
FM-200223557 0223557 1/6/03 (Marshall) 2nd floor/Stage #2: Roof is leaking very badly, needs repair. |
January 6, 2003 |
| Ballou Senior High School |
FM-200223842 1/13/03 Ballou Roof 1) Repair leaking flashing on roof. Roof leaks in at least (6) areas. |
January 13, 2003 |
| Johnson JHS |
FM-200224730 1/28/03 Johnson Urgent Safety Hazard !!! D Wing near auditorium 1) Roof leaks has affected ceiling in D- Wing corridor near the auditorium and D-12. Two large sections of ceiling is loss and about to fall in. Asbestos Code A - Clear for repairs 02/21/03. Horne Engineering - Troy Wilcome (RG 02/24/03) |
January 28, 2003 |
| Draper Elementary School |
FM-200225118 2/3/03 (Draper) 3rd Floor: Roof leaking in the following rooms: #300, 301, & 315. |
February 3, 2003 |
| Terrell Mc ES |
FM-200225452 2/5/03 (Terrell, M.C.) Roof leaks in the classroom area. |
February 5, 2003 |
| Duke Ellington School |
FM-200225812 2/13/03 Ellington, Duke First floor Back stage There is a leak coming from the roof and ceiling that need repair in the back stage area. |
February 13, 2003 |
| Gibbs Elementary School |
FM-200226014 2/21/03 (Gibbs) !!!URGENT!!! 1st Floor/Room #103: Ceiling leak, possible leak from the roof that is steady dripping. |
February 21, 2003 |
| Eastern High School |
FM-200226000 2/21/03 (Eastern) Through-Out: Roof leaking in-to the following area's: Auditorium stage, and gym ceiling. |
February 21, 2003 |
| Eastern High School |
FM-200226122 2/24/03 (Eastern) !!!URGENT!!! Basement/Hallway near B-35 Roof leaking through ceiling also, leaking in closet of B-14. |
February 24, 2003 |
| Hine JHS |
FM-200226106 2/24/03 (Hine) Roof: Unstop drains in roof areas: 1. Main lobby/Gym: 3 to 4 inches of water present. 2. Leaking in room #403; bubbling under the roof tile (Ceiling tile wet) 3. Teachers dining room: Tile is wet. 4. Over hang at top of principals office. |
February 24, 2003 |
| Watkins Elementary School |
FM-200226084 2/24/03 Watkins Fourth floor - flat roof Require flat roof check due to several top floor classroom ceiling. Water leaking on both sides of hallway. Hallway fallen ceiling tiles from water drainage. |
February 24, 2003 |
| Eastern High School |
FM-200226276 2/26/03 Eastern Room 153 Ceiling need repairing and fixing. Furnish and install floor tile due to roof leak in ceiling. Tile is buckling on floor. |
February 26, 2003 |
| Wilkinson ES |
FM-200226273 2/26/03 Wlikinson First floor 72 gymnasium Gym floor need repair. Water damage from roof leak. 40 pieces. |
February 26, 2003 |
| Dunbar High School |
FM-200226283 2/26/03 Dunbar Pool Roof Outside Asbestos Assestment Required Pool roof leaking needs to be checked Asbestos Code A - Clear for repairs on 02/27/03. Horne Engineering - Edward Rodriguez (RG 03/05/03) |
February 26, 2003 |
| Shepherd ES |
FM-200226501 3/4/03 Shepherd First floor new wing Roof leak nearest to teacher bathroom, need to be repair. |
March 4, 2003 |
| Park View ES |
FM-200226648 3/6/03 Park View Room 228 repair roof leak in coat closet. Water was dripping in area where phone equipment is located. Equipment has been push away from leak. Asbestos Code A - Clear for repairs this area was assess on 03/14/02 under FM-200204355. Horne Engineering - Troy Wilcome (RG 04/15/03) |
March 6, 2003 |
| Payne Elementary School |
FM-200227125 3/14/03 PAYNE First Floor - Lobby And Hallway 1. The roof is leaking near the cafeteria in the hallway , need to be repaired. Asbestos Code A - Clear for repairs on 03/18/03. Horne Engineering - Roger Kager (03/19/03) |
March 14, 2003 |
| Maury Elementary School |
FM-200227403 3/21/03 MAURY !! EMERGENCY !! First And Second Floor - North Side Of The Building . Please check and repair roof leak on flat roof , north side of the building as you approach west building . Asbestos Code A - Clear for repairs on 03/24/03. Horne Engineering - Edward Rodriguez (RG 03/25/03) |
March 21, 2003 |
| Powell Elementary School |
FM-200227556 3/24/03 (Powell) Roof is leaking coming through ceiling tile on 2fl near room 211. Asbestos Code A - Clear for repairs on 03/25/03. Horne Engineering - Sharon Voss (RG 03/28/03) |
March 24, 2003 |
| Marshall Educational Center |
FM-200228060 0228060 4/1/03 Marshall, T. Second floor Dr. Diya Roof is leaking very badly needs repairs. |
April 1, 2003 |
| Eastern High School |
FM-200228402 4/7/03 (Eastern) 3rd Floor/Rooms #153, 337, Office, & Auditorium: Roof leaking through-Out the building. |
April 7, 2003 |
| Benjamin Banneker Academic HS |
FM-200228444 4/8/03 Banneker Third floor - Stairwell roof or upper wall is leaking on the southwest stairwell. Work has been done in tjis area before in the past.Roof leaks when it rains. Closet floods in side the building, The closet is located by the exit door / where the trash dumpsters are on the in side of the building. |
April 8, 2003 |
| Benjamin Banneker Academic HS |
FM-200228443 4/8/03 Banneker Basement - Utility closet Roof leaks when it rains. Closet floods in side the building, The closet is located by the exit door / where the trash dumpsters are on the in side of the building. |
April 8, 2003 |
| Slowe Elementary School |
FM-200330249 5/16/03 Slowe !! EMERGENCY !! Second Floor - Hallway ( New Bldg. ) 1. Repair roof leak in the hallway in front of classroom # 211 . |
May 16, 2003 |
| Nalle Elementary School |
FM-200330242 5/16/03 Nalle !! EMERGENCY !! First Floor - Classroom #118 1. Repair major roof leak in classroom . |
May 16, 2003 |
| Eastern High School |
FM-200330312 5/19/03 Eastern Wood shop - armory and gym Repair roof leaks wood shop leaking from skylight. |
May 19, 2003 |
| Bell High School |
FM-200330891 5/29/03 Bell M.C Main Roof Correct problem thats causing water to leak into room # 201a from roof. Problem occurs when cooling tower over-flow. |
May 29, 2003 |
| Marshall Educational Center |
FM-200330888 0330888 5/29/03 Thurgood Marshall Pool Roof Drains First Floor Roofing Department need to repair roof drains. Drains are leaking in four locations around flanges. Tiles have been removed in area were leaks are (4 drains total) |
May 29, 2003 |
| Orr Elementary School |
FM-200331870 6/16/03 Orr Fourth floor- Library Media Center Roof leaking in computer area gravel falling around window. |
June 16, 2003 |
| Gibbs Elementary School |
FM-200332100 6/19/03 Gibbs !! EMERGENCY !! First Floor - Chair Room 1. Repair roof leaking damaging ceiling and water running on to the floor and causing mildew . |
June 19, 2003 |
| Garfield ES |
FM-200332217 6/20/03 Garfield Roof is leaking and the ceiling has fallen. Room #2A and #2B Asbestos Code A - Clear for repairs on 06/20/03. Horne Engineering - Philp Connolly (RG 06/23/03) |
June 20, 2003 |
| Ferebee-Hope Elementary School |
FM-200332607 6/27/03 Ferebee -Hope Penthouse Roof 1. Survey outside louver ( water leaking in to building causing damage to carpet . |
June 27, 2003 |
| Ballou Senior High School |
FM-200332988 7/8/03 Ballou Repair roof leaks room 121, gym, cooridor by 117, teachers prog. area, both sides of lobby. |
July 8, 2003 |
| Garfield ES |
FM-200333225 7/14/03 Garfield Boiler Room Unstop 4" leaking roof drain line water leaking in Boiler room brick ceiling,water is going through building. Leak is in room next to hot water heater. Check with Ms. Toon, the Engineer. |
July 14, 2003 |
| Tubman Elementary School |
FM-200334691 8/8/03 Tubman Third floor room 306 Water leaking into classroom /coming from roof when it rain. |
August 8, 2003 |
| Ballou Senior High School |
FM-200335199 8/14/03 Ballou First Floor center section Survey and repair the following rooms 104 and 105 for roof leaks. |
August 14, 2003 |
| Woodson High School |
FM-200336907 9/5/03 (Woodson) !!!VERY URGENT!!! Ground Floor/Music Room: Roof leaking, water running in-to the music room. Asbestos Code A - Clear for repairs on 09/08/03. Horne Engineering - Troy Wilcome (RG 09/09/03) |
September 5, 2003 |
| Rudolph Elementary School |
FM-200337264 9/11/03 Rudolph Roof leaking from girls. Ceiling in the lavatories in rec area. Please attend to this matter ASAP. |
September 11, 2003 |
| Gage-Eckington ES |
FM-200337542 9/15/03 Gage-Eckington Second floor kitchen area Paint is peeling from ceiling over top steam table. Need to be scraped and painted. Due to roof leaking. Continuing to come back. Lead & Asbestos Code A - Clear for repairs on 09/22/03. Horne Engineering - Edward Rodriguez (RG 09/25/03) |
September 15, 2003 |
| Eaton Elementary School |
FM-200337492 9/15/03 Eaton Emergency Roofs-East, West, Middle, and Kitchen R/R roof, missing slates, damage gutters, and damage flashing from last year snow storm. Water leaking into the class rooms and office areas every time it rains-leaks are very bad. |
September 15, 2003 |
| Nalle Elementary School |
FM-200337641 9/16/03 Nalle, J.C. Second floor boys restroom Ceiling damage due to roof leak. Asbestos Code A - Clear for repairs on 10/23/03. Horne Engineering - Sheryll James (RG 10/27/03) |
September 16, 2003 |
| Reed LC |
FM-200337609 9/16/03 Reed Second Floor 1. Repair roof leak in the auditorium near learning center #3 and roof top planters over canopy. |
September 16, 2003 |
| Whittier Elementary School |
FM-200337824 9/22/03 (Whittier) Asbestos Assessment Required. Old Side/1st Floor: Repair wall in Assist. Principal's restroom; water leaking from the outside. (Possible roof leak) Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Tony Marcolin (RG 10/08/03) |
September 22, 2003 |
| Whittier Elementary School |
FM-200337823 9/22/03 (Whittier) 2nd Floor/Media Center: Roof leaking through ceiling tile. Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Tony Marcolin (RG 10/08/03) |
September 22, 2003 |
| Whittier Elementary School |
FM-200337827 9/22/03 (Whittier) Asbestos Assessment Required. 2nd Floor/Teachers Lounge: Repair middle of wall damaged by water. (Possible roof leak) Asbestos Code A - Clear for repairs on 09/24/03. Horne Engineering - Tony Marcolin (RG 11/18/03) |
September 22, 2003 |
| Beers Elementary School |
FM-200337891 9/23/03 Beers Second floor building 2 Room 210 due to weather storm and rain the ceilings are very wet and the roof leaks. |
September 23, 2003 |
| Deal Junior High School |
FM-200337854 9/23/03 Deal Girls Gym - Southwest Corner - Water coming down walls. Girls Locker Room - Water coming in around windows. Boys Gym Office - Water coming down wall. Boys Locker Room - Water coming down wall. Hallway leading to Kitchen - Roof Leak. |
September 23, 2003 |
| Seaton Elementary School |
FM-200337997 9/24/03 (Seaton) 3rd Floor/Room #315: Roof leak in Room #315, over teachers desk. (Very heavy rains) Asbestos Code A - Clear For Repairs On 09/25/03. Horne Engineering - Troy Wilcome (RG 09/26/03) |
September 24, 2003 |
| Francis Junior High School |
FM-200338057 7 9/25/03 Francis Tunnel leading from Boiler Room Repair and or replace 4" or 6" roof drain line pipe. Pipe is busted and water is leaking on first floor. |
September 25, 2003 |
| Winston EC |
FM-200338186 9/29/03 Winston Third and fourth floor Roof leaking third floor corridor by rooms 312, 320 and main entrance by security fourth fllor storage room in cafeteria. |
September 29, 2003 |
| Cardozo High School |
FM-200338268 9/30/03 Cardozo Attic Over Auditorium 1) Assess ducts insulation. Code 'A' cleared for repairs 12/29/04. DCPS Safety R. Edwards (RE-12/29/04) Abatement conducted by EnviroBate Global; Air Monitoring conducted by USA Environmental Inc. Damaged asbestos duct insulation repaired and encapsulated. Debris cleanup from surrounding surfaces and encapsulation applied. DCPS Safety R. Edwards (RE-12/29/04) Note: Damage was caused by previous roof leak. Evidence of a form of roof repair is obvious from the excess tar that dripped onto the damaged duct surface. Recommend reinspection of the repaired area during inclement weather. (RE-DCPS Saftey) |
September 30, 2003 |
| Ferebee-Hope Elementary School |
FM-200338276 9/30/03 Ferebee-Hope Roof by muisc room and rec game room Roof leaking in the above areas. |
September 30, 2003 |
| Gage-Eckington ES |
FM-200338357 10/1/03 Gage-Eckington Outside roof Top of roof has to be repaired due to water leaking inside causing damage to ceiling, ceiling tile and lights, etc...... |
October 1, 2003 |
| Kimball Elementary School |
FM-200338754 10/9/03 (Kimball) !!!VERY URGENT!!! Asbestos Assessment Required. Middle Wing/2nd Floor: Roof leaking down on 2nd floor hallway. Asbestos Code A - Clear for repairs on 10/24/03. Horne Engineering - Tony Marcolin (RG 10/27/03) |
October 9, 2003 |
| Garfield ES |
FM-200338857 10/14/03 Garfield Room 2-A Repair holes in newly installed 12x12 floor tile. Scrape loose plaster in storeroom ceiling that was cause by previous roof leak that was repaired and paintes same. Please expedite Asbestos Code A - Clear for repairs on 10/15/03. Horne Engineering - Edward Rodriguez (RG 10/22/03) Lead & Asbestos Code A - Clear for repairs on 08/23/05. Tidewater - Rodney Distance/Philp Connolly(RG 08/25/05) |
October 14, 2003 |
| Seaton Elementary School |
FM-200339538 10/27/03 (Seaton) 1st Floor/Cafeteria: Ceiling leak, coming from the roof. Asbestos Code A - Clear for repairs on 10/29/03. Horne Engineering - Edward Rodriguez (RG 10/30/03) |
October 27, 2003 |
| Lafayette Elementary School |
FM-200339582 10/28/03 Lafayette Gym Roof leaking as you go into gym by water fountain. Top slanted part of roof. |
October 28, 2003 |
| Powell Elementary School |
FM-200340083 11/7/03 Powell Second floor room 211 and hallway outside room 211 Repair roof leak in room 211 and outside room 211. Asbestos Code A - Clear for repairs on 11/10/03. Horne Engineering - Bipin Nanavaty (RG 11/12/03) |
November 7, 2003 |
| Meyer Elementary School |
FM-200340517 11/20/03 Meyer 1) Inspect the entire building including the roof for water leaks. Initiate repair. Poc - Eric Dreher - 202-438-3339 |
November 20, 2003 |
| Takoma Educational Center |
FM-200340680 11/24/03 (Takoma) 3rd Floor/Room #210: At the time of heavy rain storms, the roof leaks in the classroom area, coming through the ceiling. Asbestos Code A - Clear for repairs on 11/25/03. Horne Engineering - Sophia Kapranos (RG 12/01/03) |
November 24, 2003 |
| Reed LC |
FM-200341193 12/8/03 Reed, Marie Second floor learning Ctr. #1 and special Ed Survey and repair roof leak. |
December 8, 2003 |
| Eastern High School |
FM-200341790 12/18/03 Eastern First floor room 154 Repair roof leak above room 154. Ceiling plaster is already falling. |
December 18, 2003 |
| Gibbs Elementary School |
FM-200341955 12/22/03 (Gibbs) 1st Floor/Hall: Ceiling leaking from roof, and smelling of mildew. Asbestos Code A - Clear for repairs on 12/23/03. Horne Engineering - Philp Connolly (RG 01/06/04) |
December 22, 2003 |
| Draper Elementary School |
FM-200442624 1/13/04 Draper Basement cafeteria storage room in kitchen Repair HAZARDOUS storage room in kitchen leaking water from ceiling. Ceiling is drooping downward possibly from the weight of the water on roof. Outside drain on roof of cafeteria is stopped up. Cafeteria ceiling is flaking and wet. May fall in. |
January 13, 2004 |
| Horace Mann Elementary School |
FM-200442782 1/15/04 Mann Repair roof leak over entrance to community center. |
January 15, 2004 |
| Draper Elementary School |
FM-200442961 1/20/04 Draper Roof leak third floor Roof leaking on third floor hall, and room 304. |
January 20, 2004 |
| Horace Mann Elementary School |
FM-200443643 2/3/04 (Mann) Asbestos Assessment Required. 2nd Floor/Room #201: Roof leaking through ceiling, and wall in the above room. Asbestos Code A - Clear for repairs on 03/03/04. Horne Engineering - Bipin Nanavaty (RG 02/04/04) |
February 3, 2004 |
| West Elementary School |
FM-200443672 2/4/04 West Boiler room Roof is leaking into boiler room. Please repair. |
February 4, 2004 |
| Rudolph Elementary School |
FM-200445459 3/16/04 Rudolph Hallway across from room 200B Need roof repairing were roof is leaking. Asbestos Code A - Clear for repairs on 03/17/04. Horne Engineering - Philp Connolly (RG 03/19/04) |
March 16, 2004 |
| Ludlow-Taylor ES |
FM-200445524 3/17/04 (Ludlow-Taylor) Asbestos Assessment Required. 1st Floor/Multipurpose room: Roof leaking through ceiling in the above room. Asbestos Code A - Clear for repairs on 03/22/04. Horne Engineering - Bjarne Smith (RG 04/13/04) SEE LINKED DOCUMENTS |
March 17, 2004 |
| Stanton Elementary School |
FM-200445488 3/17/04 Stanton Urgent !! Roof - Room - 308 1) Water is leaking from the ceiling. |
March 17, 2004 |
| Garnet-Patterson MS |
FM-200446211 4/1/04 Garnet- Petterson Third floor attic roof leak Assessment and Abatement design Ceiling leaking hole in ceiling. Assess spray on material in attic and design abatement so that hole can be fixed. Asbestos Code A - Clear for repairs on 04/05/04. Horne Engineering - Philp Connolly (RG 04/23/04) SEE LINKED DOCUMENTS |
April 1, 2004 |
| Duke Ellington School |
FM-200446230 4/1/04 (Ellington) 3rd Floor/Band Room: Roof leak causing plaster to fall. Asbestos Code A - Clear for repairs on 04/02/04. Horne Engineering - Tony Marcolin (RG 04/06/04) |
April 1, 2004 |
| Gage-Eckington ES |
FM-200446208 4/1/04 (Gage-Eckington) Asbestos Assessment Required. Cafeteria: Water leaking from roof causing ceiling tile too fall. Code A- clear for repairs as 4/1/04 by Horne Eng. |
April 1, 2004 |
| Ferebee-Hope Elementary School |
FM-200446399 4/6/04 Ferebee-Hope First floor B-building rec gameroom Roof leaking (water damage to floor tile). |
April 6, 2004 |
| Whittier Elementary School |
FM-200446837 4/19/04 Whittier Third floor room 302 Replace or repair ceiling in room 304 due to leaking roof, plaster falling. Health hazard to students and satff. Please expide. Asbestos Code A - Clear for repairs on 04/20/04. Horne Engineering - Bipin Nanavaty (RG 04/20/04) |
April 19, 2004 |
| Ludlow-Taylor ES |
FM-200447401 5/3/04 Ludlow-Taylor Roof Roof drain line leaking into 209. |
May 3, 2004 |
| Eastern High School |
FM-200447447 5/4/04 Eastern Auditorium room 152 stadium back across from B-35 and gym hallway Repair or replace down spouts and roof leaks in above locations wall are damage and getting worse. 1. Down spouts on back of school, 17th St. side of bldg. 2. Repair roof leak in boys bathroom in stadium - damaging ceiling. |
May 4, 2004 |
| King M L ES |
FM-200449529 6/21/04 King Outside lobby roof Need to have the lobby roof repair or replace it is leaking. |
June 21, 2004 |
| Eastern High School |
FM-200450250 7/14/04 Eastern Roof Annex Repair or replace tarp / flashing around AC unit and or pan inside AC unit to stop leak in room 152. |
July 14, 2004 |
| West Elementary School |
FM-200451023 7/28/04 West Second floor ESL room The roof is leaking in the ESL classroom and the ceiling is falling. |
July 28, 2004 |
| Coolidge High School |
FM-200451111 7/29/04 (Coolidge) !!!VERY URGENT!!! Asbestos Assessment Required. 3rd Floor/Hallway Leaking from roof into 3rd floor hallway. Asbestos Code A - Clear for repairs on 08/11/04. DCPS Safety - Leroy Minton Jr. (RG 08/17/04) |
July 29, 2004 |
| Terrell Mc ES |
FM-200451086 7/29/04 Terrell, M.C. Roof There is a lot of water standing on the roof. the water is leaking in the hallway and the kindegarten area. |
July 29, 2004 |
| Shaw JHS |
FM-200452577 8/13/04 Shaw Stairwell 1 and 7 There is a roof leak in both stairwells. |
August 13, 2004 |
| Wilson High School |
FM-200452834 8/18/04 Wilson, W. First floor hallways Repair roof leaks in auditorium and library hallways. |
August 18, 2004 |
| Wilson High School |
FM-200452970 8/19/04 Wilson, W. First floor L-14 Replace ceiling tile, tiles was damage due to leaks from the library roof. Asbestos Code A - Clear for repairs on 08/25/04. DCPS Safety - Leroy Minton Jr. (RG 08/26/04) |
August 19, 2004 |
| Benning Elementary School |
FM-200453029 8/20/04 Benning Ground Roof leaking water into stairway. Water starting to leak from the ceiling in Pre Kindergarten. |
August 20, 2004 |
| Spingarn High School |
FM-200453229 8/24/04 Spingarn Third floor by stairway # 8 Requesting an plaster to fix existing hole in the ceiling due to leak from the roof. Asbestos Code A - Clear for repairs on 08/24/04. DCPS Safety - Richard Gibson (RG) |
August 24, 2004 |
| Draper Elementary School |
FM-200453269 8/24/04 Draper URGENT Third floor hallway ceiling Leaking ceiling in hallway on third floor. Roof drains may be stopped up. Request all drains be checked and unstopped. |
August 24, 2004 |
| Beers Elementary School |
FM-200455099 9/20/04 Beers Emergency Roof Building # 1 second by girls and boys restroom there is a roof leak. Water is coming thru the lights. |
September 20, 2004 |
| Eastern High School |
FM-200455379 9/22/04 Eastern Basement Replace the tra and gravel on both workshops and armory roofs . Due to leaks in serveral areas in the building. |
September 22, 2004 |
| Ketcham Elementary School |
FM-200455596 9/24/04 Ketcham Second floor old wing Requesting repair of wood floor. Floor was damaged due to leaky roof, which has since been repaired. Room haso been replastered and painted. Code A-clear for repair by DCPS Charles Buchanan on 9/27/04 |
September 24, 2004 |
| Wilson High School |
FM-200455778 9/27/04 Wilson, W. First floor girls locker room Roof leaks. |
September 27, 2004 |
| Gage-Eckington ES |
FM-200455793 9/27/04 Gage-Eckington Outside roof drain The drain on roof needs to be unclogged, causing water to leak inside, when heavy rain falls knocking ceiling tile down inside the building. |
September 27, 2004 |
| Gibbs Elementary School |
FM-200456324 10/1/04 Gibbs Third floor room 307 Ceiling leaking from roof. |
October 1, 2004 |
| Barnard Elementary School |
FM-200456382 2 10/4/04 Barnard First floor gym/auditorium Roof is leaking that need immediate repair. It is located at the far end of the gym-augitorium left side of the hoop. While school is in session, this is a potential hazard. |
October 4, 2004 |
| Gibbs Elementary School |
FM-200457954 11/5/04 (Gibbs) First floor kitchen Roof leaking in the storage room. |
November 5, 2004 |
| Tyler Elementary School |
FM-200458047 11/8/04 Tyler Wing hall Roof leak. |
November 8, 2004 |
| Thomas Elementary School |
FM-200458295 11/16/04 Thomas First and second floor Pre school, 223, 218 and landing Survey roof for leakage and repair. |
November 16, 2004 |
| Browne Junior High School |
FM-200458565 11/22/04 Browne Third Floor-Roof Roof leaking onto the Second Floor Hallway. |
November 22, 2004 |
| Roosevelt High School |
FM-200460027 12/23/04 Roosevelt Rooftop Over DA Tank (Boiler Room) Repair leaking roof, has pit holes in concretes ceiling. (section 8' X 16') Urgent !!!!! Asbestos Code A - Clear for repairs on 04/21/05. DCPS Safety - Leroy Minton Jr. (RG 04/21/05) |
December 23, 2004 |
| Eastern High School |
FM-200500177 1/6/05 Eastern Paint plaster cafeteria mgr. office, brick point up stage in auditorium-paint plaster roof leak removal 525 equipment. Lead Code A-clear for repair by Tirewater Rodney Distance on 8/3/05 |
January 6, 2005 |
| Barnard Elementary School |
FM-200500441 1/14/05 Barnard Second floor Roof leakingon second floor and some areas on the first floor. |
January 14, 2005 |
| Takoma Educational Center |
FM-200500440 1/14/05 Takoma Third floor Roof leaking, and it is coming through the light fixtures. |
January 14, 2005 |
| Takoma Educational Center |
FM-200500624 1/19/05 TAKOMA URGENT URGENT AUDITORIUM ROOF LEAK |
January 19, 2005 |
| Coolidge High School |
FM-200500912 1/28/05 Coolidge Roof Repair all existing roof leaks at this site. |
January 28, 2005 |
| Spingarn High School |
FM-200501103 2/1/05 Spingarn First floor room 115 and third floor room 320 A plasterer is needed to fix ceiling that was damage from a water leak above and roof leak. Code A-clear repair by DCPS Charles Buchanan on 2/14/05 |
February 1, 2005 |
| Eastern High School |
FM-200501170 2/3/05 Eastern Auditorium Repair roof leak above stage and paint plaster after repair of leak need light replaceing in auditorium - repair 5 lights above stage where speaker talks. SUPT. Conference being held at EASTERN JANUARY 18, 2004. |
February 3, 2005 |
| Gibbs Elementary School |
FM-200501197 2/4/05 Gibbs First Floor - Cafeteria 1) Roof leak. |
February 4, 2005 |
| Takoma Educational Center |
FM-200501345 2/8/05 (Takoma) !!!URGENT!!! First floor room 65 Ceiling is leaking in auditorium damaging hardwood floor on stage. The floor is buckling up due to roof leak. |
February 8, 2005 |
| Thomas Elementary School |
FM-200501708 2/16/05 Thomas Roof Area above Rm 301 Roof Leaking 02/16/2005 16:37 OB - Asbestos Code A - Clear for repairs on 03/14/05. DCPS Safety - Leroy Minton Jr. (RG 03/14/05) |
February 16, 2005 |
| Tyler Elementary School |
FM-200501954 2/23/05 Tyler Wing Area Hallway Repair Roof Leak |
February 23, 2005 |
| Maury Elementary School |
FM-200502019 2/25/05 MAURY Rm 7 Roof Leaking HA 003 Ceiliing tile white 2' X 4' with pinholes No Asbestos HA 006 Plaster white No Asbestos HA 706 brown Coat with ... HA 003 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 3/10/05 |
February 25, 2005 |
| Eastern High School |
FM-200502115 3/1/05 Eastern Sub basement by stairwell across from B -28 Roof leak coming from ceiling through the light fixture. HA 003 Plaster White No Asbestos HA 703 Brown Coat No Asbestos Code A-Clear for repair by DCPS Charles Buchanan on 3/14/05 |
March 1, 2005 |
| Cook J.F. Elementary School |
FM-200502383 3/8/05 Cook, J.F. Third floor The roof in the library is leaking. |
March 8, 2005 |
| Payne Elementary School |
FM-200502588 3/11/05 Payne New Wing/Ms Walker's RM. Roof Leaking HA 002 Plaster White Wall Plater No Asbestos HA 702 Brown Coat No Asbestos HA 010 Plaster White Ceiling Plaster No Asbestos HA 710 Brown Coat No Asbesstos Code A-clear for repair by DCPS Charles Buchanan on 3/30/05 |
March 11, 2005 |
| John Burroughs ES |
FM-200503152 3/23/05 (Burroughs} "Emergency" Asbestos Assessment Required. Room 15/Lobby area Roof leaking need it repaired asap. Code A-clear for repair by DCPS Charles Buchanan on 2/17/06 |
March 23, 2005 |
| Eastern High School |
FM-200503391 3/30/05 Eastern Rm 153/327,& the Armory Roof Leaking into the Classrooms Code A-clear for repair by DCPS Charles Buchanan on 4/8/05 |
March 30, 2005 |
| Marshall Educational Center |
FM-200503439 3/30/05 (Marshall, Thurgood) . Asbestos Assessment Required. Second floor/ Book room, Stages # 2, 3 and mezzanine. Repair roof water leaks on mezzanine ramp and on stage # 2 by computer lab. There's also leakage in book room and on stage # 3 due to rain. This work order (FM-200455114] was survey for asbestos on 3/31/05 Code A-clear for repair by DCPS Charles Buchanan on 4/8/05 |
March 30, 2005 |
| Cook J.F. Elementary School |
FM-200503625 4/6/05 (Cook, J.F.) Asbestos Assessment Required. Third floor/ Auditorium Balcony. Repair leaking roof drain. HA 015 Plaster Ceiling No Asbestos HA 016 Plaster Walls No Asbestos HA 716 Brown Coat with HA 015 & 016 Code A-clear for repair by DCPS Charles Buchanan on 4/15/05 |
April 6, 2005 |
| Browne Junior High School |
FM-200503818 4/11/05 ( BROWNE ) Gym - Roof 1) In the new gym is a roof leak, in the gym area in the ceiling. Code A-clear for repair by DCPS Charles Buchanan on 1/13/06 |
April 11, 2005 |
| Ferebee-Hope Elementary School |
FM-200504331 4/20/05 ( FEREBEE-HOPE ) First Floor - Green Hall 1) Repair roof, it's leaking. |
April 20, 2005 |
| West Elementary School |
FM-200504492 4/21/05 ( WEST ) Roof 1) Repair Roof, it's leaking on the stairway by the gym. Asbestos Code A - Clear for repairs on 05/25/05. DCPS Safety - Leroy Minton Jr. (RG 05/25/05) |
April 21, 2005 |
| Bunker Hill Elementary School |
FM-200505818 5/20/05 ( EATON ) Second Floor - Room 220 1) Repair roof leak. |
May 20, 2005 |
| Eaton Elementary School |
FM-200505817 5/20/05 ( EATON ) Third Floor - Rooms 312, 315, and 306 1) Repair roof leak. |
May 20, 2005 |
| Whittier Elementary School |
FM-200505805 5/20/05 ( WHITTIER ) Emergency!!!!! Third Floor - Room 312 1) Roof leak in three spaces. |
May 20, 2005 |
| Brent Elementary School |
FM-200505842 5/23/05 (Brent) "Very Urgent" Asbestos Assessment Required. First, Second and Third floor/Room 207, 212, 313 and Exit door. Water leaks: 1.) Room 313-roof leaks 2.) First floor near security door roof/down spout problem 3.) Rooms 207 & 212 window caulking needed to paint work, water is coming through closed windows. Asbestos Code A - Clear for repairs on 06/28/05. Tidewater - Philp Connolly (RG 07/12/05) |
May 23, 2005 |
| Jefferson JHS |
FM-200505862 5/23/05 (Jefferson) "Urgent" Asbestos Assessment Required. Roof/Auditorium. Repair ceiling leak in auditorium over seats. Asbestos Code A - Clear for repairs on 06/28/05. Tidewater - Thomas Johnson (RG 07/05/05) |
May 23, 2005 |
| Jefferson JHS |
FM-200505863 5/23/05 (Jefferson) "Urgent" Asbestos Assessment Required. Roof/Second floor area Repair ceiling leak in rooms 220 and 221. Asbestos Code A - Clear for repairs on 06/28/05. Tidewater - Thomas Johnson (RG07/19/05) |
May 23, 2005 |
| Anacostia Senior High School |
FM-200506276 5/25/05 (ANACOSTIA) Main Roof, Gutters, Gymnasium, and Cafeteria 1) Repair Roof Leaks. Asbestos Code A - Clear for repairs on 10/20/05. Tidewater - Rodney Distance (RG 10/21/05) SEE ASSESSMENTS |
May 25, 2005 |
| Lafayette Elementary School |
FM-200506181 6/1/05 ( LARAYETTE ) Second Floor - Greathall Area, Above Steps on Restroom side, also in Team Three in Mrs. Gregorio area, and in Early Childhood as you enter the team. 1) Repair roof leaks Lead & Asbestos Code A - Clear for repairs on 06/02/05. Tidewater - Philp Connolly (RG 06/07/05) |
June 1, 2005 |
| Terrell Mc ES |
FM-200508547 6/9/05 (Terrell, M.C.) Asbestos Assessment Required. Hallway 7. Replace ceiling tiles damaged from roof leak. Asbestos Code A - Clear for repairs on 10/20/05. Tidewater - Rodney Distance (RG 10/25/05) |
June 9, 2005 |
| Terrell Mc ES |
FM-200508579 6/9/05 (Terrell, M.C) Asbestoe Assessment Required. Third floor, Teachers' lounge. REPLACE DAMAGED TILE, FROM ROOF LEAK. THERE IS NOTHING BUT THE CONCRETE FLOOR Asbestos Code A - Clear for repairs on 10/20/05. Tidewater - Rodney Distance (RG 10/25/05) NOTE: CARPET WAS TAKEN UP LAST SUMMER BECAUSE OF SEVERE ROOF LEAK CAUSING IT TO MOLE. |
June 9, 2005 |
| Horace Mann Elementary School |
FM-200506655 6/13/05 (MANN) 1) Repair the leaking roof - continues to leak into the Library over the computer station. This is the main building. 2) Repair leaking room in Community Center lunch and general purpose room. This roof leaks in many places. HA 026 Ceiling Tile White 2X4 Ceiling Tile W/Pinholes No Asbestos HA 028 Wall Board white Dry/Wall/Tap Compound New Construction No Asbestos HA 032 Plaster White No Asbestos HA 042 Brown Coat With .... HA 032 No Asbestos Code A-clear for repair by DCPS Charles Buchanan on 6/13/05 |
June 13, 2005 |
| Browne Junior High School |
FM-200506795 6/14/05 (Browne, H.M.) Third floor, Roof. Unstop two storm drains, roof is leaking on third floor. Asbestos Code A - Clear for repairs on 06/16/05. DCPS Safety - Richard Gibson (RG) |
June 14, 2005 |
| Spingarn High School |
FM-200512459 9/13/05 (Spingarn) "Very Urgent" Third floor, Room 311. Repair roof leak that's destroying the 2 X 4 ceiling tiles. |
September 13, 2005 |
| Macfarland Middle School |
FM-200513056 9/22/05 Mcfarland Urgent Third Floor-Boy Gym Repair floor, damage caused by roof leak Asbestos Code A - Clear for repairs on 09/23/05. Tidewater - Tony Marcolin (RG 10/11/05) |
September 22, 2005 |
| Garfield ES |
FM-200513601 10/6/05 Garfield Very Urgent Second Floor-Main Bldg. 2I Roof leaking in room 2I Check roof drains |
October 6, 2005 |
| Raymond Elementary School |
FM-200513673 10/7/05 Raymond RM, 110 and The Library Repair Roof Leak |
October 7, 2005 |
| Garfield ES |
FM-200513616 10/7/05 Garfield Urgent Demandable Wing-Repair demandable roof, it is leaking in between new wing and demandable causing the walls to decay. |
October 7, 2005 |
| Hearst Elementary School |
FM-200513704 10/11/05 Hearst Emergency Rooms-208A, Second Floor Boys Restroom, First Floor Boys Bathroom, and Rm. 106 Repair roof leak |
October 11, 2005 |
| Cleveland Elementary School |
FM-200513708 708 10/11/05 Cleveland Emergency Second Fl.-Rm. 201 Repair roof leak. |
October 11, 2005 |
| Gage-Eckington ES |
FM-200513677 10/11/05 Gage-Eckington Emergency Cafeteria, Ms Carter Room, and Ms. Bennet Room-Investigate and repair roof leaks. |
October 11, 2005 |
| Maury Elementary School |
FM-200513705 10/11/05 Maury Emergency Second Fl. West Building Hallway Rm. 6, and 8 Repair roof leak. |
October 11, 2005 |
| Hendley Elementary School |
FM-200513696 10/11/05 Hendley Emergency First Floor-Auditorium Repair roof leak, have to take a wet vacuum to get up the water. |
October 11, 2005 |
| Adams Elementary School |
FM-200513747 10/12/05 Adams Emergency Front and Back side of the Roof Third Floor Classrooms are leaking, the drain bay be stopped up, investigate and repair. |
October 12, 2005 |
| Bunker Hill Elementary School |
FM-200513784 10/12/05 Bunker Hill Library Repair Roof leak in area |
October 12, 2005 |
| Kramer Middle School |
FM-200513806 10/13/05 Kramer Emergency First Floor-Auditorium Repair Roof Leak |
October 13, 2005 |
| Gibbs Elementary School |
FM-200514217 10/22/05 Gibbs First Floor - Kitchen Roof leaking in Food Room. |
October 22, 2005 |
| Wilson High School |
FM-200514493 10/23/05 (Wilson) Second floor, Room 229. Repair breeches in the wall and also paint the classroom. The wall was damaged due to a roof leak. Note: The roof was repaired. Asbestos Code A - Clear for repairs on 10/28/05. Tidewater - Rodney Distance (RG 11/01/05) |
October 23, 2005 |
| Roosevelt High School |
FM-200514408 10/23/05 Roosevelt Roof (Room #203) Ceiling near room #203 Repair roof leak in ceiling near Balcony in auditorium. Water is running down window tract. |
October 23, 2005 |
| Gage-Eckington ES |
FM-200514545 10/24/05 Gage-Eckington Roof - Second Floor - Entering Kitchen 1) Lights leading into the Kitchen will not work due to water leaking from roof and shorting out the light. We change the blubs but it still does not work.. Very dark in that area. 2) First Floor - 104 - Water is leaking from the ceiling. Asbestos Code A - Clear for repairs on 10/27/05. Tidewater - Thomas Johson (RG 11/01/05) |
October 24, 2005 |
| Turner Elementary School |
FM-200514636 10/25/05 Turner Emergency Computer Room-301, and Music Room-201 Repair roof leak in computer room, water is running on the floor and down into ceiling of music room. |
October 25, 2005 |
| Stuart-Hobson Middle School |
FM-200514696 10/26/05 (Stuart-Hobson) "Urgent" Interior of Second & Third floor. Repair ceiling (third floor) in room 308 & teachers' lounge, also on (second floor) across from room 216 and directly in front of stairwell # 3. Note: Damage was caused by roof leaks. Lead & Asbestos Code A - Clear for repairs on 11/03/05. Tidewater - Rodney Distance (RG 11/04/05) |
October 26, 2005 |
| Eastern High School |
FM-200514720 10/27/05 Eastern Urgent Repair roof leak in room 237 |
October 27, 2005 |
| Eastern High School |
FM-200514716 10/27/05 Eastern Urgent There are several roof leaks over different areas of roof. Rm. 327, hallway third floor across from rm. 330, rm. 344, 345, auditorium has been leaking. |
October 27, 2005 |
| Patricia R Harris Ed Center |
FM-200514858 10/31/05 Urgent-Third Floor-Stairwell #6 - Repair Roof Leak |
October 31, 2005 |
| Patricia R Harris Ed Center |
FM-200514868 10/31/05 Urgent-First Floor-Big Gym - Repair Roof Leak |
October 31, 2005 |
| Patricia R Harris Ed Center |
FM-200514867 10/31/05 Urgent-First Floor-Little Gym - Repair Roof Leak |
October 31, 2005 |
| Roosevelt High School |
FM-200514965 11/2/05 Repair roof leak in ceiling near balcony in auditorium, water is running down window tract. |
November 2, 2005 |
| Gibbs Elementary School |
FM-200515005 11/2/05 Urgent: Second Floor-Storage Room: Repair ceiling it is damaged from roof leak Asbestos Code C - on 11/07/05. Tidewater - Philp Connoll (RG 11/09/05) |
November 2, 2005 |
| Cardozo High School |
FM-200515121 11/3/05 CLASSROOM 315,REPAIR ROOF LEAK. RAIN WATER LEAKING INTO CLASSROOM FROM CEILING . |
November 3, 2005 |
| Tubman Elementary School |
FM-200515375 11/10/05 Rm 308 Repair roof leak Asbestos Code A - Clear for repairs on 11/16/05. Tidewater - Roger Small (RG 11/16/05) SEE ASSESSMENTS |
November 10, 2005 |
| Meyer Elementary School |
FM-200515369 11/10/05 Urgent: Roof-One of the fans on the roof need a top on it, when it rains it leaks into the art room. |
November 10, 2005 |
| Bancroft Elementary School |
FM-200515673 11/22/05 Emergency: Repair roof leak in the corner causing the plaster to break loose in the auditorium on the first floor (main bldg.) |
November 22, 2005 |
| Walker-Jones EC |
FM-200515668 11/22/05 Emergency: Repair roof leak on the second floor in the open space area where the two ceiling tiles fell down. |
November 22, 2005 |
| Merritt Middle School |
FM-200515837 11/28/05 Repair roof leak in the stairwell on the fourth floor. |
November 28, 2005 |
| Duke Ellington School |
FM-200516010 12/2/05 Lobby Gallery. Asbestos Assessment Required. Repair falling plaster on ceiling. Note: Due to roof leak. Asbestos Code A - Clear for repairs on 12/05/05. Tidewater - Tony Marcolin (RG 12/08/05) |
December 2, 2005 |
| Peabody Elementary School |
FM-200516153 12/7/05 Urgent: Repair roof leak in the ceiling of room 11 on the third floor at the south end of the room near the coat room. |
December 7, 2005 |
| Marshall Educational Center |
FM-200516168 12/8/05 Marshall Rooftop AHU # 2 for stage # 3 Repair or replace the leaking mechanical seal on circulating pump for AHU # 2 heating coil. |
December 8, 2005 |
| Shepherd ES |
FM-200516759 12/19/05 Emergency: Second Floor (New Wing) Rm. 222-Repair Roof Leak There is water comming from the ceiling and down the wall, over top of the room is a flat roof. |
December 19, 2005 |
| Shepherd ES |
FM-200516777 12/20/05 Very Urgent: Second Floor (New Wing) Rm. 220-Repair Roof Leak There is water comming from the ceiling and down the wall, over top of the room is a flat roof. |
December 20, 2005 |
| Wilson High School |
FM-200516979 12/28/05 Repair roof leak in rm. A1 on the first floor. |
December 28, 2005 |
| Wilson High School |
FM-200516978 12/28/05 Repair roof leak in classroom L11 above the library. |
December 28, 2005 |
| Spingarn High School |
FM-200517016 12/29/05 First floor, Gymnasium. Repair roof leak in gymnasium area, water is leaking on floor. |
December 29, 2005 |
| Anacostia Senior High School |
FM-200517078 1/2/06 Roof leaking on west side of gym in two areas adjacent to windows. |
January 2, 2006 |
| Stuart-Hobson Middle School |
FM-200517364 1/12/06 Very Urgent: Repair the roof leak on the first floor in the hallway across from #3 stairwell on the first floor. |
January 12, 2006 |
| Whittier Elementary School |
FM-200617818 1/25/06 Replace water spout From the roof, it broke off due to heavy rain. When it rains the water leaks inside the auditorium. |
January 25, 2006 |
| Gibbs Elementary School |
FM-200617949 1/27/06 Replace roofs of all overhangs to prevent any further water penetration. Replace ceilings of all overhangs. Have a Structural Engineer access the condition of all overhangs. The underside of the roof or ceiling area is composed of wire mesh that has been covered with brown coat stucco. Due to water leaks the wire mesh has deteriorated. Clifton C. Purks, III Code & Compliance Officer (202) 576-6049 Asbestos Code A - Clear for repairs on 01/27/06 Tidewater - Philp Connolly (RG 02/08/06) |
January 27, 2006 |
| Anacostia Senior High School |
FM-200618192 1/30/06 Asbestos Assessment Required. The following rooms have severe plaster damage do to roof leaks:boys bathroom 3rd fl.,301,312,307,306,201,239,202,209,231,121,222,126,cafeteria,1st&2nd fl. inner walls,and 3rd fl. hall ceiling Lead & Asbestos Code A - Clear for repairs on 03/08/06 Tidewater - Roger Small (RG 03/10/06) |
January 30, 2006 |
| Webb Elementary School |
FM-200618080 1/31/06 "Emergency" Roof, First floor/Vice Principal's Office. Repair roof leak, water is coming through light fixtures into Vice Principal's office. |
January 31, 2006 |
| Wilson High School |
FM-200618414 2/7/06 Repair roof leaks-Due to the leaks the gym floor has water damage, in addition there is an 18 inch swath of slight elevation where a divider used to exist. Warped boards and protruding nails are a constant concern. Asbestos Code A - Clear for repairs on 02/08/06. Tidewater -Thomas Johnson (RG 02/09/06) |
February 7, 2006 |
| Coolidge High School |
FM-200618619 2/13/06 Very Urgent Third Floor-Rm. 300 (Storage Closet) Investigate and repair the roof leak, roof drains may be clogged. |
February 13, 2006 |
| Marshall Educational Center |
FM-200618798 2/17/06 Second Floor-Bookroom Repair roof leaks in the back of the bookroom |
February 17, 2006 |
| Marshall Educational Center |
FM-200618804 2/17/06 Second Floor-Stage 2 Investigate and repair roof leak-(Leaking around joints of roof) |
February 17, 2006 |
| Terrell Mc ES |
FM-200618932 2/21/06 AT M.C. TERRELL PRE-KINDERGARTEN AND KINDERGARTEN ROOF DRAIN CLOGGED - WATER STANDING ON ROOF FOR MORE THAN 2 WEEKS CAUSING LEAKS. |
February 21, 2006 |
| Terrell Mc ES |
FM-200618933 2/21/06 Asbestos Assessment Required. AT M. C. TERRELL - WATER FROM ROOF LEAK CAUSING PLASTER TO FALL DOWN ONTO FLOOR IN BOYS' BATHROOM IN KINDERGARTEN AREA. (SCHOOL IS CLOSING PLEASE CLOSE OUT ) Note: School did not close. DSE 9/21/06 Lead & Asbestos Code A - Clear for repairs on 03/07/06 Tidewater - Roger Small (RG 03/08/06) |
February 21, 2006 |
| John Burroughs ES |
FM-200618967 2/22/06 Repair or Replace roof, water is leaking on drop ceiling tile Account #: no |
February 22, 2006 |
| John Burroughs ES |
FM-200618975 2/22/06 Roof leaking in boys restroom. Account #: no |
February 22, 2006 |
| Anacostia Senior High School |
FM-200619178 2/23/06 Investigate and make repairs to main roof, water is leaking in rms. 301,302,304;312,306,307 & 300. |
February 23, 2006 |
| Emery Elementary School |
FM-200620018 3/16/06 Replace compressor on roof units. Compressors on unit 2 were remove May 2005 by AC Shop. Unit 1 has leak and and needs to be charged. |
March 16, 2006 |
| Benning Elementary School |
FM-200621130 4/10/06 The roof is leaking water into the music room again. Asbestos Code A - Clear for repairs on 04/11/06 Tidewater - Carlos Vera (RG 04/12/06) |
April 10, 2006 |
| Marshall Educational Center |
FM-200621967 5/1/06 Thurgood Marshall Roof- Mechanical room Repair or replace drain line on stage #3 air handler unit , leaking from the drain pan. |
May 1, 2006 |
| Malcolm X ES |
FM-200622064 5/2/06 Malcolm X Roof -Cooling Tower 4th Floor Roof Survey and construct drain line with a 2"drain valve that will extend to the roof drain drain to prevent water from leaking down in classrooms on the 4th floor when draining cooling tower. *Existing PVC piping was damaged during replacement of drain valve. |
May 2, 2006 |
| Marshall Educational Center |
FM-200622342 5/8/06 The roof is leaking in one the labs. |
May 8, 2006 |
| Eastern High School |
FM-200622602 5/12/06 Water leaking from Roof, down through Auditorium,to Stage, down to Cafeteria.. Roof Drains may be stopped up. Possibility of mold growing in Roof area, maybe asbestos..causing damage to auditorium floor. Asbestos Code A - Clear for repairs on 05/25/06. Tidewater - Thomas Johnson (RG 05/30/06) |
May 12, 2006 |
| Cleveland Elementary School |
FM-200623041 5/19/06 Outside- Roof The roof needs to be repaired to prevent future leaks. Tile is bulking. |
May 19, 2006 |
| Takoma Educational Center |
FM-200623380 5/25/06 1st Floor- Room 65 Replace ceiling tile because of roof leaks. Asbestos Code A - Clear for repairs on 05/30/06. DCPS Safety - Richard Gibson (RG) |
May 25, 2006 |
| Marshall Educational Center |
FM-200623738 6/2/06 Marshall Rooftop Unit (Mechanical Room) Replace stage #2 air handler unit drip pan 5' X 4' (has rotten out) drip pan is leakinginto areas below unit and also replace aluminum side, size is 3'X3" (both side) (ASAP) |
June 2, 2006 |
| Brent Elementary School |
FM-200624198 6/12/06 First floor, Multi-Purpose Room. Roofing is leaking. |
June 12, 2006 |
| Bunker Hill Elementary School |
FM-200624210 6/12/06 Roof Over Room 225. Repair or Replace roof over room 225, water is leaking through light fixtures. |
June 12, 2006 |
| Benjamin Banneker Academic HS |
FM-200624200 6/12/06 Stairwell in Girls Gym The roof is leaking in the corner of the stairwell. |
June 12, 2006 |
| Rudolph Elementary School |
FM-200624324 6/14/06 Basement- Boys Bathroom Ceiling needs to be re-plastered because of a leaking roof. Lead & Asbestos Code A - Clear for repairs on 06/19/06. Tidewater - Roger Small/Thomas Johnson (RG 06/21/06) |
June 14, 2006 |
| Rudolph Elementary School |
FM-200624328 6/14/06 Roof- Old Wing Drain pipe needs to be snaked out; the roof leaks when it rains because the pipes need to be cleaned. |
June 14, 2006 |
| McKinley Technology High |
FM-200624781 6/23/06 Please repair leak on atrium roof. When it rains it leaks badly. THANK YOU. |
June 23, 2006 |
| Reed LC |
FM-200624765 6/26/06 First Floor/Hallway & Health Suite - Replace/repair light fixtures due to roof leaks |
June 26, 2006 |
| Garfield ES |
FM-200624807 6/26/06 In rooms 2B, 2C, 2E, and 2I the roof is leaking due to the out side drain, flooding the classrooms |
June 26, 2006 |
| Reed LC |
FM-200624767 6/26/06 First Floor/Hallway & Health Suite - Roof leak, damaging ceiling tiles and light fixtures |
June 26, 2006 |
| Rudolph Elementary School |
FM-200624810 6/26/06 Roof leaking in cafeteria area, Hallway and kitchen area. |
June 26, 2006 |
| Savoy Elementary School |
FM-200624792 0624792 6/26/06 Both sides of the roof are leaking (lower and upper) into the Main Lobby and Multi-Purpose Room. |
June 26, 2006 |
| Maury Elementary School |
FM-200624726 6/26/06 3rd Floor- Old Side/Room 6 Ceiling fell; the roof is leaking. |
June 26, 2006 |
| Tubman Elementary School |
FM-200624914 6/27/06 1st Floor- Room 114 Headstart The rain and water sitting on the roof caused the coat closet to leak. The plaster is also peeling. |
June 27, 2006 |
| Raymond Elementary School |
FM-200624876 6/27/06 Roof Area. Roof is leaking in library area, Cafeteria and Room 302. |
June 27, 2006 |
| Hearst Elementary School |
FM-200624881 6/27/06 Second Floor/Boy's Restroom & Rm. 208A - First Floor/106 & Boy's Restroom: There is roof leaks in the above areas, and water floods the floor every time it rains, Repair or replace gutters and downspouts. |
June 27, 2006 |
| Stuart-Hobson Middle School |
FM-200624904 6/27/06 3rd Floor- Stairwell #1 The ceiling is leaking, especially around the ladder that leads to the roof. |
June 27, 2006 |
| Leckie Elementary School |
FM-200624974 6/28/06 3rd Floor- Room 319 The roof is leaking nonstop, and flooding the room. |
June 28, 2006 |
| Bancroft Elementary School |
FM-200624945 6/28/06 Science Area Repair leak; source is unknown. Water is either leaking from the roof or the univent, down off of the duct work. |
June 28, 2006 |
| Tyler Elementary School |
FM-200625181 7/3/06 New Wing/Hallway - Leaking roof by room 125 and 139 |
July 3, 2006 |
| Gibbs Elementary School |
FM-200625388 7/6/06 1st Floor- Main Corridor There is a large hole in the ceiling because of a roof leak. |
July 6, 2006 |
| Coolidge High School |
FM-200625323 7/6/06 3rd Floor- Rooms 304, 305, Back Stairway #8 The roof is leaking; there is a breach in the ceiling. |
July 6, 2006 |
| Ross Elementary School |
FM-200625379 7/6/06 Stairway- the roof is leaking into the stairway. |
July 6, 2006 |
| Takoma Educational Center |
FM-200626162 7/24/06 The roof leaks in the following rooms when it rains: 35, 46, 65, 113 ABCD, 124 ABCD, 169, 168, 175, 176, 183 ABC, 235, 226 BC. Lead & Asbestos Code A - Clear for repairs on 08/01/06. Tidewater - Roger Small/Shamika Parker (RG 08/03/06) |
July 24, 2006 |
| West Elementary School |
FM-200626275 7/24/06 Roof needs repairing - Currently leaking in various areas. Current health hazzard. Asbestos Code A - Clear for repairs on 08/08/06. Tidewater - Kenny Long (RG 08/11/06) |
July 24, 2006 |
| Amidon Elementary School |
FM-200626976 8/2/06 REPAIR ROOF LEAKS OVER AUDITORIUM ROOF. Asbestos Code A - Clear for repairs on 11/11/06. Tidewater - Kenny Belton (RG 11/17/06) |
August 2, 2006 |
| Anacostia Senior High School |
FM-200626982 8/2/06 REPAIR SEVERE ROOF LEAKS. Asbestos Code A - Clear for repairs on 08/23/06. Tidewater - Cornell Parks - (RG 03/29/07) |
August 2, 2006 |
| Jefferson JHS |
FM-200626783 8/3/06 Repair roof; it leaks everytime it rains. |
August 3, 2006 |
| Cardozo High School |
FM-200627152 8/4/06 3rd floor, classroom 314-A, seal exhaust duct that rain water is leaking into .water is leaking on to IT equipment ( possible roof leak). |
August 4, 2006 |
| Garfield ES |
FM-200627057 8/9/06 Exterior Roof Area. Assess and repair or replace roof leaks in room 1C and hallway Asbestos Code A - Clear for repairs on 08/14/06. Tidewater - Roger Small (RG 08/15/06) |
August 9, 2006 |
| Whittier Elementary School |
FM-200628364 8/28/06 1st Floor- Room 102 Repair leaking roof. bay roof is leaking. |
August 28, 2006 |
| Walker-Jones EC |
FM-200628525 8/30/06 Second floor, Teacher's Lounge/Ladies Restroom. Repair leak in roof above second floor teacher's lounge women' restroom. Note: This leak is near a light fixture.. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Tony Marcolin (RG 09/07/06) |
August 30, 2006 |
| Bancroft Elementary School |
FM-200628522 8/30/06 2nd Floor- Room 120 Repair roof leak near the window. |
August 30, 2006 |
| Brent Elementary School |
FM-200628711 9/1/06 Repair roof leak. New ceiling tile in the library are being damaged. |
September 1, 2006 |
| Roosevelt High School |
FM-200628724 9/1/06 Room 204- Repair roof leak. |
September 1, 2006 |
| Merritt Middle School |
FM-200628718 9/1/06 Second floor, Gynasium. Repair roof leak in gymnasium. Asbestos Code A - Clear for repairs on 11/10/06. Tidewater - Kenny Belton (RG 11/16/06) |
September 1, 2006 |
| Wilson J. O. ES |
FM-200628806 9/5/06 Rooms 302 on North & South side/Second floor library . Repair leaking roof. Note: Water is leking from the roof down through the light fixtures in rooms 302. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Shamika Parker (RG 09/08/06) |
September 5, 2006 |
| Eliot Junior High School |
FM-200628765 9/5/06 Repair leaking roof in the following locations: Room 307, 1st Floor- Boys Gymnasium. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Shamika Parker (RG 09/08/06) |
September 5, 2006 |
| Patterson ES |
FM-200628788 9/5/06 First floor/Main Lobby front entrance, Room 235 & Stairwell closes to the right side of main entrance. Repair leaking roof. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Cornell Parks (RG 09/13/06) |
September 5, 2006 |
| Eastern High School |
FM-200628764 9/5/06 Unstop roof drains; it is causing the roof to leak in the following locations: Auditorium, cafeteria, west side, lower roof, 3rd Floor Room 330. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Shamika Parker (RG 09/11/06) |
September 5, 2006 |
| Walker-Jones EC |
FM-200628767 9/5/06 Repair multiple roof leaks: - 2nd floor/open space area - 1st Floor/Main Lobby - 2nd Floor/Hallway near 216. Asbestos Code A - Clear for repairs on 09/08/06. Tidewater - Carlos Vera (RG 03/07/07) |
September 5, 2006 |
| Ferebee-Hope Elementary School |
FM-200628786 9/5/06 Repair leaking roof. Water is leaking in the following locations: * 4th Floor- through ceiling, windows, and walls * 3rd Floor- around light fixtures * 2nd Floor Asbestos Code A - Cleared for repairs on 09/07/06 by Tidewater/Kenny Long (LM-09/06/06) Safety Office 202-576-8962. |
September 5, 2006 |
| Barnard Elementary School |
FM-200628780 9/5/06 First floor/Gymnasium & Second/Library. Repair leaking roof. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Tony Marcolin (RG 09/11/06 |
September 5, 2006 |
| Cook J.F. Elementary School |
FM-200628779 9/5/06 Repair roof leaks in the following locations: - 1st Floor- Room 102 - 3rd Floor- Room 306 - Cafeteria Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Carlos Vera (RG 09/07/06) |
September 5, 2006 |
| Gage-Eckington ES |
FM-200628800 9/5/06 Second floor, Cafeteria & Hall near elevator. Repair leaking roof. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Carlos Vera (RG 09/07/06) |
September 5, 2006 |
| Young Elementary School |
FM-200628760 9/5/06 2nd Floor- Multiple Rooms Repair roof leaks. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Shamika Parker (RG 09/13/06) SEE ASSESSSMENTS |
September 5, 2006 |
| Park View ES |
FM-200628772 9/5/06 2nd Floor- Room 228 Repair bad roof leak. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Tony Marcolin (RG 09/11/06 |
September 5, 2006 |
| Bruce-Monroe Elementary School |
FM-200628803 9/5/06 Roof in Old Gymnasium near roof drain area). Repair leaking roof. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Tony Marcolin (RG 09/11/06 |
September 5, 2006 |
| Malcolm X ES |
FM-200628862 9/6/06 First floor, Principal's Office. Repair leaking roof. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Carlos Vera (RG 09/15/06) |
September 6, 2006 |
| Nalle Elementary School |
FM-200628861 9/6/06 Second floor, Boys' Restroom/Main Bldg. Repair leaking roof, this leak is causing the entire restroom to flood. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Carlos Vera (RG 09/11/06 |
September 6, 2006 |
| Macfarland Middle School |
FM-200628828 9/6/06 ALL Stairwells. Repair leaking roof. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Tony Marcolin (RG 09/07/06) |
September 6, 2006 |
| Meyer Elementary School |
FM-200628881 9/6/06 Second floor, Boys' Restroom. Repair leaking roof, water is pouring through the ceiling causing it to collaspe. Lead & Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Roger Small/Thomas Johnson (RG 09/11/06) SEE ASSESSMENTS |
September 6, 2006 |
| Shaw JHS |
FM-200628867 9/6/06 Top floor, Blue,Yellow and Orange Houses. Repair leaking roof, water is pouring into the building. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Thomas Johnson (RG 09/11/06) |
September 6, 2006 |
| Savoy Elementary School |
FM-200628829 0628829 9/6/06 Rm. 127/Roof Leak, water leaking on electrical panel box. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Cornell Parks (RG 09/11/06 |
September 6, 2006 |
| Aiton Elementary School |
FM-200628860 9/6/06 Fourth floor, Rooms 406 & 407. Repair leaking roof, water is pouring into classroom. Asbestos Code A - Clear for repairs on 09/06/06. Tidewater - Shamika Parker (RG 09/08/06) |
September 6, 2006 |
| Garfield ES |
FM-200628859 9/6/06 Lower Level, Main Bldg. Repair leaking roof. Roofs are leaking in all the demountables Asbestos Code A - Clear for repaors on 09/13/06. Tidewater - Shamika Parker (RG 09/18/06) |
September 6, 2006 |
| Ross Elementary School |
FM-200628869 9 9/6/06 First floor, Room 107 (Lockerroom) Repair leaking roof, water is pouring through the ceiling wall. Asbestos Code A - Clear for repairs on 09/07/06. Tidewater - Thomas Johnson (RG 09/11/06) |
September 6, 2006 |
| Eastern High School |
FM-200628901 9/7/06 Sub - Custodian's Locker Room - Repair roof leak in custodian women's restroom. Ceiling collapsed, walls and lockers are deteriorating. Ceiling lights are in danger of shorting out because of the water. |
September 7, 2006 |
| Merritt Middle School |
FM-200629021 9/8/06 4th Floor- Room 403 Repair roof above room; water leaks inside when it rains. Asbestos Code A - Clear for repaors on 09/13/06. Tidewater - Kenneth Belton (RG 09/18/06) |
September 8, 2006 |
| Bancroft Elementary School |
FM-200628992 9/8/06 2nd Floor- Room 120 Main Building Repair leakey roof. Asbestos Code A - Clear for repairs on 09/12/06. Tidewater - Shamika Parker (RG 09/13/06) |
September 8, 2006 |
| Francis Junior High School |
FM-200629003 9/8/06 1st Floor- Auditorium Repair roof leak above the room. Asbestos Code A - Clear for repaors on 09/13/06. Tidewater - Shamika Parker (RG 09/18/06) |
September 8, 2006 |
| Payne Elementary School |
FM-200629160 9/12/06 St. John - Roof is leaking in back rm. when it rains. |
September 12, 2006 |
| Benjamin Banneker Academic HS |
FM-200629312 9/13/06 305/Roof Leak from upper ceiling-middle window, room floods when raining. |
September 13, 2006 |
| Harris, C.W. ES |
FM-200629362 9/13/06 1st Floor- Roomos 143, 144, 146, 149, Near 111, and Hallway near Boiler Room Repair roof leaks above these areas. Asbestos Code A - Clear for repairs on 09/15/06. Tidewater - Thomas Johnson (RG 09/18/06) |
September 13, 2006 |
| Eastern High School |
FM-200629389 9/14/06 Unclog Roof Drains, Roof Leaks In The Stairwell Near B78 Leading To Cafeteria, Armory, And Auditorium. |
September 14, 2006 |
| Coolidge High School |
FM-200630008 9/25/06 Survey leaky roof over class 317, 325 and 329, this leak is causing damage to plaster ceiling. Asbestos Code A - Clear for repairs on 01/17/07. Tidewater - Roger Small (RG 01/19/07) |
September 25, 2006 |
| Duke Ellington School |
FM-200630012 9/25/06 Repair condensation leak from cooling tower on the roof. Note: The water is spilling over and leaking down into classrooms. |
September 25, 2006 |
| Stanton Elementary School |
FM-200630050 9/26/06 Repair damage plaster ceiling that's coming from roof leak into room 106. HA 016 Plaster No Asbestos HA 716 Brown Coat with HA016 Code A-clear for repair by DCPS Charles Buchanan on 9-26-06 |
September 26, 2006 |
| Whittier Elementary School |
FM-200630213 9/28/06 (new side) - Roof - Need Assessment, roof water is leaking in girls restroom when it rain Asbestos Code A - Clear for repairs on 09/26/06. Tidewater - Kenny Belton ( RG 10/02/06) |
September 28, 2006 |
| Harris, C.W. ES |
FM-200630391 10/3/06 1st Floor- Custodial Closet Repair leaking roof. Asbestos Code A - Clear for repairs on 10/04/06 Tidewater - Kenny Long (RG 10/05/06) |
October 3, 2006 |
| Garfield ES |
FM-200630555 10/6/06 Demountable Wing & Room D107 Repair leaking roof above these areas. Asbestos Code A - Clear for repairs on 10/10/06 Tidewater - Carlos Vera (RG 10/11/06) |
October 6, 2006 |
| Bunker Hill Elementary School |
FM-200630553 10/6/06 Auditorium & Room 229 & 220 Repair leaking roofs. Water is coming through the light fixtures in both locations. Note: Lights have been shut off in these rooms. Asbestos Code A - Clear for repairs on 10/10/06 Tidewater - Carlos Vera (RG 10/11/06) |
October 6, 2006 |
| Bancroft Elementary School |
FM-200630576 10/6/06 2nd Floor- Stairwell (across from Room 221/Main Building) Repair leaking roof above this area. Water is leaking into the light fixtures. Asbestos Code A - Clear for repairs on 10/10/06 Tidewater - Shamika Parker (RG 10/12/06) |
October 6, 2006 |
| Webb Elementary School |
FM-200630884 10/17/06 First Floor - N.E. End Of The Building, In All Classrooms - Roof Leak, Causing Damage To Ceiling Tiles. |
October 17, 2006 |
| Patterson ES |
FM-200631000 10/19/06 Roof - Repair roof lobby area leaks when it rains. |
October 19, 2006 |
| Key Elementary School |
FM-200631019 9 10/19/06 Paint all areas that are water damaged by roof leaks, (Third floor ceilings, stairwells and classrooms). Lead & Asbestos Code A - Clear for repairs on 10/20/06. Tidewater - Roger Small (RG 10/24/06) |
October 19, 2006 |
| Rudolph Elementary School |
FM-200631111 10/20/06 Flat portion of the roof on the left side of the cafeteria. Roof is leaking down into first floor main hallway. Asbestos Code A - Clear for repairs on 10/23/06. Tidewater - Tony Marcolin (RG 10/25/06) |
October 20, 2006 |
| Merritt Middle School |
FM-200631825 11/6/06 Fourth Floor - Room 403 - Roof Leak |
November 6, 2006 |
| Thomas Elementary School |
FM-200631811 11/6/06 Third Floor - Roof - Survey roof for leakage and repair to stop damage to classroom ceilings. |
November 6, 2006 |
| Wilson J. O. ES |
FM-200631838 11/6/06 Wilson, J. O. Main Roof After, leak to return line is repair. Replace glycol in split system for roof units. Empty, because of leak. |
November 6, 2006 |
| Webb Elementary School |
FM-200632028 11/8/06 Second floor, Media Center/Open Space Area. Repair roof leak. Note: Water is pouring in. Asbestos Cosde A - Clear for repairs on 11/09/06. Tidewater - Aaron Gholson (RG 11/13/06) |
November 8, 2006 |
| Eastern High School |
FM-200632017 11/8/06 Roof Leak In The Following Areas - Rm. 337, Auditorium-Over Stage, Cafeteria-Near Serving Area, Stairwell-Across From rm. B-79, Band Room & Armory |
November 8, 2006 |
| Thomas Elementary School |
FM-200632008 8 11/8/06 First Floor - Kitchen - Survey and R/R plaster ceiling that was damaged from roof leaks. Asbestos Code A - Clear for repairs on 11/08/06. Tidewater - Aaron Gholson (RG 11/09/06) |
November 8, 2006 |
| Thomas Elementary School |
FM-200632009 9 11/8/06 First Floor - Kitchen - Survey and R/R ceramic wall tile that was damaged from roof leaks. Asbestos Code A - Clear for repairs on 11/08/06. Tidewater - Aaron Gholson (RG 11/09/06) |
November 8, 2006 |
| Powell Elementary School |
FM-200632019 M-200632019 11/8/06 Second Floor - Outside of Rm. 211 - Roof Leak |
November 8, 2006 |
| Young Elementary School |
FM-200632155 11/14/06 First Floor - Auditorium & Stairwell #2 - Repair roof leak |
November 14, 2006 |
| Noyes Elementary School |
FM-200632459 11/24/06 Repair Roof Leaks In The Following Areas: Auditorium, Gym Office & In Fron Of The Elevator On The Second Floor. |
November 24, 2006 |
| Takoma Educational Center |
FM-200632503 0632503 11/24/06 First Floor - Rm. 65 Auditorium - Roof Leaks. Asbestos Code A - Clear for repairs on 11/27/06. Tidewater - Kenny Long (RG 12/01/06 ) |
November 24, 2006 |
| Hine JHS |
FM-200632674 4 11/29/06 Roor - Repair roof drain it's leaking water - B-Wing |
November 29, 2006 |
| Davis Elementary School |
FM-200632614 11/29/06 Stairway top landing by rms. 204 & 212, Hallway By Library - Repair Roof Leaks. |
November 29, 2006 |
| Terrell Mc ES |
FM-200633419 12/19/06 Gym Office Area - Roof leaking. |
December 19, 2006 |
| Deal Junior High School |
FM-200633492 12/21/06 Kitchen corridor to cafeteria paint and plaster peeling. Water penetration from roof leak. Asbestos Code "A" cleared for repairs 12/29/06--DCPS Safety/Tidewater Lead Code " A" Cleared for repairs ("Lead level 1" no lead based paint inpact) 12/29/06--DCPS Safety/Tidewater |
December 21, 2006 |
| Drew Elementary School |
FM-200633693 1/5/07 4th Floor - Art Room - Roof leak Asbestos Code A - Clear for repairs on 01/12/07. Tidewater - Shamika Parker (RG 01/16/07) |
January 5, 2007 |
| Bancroft Elementary School |
FM-200633842 1/8/07 Cafeteria - Water leaking from the ceiling - Knocking some of the ceiling tiles loose over to heating table. Mr. Hubbard has no Idea where the water is coming from, Maybe a roof leak/gutters and down spouts. Investigate and make repairs. Note: See Mr. Hubbard or Mr. Chicas Asbestos Code A - Clear for repairs on 01/08/07. Tidewater - Kenny Belton (RG 02/22/07) |
January 8, 2007 |
| Francis Junior High School |
FM-200633859 1/9/07 First Floor - Main Office Storage Room - Water leaking from the ceiling, the water is not going down to the drain (Roof Leak) |
January 9, 2007 |
| Kramer Middle School |
FM-200634073 1/18/07 First Floor - Auditorium - Falling ceiling tile due to roof leak Asbestos Code A - Clear for repairs on 01/19/07. Tidewater - Roger Small (RG 01/22/07) |
January 18, 2007 |
| Adams Elementary School |
FM-200634150 1/22/07 Roof - Secure roof hatch, water is leaking into the building |
January 22, 2007 |
| Maury Elementary School |
FM-200700514 514 2/13/07 The roof drain above room 5 is leaking through the window seal frame and causing the room to flood, Asbestos Code A - Clear for repairs on 02/15/07. Tidewater - Shamika Parker (RG 02/20/07 |
February 13, 2007 |
| Wilson J. O. ES |
FM-200700576 2/16/07 Kitchen - Roof leak - Water leaking from the ceiling in several spots, the ceiling looks like it's going to fall. |
February 16, 20 |